FORM -Pricing Attachment -81044
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Long Description
AREA
UOM
Quantity
Unit Price
Currency
Total
MAINTENANCE OF CIVIL, MECHANICAL AND ELECTRICAL WORKS FOR EASTERN OPERATING AREA
1
I
AMD-Dammam
Asset Maintenance Department - Dammam Area (Qatif, Dammam, Khobar, Dhahran and Ghunan)
SAR
26,432,294.61
2
II
AMD- Hassa
Asset Maintenance Department-Hassa (Uray’iyah, Ain Dar, Abqaiq, Qurayyah, Shedgum, Al Uqair
Mubaraz, Hofuf, Haradh, Wasia, Khurais, Uthmaniyah, Faras and Hawiyah)
SAR
31,158,484.05
3
III
AMD-North
Asset Maintenance Department-North (Khursaniyah, Jubail Industrial City, Jubail City, Berri, Ghazlan, Rahimah and Ras
Tanurah)
SAR
20,206,947.48
4
IV
AMD-Northeast
Asset Maintenance Department-North East (Al Jouf, Sakaka, Domat Al Jundol, Abu Ajaram,
Zalloum, Al Qurayyat, Taburjel, Turaif, Wa’ad Al Shamal, Arar, Al Awaiqilah and Rafha)
SAR
13,921,846.99
Asset Maintenance Department-Nariyah & Hafar Al Batin (Nariyah, Khafji, Safaniyah, Qaryat Al-Ulya, Wadi Al-Miyah,
Tanajeeb, Hafar Al-Batin, Qaisumah and As-Suman)
SAR
17,775,504.73
SAR
109,495,077.86
V
5
AMD-N&H
TOTAL BID PRICE FOR SIX YEARS PERIOD (ITEMS I + II + III + IV + V)
COMPANY NAME:
ARAB AXCED EST FOR OPERATION AND
MAINTENANCE
NAME OF AUTHORIZED PERSON:
MAJID MOHAMMAD AL MUQBEL
DESIGNATION
GENERAL MANAGER / OWNER
SIGNATURE
DATE:
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
1
Description
1.A
Description
Short Description
Long Description
UOM
Quantity
NOTE 2
1.B
Description
NOTE 3
1.C
Description
NOTE 4
Bidder shall indicate the unit price and the total amount for each item indicated in this Pricing Attachment. The words
"Included" or "Included in Item xx" is not acceptable."
I
Description
Dammam
I.1
Description
CIVIL WORKS
CIVIL WORKS as Per Item # 5.1 of Schedule "B"
I.1.1
Description
CIVIL WORKS
SURVEYING as Per Item # 5.1.1 of Schedule "B"
Total
Payment
Type
Asset Maintenance Department - Dammam Area (Qatif, Dammam, Khobar, Dhahran and Ghunan)
I.1.1.1
Breakdown
Land surveying of area, the boundaries of which shall be specified by the Company. Includes site surveying, preparation
of detailed topographical maps, showing all existing structures, roads, electrical and communication networks, etc.,
with scales (1:250) or (1:100). The maps shall be submitted in hard and softcopies
M2
350
I.1.1.2
Breakdown
Preparation of topographical maps only as explained in item 5.1.1 in Schedule "B" for a pre-surveyed area,
excluding collection of site data with scales (1:50) or (1:20)
EA
I.1.1.3
Breakdown
Preparation of construction drawing of as built drawings for civil, electrical, mechanical works.
Description
Currency
MAINTAINANCE OF CIVIL, MECHANICAL AND ELECTRICAL WORKS FOR EASTERN OPERATING AREA .
The estimated quantities indicated herein are for purposes of bid evaluation and Comparison only. There are no
guaranteed quantities under the Contract.
Work Unit Rates set forth in this pricing Attachment comprise all CONTRACTOR direct and indirect costs including but not
limited to Access Road, direct labor and supervisory labor with associated payroll additives, equipment and equipment
maintenance, transportation, overtime and Ramadan premiums, vacation and holiday pay, consumables, small tools,
scaffolding, services, mobilization and demobilization, travel time to and from the WORK SITE, site overheads,
CONTRACTOR's camp facilities and operations, safety, Saudi Arab Social Insurance contributions, all taxes, fees of every
kind and nature, insurance and related costs, overheads and profit. All rates payable on account of any WORK performed
shall apply regardless of the time of day or night, or day of the week, or whether any given day worked is a holiday or
weekend day.
I.1.2
Unit Price
CIVIL WORKS
22.21
SR
7,772.63
Unit Rate
30
1,748.25
SR
52,447.50
Unit Rate
EA
30
1,748.25
SR
52,447.50
Unit Rate
EXCAVATION, BACKFILL AND COMPACTION SURVEYING as Per Item # 5.1.2 of Schedule "B"
I.1.2.1
Breakdown
Breaking and removal of asphalted top surface using adequate equipment and disposal to designated places
M3
450
121.20
SR
54,538.31
Unit Rate
I.1.2.2
Breakdown
Excavation in Rocky soil using all necessary equipment and dispose excavated material to dump areas
M3
400
85.29
SR
34,114.50
Unit Rate
I.1.2.3
Breakdown
Excavation in normal soil using all necessary equipment and dispose excavated material to dump areas
M3
350
68.04
SR
23,814.00
Unit Rate
M3
200
127.58
SR
25,515.00
Unit Rate
M
200
141.75
SR
28,350.00
Unit Rate
Manual excavation using manual equipment in restricted area due to specialty of any areas specified by COMPANY
Engineers
Shoring of trench wall(s) where necessary, using CONTRACTOR’s shoring gear. Work includes removal after job
completion. Rate per running meter of trenches shored up
I.1.2.4
Breakdown
I.1.2.5
Breakdown
I.1.2.6
Breakdown
Supply and backfill clean sand, general fill, select fill, source within 100 km from Work site
M3
170
51.98
SR
8,835.75
Unit Rate
I.1.2.7
Breakdown
Supply and backfill clean sand, general fill, select fill, source beyond 100 km from Work site
M3
170
51.98
SR
8,835.75
Unit Rate
I.1.2.8
Breakdown
Supply Backfilling material for sub-base course layer (under asphalt layer) as per COMPANY Specifications
M3
2,800
141.75
SR
396,900.00
Unit Rate
I.1.2.9
Breakdown
Supply Normal backfilling material as per COMPANY Specifications
M3
200
70.88
SR
14,175.00
Unit Rate
I.1.2.10
Breakdown
Supply and lay gravel, 10-15 cm thick layer, including leveling and compaction of selected area as per COMPANY
Standards
M3
200
70.88
SR
14,175.00
Unit Rate
I.1.2.11
Breakdown
Supply and lay cable warning tapes and cement tiles 20x30cm dark red color
M
350
23.63
SR
8,268.75
Unit Rate
I.1.2.12
Breakdown
Safety signs and equipment around excavation area (stand, warning tape, warning lights, caution warning plates, plastic
net orange color, cement blocks as required).
