REGINE PANES OREDINA--
Present Address:
Purok 5, Bontoc Village, Brgy. Camp 8, Baguio City 2600,
Benguet, Philippines
Basic Information
Age
27
Birth Date
Nov 16, 1997
Gender
Female
Civil Status
Single
Height (cm)
152.4
Weight (kg)
54
Nationality
Filipino
Religion
Christianity - Catholic
Work Experience
I have been working for 5.5 years
June 13,2023 - PRESENT
(2 Years)
A.I.P. CONSTRUCTION
CONTRACT MANAGEMENT ENGINEER
Construction / Building / Engineering
Baguio City
Contract Preparation and Review
-Ensure all contractual terms comply with legal requirements and
company standards.
-Draft, review, and revise contracts including subcontract
agreements, supplier contracts, and client agreements.
Bid Support
-Assist in the preparation of bid evaluations.
Cost and Budget Management
-Track variations, claims, and cost impacts throughout the project
lifecycle.
-Monitor project budgets in line with contractual obligations.
Change and Variation Management
-Prepare and submit variation orders (VOs) with supporting
documentation for client approval.
-Identify, evaluate, and document changes and variations.
Reporting and Documentation
-Document lessons learned and maintain contract closure records.
-Prepare periodic reports on contract status, risks, and opportunities.
Jan 13,2020 - Jun 1,2023
(3 Years, 5 Months)
BENCH MARK CONSTRUCTION MANAGEMENT SERVICE
SITE ENGINEER
Construction / Building / Engineering
La Trinidad, Benguet
Site Supervision
-Oversee daily construction activities to ensure work is carried out
according to approved drawings, specifications, and safety standards.
-Monitor contractor and labor performance on-site.
Technical Support
-Provide technical assistance and resolve site issues in coordination
with design and project management teams.
-Interpret engineering drawings and specifications.
Quality Control
-Prepare and maintain quality-related documentation and checklists.
-Conduct inspections and ensure work is performed to meet quality
standards and project specifications.
Progress Monitoring
-Prepare daily/weekly site reports, including manpower, equipment,
and work status.
-Track work progress against the project schedule and report any
delays or issues.
Coordination
-Attend site meetings and participate in planning and coordination
efforts.
-Coordinate with subcontractors, consultants, and client
representatives.
Documentation
-Maintain site records, including work inspection requests (WIRs),
site instructions (SIs), request for information (RFIs), and daily
reports.
-Assist in the preparation of as-built drawings and handover
documentation.
Educational Attainment
Secondary: 2010 - 2013
2013 - 2014
Tertiary: 2014 - Dec 2018
Golden Lamp School
082 Gold St, Quezon City, 1121 Metro Manila
University of Baguio Preparatory High School
Upper General Luna, Baguio City
University of Baguio
Bachelor's / College Degree
Bachelor of Science in Civil Engineering (BSCE)
Trainings / Seminars
Jun 27, 2025 – July 1, 2025
CONSTRUCTION OCCUPATIONAL SAFETY
AND HEALTH (COSH) WITH TRAINING OF
TRAINERS
J3 TRAINERS & CONSULTANTS INC.
Online Course (40 hours)
Oct 26, 2024 - Oct 27, 2024
Jun 18, 2024 - Jun 18, 2024
AUTODESK CIVIL 3D FUNDAMENTALS
J3 TRAINERS & CONSULTANTS INC.
Online Course
CONSTRUCTION AND MAINTENANCE OF
BRIDGE STRUCTURES
J3 TRAINERS & CONSULTANTS INC.
Online Course (12 hours)
Jun 18, 2024 - Jun 18, 2024
WORK BREAKDOWN
STRUCTURE/PRECEDENCE DIAGRAM
J3 TRAINERS & CONSULTANTS INC.
Online Course (8 hours)
Dec 25, 2023 - Dec 25, 2023
TRAINING OF TRAINERS FOR SAFETY
OFFICERS
J3 TRAINERS & CONSULTANTS INC.
Online Course (2 hours)
Dec 24, 2023 - Dec 24, 2023
SUPERVISING CONCRETE WORKS
J3 TRAINERS & CONSULTANTS INC.
Online Course
Dec 24, 2023 - Dec 24, 2023
CONCRETE TECHNOLOGY
Aug 25, 2023 - Aug 25, 2023
CONSTRUCTION PROJECT QUALITY
ASSURANCE AND CONTROL
J3 TRAINERS & CONSULTANTS INC.
