Award Entry Write-Up Submission
"Education is the most powerful
weapon that can change the
world!"
NELSON MANDELA
GREETING FROM HBMK!
FOR THE EDGE MALAYSIA 2022 , OUR CREATIVE TEAM HAS COME OUT WITH AN IDEA
WHERE EACH OF OUR ENTRY SUBMISSION WOULD HAVE A CHARACTER NARRATING IT
(MOSTLY MOVIE CHARACTERS). WE HOPE YOU ENJOY READING OUR ENTRIES.
REALLY LOOKING FORWARD TO RECEIVE GREAT NEWS SOON!
WE THANK YOU FOR YOUR KIND CONSIDERATION.
DISCLAIMER: PLEASE NOTE NO COPYRIGHT INFRINGEMENT IS INTENDED, AND WE DO NOT OWN NOR CLAIM TO OWN ANY
OF THE IMAGES USED IN OUR ENTRY COVER & SUBMISSION.
Table of Contents
1.0 INTRODUCTION ..................................................................................... 2
1.1 Site Plan .................................................................................................................................................. 3
1.2 Type of Layouts ................................................................................................................................... 5
1.3 Accessibility .......................................................................................................................................... 7
1.4 Common Facilities .............................................................................................................................. 8
2.0 MAINTENANCE ........................................................................................................................ 10
2.1 Quality of M&E and Building Services ...................................................................................... 10
2.2 Quality of indoor air quality ......................................................................................................... 13
2.3 Cleanliness and Upkeep of Facilities ......................................................................................... 14
2.4 Special or Key Features of Hijauan Kiara ................................................................................ 22
3.0 ADMINISTRATION .................................................................................................................. 26
3.1 Standard Operating Procedure (SOP) ....................................................................................... 29
3.2 Transparency of Accounts ............................................................................................................. 31
3.3 Crisis Management and Preparedness ..................................................................................... 33
4.0 COLLECTIONS........................................................................................................................... 35
4.1 Debtor Aging/ Billing/ Collection Ratio ................................................................................... 35
4.2 Proportion of Debtors ..................................................................................................................... 36
4.3 Collection Procedure ....................................................................................................................... 37
5.0 FINANCIAL SUSTAINABILITY ............................................................................................. 38
5.1 Adherence to Budget ....................................................................................................................... 38
5.2 Management Initiative and Innovations .................................................................................. 40
6.0 SECURITY .................................................................................................................................. 44
6.1 Use of Technology............................................................................................................................. 45
6.2 Proactive measure to enhance building security ................................................................. 47
6.3 Crisis Management and Preparedness ..................................................................................... 48
7.0 Community and Communication ...................................................................................... 49
7.1 Community Building Initiative .................................................................................................... 49
7.2 Procedure for tenant or occupant liaison................................................................................ 51
8.0 Development Value/ Yield .................................................................................................. 54
8.1 Comparative Growth in Value Overtime .................................................................................. 54
8.2 Comparative Rental Yield .............................................................................................................. 55
9.0 Reviews ...................................................................................................................................... 56
1.0
Page 2 of 66
Hi! My name Hijauan Kiara and I am of those many luxurious high-end low density
condominiums standing tall within the Mont Kiara enclave which was completed in 2008. I also offer
exclusivity and built with spa-themed philosophy.
If I was a student in real life, I can say that I would be one of those top achieving, dedicated
number one student. Not trying to “angkat bakul sendiri” but I honestly think I am in a pretty good
shape even after 14 years.
Uniquely, I also offer private lift lobbies to each of its home owners. Besides that, I comprise
of only 188 units with not more than 2 units per floor. With only 188 units and a layout of not more
than 2 units per floor, Hijauan Kiara is one of the lowest density and most exclusive offering in
Mont'Kiara. When I was handed over to the homeowners in 2008, I was also the first condominium
to introduce the private lift lobby concept in the neighborhood. You can say that I am somewhat a
“murid contoh” in school. From breathtaking views to soul-soothing greenery, lavish homes to
intimate spaces, azure pools to private spas, all pleasurable things in life can be found in Hijauan
Kiara.
That’s me!
Built-up
per block
Page 3 of 66
WHY HIJAUAN KIARA AS CASE STUDY?
Honestly, I would say that I have had my fair share of experience being a student for so
long. After all, learning is a lifelong process that doesn’t end, isn’t it? Besides overseeing
the day-to-day operations in the common areas, Hijauan Kiara strictly complies to the
existing applicable laws which are Strata Management Act 2013 (Act 757) and Strata
Title Act (Act 318) as well as our By-laws which are also known as "House Rules”.
MC members (term-) had noticed that some of the previous owners had
certain arrears that were passed on to the new owners. Subsequently, there have been
requests from new owners to waive the last payment interest as the new owners were
not aware of the outstanding service charges and sinking fund from the previous
owners. A resolution was proposed and resolved in the 11th AGM that to waive late
payment interest imposed on new proprietors due to default in payment by the
previous proprietors for Sales and Purchase Agreements executed up to 31st
December 2018 which equivalent of a total of RM 4,300.
From time to time, there will be residents that are not in compliance with our “Rules”
set. A verbal warning may not be bothered by the violator(s) and a warning letter is a
better option. The aim is to remind the violator(s) how their misconduct has
negatively affected their neighbours and the community living as a whole. Reminders
were issued to residents such as wrongly parking, pets transit issues, and etc.
One of the good practices being strictly complied with in Hijauan Kiara is the approval
on petty cash usage. All the petty cash usage was at the cap of RM 500 per receipt.
