YESID ROJAS DAZA
ID NUMBER
-
DATE OF BIRTH
8/12/1991
PLACE OF BIRTH
Bogotá
CONTACT ADDRESS
Calle 143 # 128-02
MOBILE
(+57)
E-MAIL
-
CITY OF RESIDENCE
Bogotá, Colombia
DRIVING LICENSE
C1
PASSPORT NUMBER
AS336441
-
EDUCATIONAL BACKGROUND
Bachelor of Science
Electrical Engineering
National University of Colombia
Professional Card CN-
Secondary School
Colegio Técnico Comercial Manuela Beltrán
Secondary School graduate
Accounting Assistant
2008
Complementary studies
Installation of High Voltage accesories for XLPE cables
up to 170kV
NKT Gmbh & Co.KG
Training Center Berlin
Berlin, Germany
2016
Secretary Health Bogota
First responder, First Aid Course and Safety
2015
Spoken Languages
English (Low Advanced - iTEP Certified B2)
Spanish (Native)
German (Basic)
ACADEMIC EXPERIENCE
Design
of
a
High
Voltage
Substation
with
Breaker-And-A-Half
Configuration and load analysis (2015)
Electrical Substations. Complete design with load analysis of a 500kV electrical
substation with breaker-and-a-half configuration. This substation had 6 overhead
lines and 6 single-phase transformer, it was designed according to local regulations
and international standards.
Design of a distribution system for Alcala substation in Bogotá (2013)
National University of Colombia – Transmission & Distribution Systems. A design
of distribution system for the area located between Calle 127 and 134 and Carrera
19 y 54 of Bogota. Firstly, data gathering of the area has been made, identifying
load types and consumption with 20 years of projection. According to this, each
transformer and public illumination were located.
Besides, conductor has been
specified and regulation, losses and economic analysis of this Project was made.
Another developed projects:
•
Design of a wireless EV Charging Station. National University of
•
Design of a 214 km overhead line in Colombia. National University of
•
Design of a High efficiency and low-cost LED Bulb with 300 luxes of
illuminance. Universidad Nacional de Colombia.
Colombia.
Colombia.
PROFESSIONAL EXPERIENCE
ACJ High Voltage - (August 2015 – present)
•
Planning, Design, Management and commissioning for HV and MV projects
with cable systems according to international standards (IEC, ANSI, IEEE,
NFPA).
•
Installation of cable systems of PFISTERER, NKT, SILEC and PRYSMIAN.
•
Erection of Equipment, QA/QC, Calibration and commissioning tests for HV
and MV equipment with CPC-100, CT-Analyzer, Botano, Megger, and more.
Thermographic analysis for MV and HV substations. VLF tests with PD and
tan-delta on HV and MV Cables.
•
Setting up energy meters, installation and commissioning for instrument
transformers and telemetry.
•
Bring technical concept for customers. Communicate in English with
manufacturers (MV and HV cable systems, instrument transformers, energy
meters, relays, surge arresters, insulators, energy meters, and more) in order
to answer technical questions of the customers.
•
Compliance Certification Processes (IEC, CEI, ANSI and others) with certifiers
companies.
•
Technical specifications and creation of technical and economic quotations to
customers.
Some developed projects:
•
EPSA SA ESP – Valledupar Substation – Valledupar
Planning, management, supervision and implementation for 12
terminations PFISTERER ESF 123kV with commissioning and
acceptance tests.
•
Siemens Colombia – 20 de Julio Substation – Barranquilla
QA/QC. Supervision and technical support for the maintenance for
115kv power transformer with HV PFISTERER terminations and
bushing.
•
Celsia – Cuestecita Substation – Guajira
QA/QC Supervision and technical support for the installation of 6 HV
terminations CONNEX.
•
Siemens Argentina – Punta del Tigre – Uruguay
48 170kV Outdoor terminations and 40 145kV CONNEX were installed.
3,5 Km of 150kv NKT cable laying are being supervised.
•
Electricaribe – Bocagrande – Cartagena
A 115kV overhead cable transition was designed based on local and
international regulations (IEC60071 and others). Bonding systems were
designed and short circuit analysis were performed. Mechanical design
of structures for outdoor terminations. 3 HV Prysmian, 3 NKT joints and
6 Non Self-Supporting Termination were installed. 1,4 km of 123 kV NKT
Subsea and 1 km of underground cable were laid.
•
Electricaribe – El Bosque Substation – Cartagena
80 ESF-115kV terminations, 3 ESS245 245kV and 36 CONNEX 115 kV
were installed. 4200 m of 115 kV insulated cable and 200 m of 230 kV
insulated cable were laid.
•
EPM – Substation of José María Córdoba Airport – Medellín
8 115kV ESP-115 terminations were mounted.
•
Electrohuila – Subestación El bote – Palermo
Retrofitting of MV substation.
•
Telmex – Electrical Works– Soledad
Increased loading capacity to 1000kVA at 13200 V for datacenter
facility.
•
Telmex – CCM Venecia – Bogotá
Increased loading capacity to 2250 kVA at 13200 V for datacenter
facility.
Ingeniería y Proyectos de Colombia - (February 2015 – August 2015)
For improving the quality management systems of the company, a study of
procedures for pre-operational tests of protection systems for high voltage
substations, overcurrent, and distance relays, as well as main configurations of high
voltage substations are made. These procedures include a review about the theory
of protection systems functions, their main characteristics, and a brief explanation
about overcurrent and distance relays is given. After that, a case study realized
during the internship is described, and the main parameters of the SEL 421 and SEL
451 relays (previously characterized through the reference manual of manufacturer)
are explained.
In addition to this, general security procedures and tests in-situ for guaranteeing
reliability, robustness, and selectivity of the distance and overcurrent protections for
a specific substation were made.
Corporación para la Energía y el Medio Ambiente - (February 2013 –
February 2015)
Energy Characterization and identification of solutions to improve efficiency in
electric machines for industrial and residential sector, Thermographic analysis and
electric installations evaluation according to international and local regulations.
Illumination verification to different sectors according to local and international
regulations.
Envases Farmacéuticos Cruz - (April 2012 – July 2012)
Installation, design and development of an automation system for a plastic injection
machine.
_______________________
Yesid Rojas Daza
CC-