M
550
103.95
SR
57,172.50
Unit Rate
I.1.2.13
Breakdown
Supply and place sand as directed. When used to fill substation trenches this item includes skimming the surface with a
weak mix of sand and cement to a thickness of 5 cm. When this item is used in packing around 110 kV, 115 kV, 132 kV,
230 kV & 380 kV joints, the price includes placing the sand in bags and positioning them around the joint
M3
300
61.43
SR
18,427.50
Unit Rate
I.1.2.14
Breakdown
Perform soil investigation according to the company's approved specifications WI.GM- after any excavation
and backfilling
EA
30
1,559.25
SR
46,777.50
Unit Rate
BF-PA -2 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
I.1.2.15
Breakdown
I.1.2.16
Breakdown
Perform soil Conduct soil testing for compaction, bearing capacity, and soil resistivity
EA
30
1,559.25
SR
46,777.50
Unit Rate
Shallow Compaction: Using rollers, rammers, or vibratory plates to compact the soil at shallow depths
M3
20
61.43
SR
1,228.50
Unit Rate
I.1.2.17
I.1.2.18
Breakdown
Deep Compaction: Techniques like vibroflotation, dynamic compaction, and blasting compact soil at greater depths
M3
10
Breakdown
Permeation Grouting: Supply and injecting grout into the soil to fill voids and increase strength
M3
8
I.1.2.19
Breakdown
Compaction Grouting: Supply and injecting a stiff grout to displace and compact the surrounding soil
M3
I.1.2.20
Breakdown
Jet Grouting: Using high-pressure jets to mix grout with the soil, creating a solidified mass (including the injection
material)
M3
I.1.2.21
Breakdown
Chemical Stabilization: Supply and Adding lime, cement, or other chemicals to improve soil properties
I.1.2.22
Breakdown
I.1.2.23
Breakdown
I.1.2.24
I.1.3
Mechanical Stabilization: Mixing soil with aggregates or geosynthetics to enhance strength and stability (including supply
of the aggregates)
Geosynthetics: Using geotextiles, geogrids, or geomembranes to reinforce and stabilize the soil (including supplying the
material)
Breakdown
Description
Long Description
Soil Nailing: supply and Install steel bars (nails) into the soil to provide additional support and stability
CIVIL WORKS
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
70.88
SR
708.75
Unit Rate
1,063.13
SR
8,505.00
Unit Rate
6
699.30
SR
4,195.80
Unit Rate
6
1,063.13
SR
6,378.75
Unit Rate
M3
3
330.75
SR
992.25
Unit Rate
M3
3
448.88
SR
1,346.63
Unit Rate
M3
2
307.13
SR
614.25
Unit Rate
M3
2
155.93
SR
311.85
Unit Rate
ASPHALTING SURVEYING as Per Item # 5.1.3 of Schedule "B"
I.1.3.1
Breakdown
Supply, deliver to site and lay tarmac, asphalt or other tar surface to a thickness of 10 cm including spray of liquid asphalt
(MC1) on final soil layer
M2
2,800
66.15
SR
185,220.00
Unit Rate
I.1.3.2
Breakdown
Grind and remove top surface of asphalt to the required thickness using milling machine, Supply and deliver approved
asphalt to site and lay to restore the required level (Max 10 cm thick) using planner Asphalt Paper (Faraday)
M2
2,000
25.52
SR
51,030.00
Unit Rate
I.1.3.3
Breakdown
Supply and lay a layer of sub-base to a thickness not less than 20 cm composed from clean material, free from organic
material or clay and aspersion of water and compacting to reach required compaction, also supply, deliver to site and lay
asphalt areas at a thickness not less than 8 cm including preparation of surfaces to be cleaned from dust with air
compressor after removing all loose material from sub-base and spreading MC1 coat
M2
2,500
118.13
SR
295,312.50
Unit Rate
I.1.3.4
Breakdown
Road limit on both sides, left and right marking lanes with yellow color, shall be 15 cm and thickness not less than 0.3
mm
M
550
8.79
SR
4,833.68
Unit Rate
I.1.3.5
Breakdown
Paint road pavement (footpath) by black and yellow paint, 0.3 mm
M
550
I.1.3.6
Breakdown
Caution warning plate included plate pole shall be provided
EA
60
Road middle line white color 15 cm, 0.3 mm thickness
M
I.1.3.7
I.1.4
Breakdown
8.79
SR
4,833.68
Unit Rate
529.20
SR
31,752.00
Unit Rate
550
8.79
SR
4,833.68
Unit Rate
Description
CIVIL WORKS
SIDEWALKS SURVEYING as Per Item # 5.1.4 of Schedule "B"
I.1.4.1
Breakdown
Supply and Lay
Paving Only
Supply and lay paving tiles. All materials to be supplied by CONTRACTOR. Item includes bedding the tiles but not
construction foundation
M2
700
43.47
SR
30,429.00
Unit Rate
I.1.4.2
Breakdown
Walkways Works
Supply and erect curbstones 15x15x30cm with toggle joint 15cm (shape L) and backfilling with clean sand and immersion
with water, then lay lean concrete 10cm thick with reinforcement steel (4mm) and erect pathway tiles as per sample
approved by the Company Representative and making dilation joints and slope for drainage
M2
300
45.69
SR
13,707.23
Unit Rate
I.1.4.3
Breakdown
Curbstones
M
170
45.69
SR
7,767.43
Unit Rate
I.1.4.4
Breakdown
Reinstall existing Marbled tiles or special tiles work includes concrete base laying, jointing paving
M2
110
26.46
SR
2,910.60
Unit Rate
I.1.4.5
Breakdown
Reinstatement of Asphalted Sidewalk using Hot Asphalt includes base preparation according to site Conditions
M2
350
33.08
SR
11,576.25
Unit Rate
I.1.4.6
Breakdown
Reinstatement of plain concrete sidewalk according to site Conditions
M2
300
34.02
SR
10,206.00
Unit Rate
I.1.4.7
Breakdown
Reinstatement of reinforced concrete sidewalks according to site Conditions
M2
300
34.02
SR
10,206.00
Unit Rate
I.1.4.8
Breakdown
Reinstatement of graveled sidewalks according to site Conditions, thick 5-10cm
M2
1,600
26.46
SR
42,336.00
Unit Rate
Supply and lay curbstones, Item includes all work needed to cut , fit and bed curbstone on an existing cement mortar
layer at a thickness of not less than 5cm
BF-PA -3 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
I.1.4.9
Breakdown
Painting of curbstone around the sidewalk
I.1.4.10
Breakdown
Laying Cement tiles on sidewalks
Supply and Construct reinforced concrete sidewalks with welded wire mesh
I.1.4.11
Short Description
Breakdown
I.1.5
Description
CIVIL WORKS
I.1.5.1
Description
CONSTRUCTION
CIVIL WORK
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
M
550
15.12
SR
8,316.00
Unit Rate
M2
550
33.22
SR
18,269.21
Unit Rate
M2
550
39.69
SR
21,829.50
Unit Rate
CONSTRUCTION CIVIL WORK SURVEYING as Per Item # 5.1.5 of Schedule "B"
FENCING as Per Item # 5.1.5.1 of Schedule "B"
I.1.5.1.1
Breakdown
Supply and installation of perimeter fence with concrete posts as per COMPANY Standards (70-TMSS-02 and TCS-M112.01)
M
450
959.18
SR
431,628.75
Unit Rate
I.1.5.1.2
Breakdown
Removal of existing fence and supply and erect of PVC coated mesh 4mm thick at a height of 2.45m with all accessories,
fixation and bottom flat bar to be fixed to the posts, including all necessary for erection as per COMPANY standards.