Petty cash float request is RM 3,000 and designates the Building Manager as the petty
cash holder/custodian.
Hijauan Kiara also practices issuing cheques following the sequence of the cheque
running number. A listing will be prepared according to the cheques running when
sent to MC members for approval. All the cheque numbers included those cancelled
cheques and the remarks were listed in the listing. This is to have better monitoring
on the expenses tracking and/or approval on the cheques.
Page 4 of 66
1.1
C
B
A
D
E
F
G
As illustrated in the site plan, there are seven (7) blocks in Hijauan Kiara which
consists of varying heights to ensure the project blends in with the natural contours
of the site and its surroundings.
Page 5 of 66
1.2
The three high-rises of 24, 26 and 29 stories are named Angelica, Bergamot and
Chamomile respectively. The four low-rise blocks are 12, 10, 8 and 6 stories and are
named Dandelion, Eucalyptus, Frangipani and Geranium. Hijauan Kiara offers elegant
and spacious residences range from three-plus-one bedrooms to duplex condovillas
with four-plus-two bedrooms.
Block A: (2,090 sq ft)
(4,068 sq ft)
(penthouse)
Block B: (2,487 sq ft)
(4,622 sq ft)
(penthouse)
Block C: (2,735 sq ft)
(5,045 sq ft)
(penthouse)
Block D: Dandelion
(3,732 sf) (duplex)
Block E: (3,673 sf)
(super deluxe)
Block F: (3,732 sf)
(duplex)
Block G: (3,673 sf)
(super deluxe)
Page 6 of 66
Type A: 2,090 sq. ft.
Type E & G: 3,673 sq. ft.
Page 7 of 66
1.3
Strategically located in Mont Kiara, residents of Hijauan Kiara have easy access to
NKVE, Penchala Link, Jalan Duta, Jalan Kuching and SPRINT highway to go places.
Homeowners can reach main commercials and offices area such as Damansara
Heights within 10 mins driving and Kuala Lumpur City Centre within 20 minutes of
driving. Not only that, homeowners can also travel to Petaling Jaya, Taman Tun Dr
Ismail, Bangsar and Desa Sri Hartamas within 10 minutes of driving as these places
are just nearby the vicinity. There are numerous amenities and facilities around the
area.
For sports enthusiasts, there are two golf clubs namely KGPA and KLGC located along
SPRINT highway, and Tropicana Golf and Country Resort and Sri Selangor Golf Club
which are also reachable. There is also Bukit Kiara Equestrian Club is also close for
equestrian enthusiasts. Additionally, Mont Kiara is a great place to have a family, as
there are numerous international schools around namely Mont Kiara International
School, Garden International School and French International School. Also, National
Science Centre is also within reach.
Page 8 of 66
1.4
Hijauan Kiara provides various facilities for residents to enjoy. It meets the needs of
all walks of life. Various entertainment and facilities that can be enjoyed by residents
such as:
Squash Court
Water Features
Barbecue Area
Indoor Gymnasium
Tennis Court
Indoor/Outdoor
Reading Pavilions
Sauna & Steam
Rooms
Hot & Cold Spa
Pools
Therapy Pavilion
Jacuzzi Sundeck
Function Room
Outdoor
Gymnasium
Games Room &
Table Tennis Room
Reflexology Path
Reading Room
Swimming &
Wading Pools
Children's
Playground
Viewing Deck
Page 9 of 66
2.0
Page 10 of 66
As a student, my mother (building manager) handles my day to day routine and makes
sure I am safe and always in a good state. Henry Butcher Malaysia (Mont Kiara) Sdn
Bhd (hereinafter referred to as “HBMK”), which was entrusted to manage and
maintain this upscale condominium in 2018, has devised a regular maintenance plan
to ensure that the condominium's facilities are always in working order. Proper
maintenance is critical to upkeep the property and to ensure a long-lasting lifespan of
the equipment and facilities. HBMK always believe that prevention is better than cure
hence preventive maintenance is conducted on a daily, weekly, monthly, quarterly,
yearly and bi-yearly basis.
2.1
&
Preventive
Maintenance
Checklist (PPM)
1. PPM - Civil, Mechanical & Electrical
2. Appointed Service Provider
MaintenanceSchedules
As a student, I also have to make sure that I am in top form and constantly review
myself so that I don’t burn out when I am studying. Preventive and good maintenance
processes must be done to prevent any probable failures/ breakdowns and
deterioration of the building whilst also repairing the faulty equipment in the building
and common facilities. Sample of the checklists and the schedules are as follows:
Page 11 of 66
PPM
Task
No.
C1
C2
C3
C4
C21
C22
C23
C24
C25
C26
C27
C28
C29
C30
C31
C32
C33
M7
PPM
TASK
Plumbing And Sanitary System
Timber Structures / Finishes (Column, Roof Truss,
FloorFinishes, Etc)`
Sewer Line and Manholes
Cold Water Tank
Roofing
Rainwater Goods (Inclusive of Gutter)
Ceiling
Walls
Door (Including Fire Rated Door)
Built In Furniture
Handrail And Grille
Painting Touch-Up
Reinforced Concrete Structures
Road, Hard Standing and Road Furniture
Drain Sumps, Grating and Culvert
Fencing And Gates
Cold Water Tank
Lift
FREQUENCY
D+W
W
W
W
6M+Y
6M+Y
6M+Y
6M
Y
6M
6M+Y
6M
6M+Y+2Y
6M+Y
Y
6M
Y
M
Contractual service providers are being engaged and supported or monitored by our
on-site management team to manage each aspect of maintenance. A sample listing of
contractual service providers as follows:
No.