Online Course (12 hours)
J3 TRAINERS & CONSULTANTS INC.
Online Course (8 hours)
Aug 25, 2023 - Aug 25, 2023
CONSTRUCTION PROJECT SITE SUPERVISION
AND CONTRACT ADMINISTRATION
J3 TRAINERS & CONSULTANTS INC.
Online Course (8 hours)
Sep 18, 2018 - Feb 28, 2019
ON-THE-JOB TRAINING
MARCON’S BUILDER
#92 Upper Gen. Luna Road, Baguio City
Work Experience
i. Project Name & Location
ii. Owner’s Name & Address
iii. My Position
i. Project Description
ii. Total Project Cost
i. Part of Project I
handled
ii. Cost of Part
i. Start Date
ii. Completion Date
i. RRA: Roads:
Rehabilitation - Asphalt
ii.Php 156,329,128.30
i. All Items of work
ii. Php156,329,128.30
i. June 13, 2023
ii. November 7, 2023
i. RCP: Roads:
Construction - PCCP
ii. Php 98,998,920.79
i. All Items of work
ii. Php 98,998,920.79
i. June 13, 2023
ii. January 15, 2024
i. RCG: Roads:
Construction - Gravel
ii. Php 98,999,998.78
i. All Items of work
ii. Php 98,999,998.78
i. June 13, 2023
ii. December 15, 2023
i. BCCCP: Bridges:
i. All Items of work
i. June 13, 2023
Completed Projects
i. Preventive Maintenance - Secondary
Roads, Agoo-Baguio City Rd - K0237
+ (-885) - K0237 + (-810), K0237 +
000 - K0237 + 885, K0238 + 000 K0238 + 159, K0240 + 937-K0241 +
000, K0241 + 234 - K0242 + 610,
K0242 + 960 - K0243 + 226, K0243 +
596 - K0244 + 118, K0244 + 178 K0244 + 520, K0246 + 000 - K0246 +
898, K0247 + 153 - K0247 + 608,
K0249 + 550 - K0249 + 750, K0250 +
463 - K-
ii. DPWH-RO1, San Fernando, La
Union
iii. Contract Management Engineer 1
i. Basic Infrastructure Program (BIP),
Construction of Road-Alilem-Sugpon
(Ilocos Sur)-Bakun (Benguet) Road,
Ilocos Sur (Package 4)
ii. DPWH-RO1, San Fernando, La
Union
iii. Contract Management Engineer 1
i. Basic Infrastructure Program,
Construction of Road, Cervantes
(Ilocos Sur) - Besao - Sagada via
Laylaya Road, Ilocos Sur (Package 3)
ii. DPWH-RO1, San Fernando, La
Union
iii. Contract Management Engineer 1
i. Construction of Missing Links / New
Roads Cervantes- Quirino (Ilocos Sur) Abra Road, Ilocos Sur
ii. DPWH-RO1, San Fernando, La
Union
iii. Contract Management Engineer 1
i. Basic Infrastructure Program (BIP),
Construction of Road, Cervantes Quirino (Ilocos Sur) - Abra Road,
Ilocos Sur (Package 3)
ii. DPWH-RO1, San Fernando, La Union
iii. Contract Management Engineer 1
i. Construction of Missing links / New
Roads, Alilem - Sugpon (Ilocos Sur) Bakun (Benguet) Road, Package 5, Ilocos
Sur
ii. DPWH-RO1, San Fernando, La Union
iii. Contract Management Engineer 1
i. Construction of Missing Links/ New
Roads, Cervantes (Ilocos Sur) - BesaoSagada via Laylaya Road, Ilocos Sur
(Package 4)
ii. DPWH-RO1, San Fernando, La Union
iii. Contract Management Engineer 1
Construction -Concrete
(Superstucture) - with
Cast-in-Place
ii. Php 38,599,970.96
ii. Php 38,599,970.96
ii. November 28, 2023
i. BCCCP: Bridges:
Construction -Concrete
(Superstucture) - with
Cast-in-Place
ii. Php 98,999,963.08
i. All Items of work
ii. Php 98,999,963.08
i. June 13, 2023
ii. January 5, 2024
i. RCP: Roads:
Construction - PCCP
ii. Php154,399,908.87
i. All Items of work
ii. Php154,399,908.87
i. February 26, 2024
ii. January 27, 2025
i. RCP: Roads:
Construction - PCCP
ii.Php 154,399,997.02
i. All Items of work
ii.Php 154,399,997.02
i. February 26, 2024
ii. November 21, 2024
i. Construction of Missing Links/ New
Roads, Cervantes (Ilocos Sur) - BesaoSagada via Laylaya Road, Ilocos Sur
ii. DPWH-RO1, San Fernando, La Union
iii. Contract Management Engineer 1