M
450
231.53
SR
104,186.25
Unit Rate
I.1.5.1.3
Breakdown
Supply and erection of one set of precast boundary walls consisting of two column grad beams and one wall panel having
dimension (3x3 MT as per SEC. Standard TA-800144, TA-800012 and AT-800013
M
550
1,275.75
SR
701,662.50
Unit Rate
I.1.5.1.4
Breakdown
Supply and Install of decorative steel fence on top of boundary as per Sec-Standard TA-800112
M
300
222.08
SR
66,622.50
Unit Rate
I.1.5.1.5
Breakdown
Supply and install perimeter fence with concrete posts as per SEC standard at dip station and around tower OHL different
locations
M
80
959.18
SR
76,734.00
Unit Rate
I.1.5.1.6
Breakdown
Supply and install personnel fence gate- mm Wide
EA
80
1,767.15
SR
141,372.00
Unit Rate
I.1.5.1.7
Breakdown
Supply and installation door for fence above as per COMPANY Standards.
EA
10
4,252.50
SR
42,525.00
Unit Rate
I.1.5.1.8
Breakdown
Supply and install metal barriers to raise the Substation boundary in areas facing equipment that poses a danger
M
110
222.08
SR
24,428.25
Unit Rate
I.1.5.1.9
Breakdown
Removal of existing barbed wire and erection of 3 barbed wires and flat bar in between 2 posts to fix these wires.
M
450
33.08
SR
14,883.75
Unit Rate
I.1.5.1.10
Breakdown
Additional cost to be added to item (I.1.5.1.9) when supplying and erection of spiral barbed wire instead of the 3 barbed
wires.
M
200
146.48
SR
29,295.00
Unit Rate
Removal of existing barbed wire and erection of spiral barbed wires and flat bar in between 2 posts to fix these wires
M
200
174.83
SR
34,965.00
Unit Rate
I.1.5.1.11
I.1.5.2
Breakdown
Description
CONSTRUCTION
CIVIL WORK
DOOR AND WINDOW WORKS as Per Item # 5.1.5.2 of Schedule "B"
I.1.5.2.1
Breakdown
Supply and erection of steel door with all required accessories including frames, anchors, hinges, dust proof strips, the
thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant paint at least
0.5mm thick with primer and final paint as per COMPANY specifications, with inside size of 100 x 220cm
EA
35
4,231.80
SR
148,113.16
Unit Rate
I.1.5.2.2
Breakdown
Supply and erection of steel sliding door size 400 x 500cm with all required accessories including frames, anchors, wheels
& sliding channels, dust proof strips, the thickness of the metal sheets is 2mm, filled-in with insulation, fire rated with a
coat of fire-resistant paint at least 0.5mm thick with primer and final paint as per company specifications. COMPANY
representative may request a single door 100 x 220cm in one of the leaves if needed
EA
10
31,185.00
SR
311,850.00
Unit Rate
I.1.5.2.3
Breakdown
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant
paint at least 0.5mm thick with primer and final paint as per company specifications, with inside size of 200 x 220 cm.
EA
35
6,860.70
SR
240,124.50
Unit Rate
I.1.5.2.4
Breakdown
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant
paint at least 0.5mm thick with primer and final paint as per company specifications, with inside size of 400 x 300 cm.
EA
15
18,711.00
SR
280,665.00
Unit Rate
I.1.5.2.5
Breakdown
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, fire rated with a coat of fire-resistant paint at least 0.5mm thick with primer and final paint as per company
specifications, with inside size of 500 x 420 cm.
EA
10
32,744.25
SR
327,442.50
Unit Rate
BF-PA -4 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
I.1.5.2.6
Breakdown
Supply and erection of single steel door with all required accessories including frames, anchors, hinges, dust proof strips,
the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire resistant paint at
least 0.5mm thick with primer and final paint as per company specifications, with inside size of 100 x 220cm (emergency
door), equipped with anti-panic arm to open and the arm closer
EA
15
4,441.50
SR
66,622.50
Unit Rate
I.1.5.2.7
Breakdown
Supply and installation of a metal door of 100 × 220cm with all accessories including Framing, fixtures, Hinges, Handles,
locks and arm-closer and dust proof strips, type steel artwork and painted with furnace electrostatic powder, form and
color to be determined by the company Representative and provide number (3) Keys “Master Key”
EA
15
4,441.50
SR
66,622.50
Unit Rate
I.1.5.2.8
Breakdown
Supply and installation of a metal double leaf door of 200 × 220cm (100×220cm each leaf) with all accessories including
Framing, fixtures, Hinges, Handles, locks and arm-closer and dust proof strips, type steel artwork and painted with
furnace electrostatic powder, form and color to be determined by the company Representative and provide number (3)
Keys “Master Key”
EA
15
9,060.66
SR
135,909.90
Unit Rate
I.1.5.2.9
Breakdown
Supply and install aluminum doors with all the accessories including Framings, fixtures, Hinges, arm closer, handles, locks
and dust proof strips, the thickness of the fiber sheet must be 3mm filled in between with insulation materials and the
size 100×220cm, catalogs must be presented for approval of the door and choose the color. Note that COMPANY
Representative may request to leave a ventilation gap at the bottom of the door of approximate size 15 × 40cm segments
with filter and rips for ventilation
EA
15
6,756.75
SR
101,351.25
Unit Rate
I.1.5.2.10
Breakdown
Supply and install wooden doors size 100×220cm with all accessories including Framings, fixtures, Hinges, Handles, locks,
arm closer, and in this regard the CONTRACTOR must provide samples for the initial choice of colors from all variety of
colors and finishes available in the factory to decide the finishing of doors and frames, these samples must come in the
form of angled section of about 15cm2 at the same thickness and material of the WORK in its final form
EA
15
2,598.75
SR
38,981.25
Unit Rate
I.1.5.2.11
Breakdown
Supply and erection of a roll-up door with all required accessories including frames, anchors, hinges, fire rated with a coat
of fire-resistant paint with a three-hour fire rating, with size of 500 x 600 cm
EA
10
75,127.50
SR
751,275.00
Unit Rate
I.1.5.2.12
Breakdown
Supply and installation of bird screen doors with all accessories including the bird screen mesh 3mm thick and size
100×200cm with the appropriate metal supports and Framings, fixtures, Hinges, Handles, locks in accordance with the
COMPANY Specifications
EA
10
3,014.55
SR
30,145.50
Unit Rate
Breakdown
Supply and installation of aluminum window, section with thickness not less than 3mm to be fixed in the openings
adequately by sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any
leak of dust and water, and double glass isolated (6/8/6)mm to be well fixed and surrounded by rubber entirely
continuous from both sides, and all the accessories such as handles and wheels must be of high quality, and the color of
glass as determined by the Company Representative with the installation of a sliding wire mesh, the size 60x80cm twist
type and a single glass reinforced with wire mesh for toilets, and a sample of these windows must be provided for
approval. Also supply and erect external metal grids to protect the windows with squared bars 1.5 cm # 15 x 15cm, to be
painted with primer coat and final coat same as paint specifications of the outer walls
EA
10
1,397.09
SR
13,970.88
Unit Rate
Breakdown
Supply and installation of aluminum, section with thickness not less than 3 mm to be fixed in the openings adequately by
sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any leak of dust
and water, and double glass isolated (6/8/6 ) mm to be well fixed and surrounded by rubber entirely continuous from both
sides, and all the accessories such as handles and wheels must be of high quality, and the color of glass as determined by
the Company Representative with the installation of a sliding wire mesh, the size 120x100cm, and a sample of these
windows must be provided for approval. Also supply and erect external metal grids to protect the windows with squared
bars 1.5 cm # 15 x 15 cm, to be painted with primer coat and final coat same as paint specifications of the outer walls.