1
Type of Servicing
2
3
4
CCTV Surveillance, Barrier Gate & Door Access
System
Elevator Card Access System
Lift Maintenance & Services
Pest Control Services
5
6
7
8
Pest Control Services - Termite
Visiting Electrical Engineering
Chargemen
Photocopier Machine
9
Resident Communication Portal (residential
Portal)
Resident Communication Portal (JagaApp)
Parcel365 Locker
Swimming Pool Cleaning & Maintenance
Fire Fighting System
Natural Gas Bulk Meter Supply
-
Appointed Service Provider
Occhio Tec Sdn Bhd
M S ICT Solution Sdn. Bhd.
Ms Elevators Engineering Sdn Bhd
City Pest Control & Fumigators (M)
Sdn Bhd
Pest Busters
Jaya Tech Resources
Sakti Maintenance
Konica Minolta Business Solutions
(M) Sdn Bhd
IMT Tech Sdn. Bhd.
Red Ideas Sdn Bhd
Red Ideas Sdn Bhd (JagaApp)
Acacia Pool
PK Technical Services Sdn Bhd
Gas Malaysia Energy and Services
Sdn Bhd
Page 12 of 66
Fire
Fighting
1. Ensuring accessibility for fire trucks and Joint Inspection
with Bomba Inspector
2. Routine Inspection and rectification of firef ighting/alarm
systems
3. Fire Extinguisher servicing and Battery replacement
Lift
Systems
1. Emphasis on general maintenance
2. Implementation of standard operating procedures
3. Calibration – Lift weight calibration
Page 13 of 66
Piping and
Plumbing
Electrical
Equipment
1.
2.
3.
4.
5.
Piping and plumbing rectification works
Servicing of incoming Bacfree water filter
Cleaning of all water tanks
Routine checking at the panels
Manhole and pipeline servicing
1. Rectification of landscape lighting, pool lighting,
podium lighting and etc.
2. Calibration – LV& HT
3. Chargemen and Electrical Engineer
Page 14 of 66
2.2
Hijauan Kiara is surrounded by sufficient plants which provides abundance of fresh
air and good air flow. Most of the common facilities is outdoor and open air except for
some enclosed facilities such as reading room, function room and gymnasium. M&E
rooms and some common areas are equipped with ventilation fans to ensure the
internal air inside.
As an initiative for better indoor air, HBMK Management Team ensures that the
ventilation inside common facilities is being taken care of, for instance, all windows of
enclosed common facilities are left open unless the air conditioner is turned on. In
fact, AGM of Hijauan Kiara is conducted at an open-air area.
Page 15 of 66
2.3
When it comes to safeguarding the welfare of a building, HBMK believes in joining
forces with all service providers. Performance evaluation is done yearly prior to
monitor and ensure that Hijauan Kiara receives the best standard of service. HBMK
works closely with the following service companies to ensure the general cleanliness
and upkeep:
Megahkleen
Sdn Bhd
Cleanliness
Landscaping
NYH
Enterprise
HBMK
Poolcare
Sdn Bhd
Pool &
waterfall
maintenance
Pest
Control
City Pest
Control &
Pest Busters
Sample of performance evaluation form
Page 16 of 66
Cleanliness
A total of ten (10) cleaners including one (1) supervisor being deployed by
Megahkleen Sdn. Bhd. to execute the daily cleaning works in Hijauan Kiara. Their
working hours and working days as shown in the table below.
Description
Working Hours
Working Days
One (1) Supervisor
7:30am to 5:00pm
Monday to Saturdays
Nine (9) Cleaners
7:30am to 5:00pm
Monday to Saturdays
One (1) Supervisor
7:30am to 3:00pm
Sundays & Public Holidays
Nine (9) Cleaners
7:30am to 3:00pm
Sundays & Public Holidays
All of these cleaners have been systematically assigned to their respective tasks
covering all common areas in the development as shown in the following cleaning
schedule:
No.
1
Job
scope
Clean ash trays and clear
wastepaper baskets.
2
Sweep and damp mop floors
withdetergent and water.
3
Scrub, wet mop, vacuum dry.
4
5
6
Damp wipe control panels, lift
doorsand walls and dry thoroughly
with alint free cloth.
Vacuum light diffusers and
removedead insects
Polish brass/stainless steel
trimspanels.
Frequency
Daily
Daily
Monthly
Daily
Weekly
Monthly
7
Machine scrub and jet wash floors with detergent
Quarterly
8
Damp wipe fire extinguishers, "Keluar" signs,
hosereel drums and canvas hose cabinets.
Monthly
9
Jet wash with detergent and water and apply
algaecide
Quarterly
10
Dust and vacuum ceilings and equipment.
Quarterly
Page 17 of 66
Routine Cleaning
Page 18 of 66
Landscaping
To uphold the “Hijauan”, NYH has been engaged to maintain the landscape of Hijauan
Kiara for the past 5 years. On-site landscape team consist of a total of three (3)
gardeners and one (1) supervisor conducting landscape maintenance works as shown
in the table below. Our gardeners working hours is from 8am-5pm on weekdays and
Saturdays excluding Sundays and Public Holidays.
No.
Job scope
1
Watering
2
Sweeping of
dried leaves
Frequency
Descriptions
Daily
All trees, palms, shrubs and grasses are to be
watered daily. Watering will not be carried out
during heavy rainy days.
