Pedro E. De Dios

Pedro E. De Dios

$15/hr
Anything technical, water treatment, autocad
Reply rate:
-
Availability:
Full-time (40 hrs/wk)
Age:
62 years old
Location:
Biñan, Laguna, Philippines
Experience:
30 years
CURRICULUM VITAE PEDRO E. DE DIOS Bachelor of Engineering, Technological University of the Philippines (TUP) Electrical Technology, Manila Technician Institute – TUP Birthdate: June 29, 1963 Mobile Number: Manila: - Email:- POSITION –- Water and Wastewater Process Engineer Present Job Description and Responsibilities: • Design of Water Treatment Systems for Industrial, Municipal and Institutional customers. • Designs water distribution system including pumps and piping systems. • Maintain, Service and Troubleshoot pump systems for water and wastewater application. • Manage the service and maintenance for electromechanical works of water treatment systems. • Undertake study of water and wastewater system and formulate improvement programs. • Implement improvement programs for water treatment systems. • Project management of water infrastructure projects from conceptual design up to full project implementation. Employment History Applications Engineer ZIONTEC TRADING & SERVICES Binan, Laguna September 2017 to October 2018 Project Name: Consultant Work for Lexington Garden Village, Pasig City July 2018 – August 2018 Preparation of Village As-Built Potable Water Piping Plans Job Description and Responsibilities: • Preparation of As-Build Plan potable water piping plan using Autocad. Scope includes site inspection and investigation, taking site measurements, update and revise piping plans using Autocad software. • Investigate causes of water loss and prepare report to include possible corrective actions. • Prepare a draft design for the new potable water piping system. • Present to the Board of Directors and explain the findings of the study and the corrective actions suggested. • Prepare BOQ and budgetary costing for the new potable water piping system. Project Name: Consultant Work for Wintech Builders and Industrial Supply, Sto.Tomas, Batangas April 2018 – July 2018 EDS Manufacturing Inc – Preparation of As-Built Engineering Plans Job Description and Responsibilities: • Preparation of Mechanical and Electrical As-Build Plan using ACAD. Scope includes site inspection and investigation, taking site measurements, update and revise plant engineering plans using Autocad software. • Design of the wastewater effluent recycling system for toilet flushing. Design work includes specifications for storage tank, booster pump system, distribution piping and electrical controls. • Design of water supply system for island resort in Coron, Palawan. Design works includes rain water harvesting, desalination system, water storage and distribution system. Project Name: Consultant Work for Flowline Water Technology Papua New Guinea January 2018 – March 2018 Daru Island Water Supply System for Water PNG Job Description and Responsibilities: • Design 2,800m3/hr water supply system for Daru Island using deepwell water source. Using deepwell water analysis, the system design includes deep well pumps, water storage tanks, Media Filter, Water Softener, Iron-Manganese Filters, Nanofiltration Stystem and UV disinfection system. Design includes piping system, instrumentation and controls, pump system specifications and tank sizing. Port Moresby General Hospital Main Water Storage Tank Job Description and Responsibilities: • Design a 170 cubic meter water supply tank using GRP panel tanks. Design works includes tank RC base, PE piping system, tank level measurement and pump system to supply the hospital with raw water. Project Name: Due Diligence Study for Mera Senko Cebu for their Wastewater Treatment Plant-Manufacturing Plant Chemical Waste Treatment System. Consultant work for Hydro Sense Cebu October 2017 – November 2017 Job Description and Responsibilities: • Perform due diligence study to find out the cause of failure of the customers wastewater treatment plant. Works include production process optimization and conceptualizing the design of the chemical waste treatment plant to separate domestic wastewater treatment from manufacturing wastewater treatment. • Review manufacturing system protocols on chemical dispensing, storage, handling and transport to comply