EA
10
3,492.72
SR
34,927.20
Unit Rate
I.1.5.2.15
Breakdown
Supply and installation of aluminum window, section with thickness not less than 3 mm to be fixed in the openings
adequately by sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any
leak of dust and water, and double glass isolated (6/8/6 ) mm to be well fixed and surrounded by rubber entirely
continuous from both sides, and all the accessories such as handles and wheels must be of high quality, and the color of
glass as determined by the Company Representative with the installation of a sliding wire mesh, the size 60x80cm twist
type and a single glass reinforced with wire mesh for toilets, and a sample of these windows must be provided for
approval. Also supply and erect external metal grids to protect the windows with squared bars 1.5 cm # 15 x 15 cm, to be
painted with primer coat and final coat same as paint specifications of the outer walls.
EA
10
1,397.09
SR
280,665.00
Unit Rate
I.1.5.2.16
Breakdown
Supply and install substation drive gate 6-meters width as per company standard drawing SA-036272
EA
10
28,066.50
SR
280,665.00
Unit Rate
I.1.5.2.17
Breakdown
Supply and install personnel gate for substation 1-meter-wide as per company Sec-Standard SA-036272
EA
10
7,276.50
SR
72,765.00
Unit Rate
I.1.5.2.18
Breakdown
Supply and install gates at dip stations at different locations Sec-Standard
EA
6
17,340.75
SR
104,044.50
Unit Rate
I.1.5.2.13
I.1.5.2.14
Long Description
BF-PA -5 of 104
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
UOM
EA
10
110
I.1.5.2.19
Breakdown
I.1.5.2.20
Breakdown
Supply and install steel handrails (2-inch G.I. pipe) for stairways as per NFPA101 requirements, painted canary yellow
M
I.1.5.2.21
Breakdown
Supply and install exit safety devices for all exterior doors as per SEC standard TES-P-119.19
EA
I.1.5.2.22
Breakdown
Supply and install canopy above door and windows frame
I.1.5.2.23
Breakdown
Supply and install clear anodized aluminum window curtains
I.1.5.3
Description
CONSTRUCTION
CIVIL WORK
Quantity
Supply and install gates of fence with concrete posts as per SEC standard at dip station and OHTL tower at different
locations
Unit Price
Currency
Total
Payment
Type
17,340.75
SR
173,407.50
Unit Rate
137.03
SR
15,072.75
Unit Rate
10
1,020.60
SR
10,206.00
Unit Rate
EA
10
930.83
SR
9,308.25
Unit Rate
M2
300
127.58
SR
38,272.50
Unit Rate
Building Works as Per Item # 5.1.5.3 of Schedule "B"
I.1.5.3.1
Breakdown
Concrete block wall thickness 20 cm
M2
110
154.63
SR
17,009.34
Unit Rate
I.1.5.3.2
Breakdown
Concrete block wall thickness 15 cm
M2
110
119.29
SR
13,121.61
Unit Rate
I.1.5.3.3
Breakdown
Concrete block wall thickness 10 cm
M2
110
88.36
SR
9,719.33
Unit Rate
I.1.5.3.4
Breakdown
Sand lime block wall thickness 20 cm
M2
60
162.36
SR
9,741.63
Unit Rate
I.1.5.3.5
Breakdown
Sand lime block wall thickness 15 cm
M2
60
125.25
SR
7,515.02
Unit Rate
I.1.5.3.6
Breakdown
Construction of decorative block wall (rock type) 20cm thick.
M2
60
92.78
SR
5,566.81
Unit Rate
I.1.5.3.7
Breakdown
Work of the repair of walls
M2
300
I.1.5.3.8
Breakdown
Construct a substation security guard house as per company construction standard drawings TA 800039, TA 800040, TA
800041, and TA 800042
EA
3
I.1.5.3.9
Breakdown
Supply and install Substation signboard on the Substation Building as per Sec-Standard TC-800003
EA
Supply and install Substation signboard on the Gate House as per Sec-Standard TA-800111
I.1.5.3.10
I.1.5.4
Breakdown
Description
CONSTRUCTION
CIVIL WORK
135.14
SR
40,540.50
Unit Rate
138,612.60
SR
415,837.80
Unit Rate
10
3,638.25
SR
36,382.50
Unit Rate
EA
10
3,638.25
SR
36,382.50
Unit Rate
Concrete Works as Per Item # 5.1.5.4 of Schedule "B"
I.1.5.4.1
Breakdown
Supply and deliver to site and lay concrete for slabs with a mix of 1:2:4, the cement must not be less than 350kg/m3,
item includes covering the background lean concrete or backfilling with polyethylene sheet 200 micron thick and
reinforcement steel mesh #15x15cm 8mm dia., to be doubled (two layers) on at least 1m from the grade beam
centerlines.
M3
110
1,370.25
SR
150,727.50
Unit Rate
I.1.5.4.2
Breakdown
Supply and deliver to site and lay concrete including reinforcement steelwork for foundations, grade beams, beams and
columns, with a mix of 1:2:4, the cement must not be less than 350kg/m3 and the reinforcement steel not less than 100
kg, unless specifically indicated in drawings or directed by the Company Representative. It is required to paint the
underground portion of the reinforced concrete with an approved waterproofing material to prevent corrosion. The
contactor must use a vibrator (50mm dia. And speed 3000tr/Min) sufficiently during concreting as directed.
M3
190
1,370.25
SR
260,347.50
Unit Rate
I.1.5.4.3
Breakdown
Supply and deliver to site 50 kg of cement additional to normal concrete mix design of 1:2:4
EA
110
40.92
SR
4,501.04
Unit Rate
I.1.5.4.4
Breakdown
Supply and deliver to site and lay lean concrete without reinforcement steel with a mix of 200kg/m3. The underground
portion must be painted with an approved waterproofing material to prevent water infiltration into the reinforced concrete
as directed by the Company Representative. Concrete strength should be 2500 Psi
M3
80
197.51
SR
15,800.40
Unit Rate
I.1.5.4.5
Breakdown
Supply and erect on site pre-cast reinforced concrete pits according to the company specifications. Item include
installation and supply cover for pit and also excavation and restoration of site to original
M3
30
297.68
SR
8,930.25
Unit Rate
I.1.5.4.6
Breakdown
Raise the level of the cable trench side walls by at least 10 cm. This item includes supplying and delivering to the site
concrete with a mix of 1:2:4, including reinforcement steel, which must be fixed after drilling the top of trench walls with
epoxy grout (glue). Also, fix a steel angle 5x5 cm on the internal edge of trench walls
M3
60
340.20
SR
20,412.00
Unit Rate
I.1.5.4.7
Breakdown
Cover the cable trenches with tight covers to avoid infiltration of water and oil. The covers should be in the form of steel
frames (frame with steel angles 5x5 cm and closing the frame from the bottom with a 2 mm thick steel plate) to be
poured with lightweight foam concrete (450 kg/m³) reinforced with #15x15 cm steel mesh, 4 mm diameter at least. The
joints between the covers (8 mm) will be filled with polyurethane sealant
M2
80
144.59
SR
11,566.80
Unit Rate
BF-PA -6 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
I.1.5.4.8
Breakdown
I.1.5.4.9
Breakdown
I.1.5.5
Description
Short Description
CONSTRUCTION
CIVIL WORK
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
Repair and replace damaged or weak cable trench covers according to the COMPANY Specifications
M2
60
137.03
SR
8,221.50
Unit Rate
Supply and erect covers for cable trenches according to the COMPANY Specifications
M2
60
171.28
SR
10,276.88
Unit Rate
Long Description
Flooring Works and finishing as Per Item # 5.1.5.5 of Schedule "B"
I.1.5.5.1
Breakdown
Supply and lay ceramic tiles with a minimum thickness of 4 mm for walls and 9.5 mm for floors, including all necessary
materials for execution and the skirting at the foot of the wall, implemented as per technical standards. A sample of these
tiles should be provided for approval by the COMPANY Representative before implementation