Daily
All fallen leaves and branches on ground level of
the landscaping area (i.e., grass field) shall be
removed from the site on daily basis.
3
Raking of dried
leaves
Weekly
All garden waste, cuttings, fallen leaves and
branches in the landscaping area other than the
area specified in task 2 (e.g., planter boxes, slopes,
etc) shall be removed from the site on weekly
basis.
4
Weeding
Weekly
All plant-material bases are to be hand-weeded
once a week.
5
Soil
loosening
Weekly
Soil loosening of planting pits and beds shall be
carried out once a week.
6
Grass Cutting
Monthly
Grasses at the landscaping area are to be cut once
a month.
7
Fertilizing
Monthly
Fertilizers to all trees, palms, shrubs,
groundcovers and foliage plants are to be applied
once a month.
8
Pruning &
trimming
Monthly
The trees, palms, shrubs, groundcover and foliage
plants shall be trimmed and pruned once a month.
9
Pest &
diseasecontrol
Monthly
The approved brand of chemicals is to be sprayed
to control pests and diseases on plants once a
month.
Page 19 of 66
Routine Landscaping works
Appointment of Arborist
Certified Arborist has been engaged to look into at the matured trees that have been
planted fourteen (14) years back. Job scope includes to carry out due diligence on the
trees, pointing out the issues and to provide recommendations on the next step of
action.
A couple of visits were made by the arborist in November 2020 to check on the trees.
Areas of concern are the podium level where most of the trees were located and also
the Spa Area where a few trees with issues were located.
Page 20 of 66
Pools & Water Features Maintenance
Poolcare Sdn Bhd has been appointed to maintain and upkeep facilities such as the
swimming pool, wading pool, waterfall, fishpond and other water features in Hijauan
Kiara.
Fishpond
Swimming
pool &
wading
pool
Waterfall &
water feature
1. Swimming Pool & Wading Pool Maintenance
No.
Description
Remarks
1.
Skim water surface to remove floating matter
3 times a week
2.
Clean and brush tiles in pool wall and floor
During Maintenance
3.
Vacuum to pools floor
During Maintenance
4.
Remove and clean strainer basket
3 times a week
5.
Treat pool with necessary chemicals each trip
3 times a week
6.
Test pool for chlorine and PH each trip.
3 times a week
7.
To checking of water supply and make-up line at
Balancing Tank
During Maintenance
8.
To checking of pump pressure and conditions
During Maintenance
9.
To checking of filter pressure.
During Maintenance
10.
To check screens and strainers
During Maintenance
Page 21 of 66
11.
12.
13.
Regular checking of underwater lights and
electrical components.
Backwash and clean filter system.
Regular checking all valves & fitting position in the
pump room.
Once a week
Once a week
Once a week
14.
Regular checking of quality of Filter Media
when necessary
15.
Cleaning of Balancing Tank
Once a year
16.
Super Chlorination to the Pool
when necessary
17.
To ensure the tidiness of pump room at all times
Yes
18.
Submit of service report for each trip
Yes
2. Fishpond Maintenance
No.
Description
Remarks
1.
Skim water surface to remove floating matter
3 trips a week
2.
Remove and clean debris at filter pond sump
Once a week
3.
To checking of water supply and make-up line at
Bead filter system
Once a week
4.
To checking of pump pressure and conditions
Once a week
5.
To checking incoming supply to the system
Once a week
6.
To back wash Bead filter system
Once a week
7.
Necessary chemical treatment to water
When needed
8.
Make clean to the Fish Pond pump sump areas
Yes
3. Waterfall & Water Feature
No.
Description
Remarks
1.
Skim water surface to remove floating matter
3 trips a week
2.
Remove and clean debris at filter pond sump
Once a week
Page 22 of 66
Routine Maintenance for Pools & Water Features
Page 23 of 66
2.4
/
➢ Waterfall
Not only do I perform work academically, my mother also ensures that I
look presentable and well-groomed too. One of the features that make
Hijauan Kiara one of a kind is the waterfall. Such a feature is hardly ever
seen in most condominiums. This was also one of the selling points of
Hijauan Kiara when it first launched in 2008. Residents can truly relax
and enjoy the development itself.
Small Waterfall
Big Waterfall
Page 24 of 66
➢ Spa themed
Hijauan Kiara features a Spa Island where residents can relax and rejuvenate with the
amenities that include a Jacuzzi, hot and cold pools and therapy pavilions. It is truly a
private oasis for the residents.
Page 25 of 66
➢ Green Oasis
As fitting with its name which means the “Greeneries of Kiara”, the entire
development of Hijauan Kiara is filled with beautiful and seemingly wild
landscaping, along with ponds filled with and surrounded by water-loving plants.
➢ Meditation corner
Hijauan Kiara offers a wonderful
retreat from the demands and
pressures of the workday. The
meditation corner is a natural
sanctuary that allows residents
to disconnect and experience
calmness and tranquillity.
Page 26 of 66
➢ Salt Pool
Hijauan Kiara was originally a salt chlorinated pool. However, along the way, it was
changed to chlorinated pools as the main pool water quality was frequently
compromised. When HBMK took over, at the 10th Annual General Meeting of the
Hijauan Kiara Management Corporation held on 27th October 2018, it was suggested
that the new MC evaluate whether it is feasible to revert back to a salt-chlorinated
swimming pool instead of chlorine for the swimming pool and wading pool. Although
it is more complex and requires a specialist for maintenance, it was decided to convert
back to salt chlorinated pool as it benefits the user where it is gentler on the skin, eyes,
and hair.
