RESUME
CONTACT
NAME: Pramod pandagre
EMAIL:-PHONE:-(India),-( Whatsapp Number )
ADDRESS: Near Air Force Station Amla,
Dist-Betul, Madhya Pradesh (India)
OBJECTIVE
Seeking for a challenging position as a Civil Engineer/Senior Estimator, where I can
use my planning, designing andoverseeing skills in construction and help grow the
company to achieve its goals.
EXPERIENCE:
2 year’s pf experience as an Estimator
Company Name: Freelancer Estimator
From- 02/01/2019 to 05/18/2021
Number Of Project done in 2 years’: Approximate 350 (all UK and USA Projects)
DESCRIPTION OF MY WORK:
I have done the estimates and quantity-takeoffs for all USA and UK based general
contractors , subcontractors and owners. I am able to work on all 16 CSI DEVISION ,
plumbing, mechanical, Structure , masonry, Concrete, finishes.
Having 2 year of experience as a Freelancer Estimator for multiple clients from UK and
USA.
KEY SKILLS
Excellent Mathematical skill
Active listener
Team player
Confident
Eye for detail
Quick learner
TECHNICAL SKILLS
PlanSwift 10.2 and Planswift 9.0
Auto CAD(Basics)
Microsoft office (2017)
MS Excel (2017)
Power point
MS World (2017)
Internet surfing (Email accessing etc.)
ACADMIC QUALIFICATION
Degree in Civil Engineering from Rajiv Gandhi Proudyogiki Vishwavidyalaya Bhopal
India in (2020)
– 81.2%
Intermediate from MP. Board in (2014)-77.02%
High School from MP. Board in (2016)-78.02%
MAJOR PROJECT:
Project name: Reactive Powder Concrete
Team Size: 6 members
Roles and responsibility:
Aim of our project to prepare a modern concrete which has higher compressive strength as
compare to ordinary concrete. I am working as a group leader, my responsibilities to find out the
mix proportion and also find out the how much quantity of material should be added in the reactive
powder concrete at theplace of aggregate and cement to achieve higher compressive strength.
Extra curriculum activities:
Served as the Head boy of the school and college
Participated in cricket
Participated in youth festival in college.
HOBBIES:
Learning new thinks
Riding bikes
PERSONAL INFORMATION:
Father’s Name: Mr. Nakul Pandagre
Date of Birth: 20/06/1998
Mother's Name: Mrs. Anita Pandagre
Marital Status: Single
Language Known: Hindi & English & Marathi
Nationality: Indian
Date:
Place:
Sign.
Work Samples
Markup Samples
Excel / Drywall
Samples
DREAM ESTIMATING SERVICES-CONTACT +1 (315)-
SR-
DWG
NO.
A-105
A-105
A-105
A-105
A-105
A-105
10
A-105
-
A-105
16
A-105
-
A-105
A-105
A-105
21
A-105
-
A-105
36
A-105
-
A-105
A-105
42
A-105
43
A-105
-
A-105
A-105
A-105
51
A-105
52
A-105
A-105
A-105
A-105
A-105
A-105
A-105
A-105
A-105
A-105
A-105
A-105
A-105
A-105
A-105
A-105
A-105
A-105
A-105
A-105
CSI
SEC.
7
ITEM DESCRIPTION
THERMAL AND MOISTURE PROTECTION
ROOF ASSEMBLY-1
TPO ROOFING MEMBRANE
1/2" COVER BOARD
4-1/2" THICK RIGID INSULATION (MIN. R-25)
ROOF ASSEMBLY-2
ASPHALT ROOF SHINGLES
30# FELT UNDERLAYMENT (2 LAYERS)
7/16" O.S.B.
2-1/2" THICK RIGID INSULATION-POLYISOCYANURATE
INSULATION PANEL (MIN. R-25) W/ 2" AIR GAP- VENT SPACER
STRIPS
2" THICK RIGID INSULATION (MIN. R-25)
ROOF ASSEMBLY-3
STANDING SEAM METAL ROOF
30# FELT UNDERLAYMENT
7/16" O.S.B.
4-1/2" THICK RIGID INSULATION-POLYISOCYANURATE
INSULATION PANEL (MIN. R-25)
ROOF ASSEMBLY-4
ASPHALT ROOF SHINGLES
30# FELT UNDERLAYMENT (2 LAYERS)
7/16" O.S.B.