M2
170
171.99
SR
29,238.30
Unit Rate
I.1.5.5.2
Breakdown
Supply and lay Acid-resistant ceramic tiles with a minimum thickness of 4 mm for walls and 9.5 mm for floors at the
battery room, including all necessary materials for execution and the skirting at the foot of the wall, implemented as per
technical standards. A sample of these tiles should be provided for approval by the COMPANY Representative before
implementation
M2
80
171.99
SR
13,759.20
Unit Rate
I.1.5.5.3
Breakdown
Supply and lay tiles, including spreading clean sand under the tiles at the required thickness for final finishing with an
average slope of 5 to 8 cm. Fix the tiles with cement mortar and sand, with a mix of 300 kg of cement per cubic meter of
sand at a thickness of not less than 3 cm, and joint with white cement
M2
170
171.99
SR
29,238.30
Unit Rate
I.1.5.5.4
Breakdown
Supply and fix rubber tiles, size 30x30 cm, with glue after cleaning the existing surface with a brush, implemented as per
technical standards. A sample of these tiles must be provided for approval by the COMPANY Representative before
implementation
M2
170
171.99
SR
29,238.30
Unit Rate
I.1.5.5.5
Breakdown
Supply, install and replace damaged raised floor tiles, matching the existing ones in the Control Room, Optical Fiber
Room, AC/DC Room, and PLC Room (without jack)
M2
140
226.80
SR
31,752.00
Unit Rate
I.1.5.5.6
Breakdown
Supply, install and replace damaged baseboards, 100 mm thick, matching the existing ones over telecommunication cable
trenches
M2
140
89.78
SR
12,568.50
Unit Rate
I.1.5.5.7
Breakdown
Supply and lay un-scratchable granite tiles, dimensions 30x60 cm and 2 cm thick, for floors and walls. Fix with white
cement, wire mesh, and mortar for wall fixing. The granite must be sorted before fixing, and non-assorted samples should
be rejected
M2
170
222.08
SR
37,752.75
Unit Rate
I.1.5.5.8
Breakdown
Supply and lay granite tiles for steps, 3 cm thick, with two rubber strips for each step, implemented as per company
specifications
M2
110
174.83
SR
19,230.75
Unit Rate
I.1.5.5.9
Breakdown
Supply and lay epoxy flooring resistant to scratches and chemical wear, with a thickness of 1000 microns and 300 microns
M2
300
165.38
SR
49,612.50
Unit Rate
I.1.5.5.10
Breakdown
Plaster with epoxy screed mortar, which must have low susceptibility to expansion and good compressive strength. An
epoxy primer coat may be required for bonding with existing concrete. The surface must be completely leveled to the final
required level, with a thickness varying from 10 to 15 mm
M2
200
203.18
SR
40,635.00
Unit Rate
I.1.5.5.11
Breakdown
Build Substation steps, including materials and labor according to company specifications. This includes plastering the
steps, compacting the soil, reinforcement steel, paint, and all materials provided at a height of 15 cm
M2
110
231.53
SR
25,467.75
Unit Rate
I.1.5.5.12
Breakdown
Supply and fix natural rock aspects. This item includes providing tools, labor, equipment, and materials to fix vertical rock
tiles with thickness not exceeding 75 mm, including the inside of the tiles and oblique planes. Fixtures must be adjustable
in three directions for proper fixing. Lay marble tiles at the bottom of the aspects at a height of 60 cm, implemented as
per the specifications for fixing marble tiles. It is preferable to finish the faces of the marble tiles with a light gloss or
almost faded finish, as the marble tiles may lose glossiness under weather conditions
M2
110
222.08
SR
24,428.25
Unit Rate
I.1.5.5.13
Breakdown
Supply and erect ceiling tiles, including metal frames, steel supports, and all necessary accessories. A sample of the tiles
must be submitted for approval by the COMPANY Representative
M2
110
174.83
SR
19,230.75
Unit Rate
I.1.5.5.14
Breakdown
Supply and erect stainless-steel slides, including steel supports and all necessary accessories. A sample of the slides must
be submitted for approval by the COMPANY Representative
M2
60
165.38
SR
9,922.50
Unit Rate
I.1.5.5.15
Breakdown
Supply and erect a surrounding crown on the top part of buildings with brick tiles (GUERMID), including supplying and
erecting a steel structure to support the bricks (1.5x1.5 m) and fixing the bricks as per usual technical standards. Also,
erect the false ceiling for this crown with all supports and frames and all necessary works
M
60
203.18
SR
12,190.50
Unit Rate
I.1.5.5.16
Breakdown
Supply and install vinyl tiles with skirting in offices and corridors
M2
80
105.84
SR
8,467.20
Unit Rate
BF-PA -7 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
I.1.5.5.17
Breakdown
I.1.5.5.18
Breakdown
I.1.5.6
Description
Short Description
CONSTRUCTION
CIVIL WORK
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
Apply epoxy on the manhole's ground at various locations
M2
60
92.61
SR
5,556.60
Unit Rate
Supply and apply an epoxy coating system for the S/S floor building, stone grey color RAL7030
M2
110
92.61
SR
10,187.10
Unit Rate
Plumbing and Sanitary Works as Per Item # 5.1.5.6 of Schedule "B"
I.1.5.6.1
Breakdown
Supply and erect a kitchen washing basin with all accessories, including alimentation, sewage, and mixers
EA
10
5,433.75
SR
31,392.90
Unit Rate
I.1.5.6.2
Breakdown
Supply and erect a WC oriental chair (Saudi ceramic or similar), including all installation and necessary components for
operation
EA
20
3,139.29
SR
62,785.80
Unit Rate
Breakdown
Supply and erect a WC Frank chair (“American type one piece” or similar), including all installation and necessary
components for operation
EA
15
3,419.01
SR
51,285.15
Unit Rate
I.1.5.6.4
Breakdown
Supply and erect lavatories made from artificial marble, Corian material, or similar, in one piece, as per the color and form
approved by the COMPANY Representative. The lavatories shall be solid surface type and un-scratchable, including all
accessories, mirrors, etc
EA
15
5,551.88
SR
83,278.13
Unit Rate
I.1.5.6.5
Breakdown
Supply and replace water closets, including all accessories, in the toilet
EA
15
4,320.54
SR
64,808.10
Unit Rate
I.1.5.6.6
Breakdown
Supply and construct a septic tank as per SEC construction standard drawing TA-800134
EA
10
16,877.70
SR
168,777.00
Unit Rate
I.1.5.6.7
Breakdown
Supply and construct a disposal system and seepage as per SEC Standard TA-800135
EA
10
8,977.50
SR
89,775.00
Unit Rate
I.1.5.6.8
Breakdown
Supply and construct a sanitary sewer manhole as per SEC Standard TA-800137
EA
15
8,977.50
SR
134,662.50
Unit Rate
1,275.75
SR
19,136.25
Unit Rate
231.53
SR
25,467.75
Unit Rate
I.1.5.6.3
I.1.5.6.9
Breakdown
Supply and install a sewer manhole cover as per SEC Standard TA-800138
EA
15
I.1.5.6.10
Breakdown
Supply and install acid-resistant floor drains in the battery room
M
110
I.1.5.6.11
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 1500 liters
EA
6
1,918.35
SR
11,510.10
Unit Rate
I.1.5.6.12
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 2000 liters
EA
6
2,603.48
SR
15,620.85
Unit Rate
I.1.5.6.13
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 3000 liters
EA
6
4,795.88
SR
28,775.25
Unit Rate
I.1.5.6.14
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 4000 liters
EA
6
4,847.85
SR
29,087.10
Unit Rate
I.1.5.6.15
Breakdown
Supply and install a flush tank for the WC oriental chair, with all required materials, such as glue and solvent
EA
15
708.75