Page 27 of 66
3.0
Page 28 of 66
Preamble
HBMK is a registered property manager under the Board of Valuers, Appraisers,
Estate Agents and Property Manager (BOVAEP), was originally in operation under the
facilities and asset management division of Henry Butcher Malaysia Sdn Bhd, a
company dedicated to world-class real estate and plant and machinery consultancy
services since 1987.
With the esteemed guidance of the Directors of Henry Butcher Malaysia Sdn Bhd, Mr.
Lim Eng Chong and Mr. Long Tian Chek, the founder of Henry Butcher Malaysia (Mont
Kiara) Sdn Bhd, Mr. Low Hon Keong, together with his experienced operation team
are confident to deliver property management services as an ambitious independent
entity via its corporate restructuring in 2015.
With over 20-year experience in property and facility management industry, Henry
Butcher Malaysia (Mont Kiara) Sdn Bhd aims to expand its 20-million square feet
portfolio to all across Malaysia.
Our Vision
✓ Aspires to become a property manager that could provide effortless excellence
to property management services.
✓ Being an all-rounder of the industry who could consult our valued clients on
various aspects of property management.
Motto
✓ Committed to Deliver
✓ Always meeting clients’ expectation
Page 29 of 66
Management Team
HBMK has been appointed to manage and maintain the development since August
2019. HBMK on-site team consists of talented individuals which include a building
manager,an account executive and three (3) maintenance crew. This team is built to
deliver quality property management services in this high-end development. Each of
the personnel is responsible for their respective job requirements. Nevertheless, all
members of this management team are working very closely together to ensure that
the quality of property management services is always as per the market’s standard.
The organization chart of HBMK Management Team assigned for Hijauan Kiara is as
shown below:
HBMK HQ
Area
Manager
Account
Manager
Building
Manager
Account
Executive
Building
Executive
Technician
Technician
Technician
Page 30 of 66
Management Committee
The current Management Committee of Hijauan Kiara Management Corporation
(hereinafter referred to as “HKMC”) consist of five (5) committee members which
involves the Chairman, Secretary, Treasurer and two (2) Committee Members as in
portrait below. Each of the members has a different background, experience and
knowledge in different areas which make the whole management committee versatile
and competent. To ensure a top-notch maintenance of Hijauan Kiara, a committee
meeting will be held every six (6) weeks to discuss and decide on matters related to
the maintenance and management such as the Accounts Report, debtors, new
business and other matters.
Chairman
Treasurer
Secretary
HKMC
Committee
Member
Committee
Member
Page 31 of 66
3.1
Standard Operating Procedure (SOP) is a set of step-by-step instructions compiled by
an organization to help workers carry out routine operations. SOPs aim to achieve
efficiency, quality output, and uniformity of performance while reducing
miscommunication and failure to comply with industry regulations.
No.
Related Field
Description
1
Operation
Appointment of New Service Provider
2
Operation
CCTV Viewing Request
3
Operation
Complaint Management
4
Accounting
Credit Control-Debt Recovery
5
Operation
DBKL Airbnb
6
Operation
Defects Management
7
Operation
Emergency Operating Manual
8
Accounting
Expenditure Requisition
9
Operation
Inter-Floor Leakage
10
Operation
Inter-Unit Leaking
11
Accounting
Petty Cash
12
Operation
Proactive Breakdown Maintenance
13
Operation
Security SOP
14
Operation
Strata Title Search
15
Operation
Wheel Clamping
16
Operation
Request Items Supplied by HQ
Page 32 of 66
Complaint Management
1. Complainant to submit
complaint using call, email or
JagaApp 2.0 fill in form inperson.
2. The management to
acknowledge receipt of
the complaint.
3. Management office staff notify
technician or any person in
charge who is responsible for
rectification.
4. Once the complaint has been
rectified, technician will update
regarding the action taken to the
management.
5. The Management then updates
the complainant the action taken
via email, JagaApp or call.
6. The Management would insert
all complaints into Excel
complaint template and generate
monthly report to be submitted
to MC and HQ.
Page 33 of 66
3.2
Authority Limit and Procurement Procedure
Expenditure
RM 3,000 and below
RM 3,001 –
RM 5,000
RM 5,001 –
RM 50,000
(Beautification on
non-essential works)
RM 10,001 – RM
100,000
(Essential Works)
Above RM 50,000
(Beautification on
non-essential works)
Above RM 100,000
(Essential Works)
Purchase
Method
Minimum Survey
Approving Authority
Petty Cash/Credit
Term
At least one (1)
quotation
Building Manager
Quotation
At least two (2)
written quotations Majority MC Members in
(including screenshots Meeting/ Unanimousif in
& any form of
writing
documentation)
Quotation
At least three (3)
written quotations
Majority MC Members/
Unanimous if in writing
Quotation
At least three (3)
written quotations
Majority MC Members
in Meeting/ Unanimousif
in writing
Quotation
At least three (3)
quotations
AGM/ EGM
Quotation/Tender
At least three (3)
quotations/ tenders
AGM/ EGM
Urgency
Description
Procedure
Urgent
Emergency, Manhole blockage,
Leaking, Lightings/Electrical, affect
safety in nature e.g., firefighting, to
avoid complainant from going to
press / public, any other situations
deemed appropriate
To obtain one (1)
quotation after informing
the Chairman (or any
contactable committee
member) and to be
approved electronically by
all MC members
Page 34 of 66
Cheque signatories
Cheque Signatories
Office Bearers
Non-Office Bearers
1
Chairperson
Committee member
2
Treasurer
Committee member
3
Secretary
-
Rules of Operation:
The cheque can be signed by any two (2) cheque signatories.