with OSHA standard. • Formulate cleanroom protocols for the handling, storage and dispensing of chemicals used in the production process. • Develop design for the drain system to separate chemical washing wastewater from domestic wastewater. • Develop scheme design for the domestic wastewater treatment system system to comply with new DENR Standard. Project Name: SBR System Design and Installation for AMOSUP (Seamen Hospital, Intramuros, Manila), Feb 2017-November 2017 Job Description and Responsibilities: • Develop SBR STP system design for Seamen’s Hospital and worked out tank design considerations based on existing building structures. • Manage the system installation using KLARO SBR System including MEP works and site coordination with building general contractor. Project Name: 20LPS Iron-Manganese Filter for Clark Water, consultant work for Flowline Water Technologies. May 2017-October 2017 Job Description and Responsibilities: • Develop process design for 20LPS IM removal filter using DMI65 Media to treat deep well water at Sacobia Site of Clark Water in Pampanga • Design filter tank, piping system and modification to existing DI Clark Water Sacobia well 250mm main header pipes. • Manage the system installation, testing and commissioning. Consultant-Water Process Engineer Pure Green Solution Technology Inc. Alabang, Muntinlupa February 2017 to August 2017 Project Name: C-JOY Chicken Dressing Plant, Sta.Teresita, Sto.Tomas, Batangas Job Description and Responsibilities: • Develop Process and Instrumentation Diagram for Water Treatment System and Wastewater Treatment System. This is composed of filtration and softener system to treat deep well water. • Select equipment for the Water Treatment System to produce 2,500 CMD of filtered water. Process selected is Screen Filter for the Four (4) deep well water supply lines, Activated Carbon Filter System, Cartridge Filter System and UV Sterilizer. System also includes 2,000 CMD Water Softener System • Design the water treatment process according to the Customer requirement and project budget requirement. • Design, Procurement, Installation and Testing of PVC piping system within the WTP battery limits. • Design the Rotary Drum Screen for Wastewater Treatment Plant. • Design the equipment arrangement for the Wastewater Treatment Plant (SBR System) with capacity of 4,500cubic meter/day. Equipment includes submersible pumps and piping system, Roots Blower and piping system, chemical storage and injection system, electrical power supply and plant control system. • Develop testing and installation procedures and conduct functionality testing of all equipment in WTP and WWTP. Applications Engineer ZIONTEC TRADING & SERVICES Binan, Laguna September 2016 to January 2017 Job Description and Responsibilities: • Perform Due Diligence Study for Verdetec Enterprises for their customer, Vanson Paper Inc. Scope of study is the assessment of Vanson paper manufacturing process and waste generation and identification of wastewater treatment technology to treat wastewater. • Development of Non-Chemical Water Treatment System for Boiler and Cooling Tower System. • Design of Non-Chemical Water Treatment System for Vanson Paper Inc. Boiler System. System installation is estimated to be at first week of March. Consultant – Water Engineering BORACAY TUBI SYSTEMS INC. Manoc-Manoc, Boracay Island Malay, Aklan July to August 2016 Job Description and Responsibilities: • Undertake due diligence study of Boracay Tubi water infrastructure and prepare a report detailing status of systems and proposed improvement plans. The works include the following: a. Conduct site visit, assessment and investigation to determine present operational status. Sites involved includes: § Nabaoy and Potol Pumping Station § Manoc-Manoc Pumping Station § Pelayo Pumping Station § BTSI Sewage Treatment Plant § Fairways & Bluewater Sewage Treatment Plant b. Prepare as-built plan of BTSI treatment plant to include Sedimentation System, Filtration System, Water Tanks and Pumping System. c. Submit assessment report detailing proposed improvement plans. Senior Staff – Facilities Engineering Team, Fab 4 Expansion SUNPOWER PHILIPPINES MANUFACTURING LTD. 100 East Main Ave., Phase 4 Special Economic Zone, Laguna Technopark, Biñan, Laguna, Phils. 