SR
10,631.25
Unit Rate
I.1.5.6.16
Breakdown
Supply and install a flush tank for the WC Frank chair, with all required materials, such as glue and solvent
EA
10
708.75
SR
7,087.50
Unit Rate
I.1.5.6.17
Breakdown
Supply and install a washing basin mixer, including all installation and necessary materials
EA
10
656.78
SR
6,567.75
Unit Rate
I.1.5.6.18
Breakdown
Supply and install a shower mixer, including all installation and necessary materials
EA
10
793.80
SR
7,938.00
Unit Rate
I.1.6
Description
CIVIL WORKS
I.1.6.1
Description
MAINTENANCE
CIVIL WORK
MAINTENANCE CIVIL WORK SURVEYING as Per Item # 5.1.6 of Schedule "B"
Waterproofing of Substation Roof and Treatment of Water Leakage as Per Item # 5.1.6.1 of Schedule "B"
I.1.6.1.1
Breakdown
Removal of old waterproofing and cleaning of the roof from all detachable parts, the gar coating and material that may
compose a weak separating layer, also removal of the concrete layer if it is loose or totally fissured, without damaging
parapets or evacuation downspouts. WORK includes removal of debris to approved dumping area as directed by COMPANY
REPRESENTATIVE
M2
1,200
155.93
SR
187,110.00
Unit Rate
I.1.6.1.2
Breakdown
Repair of deep cracks by opening them in “V” shape to be sealed with chemical crack filler, and the hair cracks with epoxy
putty, also sandpapering the repaired area and cleaning dust, as directed by COMPANY REPRESENTATIVE
M2
350
174.83
SR
61,188.75
Unit Rate
BF-PA -8 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
I.1.6.1.3
Breakdown
Concrete the roof at a minimum thickness of 5cm (at least 5cm on top of highest corrugation in case of steel roof),
reinforced with steel mesh # 15x15, dia. 6mm
M2
550
174.83
SR
96,153.75
Unit Rate
I.1.6.1.4
Breakdown
Supply workshops insulator aqueous and thermal system urinary (polyurethane) foam thickness and average 4cm and the
intensity of 40-45 kg/m3 directly above the face of the bishop concrete or top slalom surfaces metal or insulation layer old
reformed, with the WORK and vertical height of 20cm on all Aldoara vertical surrounding bishop. Maintain proper slopes
during the application of waterproofing material towards the drain
M2
450
184.28
SR
82,923.75
Unit Rate
I.1.6.1.5
Breakdown
supply and paint with 3 layers of paint, Acrylic Foam Type Shield thickness of each layer after drought 300 microns with
the WORK of arming the network for paint textured fiber weight of 160 g/m2 to strengthen the Paint
M2
300
41.58
SR
12,474.00
Unit Rate
I.1.6.1.6
Breakdown
Supply and install Thermoplastic Single Ply Roofing Membrane, 1.5 mm thick, 1500 WMR UV PVC waterproofing
membrane, including wall corners
M2
300
108.68
SR
32,602.50
Unit Rate
I.1.6.1.7
Breakdown
Supply and install 40 x 40 cm cement tiles
M2
300
77.49
SR
23,247.00
Unit Rate
I.1.6.1.8
Breakdown
Supply and install 60 x 60 cm cement tiles
M2
300
184.28
SR
55,282.50
Unit Rate
I.1.6.1.9
Breakdown
Supply and Install 50 mm thick thermal insulation
M2
550
137.03
SR
75,363.75
Unit Rate
I.1.6.1.10
Breakdown
Carry out waterproofing paint (acrylic) on sloping deck sheeted roof using fiber mesh to reinforce the overlapping of steel
corrugated sheets and polyurethane sealant on fixing screws, implementation conform to the COMPANY specifications and
the technical procedure indicated in material catalogs
M2
550
155.93
SR
85,758.75
Unit Rate
I.1.6.1.11
Breakdown
Prevent leakage of water from the passing through external cable openings as per Item 5.1.6.1.8. of Schedule B
M2
300
137.03
SR
41,107.50
Unit Rate
I.1.6.1.12
Breakdown
Prevent leakage of water from dilation joints or cracks of the basement or cable trenches as per Item 5.1.6.1.9. of
Schedule B
M2
550
137.03
SR
75,363.75
Unit Rate
I.1.6.1.13
Breakdown
Opening dilation joints every 5m in all directions 1.5cm thick & 2.0 cm depth to fill with polyurethane sealant
M
450
61.43
SR
27,641.25
Unit Rate
I.1.6.1.14
Breakdown
Supply and install Aluminum sheet Gutter to drain the water
M
170
70.88
SR
12,048.75
Unit Rate
I.1.6.1.15
Breakdown
Supply and install Roof Drain 100 mm schedule 80
M
170
157.82
SR
26,828.55
Unit Rate
I.1.6.1.16
Breakdown
Supply and install roof Dom and concrete splash down
M3
60
174.83
SR
10,489.50
Unit Rate
I.1.6.1.17
Breakdown
Supply and install new flushing on roof parapet. With sealant
M
170
80.33
SR
13,655.25
Unit Rate
I.1.6.1.18
Breakdown
Supply and install water ingress insulation at basement as per Sec-Standard
M2
110
174.83
SR
19,230.75
Unit Rate
I.1.6.1.19
Breakdown
Supply and install Insu-wrap PVC waterproofing membrane (2000 Flee Back-UV) ultra violet membrane
M2
170
174.83
SR
29,720.25
Unit Rate
I.1.6.2
Description
MAINTENANCE
CIVIL WORK
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
Repair expansion joints in concrete structures as Per Item # 5.1.6.2 of Schedule "B"
I.1.6.2.1
Breakdown
Supply and refill the joints with flexible and waterproof materials such as polyurethane, or flexible epoxy compounds
L
2,800
42.53
SR
119,070.00
Unit Rate
I.1.6.2.2
Breakdown
Supply and install metal or rubber covers to protect the joints from future damage
M
550
33.08
SR
18,191.25
Unit Rate
I.1.6.2.3
Breakdown
Supply and replace the filler board for construction expansion joints as needed
M2
550
70.88
SR
38,981.25
Unit Rate
I.1.6.2.4
Breakdown
Supply and install protective covers over the expansion joints
M
550
70.88
SR
38,981.25
Unit Rate
M2
550
61.43
SR
33,783.75
Unit Rate
I.1.6.3
I.1.6.3.1
Description
Breakdown
MAINTENANCE
CIVIL WORK
Painting Works as Per Item # 5.1.6.3 of Schedule "B"
Removal of loose old paint using all the means used in this regard and without damaging the integrity of equipment and
devices inside and outside the substation as instructed by the company representative, and repairing the deep cracks by
opening them in "V" shape to be filled with crack filler and tiny cracks by filling with Epoxy putty, And ends of this
preparatory WORK by sanding walls or floors and cleaning from dust so that it will not be allowed any scratches or
unleveled surface or for any defects that could be observed, and these WORKs should be approved by COMPANY
REPRESENTATIVE before starting the paint, and CONTRACTOR has to follow up 5-Star Safety & Health Management
System Specification of Color Coding for Plant, Pipelines, floor and walls Epoxy Paint applications as per Safety Manual
titled "1.10 Color Coding Plant and Pipelines”
BF-PA -9 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
I.1.6.3.2
Breakdown
I.1.6.3.3
Breakdown
Removal white aunt and fill back all damage area
M2
170
33.08
SR
5,622.75
Unit Rate
Painting for First Aid/Emergency Equipment/Medical Supplies/Oxygen Station etc. Stacking and Storage, Stairs, Doors,
and Reflector stickers at basement
M2
300
41.58
SR
12,474.00
Unit Rate
I.1.6.3.4
Breakdown
Wall paint with a primer coat and a final coat, with the color to be determined by the Company Representative. The paint
must be resistant to carbon, moisture, weather factors, chemicals, acids, and oils, and must be cleanable and expandable,
with a solid content proportion of not less than 70%. The type of paint should be Acrylic Aliphatic Polyurethane Paint
M2
1,200
33.08
SR
39,690.00
Unit Rate
I.1.6.3.5
Breakdown
Coating of insulators and fire protection coating for cables, with the color to be determined by the Company Standards.