Page 35 of 66
3.3
Covid-19 Prevention Measures
Page 36 of 66
Critical Incidents Procedure
Page 37 of 66
4.0
Page 38 of 66
4.1
/
/
/
Billing
Billing & collection Analysis
Collection
300,000
250,000
200,000
150,000
100,000
50,000
Month
Billing
Collection
Collection %
Outstanding
%
Jan-21
240,376
240,-%
Feb-21
240,376
240,-%
Mar-21
240,376
240,-%
Apr-21
240,376
240,-%
May-21
240,376
240,-%
Jun-21
240,376
240,-%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Month
Billing
Collection
Collection %
Outstanding
%
Jul-21
240,376
240,-%
Aug-21
240,376
240,-%
Sep-21
240,376
239,-%
Oct-21
240,376
239,-%
Nov-21
240,376
239,-%
Dec-21
240,376
238,-%
0.00%
0.00%
0.17%
0.18%
0.25%
3.05%
The above table and bar chart indicates the billing issued by management office and
collection received from occupants from January 2021 to December 2021. It was
shown that Hijauan Kiara Management Corporation managed to maintain a healthy
collection rate at 99.88% in average. The balance of 0.12% outstanding mostly come
from the late payment interest.
Page 39 of 66
4.2
300,-,000.00
June 2017
June 2018
200,-,000.00
June 2020
100,000.00
June 2019
June 2021
50,000.00
Jan 2022
-
Month
Jun-17
Jun-18
Jun-19
Jun-20
Jun-21
Jan-22
Curr.
Month
39,-,-,-,-,-,335.16
1
Month
39,-,-,-,-,796.34
2,722.29
2
Months
36,-,-,402.11
6,444.49
6,142.70
1,228.97
3
Months
20,-,773.69
4,122.33
9,187.87
1,-
>4
Months
99,-,-,-,583.36
3,978.71
8,347.95
Total Due
235,-,-,-,-,-,537.97
Data record as at 31st January 2022
The above table and bar chart shows the debtor aging analysis for the past five (5) years
of audited reports. With the proactive follow-up action done by the Hijauan Kiara team,
the total due by the debtor has been reduced from RM235,146.51 (as at 30th June 2017)
to RM 30,537.97 (as at January 31st January 2022)
Based on the debtor aging report from June 2020, the management was able to reduce
the number of debtors owing from RM 105,823.25 to RM 41,623.25 in June 2021. This is
because there are two (2) top defaulters who have made a payment amount of
RM70,000.00 and RM40,000.00, respectively.
Page 40 of 66
4.3
Since Hijauan Kiara consist of 188 unit owners, there is no issue collecting the maintenance
fund and sinking fund from the parcel owner as they make payment very promptly. To
ensure Hijauan Kiara could maintain a healthy collection, the following actions have been
taken against the owner who is late in paying their maintenance fees.
Action
Date
(e.g., for December 2021 charges/ fees)
Reminder Phone Call
3 days before due date
(11th December 2021)
Issue 1st written notice
15th of the due date month
(15th December 2021)
Issue 2nd written notice
30th of the due date month
(31st December 2021)
Issue Letter of demand from the
Management
15th of the 2nd month from due date
(15th January 2022)
Issue Form 20 under Act 757
30th of the 2nd month from due date
(30th January 2022)
Deactivation of vehicle transponders
and access card to common facilities
30th of the 2nd month from due
(30th January 2022)
Owner’s Name, Unit No. and Amount
owing to appear on all notice boards
30th of the 2nd month from due date
(30th January 2022)
Issue Form 1 under Strata Management
Act 2013 (Act 757), Summon under
Tribunal Court for debt amount not
exceeding RM250,000.
15th of the 3rd month from due date
(15th February 2022)
Page 41 of 66
5.0
Page 42 of 66
5.1
My mother also ensures that I spend my pocket money wisely every week and I do not
spend them on unnecessary wants. A budget is an estimation of the revenue and
expenses over a specified future periodand it is usually compiled and re-evaluated on
a periodic basis. The management prepares a budget to monitor the building’s
expenses, help control spending and predict surplus or deficit for a particular
timeframe.
ACTUAL
JAN'21-DEC'21
INCOME
MAINTENANCE CHARGES
RECOVERABLE CHARGES
OTHER INCOME
TOTAL INCOME
OPERATION EXPENSES
CONTRACTUAL EXPENSES
OTHER MAINTENANCE
EXPENSES
UTILITY EXPENSES
ADMINISTRATION
EXPENSES
ANNUAL EXPENSES &
DEPRECIATION
TOTAL OPERATION
EXPENSES
SURPLUS/(DEFICIT) FOR
THE PERIOD
Table 1 : Actual vs Budget
(RM)
BUDGET
JAN'21DEC'21
(RM)
Variance
(A-B)
Variance
(RM)
(%)
2,596,318
4,329
24,464
2,625,111
2,596,318
8,276
(3,947)
28,280
(3,816)
2,632,874 (7,763.48)
0%
-48%
-13%
0%
1,831,565
228,289
1,841,887
300,000
(10,322)
(71,712)
-1%
-24%
250,380
25,294
288,000
33,991
(37,620)
(8,697)
-13%
-26%
66,130
65,734
396
1%
2,401,658
2,529,612
(127,953)
-5%
223,452
103,262
120,190
116%
As stipulated in the aforementioned Table 1, the total expenditure also was overbudgeted by 5%. As per the above table, Hijauan Kiara Management Corporation is still
able to maintain a healthy surplus of RM223,452.00 (in average of RM
18,621.00/months).