i. RCG: Roads: Construction
– Gravel
ii. Php 86,849,988.89
i. All Items of work
ii. Php 86,849,988.89
i. February 26, 2024
ii. November 21, 2024
i. Construction of Missing Links/New
Roads, Cervantes-Quirino (Ilocos Sur)Abra Road, Ilocos Sur (Package 4),
Quirino, Ilocos Sur
ii. DPWH-RO1, San Fernando, La Union
iii. Contract Management Engineer 1
i. BCCCP: Bridges:
Construction -Concrete
(Superstucture) - with Castin-Place
ii. Php 154,399,979.08
i. All Items of work
ii. Php 154,399,979.08
i. April 19, 2024
ii. March 11, 2025
i. Construction/Rehabilitation of Flood
Mitigation Facilities within Major River
Basins and Principal Rivers, Construction
of Flood Control Structure along Abra
River, Upstream and Downstream of
Quirino Bridge, Quirino, Ilocos Sur (Phase
1)
ii. DPWH-RO1, San Fernando, La Union
iii. Contract Management Engineer 1
i. Construction/Rehabilitation of Flood
Mitigation Facilities within Major River
Basins and Principal Rivers, Construction
of Flood Control Structure along Abra
River, Upstream and Downstream of
Quirino Bridge, Quirino, Ilocos Sur (Phase
2)
ii. DPWH-RO1, San Fernando, La Union
iii. Contract Management Engineer 1
i. Construction of Missing Links/ New
Roads - Cervantes - Quirino (Ilocos Sur) Abra Road, Ilocos Sur (Package 5)
ii. DPWH-RO1, San Fernando, La Union
iii. Contract Management Engineer 1
i. FCSPS: Flood Control:
Slope Protection using Structural measures (e.g.
Revetment, Retaining
structures, Wirenet)
ii. Php 157,294,568.63
i. All Items of work
ii. Php 157,294,568.63
i. February 26, 2024
ii. January 7, 2025
i. FCSPS: Flood Control:
Slope Protection using Structural measures (e.g.
Revetment, Retaining
structures, Wirenet)
ii. Php 157,294,846.25
i. All Items of work
ii. Php 157,294,846.25
i. February 26, 2024
ii. January 7, 2025
i. RCP: Roads: Construction
- PCCP (RRP, RCTP)
ii. Php 93,629,026.69
i. All Items of work
ii. Php 93,629,026.69
i. February 21, 2025
ii. November 17, 2025
i. Construction of Missing Links/ New
Roads, Cervantes (Ilocos Sur) - BesaoSagada via Laylaya Road, Ilocos Sur
(Package 5)
ii. DPWH-RO1, San Fernando, La Union
iii. Contract Management Engineer 1
i. Construction/Rehabilitation of Flood
Mitigation Facilities within Major River
Basins and Principal Rivers - Construction
of Flood Control Structure along Abra
River, Upstream of Quirino Bridge,
Quirino, Ilocos Sur
ii. DPWH-RO1, San Fernando, La Union
iii. Contract Management Engineer 1
i. Construction/Rehabilitation of Flood
Mitigation Facilities Within Major River
Basins and Principal Rivers - Construction
of Flood Control Structure along Abra
River, Downstream of Quirino Bridge,
Quirino, Ilocos Sur
ii. DPWH-RO1, San Fernando, La Union
iii. Contract Management Engineer 1
i. RCG: Roads: Construction
- Gravel (RCA, RCP, RRA,
RRP, RRG)
ii. Php 93,628,785.38
i. All Items of work
ii. Php 93,628,785.38
i. February 21, 2025
ii. November 17, 2025
i. FCSPS: Flood Control:
Slope Protection using Structural measures (e.g.
Revetment, Retaining
structures, Wirenet)
ii. Php 145,121,723.34
i. All Items of work
ii. Php 145,121,723.34
i. February 24, 2025
ii. November 17, 2025
i. FCSPS: Flood Control:
Slope Protection using Structural measures (e.g.
Revetment, Retaining
structures, Wirenet)
ii. Php 145,124,993.87
i. All Items of work
ii. Php 145,124,993.87
i. February 24, 2025
ii. November 17, 2025
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
REGINE P. OREDINA