The coating must be resistant to fire and heat, moisture, weather factors, chemicals, and acids
M
550
80.33
SR
44,178.75
Unit Rate
I.1.6.3.6
Breakdown
Sand blasting of steel doors as needed, followed by painting with a primer coat and a final coat of polyurethane paint with
a solid content ratio of not less than 70%
M2
1,400
33.08
SR
46,305.00
Unit Rate
Breakdown
Epoxy paint work for the flooring includes:
1. Repair of cracks of concrete floors by opening the deep cracks in the form of "V" and filling with chemical filler (CRACK
FILLER) and the hair cracks by filling with Epoxy putty.
2. Epoxy floor paint (solid content 100%) 200 microns thickness, the WORK carried on two layers at a thickness of not
less than 0.1mm each layer. And the execution in accordance with the method indicated in the catalogues, any change of
color will not be allowed, and the CONTRACTOR must respect the thickness and method of implementation instructed by
the company representative.
M2
1,600
127.58
SR
204,120.00
Unit Rate
I.1.6.3.8
Breakdown
Self-leveling painting work for flooring including:
1. Completely clean the concrete slab of any residue of glue and detachable parts, and then Repair of cracks of concrete
floors by opening the deep cracks in the form of "V" and filling with chemical filler (CRACK FILLER) and the hair cracks by
filling with Epoxy putty.
2. Apply a self-leveling paint (SELF LEVELING FLOOR PAINT) 4mm thick, including the primer coat in accordance with the
specifications of the company and method of execution indicated in the catalogues
M2
1,600
89.78
SR
143,640.00
Unit Rate
I.1.6.3.9
Breakdown
Apply self-leveling paint in accordance with the specifications of the item above but at a thickness of 3 mm
M2
300
80.33
SR
24,097.50
Unit Rate
I.1.6.3.10
Breakdown
Apply self-leveling paint in accordance with the specifications of the item above but at a thickness of 2 mm
M2
300
61.43
SR
18,427.50
Unit Rate
I.1.6.3.11
Breakdown
M2
110
17.01
SR
1,871.10
Unit Rate
I.1.6.3.12
Breakdown
M2
550
70.88
SR
38,981.25
Unit Rate
M2
1,600
108.68
SR
173,880.00
Unit Rate
I.1.6.3.7
I.1.6.3.13
I.1.6.4
Apply white & Black PU on exposed steel structure foundation
Apply cementitious cutting material at oil catch basin interior wall face
Epoxy coating system for floors in substation, epoxy coating color –stone grey–ral-7030 for GIS Room, Control Room,
switchgear Room, workshop, and relay rooms.
Work required as follows:
1. 1mm epoxy past for repairing cracks and floor levelling.
2. Master Top 1200 Resin: Primer
3. Master top 1230 -2-4mm self levelling epoxy coating
Breakdown
Description
Long Description
MAINTENANCE
CIVIL WORK
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
Repair Works as Per Item # 5.1.6.4 of Schedule "B"
I.1.6.4.1
Breakdown
Break of foundation layer & cable trench
M3
550
344.93
SR
189,708.75
Unit Rate
I.1.6.4.2
Breakdown
Repair of minor crack in wall and plaster defects
M2
800
137.03
SR
109,620.00
Unit Rate
I.1.6.4.3
Breakdown
Repair of major wall crack in wall and plaster defects
M2
800
250.43
SR
200,340.00
Unit Rate
I.1.6.4.4
Breakdown
Seal rodent and reptile entry holes to substations.
EA
140
80.33
SR
11,245.50
Unit Rate
I.1.6.4.5
Breakdown
Reconstruct collapsed/sagged floor
M2
800
137.03
SR
109,620.00
Unit Rate
I.1.6.4.6
Breakdown
Repair of crack due to corrosion of reinforcement
M2
200
250.43
SR
50,085.00
Unit Rate
I.1.6.4.7
Breakdown
Coring in R.C.C / block walls
EA
35
113.40
SR
3,969.00
Unit Rate
I.1.6.4.8
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 4" in thick wall
EA
30
113.40
SR
3,402.00
Unit Rate
I.1.6.4.9
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 8" in thick wall
EA
30
151.20
SR
4,536.00
Unit Rate
BF-PA -10 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
I.1.6.4.10
Breakdown
I.1.6.4.11
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 12" in thick wall
EA
30
170.10
SR
5,103.00
Unit Rate
Install duct plug on empty duct in manhole/ hand hole
EA
40
51.98
SR
2,079.00
I.1.6.4.12
Unit Rate
Breakdown
Civil work repair of the opening of manhole/ handhole cover
EA
40
803.25
SR
32,130.00
Unit Rate
I.1.6.4.13
Breakdown
Exposing Buried Manhole to clear out and exposed buried manhole. The excavated excess soil shall be scraped and
leveled to the existing ground.
EA
60
1,275.75
SR
76,545.00
Unit Rate
I.1.6.4.14
Breakdown
Replacement of damaged manhole/handhole cover or frame
EA
30
1,275.75
SR
38,272.50
Unit Rate
I.1.6.4.15
Breakdown
Raising of Manhole & Hand Hole Roof Slab: Raise the roof slab with cover and frame 50 mm from the asphalt yard level to
prevent water infiltration
EA
10
3,449.25
SR
34,492.50
Unit Rate
I.1.6.4.16
Breakdown
Supply& install protective barrier (cement Blocks), as per COMPANY Standards
EA
10
1,275.75
SR
12,757.50
Unit Rate
I.1.6.4.17
Breakdown
Relocation only, protective barrier (cement Blocks), same site.
EA
10
614.25
SR
6,142.50
Unit Rate
I.1.6.4.18
Breakdown
Supply and install concrete splash block size (1.00 x 0.20 M).
EA
40
231.53
SR
9,261.00
Unit Rate
I.1.6.4.19
Breakdown
Supply and Install Eyewash with Shower at battery room.
EA
40
3,071.25
SR
122,850.00
Unit Rate
I.1.6.4.20
Breakdown
Supply and install first aid kit at control room.
EA
60
458.33
SR
27,499.50
Unit Rate
I.1.6.4.21
Breakdown
Supply and install cabinet stand galvanized steel with roller (500 mm x 1400 mm at battery room).