Page 43 of 66
As a guideline for MC for the future project, we have prepared the capital expenditure
budget as per table 2 for the years 2021 to 2023 to allow us to forecast upgrading
work to be done in the next three (3) years.
NO
Description
Priority
Sinking Fund Available as at 1st July (as per
audited)
Add : SF billing (RM 24,016.31/mth), RM
0.4456/share unit ( Total SU : 53,896)
Add : Cash called for period 01/6/2021 to
31/05/2022
Add : Fixed deposit interest
Less : Taxation (10 %)
Less : Bank Charges
1
2
Less :- Capital Expenditures
Private Lift ceiling upgrade for 10 lift (Resolution
6.1, Approved in 11th AGM)
Fire Seal @ electrical risers (30 areas)
3
CCTV Camera and CCTV System [SPD (RM28,923)] &
purchase of hard drives [increase the memory of
video recording (RM6k)]
4
Waterproofing in Hijauan Kiara
Actual
12 Months
July 20- June 21
(RM)
ACT + BUDGET
12 Months
July 21- June 22
(RM)
BUDGET
12 Months
July 22- June 23
(RM)
1,709,690.80
2,061,971.00
1,134,742.32
288,195.72
288,195.72
288,195.72
5,-,899.88
59,-,000.00
14,000.00
(1,205.00)
-
-
-
(20.00)
(20.00)
2,061,971.00
2,427,432.32
1,436,918.04
High
-
High
(3,000.00)
High
-
-
(55,000.00)
(35,000.00)
-
-
a) Waterproofing for roof top water tank block A-G
High
(35,000.00)
b) Waterproofing for Adult pool stream
High
(70,000.00)
5
Replace broken emergency exit signage (estimated
"Keluar" signage - 250 nos.)
High
(25,000.00)
-
6
Lift Supervising Panel at Guard House
High
(4,240.00)
-
High
(80,000.00)
High
(100,000.00)
(600,000.00)
7
8
9
Refurbishment/ Replacement of wooden deck
- Spa Garden deck (Propose to replace the base and
to replace the deck as and when necessary)
Upgrading Playground including flooring.
(Resolution 6.5,12th AGM held on 03/04/2021)
a) Repainting of Building (Resolution 6.2,12th AGM
held on 03/04/2021)
b) Contingency for building repainting (e.g., external
cracks, rainwater downpipe, rectification for awning
and etc). - (Resolution 6.2 (a),12th AGM held on
03/04/2021)
c) Consultant-Repainting, (Resolution 6.2 (b),12th
AGM held on 03/04/2021)
10
Waterproofing for RC room Block E
11
Conversion of Tennis Court to Dual-Purpose (Tennis
and Basketball) Court (Resolution 6.4,12th AGM
held on 03/04/2021)
Adult pool spa jet system
Replacement of pump for stream Jacuzzi pump and
panel (5 pumps)
Riser, door lock, fire staircase door lock
Replace rotten door & door frame (100 doors)
Protection (Acrylic panels) of renovation in guest
lifts
Less : Contingency expenses (Piping, Electrical and
etc)
Total Capital Expenditures
-
Sinking Fund Available as at 30th June
Medium
Medium
-
(400,000.00)
-
(100,000.00)
Medium
-
Medium
-
Medium
-
-
(100,000.00)
-
(10,000.00)
(21,700.00)
Low
-
(20,000.00)
-
Low
-
(13,750.00)
-
Low
Low
-
(40,000.00)
-
(50,000.00)
Low
-
-
(63,000.00)
-
(70,000.00)
(70,000.00)
-
(1,292,690.00)
(673,000.00)
2,061,971.00
1,134,742.32
763,918.04
Page 44 of 66
5.2
• New wiring for
firefighting panel
• Upgrading of all
service lift ceiling
• Upgrading to
access card system
for reading rooms,
games room and
table tennis
• Fire pump room
change gate valve
for all pump
• Waterproofing for
rooftop water tank
block A-G
• Cleaning neutral
gas pipeline
• Tennis court
resurfacing
• Spa garden
replacement of
wooden decks
• Replacement of all
exit sign
Past
Ongoing
• Replacement of all
pumps
• Repainting project
• Playground
upgrading
• Installation of SPD
• Fire Seal @
electrical risers
• Polycarbonate cleaning and
rectification
• Pool panel
replacement
• RC tanks
waterproofing
• Facade cleaning
Upcoming
Page 45 of 66
Page 46 of 66
Page 47 of 66
Page 48 of 66
6.0
Page 49 of 66
For the safety and security of Hijauan Kiara, Eaza Force has been appointed. There are
eight (8) unarmed security guards for the day-shift another six (6) unarmed security
guards for the night-shift. Their duties and responsibilities include conducting regular
patrol and clocking both within the buildings and also common areas, monitoring
CCTV cameras, lift system, access card systems, barrier gate, traffic control, and
assisting residents whenever there is a request or in an emergency situation etc.
Eight (8) day shift guards
Six (6) night shift guards
Page 50 of 66
6.1
Firefighting protection/ prevention
This firefighting protection/prevention system consists of:
• Smoke detector system
• Heat detector system
• CO2 gas system
• Hose reel system
• Hydrant system around the compound
• Break glass system
• Wet riser system
All these firefighting protection/ prevention systems are being closely monitored by
our security 24 hours, daily. Any fault will be reported to the management office
immediately.
