Professional Experience
Work Flow:
•Pre-planned all the details regarding required materials of a particular design.
•Assessed needs and design requirements and presented them in layout form.
•Prepared a rough graphical representation of the desired completed design.
•Field Verifications: Supervised the complete projects from start to the finish – Advised workers and oversaw the work quality.
•Monitored the ongoing work, step by step to ensure the project is proceeding as per the planned time table.
•Ensured safe environment/practices of the ongoing projects.
•Documented work and maintenance as per the designs prepared.
•Helped the firm’s reputation and growth as a result of the success of previous projects.
•Site layout implementation according to design.
•Performs tasks of creating lesson plans, delivering lectures and evaluating the work of students in the classroom.
Petrosin Engineering PVT LTD(Oil & Gas) December 2012 – May 2016
Major Project in civil:
Indus River Resort (Service area at M1 near Indus Bridge
Swabi Premium Mall (Service area at M1.)
HAROO SITE A (Service area at M1.)
HAROO SITE B (Service area at M1.)
Muree Lower Topa Hill (Service area at Lower Topa.)
Consultancy Services Organization Islamabad Pakistan. June 2005 to December 2012
Assistant Technical Officer
Major Project:
Government Institute of Information Technology
•Performs tasks of creating lesson plans, delivering lectures and evaluating the work of students in the classroom.
•Responsible for completing the curriculum of the students.
•Selects learning materials like textbooks and laboratory to deliver quality education.
•Performs the task of designing and developing architecture programs and methods.
•Monitors supervise and grade students as per their performance in the examinations.
•Prepare lesson plan for student’s daily lecture.
•Developed, coordinated and contributed to educational activity and delivered program.
•Carried out the administrative and communication tasks associated with educational activity and delivery program.
•Provided teaching services for schools and other groups.
•Ensured that the Education Service maintains standards of quality and performance.
•Achieved targets and implemented the Education Policy.
•Provided educational advice in the development and preparation of interactive learning developments.
•Attended the Education Advisory Panel and worked as required with the Panel.
•Ensured the maintenance and security of educational equipment and material.
Pepac Pakistant Environmental Planning & Architectural Consultant. Feb 2005 to June 2005
Assistant Architect
Major Project: