Engr. Nauman R. Dar
Mechanical, Electrical & Plumbing Professional-|-
www.linkedin.com/in/naumandar
Summary
Professional Certification
Possessing 13+ years proven track record of MEP designing, services coordination,
installation and commissioning. Highly experienced in managing multiple projects
simultaneously by using various project management tools for scheduling, delegating
responsibilities and collecting information to ensure complete projects within budget
and time. Expertise in project life-cycle phases and successfully delivered over Billions
of Rupees Projects.
• PMP Workshop
PMI Karachi Chapter – 2014
Present
Academic Qualification
Project Manager at Bahria Town Karachi. October 2022 till date.
• Coordinating with architects and other stakeholders, reviewing the MEP constant
design proposals and ensuring that they meet all requirements of O&Ms,
oversees the contractors, project timelines and costing to ensure that MEP
systems are designed and installed correctly.
• Successfully saved Hundreds of Millions of Rupees by value engineering,
negotiations and intime decisions.
• Managing 50+ team of engineers, technicians, and other professionals involved in
installation to ensure that systems are installed correctly and meet safety and
quality standards.
Projects:
• Grand Mosque (World 3rd Largest)
• Sewerage Treatment Plan (SBR 2 MGD)
• BTK2 Gate House
• BTK2 Home
• BTK2 School
• BTK2 Head Office
• BTK2 Masjid e Mehmood
• Little Paris (Shopping Street)
• BTK2 Al Ahad Square
• RO Plant (1.2 MGD)
• Bus Terminal
• BTK2 Hospital
• Taxidermy Museum
• Underpass
• Masjid e Amna
• Heights Apartments (G + 9 Floors)
• Masjid e Abdullah
• Shopping Galleries
• Masjid e Mohtashim
• Masjid e Babri
• B.E. in Electronics Engineering
UIT - Hamdard University.
Karachi. - 2010
Past
MEP In-Charge at Engineering Contractor. January 2021 September 2022.
• Verification of MEP design, products, equipment, site details and proposed
alternatives considering maintenance & cost impact but without compromising the
quantity or best practices.
• Resolve bottlenecks of MEP works, including coordination with other
departments, approvals from client or negotiation with supplier to make sure
timely deliveries of projects.
Projects:
• Gate House – Phase 1, BTK
• Chirpy Park, BTK
MEP Head at UN Enterprises. Bahria Town Karachi. Feb 2016 till Dec 2020.
• Responsible for the efficient management, inspection and monitoring of quality &
progress of multiple projects simultaneously provide efficient decision to make sure
successful and in time delivery of projects.
• Analyzing of MEP design, products, equipment and proposed alternatives considering
cost impact but without compromising the quantity or standards codes. Successfully
cut down cost of Millions of Rupees.
• Take corrective measure to resolve bottlenecks to MEP works, including coordination
with other departments and negotiation with contractor or supplier.
Projects:
• Gate House – Phase 1
• Masjid e Ashiq
• 8 Marla Villas
• Drive Range Club
• 2 Bed Apartments (G + 6 Floors)
• Ali Villa Karachi
• 3 Bed Apartments (G + 6 Floors)
• 14 Marla Sports City Villas
• 2 Bed Apartments (G + 9 Floors)
• Masjid e Sarwar
• HSC (Pre-Engineering)
Govt. Degree College Gulshane-Iqbal, Karachi. - 2006
Additional Courses
• HVAC System Designing
Technomen TT&C – 2013
Designing Software
• DiaLUX
• Simaris
• ETAP
Project Software
• AutoCAD
• Design Master
• MS Project
Project Expertise
• Scope & Cost Management
• Quality Control
• Effective Negotiation
• Planning and Tracking
• Risk Management
• Empowerment & Talent
Development
• Teamwork and Collaboration
• Sustainability
Personal Skills
•
•
•
•
•
•
Analytical Skills
Results Oriented
Quick Learner
Problem Solving
Teamwork & Collaboration
Adaptability & Learning Agility
•
•
•
•
Masjid e Shauda
Farmhouse Villa
20 Marla Paradise Villas
Park Lane Tower Islamabad
•
•
•
•
Masjid e Umer
Ali Villa Annexe
Central Park Towers (G + 15 Floors)
Ali Villa Peshawar
Senior MEP Engineer at KPA Consulting. Karachi. July 2015 till February 2016.
• Provide technical expertise to multiple project teams for the evaluation of, and
resolution to, engineering problems and designs involving various engineering
disciplines.
• Develop and map out a clear strategy for all MEP requirements as detailed in design
plans.
• Preparation of tender documents, negotiation, monitoring and managing all
contractors within each project.
Projects:
• Karachi Stock Exchange, Karachi – LV to MV Supply Up-gradation
• Atlas Engineering Pvt Ltd, Karachi – Energy Conservation
• Atlas Engineering Pvt Ltd, Karachi – LV System Audit
• Atlas Engineering Pvt Ltd, Karachi – 640kg Induction Furnace MV Supply
MEP Project Engineer at UN Enterprises (Bahria Town Karachi). Karachi. February 2015 till
June 2015.
• Responsible for the Planning, scheduling, monitoring and control of the project on a
continuous basis through work schedules using MS Project for the deliverable &
milestones to ensure smooth implementation of the project.