4024 June 08, 2015 to Present Job Description and Responsibilities: • Manage the design coordination, installation, testing and commissioning of the following construction package:-. WWT Plant RODI Plant High Purity Piping System Low Purity Piping System Process Drains Industrial and Domestic Water Supply System Industrial Water Tanks Service Manager SOUTHERN CROSS PUMPS LTD. Section 62, Lot 16, Ruta Place, Morata Street, Gordons, Port Moresby, Papua New Guinea February 21, 2014 to November 30, 2014 Job Description and Responsibilities: • Design of Water Treatment Systems for Industrial, Municipal and Institutional customers in Papua New Guinea. • Designs water distribution system including pumps and piping systems. • Maintain, Service and Troubleshoot pump systems for water and wastewater application. Pumps include Southern Cross, Xylem, Grundfos, Lowara, Wilo, Davey and other brands. • Manage the service and maintenance group of the company dealing with electromechanical works. • Manage the service workshop for the servicing of pumps. • Manage the Service Department with Four (4) Service Supervisors and Fourteen (14) full-time and Technicians. • Prepare reports and coordinate with customers the works to be done for different projects. • Meet the monthly Sales Target for the Service Department that ranges from K148,000 to K158,000. • Manage the maintenance and upkeep of residential and office buildings within the company compound. Activities include painting, maintenance of grounds and upkeep of facilities. • Manage the transport fleet of the company composed of delivery trucks, company vehicles and warehouse equipment. PROJECTS DONE: • Project Manager for the following tank projects: o Fletcher Morobe Constructions – Garamut Harbourside Development, 3 x 340kl Southern Cross Steel Squatter Tanks. o o o o o Fletcher Morobe Constructions for Waigani Central – 360kl Southern Cross Squatter tanks. CCJV, part of the PNG LNG project, 17 Southern Cross Liner tanks of varying capacities. University of Goroka – 1080kl Southern Cross Squatter tank, constructed in February 2013. Installation of water tank for Patrick’s Transport at Waigani, Port Moresby Installation of GRP Panel tanks at Paddy’s Bar, Port Moresby • Project Manager for the following water projects: o LNG Plant Wastewater Treatment Project – design and installation of 3x100-gpm Turbidex Pressure Filter system including Diesel-driven Wastewater Pump. o Laloki Hospital Water Treatment Rehabilitation Project – rehabilitation of 3x100-gpm Water Softener/UV/Bore Pump System and Distribution Pumping System. o Laloki Nurses Training College – design and installation of Water Softener system , including 2xBore Pumps and Controls, 2x9000L Storage Tank, Containerized Water Treatment System composed of 3x100-gpm Water Softener with Automatic Control Valves, Grundfos Domestic Pressure Pumps with VFD Control and 2x100-gpm UV Sterilizer System. • Project Manager for the following pump projects: o Installation of 2xGrundfos Domestic Pressure pump System with Star-Delta starter for University of Goroka Happy Valley Pump Station. o Installation of stormwater pit submersible pump for QBE insurance Office, Port Moresby. o Installation of 2xBore Water Pump for City Missions at Meregeta o Installation of bore water pump and irrigation piping system for PNG National Museum Grounds. o Installation of Fire Pump and Domestic Water Pump for Glory Estate. o Rehabilitation and installation of tank liners and bore pump for Port Moresby Nature Park. • Consulting Engineer for PNG Correctional Services Department, for the following projects: o Bomana Prison System, Port Moresby – Rehabilitation and Upgrading of Anaerobic Wastewater Treatment System. Consulting work includes lift station, sewer piping system, anaerobic tank, wet lagoons and accessories including sewage pumps and controls. o BUIMO Prison System, Lae – mprovement of Domestic Water Supply System. Consulting works includes Storage Tank System, distribution piping system, pumps and control, and accessories. Senior Applications Engineer MASSCO CHEMCIAL AND MARKETING CORPORATION San Pedro, Laguna, Philippines 15 November 2011 to 01 February 2012 • Designer for the SMB Polo Water Recycling Project – Subcontract work for GE Water Philippines. Designed and specified submersible