Azdhar Dahalan

Azdhar Dahalan

$20/hr
Project Manager in semiconductor industry
Reply rate:
-
Availability:
Part-time (20 hrs/wk)
Age:
54 years old
Location:
Ampang, Selangor, Malaysia
Experience:
14 years
- Azdhar Dahalan - Program Manager Mechanical Engineering Graduate from Tohoku University, Japan. Proven project management and new product development experience Linkedin.com/in/azdhar-dahalan EXPERTISE Time Management Project Management Critical Thinking Manufacturing Design of Experiment Failure Tree Analysis Semiconductor Industry Statistical Process Control Control Plan Teamwork Verbal & Written Communication New Product Development Failure Mode and Effect Analysis Advanced Product Quality Planning Leadership TS16949 Failure Analysis 5S Japanese Language EXPERIENCE MAY 2003 – PRESENT SENIOR PACKAGING ENGINEER/PROGRAM MANAGER, TEXAS INSTRUMENTS (M) SDN BERHAD Lead team of engineers on projects introducing new products for assembly. Evaluation and selection of material to be used. Develop and setup pilot production line. Monitoring and improving product indices before handover to sustenance group. Coordinate work between local factory and overseas business groups before release of new products in local factory. Coordinate multiple new product alignment to local factory change control system. ACHIEVEMENTS TSSOP Shunt 2014 – Present Team leader to qualify first shunt product in TI. Technical contribution includes new die attach material, process and equipment introduction. QFN Automotive Multi Chip Module 2011 – 2013 Team leader to qualify first QFN MCM for automotive application. Technical contribution includes new die attach material & new equipment tooling introduction. SOIC High Voltage 2010 – 2013 Team leader to introduce first MCM in SOIC product line-up. Technical contribution includes new mold compound qualification for High Voltage application, package reliability improvement & new equipment tooling introduction. SSOP 2.5kV High Voltage Isolation 2010 – 2013 Team leader to qualify new SSOP package application. Technical contribution includes new leadframe design enabling higher isolation rating from 1kV to 2.5kV. QFN PowerClip 2009 – 2010 Team leader to find suitable die attach material replacement for solder paste. Technical contribution includes a two level shower head design for die attach material dispensing. QFN X2QFN 2007 – 2010 Team leader to develop the next generation of thinner QFN packages. Technical contribution includes leadframe design, technical disclosures on wirebond heater block & die attach ejector pepperpot design. QFN COL 2006 – 2006 Team leader for process development, material identification and execution of QFN COL. Technical contribution includes die attach process development and process integration. High Performance QFN 2004 – 2005 Developed and optimized die bond process for new high performance device using DOE methodology. Established new process specifications and conducted people training before releasing to production. QFN Multi Chip Module 2004 – 2005 Key technical contributor for the development and qualification of MCM project. Developed die bond process for the MCM. QFN Product Start-up 2003 – 2005 Key member in QFN start-up team in TIM. Developed material and process for QFN die bond process. Introduced new Esec 2008hS die bonder transport system to eliminate scratches on leadframe backside, the first in the industry. Selecting new die attach material and redesigning the process to increase die bonder capacity by 30% and saving equipment expenditure of RM1 million. Redefined the assembly process and reduce the material consumption by 50% and generated RM120k savings. Technician and operator training. QFN SWR Coordinator 2004 – 2005 Defined new system for QFN SWR SOP to cater for the complexities in business group products. Coordinated new device assembly requests between business groups and local factory. Supported on time delivery of new product introduction to the customer and increase TI’s market share in analog business. Consolidated reports and analyzing them to ensure yield and process concerns are addressed before RTP. OCT 2000 – MAY 2003 SENIOR ENGINEER, UNISEM (M) BERHAD Develop die bond process for new products. Perform equipment buyoff at supplier site to ensure purchased equipment fulfill the new product requirements before being shipped out to Unisem. Engineer and technician training on new equipment. Equipment parameter optimization through DOE (Design Of Experiment) to improve product quality and equipment efficiency. To assist on customer claim rejection issues through executing root cause analysis and preparing actions for countermeasures for problem recurrence prevention. Write up work instruction/manual for new equipment. Write up process specifications for new products. JUNE 1998 – SEP 2000 2 SENIOR ENGINEER, RIVER ELECTRONICS (M) SDN BERHAD Production line equipment modification and upgrade. Production line equipment parts localization. Air compressor, air conditioning unit maintenance for total plant. AWARDS AND HONOURS 2004 P3 Award for being pro-active in Texas Instruments. 2011 Assembly Technical Conference 3rd place 2014 Co-inventor of US patent#-. Packaged IC having printed dielectric adhesive on die pad. 3
Get your freelancer profile up and running. View the step by step guide to set up a freelancer profile so you can land your dream job.