• Prioritize workload as required to meet the fluctuating demands of the contract.
• Ensure all required necessary approvals are obtained on MEP design prior to
commencement of MEP works at site.
• Direct and facilitate effective coordination at site between MEP subcontractors and
other subcontractors for acquiring clearance required for MEP equipment installation,
commissioning and testing activities.
• Ensuring that the quality of material and installation of works are in accordance with
the acceptance criteria, specifications, approved materials and methods of installation
approved for the project.
Projects:
• Bahria Town Tower – Tariq Road (23 Storey Shops & Office Tower)
• Parking Plaza – Adjacent to Bahria Town Tower (10 Storey Parking & Cinema)
Project Engineer at Pearl Continental Hotel. Karachi. July, 2013 to February 2015.
• Develops project charter, WBS and Gantt charts for critical path analysis,
risk management and contingency planning, conferring with stakeholders.
• Preparation of tender documents and utilizing communication and interpersonal skills
for negotiations. Save 60 Million Rupees in negotiations.
• Developing the Project Implementation strategy with minimized disturbance in
operations and managing several projects concurrently. To minimize accidents and
maximize productivity actively facilitating compliance with HSE polices and guidelines.
• Generation of S-Curve & Resource Histogram for project status reports and
communicate at all levels to take necessary action for prioritizing task to meet
aggressive timelines.
Projects:
• Electrical Generator Synchronizations
• 1st to 6th Guest Floor Renovations
• Marquee Pre-Function Area Renovations
• Outside Building Renovations
• Noodle House Rectifications
• Front & Rare Scanning Rooms
• Marcopolo Restaurant Renovations
Renovations
• Lobby Renovations
• Zaver Banquet Hall Renovations
MEP Project Engineer at Matrix Engineers. Karachi, Pakistan. April 2012 to July 2013.
• Designing, conducting and coordinating the technical and management aspects of
projects (including Costing and Estimation) from concept to completion. Save wiring
cost of 5 Million Rupees in Euro Projects by simple modification in approved design.
• Preparation of tender documents, negotiation, monitoring and managing all
Professional Skills
• Decision making
• Strong IT Skills
• Innovative & Creativity Design
Concepts
• Ultimate Resource Planning
• Cost Control / Cut-Down
Approach
• Technical Support
• Effective Communication
Registrations
• Pakistan Engineering Council
• The Institute of Engineering
Pakistan
• Fire Protection Association of
Pakistan
Standards Knowledge
•
•
•
•
Health and Safety Executive
International Electrical Code
Uniform Plumbing Code
National Fire Protection
Association
• American Society of Heating,
Refrigerating and AirConditioning Engineers
contractors and suppliers within each project.
Inspection of sites and providing technical support to project team. Writing reports
and giving presentations to Directors and clients. Successfully delivered MultiMillion Projects.
Projects:
High Rise Buildings
Hospital
• Shiza Heights (2xB + G + 2xShop + 9
• Arif Defense Medical Center
Storey)
Banks
• Euro Duplex City (2xB + G + 12 Storey)
• MCB Tower (PFI)
• Euro Grand Park (B + G + 9 Storey)
• NIB Head Office & Karachi
• Euro Continental (B + G + 12 Storey)
Branches (New & Renovations)
• Euro Twin Torre (B + G + 9 Storey)
• SCB Head Office & Karachi
• Euro Clock Tower (2xB + G + 9 Storey)
Branches (Maintenance &
• Euro Regent Park (B + G + 3xP + 9
Renovations)
Storey)
•
PICIC Head Office Karachi
• Euro Classic Tower (B + G + 7 Storey)
Showrooms
Office Building
• Al- Karam Studios (Multiple Cities)
• The Harbourfront (17th Floor)
• BabyShop (Multiple Cities)
• British Petroleum Castrol (Maintenance)
• LifeStyle (Multiple Cities)
• The Channel (B + G + 13 Storey)
• Venus Carpets
Assistant Designing Engineer at Ahsan Engineering Consultants. Karachi, Pakistan.
February 2009 to March 2012.
• Through analysis of site plans for demand loads calculation, designing of MEP drawings
and attending meeting with clients to take requirements of project.
• Prepare bill of quantities, estimated budgeting for projects, onsite installation,
inspection and reporting to meet the plan requirements. Managed project worth 500
Million Rupees.
• Project scheduling, highlighting critical path activities and ensuring to complete those
activities on time to avoid any project delays.
Projects:
Townships
High Rise Buildings
• Malir Cantonment, External sewerage
• Green Wood City
system (5500 Acres)
• Al pine Plaza (G + 11 Storey)
• Noman Lake Villas (49 Acres)
• Irfan Naz (G + 3xP + 10 Storey)
• Lakhani Towers (G + 2xP + 11 Storey)
• Noman Dream Villas (72 Acres)
• Noman Royal City Villas (96 Acres)
Malls
• Flak Naz Dream & Villas (172 Acres)
• Millennium Mall Murree
• Sumya Palm Resort (252 Acres)
•
• Samama City (288 Acres)
Personal Information
Date Of Birth
Marital Status
21st July, 1987
Married