pumps, vertical centrifugal pumps including piping and controls. • Project Manager for STP Installation in JCenterMall ,Cebu City. Installed 25-Hp Tsurumi submersible pumps and 5-Hp air pumps including controls and piping. • Designer for Bataan Technology Park Incorporated water distribution system. Works include selection and installation of borehole submersible pumps ranging from 10 to 50 Hp, design and installation of motor controls and piping. Consultant/Process Engineer - Water & Wastewater MEINHARDT PHILS. INC., 05 January 2010 to 18 April 2011 Project Assignment: • Transitions Optical RODI Project – Expansion/Improvement of RODI System including design of high purity piping system Senior Electrical Engineer and Water Treatment Specialist ARUP PHILS. INC., 12 April 2009 to 30 December 2009 Project Assignment: • Detailed Design Engineering of STP Projects for Manila Water o Olandes STP Project, Contractor is JFE Engineering o Road 5 STP Project, Contractor is Balfour-Siemens JV o East Avenue STP Project, Contractor is JFE Engineering • Due Diligence study of Robinson’s Cybergate Tower 1 Electrical System. Works includes site inspection of building electrical system, desk work in verifying electrical sizing calculations and preparation of due diligence report. Water Treatment Consultant MEINHARDT PHILS. INC., 10 October 2008 to 07 March 2009 Project Assignment: • Procter and Gamble (P&G) Beijing Technical Center, Process Engineer-Consultant for Ultrapure Water System Independent Water Treatment Consultant 15 January 2005 to 08 October 2008 MASSCO Chemical Corp. Technical/Project Manager, 18 January 2004 to 20 December 2004 Advanced Hydro Treatment & Services Corp. Owner/General Manager, 08 December 1999 to 22 December 2003 Dongahn Engineering Company Ltd. - Senior Engineer, 30 March 1999 to 29 September 1999 Amkor AnamPilipinas – P3 - Senior Engineer – Environmental Section, 02 April 1997 to 28 September 1998 ASAT Ltd HK - Facilities Senior Engineer, 06 September 1993 to 06 March 1997 QPL Ltd. - Process Development Engineer, 12 June 1993 –12 September 1993 QPL Ltd. HK - Plating Engineer, 18 December 1992 to 18 June 1993 MOTOROLA PHILIPPINES INC. - Technician Specialist IC Plastics – 22 January 1983 to 20 December 1992 Professional Associations • • • • • • Management Committee Member, Industrial Wastewater Specialist Group, IWA 2010 Member, International Water Association, 2010 Member, MBR Network Europe Member, Pollution Control Association of the Philippines, 1997 Member, Australian Water and Wastewater Association, 1995 Member, Philippine Instrumentation and Controls Society, 1991 Publications Neutralization of Acid/Caustic Waste of Semiconductor Plant, Engineering Course Project Study, 2008 Short Courses Completed • Installation and Calibration of Resistivity and Flowmeter, GF Singapore, February 9, 2015 • FEDCO Pump Training Course, Singapore International Water Week, July 5, 2012 • TONKAFLO Pump Service Training, GE Water Philippines, January 2012 • Thermoplastic Piping Engineering Seminar, AGRU Bad Hall Austria, September 2011 • IR-Plus Welder Certification Training 1 Adv-J2.1, GF Signet Singapore, June 28 2010 • Water Treatment Training Course, P&G Philippines Cabuyao Plant, November-, conducted by P&G Corporate Water Treatment Engineer. • WATER TREATMENT TRAINING COURSE, Sunpower Fab2, October to November 2008, conducted by GE Water Singapore • AMIAD FILTER Training Course, Hotel Intercontinental Manila, September 7–11, 2004 • REVERSE OSMOSIS Training Course, DOW PHILS. Office, 6750 Ayala Avenue Makati, October 5–9, 2004 • Pollution Control Officers Training Course, Great Eastern Hotel, Quezon Avenue, Quezon City, August 12– 16, 1997 • Sewage and Wastewater Treatment Plant Operation – HK productivity Council thru QEDC/TAFE Australia – graduated with Honours – 1996 Special Skills and Knowledge • Knows how to do AutoCAD drawings • Water Treatment Systems Design • Electrical control design and installation, troubleshooting and repair • Hydraulic design for pumps and piping works • Mechanical fabrication works, metal working Certified true and correct to the best of my knowledge. Sincerely, Pedro E. de Dios
Get your freelancer profile up and running. View the step by step guide to set up a freelancer profile so you can land your dream job.