Manuel Rodriguez
Contact-
Senior Metallurgical & Project Engineering Leader –
Commissioning | Operations | Process Optimization
www.linkedin.com/in/manuelrodriguez-6baa061b (LinkedIn)
www.meltiumsolutions.com/
Phone: -
Top Skills
Summary
Multilingual Senior Engineer with over 25 years of experience leading projects and
operations across the full lifecycle of metallurgical and processing plants. Proven
success in commissioning, process optimization, and quality management across
Metallurgy
Brazil, Mexico, and Venezuela. Expert in pyrometallurgy and mineral processing,
Commissioning
with strong leadership in multicultural environments and international publications.
Mineral Processing
Fluent in Spanish, English, and Portuguese.
Project Management
Experience
Operations
Process
MELTIUM SOLUTIONS
• Founder & Senior Consultant
Languages
May 2022 - Present
United States
Spanish (Native or Bilingual)
English (Full Professional)
Technical Consulting and Project Management. Proven experience in Lead
Portuguese (Full Professional)
Teams to achieve project desired outcomes. International and intercultural
experience.
Education
Program Management of Excellence.
University of Pretoria. South Africa
2015.
HORIZONTE MINERALS
•
Technical Manager
May 2022 – May 2024
Management Program IESA.
Venezuela 2007.
Brazil
Provide technical leadership and guidance for process and operations. Develop
Diplomat Management Skills.
Tecnologico de Monterrey. Mexico.
2005
Bachelor of Business Administration
Management. University
Metropolitana. Venezuela. 2004.
B. Eng. Metallurgical and Materials
Science Engineering - Central
University of Venezuela 1998.
Honours Final Investigation.
and implement technical strategies to optimize flowsheet, technologies and
equipment to enhance operational performance.
▪
Contract Manager for Technological packages for $130 M with less 2%
budget variation.
▪
Led Operational Readiness Program ensuring integration across process,
maintenance and human resources, enabling successful commissioning
and handover to operations.
▪
Prepared feasibility studies for line 2 on time and budget $510M.
▪
Concluded Briquetting studies as alternative for agglomeration.
▪
Reviewed and validated engineering package deliverables for detail
engineering.
Page 1 of 3
•
Papers and Awards
Lead Process Engineer
January 2020 – April 2022
Brazil
Responsible for achieving the Value Engineer Phase and Execution
Infacon XV Congress - Paper
Co-authored with UHT vendor:
“Brazilian FeNi producer
improves product with new
granulation method”. South
Africa. 2018.
performance indicators, developing technical gap analysis, implementing
process design criteria and enabling Zero Harm, in compliance with all safety
and quality standards.
ABM -Brazil 48 Seminary Steel
& Foundry – Paper Author:
“Reduction of Refinery cycle
time without scrap addition on
FeNi” . Sao Paulo. 2017.
▪
Implemented Process Island strategy on technological packages.
▪
Technological package selection with proven vendors for other operation
▪
Lead acquisition process for existing equipment’s with $10M saving in Capex.
ABM -Brasil 48 Seminary Steel
& Foundry – Paper Author: “
Granulation of FeNI using
rotating Tundish” . Sao Paulo.
2017
▪
Optimized process design criteria, PFD, PI&D, mass energy balance and
plants.
water from feasibilities studies on value engineering phase.
▪
Applied learned lessons on flowsheet and equipment using benchmarking.
▪
Improved Capex and Opex using concept fit for purpose.
Approved Visa EB2 National
Interest USA as Nickel Expert,
August 2023.
Applaud Winner Anglo
American Meritocracy
Programme: Electrical Furnace
drainage for Rebuild
ANGLOAMERICAN
Led commissioning activities in Project Loma de Níquel (Venezuela) and Barro
Alto (Brazil), coordinating multidisciplinary teams during startup phases and
ensuring alignment with performance targets. Implemented commissioning
protocols and safety practices in collaboration with vendors and internal
departments.
•
Process Coordinator
December 2012 - December 2020
Brazil
Management the process department, monitoring KPI’s, reporting, implemented
test works and continuous improvement on the process.
▪
Study and implemented new metal granulation system, achieved minor fines
generation for the final product with safety conditions. Angloamerican awards
for applaud program.
▪
Lead operational/process furnaces rebuild Capex $250M, implemented
drainage procedure with 30 days reduction on schedule and budget,
Angloamerican awards for applaud program.
▪
Implemented new electrode seal on the electrical furnace #1 and #2 to reduce
short circuits and increase refractory campaign live.
Page 2 of 3
•
Production Coordinator – Smelting and Refinery
April 2010 - December 2012
Brazil
•
Metallurgical Project Engineer Senior
November 2008 - April 2010
Brazil
•
Production Coordinator - Refinery
January 2007 - November 2008
LE BELIER
•
Quality Manager
November 2005 - December 2006
Mexico
Management Quality Team: Internal and external controls for products
automotive as Tier II for Brake systems master cylinders, calipers; Tier I for
turbos. Costumer Service at: Continental Teves, TRW, Delphi, BorgWarner,
Garret, Ambrake, Honeywell. Monitoring PPM pieces, follow action plan, control
plan, PPAP, FMEA and APQP for new projects in Mexico and USA.
•
Smelter Manager
June 2005 - November 2005
Mexico
Management Smelting Department, 12 units aluminum furnaces to casting and
4 Smelters primary aluminum casting. Control Alloy for different products.
ANGLOAMERICAN
•
Production Coordinator - Refinery
January 2005 - June 2005
Venezuela
•
Plant Chief
January 2003 - January 2005
Venezuela
•
Metallurgical Engineer - Refinery
January 2001 - January 2003
Venezuela
•
Metallurgical Engineer - Ore Preparation
January 2000 - December 2000
Venezuela
•
Trainee Engineer
January 1999 - December 1999
Venezuela
Page 3 of 3