2-1/2" THICK RIGID INSULATION-POLYISOCYANURATE
INSULATION PANEL (MIN. R-25) W/ 2" AIR GAP- VENT
SPACER STRIPS
2" THICK RIGID INSULATION (MIN. R-25)
COPING
1'-8"Wx10"H CAST STONE COPING
2'-3"WIDE CAST STONE CAP
24"L PREFINISHED METAL COPING
9"W PREFINISHED METAL COPING
CAST STONE COPING AT BASE OF CUPOLA
2'-7"Wx2'-7"Lx1'-3"H CAST STONE COPING
FACSIA, FLASHING AND VENTS
11"H PREFINISHED METAL RAKE FASCIA
PREFINISHED METAL FASCIA W/ DRIP EDGE
PREFINISHED METAL STEP FLASHING
PREFINISHED METAL FLASHING W/ DRIP EDGE
1'-4"L PREFINISHED METAL FLASHING SILL
PREFINISHED RECEIVER AND COUNTER FLASHING W/
SEALANT AND TERMINATION BAR
PREFINISHED METAL RIDGE VENT- FIELD ROOFED
PREFINISHED METAL FASCIA VENT
GUTTER, DOWNSPOUTS, DRAIN, SCUPPERS ETC
6"Dx8"W PREFINISHED METAL GUTTER
3"Dx4"W PREFINISHED METAL GUTTER
3"Dx4"W PREFINISHED DOWNSPOUT AND RND. CAST
IRON BOOT
5" DIA. PREFINISHED METAL DOWNSPOUT W/ ROUND
CAST IRON DOWNSPOUT BOOT
METAL GUTTER EXTENTION TO MATCH EXISTING
THRU-WALL SCUPPER
ROOF DRAIN TO MATCH EXISTING
MISC.WORK
ROOF CRICKET
HIGH PERFORMANCE COATED STEEL TUBE CROSS
WEATHER BARRIER OVER 1/2" RIGID INSULATION
ROOF EXPANSION JOINT COVER W/ FIRE RETARDANT
TREATED 2X WOOD BLOCKING AND SHIMS
ASPHALT SHINGLES ON BUILT-UP COUNTER SLOPE
4
LABOR
TOTAL
COST
MAT/LAB
WASTE
QTY+WAS
TE
UNIT
3,329
3,157
3,157
10%
10%
10%
-
SQ FT
SQ FT
SQ FT
$
$
$
-
$
$
$
-
$
$
$
-
14,637
14,637
14,637
10%
10%
10%
-
SQ FT
SQ FT
SQ FT
$
$
$
-
$
$
$
-
$
$
$
-
UNIT
COST
TOTAL
14637
10%
16100.7
SQ FT
$
-
$
-
$
-
14,637
10%
16100.7
SQ FT
$
-
$
-
$
-
-
10%
10%
10%
-
SQ FT
SQ FT
SQ FT
$
$
$
-
$
$
$
-
$
$
$
-
809
10%
889.9
SQ FT
$
-
$
-
$
-
-
10%
10%
10%
-
SQ FT
SQ FT
SQ FT
$
$
$
-
$
$
$
-
$
$
$
-
650
10%
715
SQ FT
$
-
$
-
$
-
650
10%
715
SQ FT
$
-
$
-
$
-
-
10%
10%
10%
10%
10%
0%
-
LF
LF
LF
LF
SQ FT
EA
$
$
$
$
$
$
-
$
$
$
$
$
$
-
$
$
$
$
$
$
-
-
10%
10%
10%
10%
10%
-
LF
LF
LF
LF
LF
$
$
$
$
$
-
$
$
$
$
$
-
$
$
$
$
$
-
172
10%
189.2
LF
$
-
$
-
$
-
522
17
10%
10%
-
LF
LF
$
$
-
$
$
-
$
$
-
243
102
10%
10%
-
LF
LF
$
$
-
$
$
-
$
$
-
41
10%
45.1
LF
$
-
$
-
$
-
98
10%
107.8
LF
$
-
$
-
$
-
17
2
1
10%
0%
0%
18.7
2
1
LF
EA
EA
$
$
$
-
$
$
$
-
$
$
$
-
-
10%
0%
10%
-
SQ FT
EA
SQ FT
$
$
$
-
$
$
$
-
$
$
$
-
30
10%
33
LF
$
-
$
-
$
-
116
10%
127.6
SQ FT
$
-
$
-
$
SUBTOTAL
7.0%
GENERAL CONDITION
3.5%
INSURANCE
15%
O/H & PROFIT
TOTAL COST
NOTE:
1
2
3
MATERIAL
UNIT
TOTAL
COST
COST
QUANTI
TY
MATERIAL
$
-
LABOR
$
-
$
$
$
$
$
-