CCTV System
A CCTV (closed-circuit television) system enhances security by allowing the use of
videos cameras to monitor the interior and exterior of a property, transmitting the
signal to a monitor where the on-site security guards monitor. CCTV system is
equipped at the entrance, common areas, carpark lobby and etc.
Page 51 of 66
VBarrier Gate & Access Card System
VWe have installed a vehicle access card system at the guardhouse at both the main
entrance and back entrance. Residents are issued with a long-range transponder
access cards for entry and exit. Those without transponder access cards are not
allowed to enter and will need to go through the visitor registration procedure in
order to enter.
Page 52 of 66
6.2
For safety and security purposes, Hijauan Kiara’s security ensures that all persons
entering the premises are registered in accordance with the guidelines laid out by the
Management.
Registration of
Graaab Car Visitor
for Drop- Off
Registration of
Visitors Using
Graaab QR Code
•Register Graaab car driver and vehicle number
•Visitor registration as per the SOP below;
with/without QR Code
•Visitor to scan QR Code
•Guard to call resident for verification on the
visitor(s) arrival
•Once verified, the guard will update the information
in the system
•If resident fails to answer the call, guard will
intercom resident’s unit. If no response, entry will
not be permitted
Registration Of
Visitors, Maids,
Deliveries And
Contractors
•Ensure visitors/maids and contractors have an
Sop For
Evacuation
•Guard will press the evacuation alert when there is
Identification Card/ Valid driving license/ Valid
permit/ Passport for registration
•Call or intercom the resident’s unit. Once approval
is given, the guard will take a photo of the above
document and key-in the necessary information
any emergency i.e., fire incident
•Guard will follow fire evacuation plan accordingly
Page 53 of 66
6.3
All security guards have been trained and briefed on the SOP or the necessary Security
Procedures in the event of the followings:
Fire Breakout
Pipe Burst or
Water
Leakage
Fighting
Incident
Noise
complaints
from
residents
Gas Leakage
Examples
of Crisis
Injury
Incident
Electricity
Power Supply
Failure or
Blackout
Suicide
Incident
Burglary
Incident
Mantrap in
Lift
Page 54 of 66
7.0
Page 55 of 66
7.1
Page 56 of 66
E-Community Application
In line with our continuous effort to improve our community, residents were
introduced to JagaApp which is aimed at improving security, communication and
convenience in communities. Features of JagaApp as follows:
Page 57 of 66
7.2
New Tenant or Owner
Fill in resident
registration form and
submit together with
tenancy agreement.
Fill in the resident
registration form and
submit it together with
SPAfor change of
ownership.
Fill in moving-in form
and pay deposit of
RM3,000.
Fill in moving-in form
and pay deposit of
RM3,000.
Management to pass a
copy of Hijauan Kiara
House rules.
Management to provide
latest statement of
account to new owner
and a copy of Hijauan
Kiara House rules.
Download and register
for E-Community App,
JagaApp 2.0.
Download and register
for E-Community App,
JagaApp 2.0.
Page 58 of 66
JagaApp Registration Procedure
Page 59 of 66
Page 60 of 66
8.0
/
Page 61 of 66
Hijauan Kiara is one of the lowest densities and most exclusive offerings in Mont’Kiara
when it was handed over to the homeowners in 2008. It was also the first
condominium to introduce the private lift lobby concept in the neighbourhood selling
from RM500 psf back then.
8.1
The average transacted value psf of Hijauan Kiara Block A-G over the last four (4) years
are as follow:
AVERAGE PRICE
AVERAGE PRICE
OFBLOCK A – C
OFBLOCK D – G
(PSF)
(PSF)
2018
RM 602
RM 572
2019
RM 546
RM 744
2020
RM 608
N/A
2021
RM 549
RM 499
Year
Based on the average transacted price as shown in table above, it can be seen that over
the past four (4) years, average transacted price of high-rise Block A-C ranges from RM
546 psf to RM 602 psf. Meanwhile, average transacted price of low-rise Block D-G ranges
from RM 499 psf to RM 572 psf. The highest price recorded was at RM 608 psf in 2020 for
high rise Block A-C while highest price recorded was at RM 744 in 2019 for low-rise Block
D-G which may be due to factors such as renovation.
Page 62 of 66
RM800.00
RM700.00
RM600.00
2018
RM500.00
2019
RM400.00
2020
RM300.00
2021
RM200.00
RM100.00
RM0.00
AVERAGE PRICE OF
BLOCK A – C (PSF)
AVERAGE PRICE OF
BLOCK D – G (PSF)
Based on the graph portrayed, it can be seen that average price psf for low-rise and
high-rise shows a slight decrease in 2021. Such pattern is due to the Covid-19
pandemic causing housing prices to drop. It is expected that the property market will
slowly recover when the pandemic has phased to endemic when everything stabilizes.
8.2
On the other hand, based on online property portal such as ‘PropertyGuru’ and
‘Iproperty’, most of the online asking rental is from RM 2.00 psf for partially furnished
units. Meanwhile asking rental for fully furnished units is from RM2.50 psf. At such
rate, the rental market for Hijauan Kiara is still considered optimistic even though it
is during the pandemic where most rental go down the drain due to cut of salary
causing lower demand.
Page 63 of 66
9.0
Page 64 of 66
Based on Google Review, it can be concluded that Hijauan Kiara has majority
good reviews averaging to a 4.5/5.0 stars.
Page 65 of 66
Page 66 of 66