EA
60
1,748.25
SR
104,895.00
Unit Rate
I.1.6.4.22
Breakdown
Supply and Install Link Box Manhole Heavy Duty Covers: At different locations
EA
10
614.25
SR
6,142.50
Unit Rate
Supply and Repair Link Box Manhole Concrete: At different locations
EA
10
1,559.25
SR
15,592.50
Unit Rate
I.1.6.4.23
I.1.6.5
Breakdown
Description
MAINTENANCE
CIVIL WORK
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
REPAIR OF DOORS as Per Item # 5.1.6.5 of Schedule "B"
I.1.6.5.1
Breakdown
Repair of Any Defects or Damages to Substation and Dip Stations Doors: Includes skew leaves doors, hard closing doors,
repair of hinges, increasing their number, changing them in case of spoilage, dismantling door leaves, balancing door
leaves, re-erecting instantly, and any necessary materials for the repair, including welding works and assembling
EA
70
1,559.25
SR
109,147.50
Unit Rate
I.1.6.5.2
Breakdown
Repair and Re-fixing Latches or Any Type of Substation and Dip Stations Door Lock Systems: Includes welding works,
dismantling and re-erecting doors, changing latches and locks to ensure proper operation
EA
110
1,181.25
SR
129,937.50
Unit Rate
I.1.6.5.3
Breakdown
Repair and re-fix latches or any type of door lock systems for the internal doors in the substations. This includes
dismantling and re-erecting doors, changing latches, locks, and hinges to ensure proper operation
EA
110
1,181.25
SR
129,937.50
Unit Rate
I.1.6.5.4
Breakdown
Repair of Locks, Door Handle, and Arm-Closer of Substation and Dip Stations Doors: Includes replacing them in case of
spoilage as per COMPANY specifications, ensuring their operation in good condition, and necessary greasing of hinges and
locks
EA
110
1,181.25
SR
129,937.50
Unit Rate
I.1.6.5.5
Breakdown
Repair or Change Door Lock Cylinders: As per COMPANY standard
EA
130
614.25
SR
79,852.50
Unit Rate
EA
80
614.25
SR
49,140.00
Unit Rate
EA
80
803.25
SR
64,260.00
Unit Rate
EA
80
614.25
SR
49,140.00
Unit Rate
EA
10
3,307.50
SR
33,075.00
Unit Rate
EA
10
1,181.25
SR
11,812.50
Unit Rate
EA
60
3,307.50
SR
198,450.00
Unit Rate
EA
80
1,275.75
SR
102,060.00
Unit Rate
EA
30
803.25
SR
24,097.50
Unit Rate
1,275.75
SR
76,545.00
Unit Rate
708.75
SR
212,625.00
Unit Rate
Supply and Erect Dustproof Weather Straps for Substation External Doors: As per COMPANY specifications, including
removing worn-out existing straps
Supply and Erect Anti-Panic Arm for Emergency Doors: Includes all necessary for erection as per technical code of practice
and corresponding modifications to door frames
Supply and Apply Steel Sheet (2 mm): Includes welding work for any small part of the door damaged by corrosion and
repainting the part with the same door color
Maintenance and Cleaning of the Roller of Shutter Rolling Doors: Includes greasing and repair of its electrical motor (for
electrical doors) and/or truss (for manual doors) gears to ensure proper operation
Supply, Erect, and Replace Dustproof Weather Straps for Shutter Rolling Doors: Same specifications and size as initially
erected straps
Supply, Erect, and Replace Worn-Out Steel Slides of Shutter Rolling Doors: Same specifications and size as existing slides,
including all necessary for dismantling damaged slides and erecting new ones
Replacement of All Damaged Door Rubber: Around the door itself or around the door frame and door strap, especially
important for halls protected by firefighting systems
I.1.6.5.6
Breakdown
I.1.6.5.7
Breakdown
I.1.6.5.8
Breakdown
I.1.6.5.9
Breakdown
I.1.6.5.10
Breakdown
I.1.6.5.11
Breakdown
I.1.6.5.12
Breakdown
I.1.6.5.13
Breakdown
Supply and Install Door Threshold: Outdoor/indoor type to prevent water and dust infiltration
I.1.6.5.14
Breakdown
Supply and Install Heavy Duty Door Closer
EA
60
I.1.6.5.15
Breakdown
Supply and install glass for the internal doors in the substations (6 mm thickness)
M2
300
BF-PA -11 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
I.1.7
Line type
Short Description
Description
CIVIL WORKS
I.1.7.1
Breakdown
I.1.7.2
Breakdown
I.1.7.3
Breakdown
Description
CIVIL WORKS
I.1.8.1
Description
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
I.1.8.2
Breakdown
Description
I.1.8.2.1
Breakdown
I.1.8.2.2
Breakdown
I.1.8.2.3
Breakdown
I.1.8.2.4
Breakdown
I.1.8.2.5
Breakdown
I.1.8.2.6
Breakdown
I.1.8.2.7
Breakdown
I.1.8.3
Description
I.1.8.3.1
Breakdown
I.1.8.3.2
Breakdown
I.1.8.4
I.1.8.4.1
I.1.8.5
I.1.8.5.1
I.1.8.6
I.1.8.6.1
Description
Breakdown
Description
Breakdown
Description
Breakdown
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
By Sweeping /
Pushing
By Sweeping /
Pushing
By Sweeping /
Pushing
By Loading /
Unloading
By Loading /
Unloading
By Loading /
Unloading
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
CIVIL WORK DEMOLITION AND REMOVAL SURVEYING as Per Item # 5.1.7 of Schedule "B"
M
300
170.10
SR
51,030.00
Unit Rate
Removal of concrete block walls and its structure.
M2
700
146.48
SR
102,532.50
Unit Rate
Removal and Disposal of Concrete Structure/Debris/Surplus Materials: Includes breaking and clearing
M3
170
141.75
SR
24,097.50
Unit Rate
M
550
3,524.85
SR
1,938,667.50
Unit Rate
Around Substations/dip stations yard Boundary and Access Roads
M3
5,500
41.58
SR
228,690.00
Unit Rate
Around Substation/dip stations yard Equipment using brooms and Bobcats or suitable loader
M3
5,500
41.58
SR
228,690.00
Unit Rate
Under or beneath disconnect platforms without damaging or loosening the ground cables or connections by using brooms
only
M3
550
61.43
SR
33,783.75
Unit Rate
Around Substations/dip stations yard Boundary and Access Roads
M3
5,500
41.58
SR
228,690.00
Unit Rate
Around Substation/dip stations yard Equipment using brooms and Bobcats or suitable loader
M3
5,500
41.58
SR
228,690.00
Unit Rate
Under or beneath disconnect platforms without damaging or loosening the ground cables or connections by using brooms
only
Removal of Accumulated Sand Inside and Outside the Surface of Manhole/Hand Hole or Its Cover: Excess soil shall be
removed and leveled to the existing ground
M3
550
61.43
SR
33,783.75
Unit Rate
M3
550
61.43
SR
33,783.75
Unit Rate
M2
170
14.18
SR
2,409.75
Unit Rate
M2
170
21.12
SR
3,590.53
Unit Rate
M3
550
86.94
SR
47,817.00
Unit Rate
M3
1,200
99.23
SR
119,070.00
Unit Rate
M2
300
108.68
SR
32,602.50
Unit Rate
Removal of fence including gate and all fittings.
I.1.8
I.1.8.1.1
Long Description
MAINTAIN THE SUBSTATIONS ACCESS ROADS AND SAND REMOVAL SURVEYING as Per Item # 5.1.8 of
Schedule "B"
SUBSTATIONS/NG FACILITIES ACCESS ROADS as Per Item # 5.1.8.1 of Schedule "B"
Design, supply and construction of 8m width service road with suitable structures which is essentially to fulfill the
requirements of service roads such as, site preparation, soil test, site survey, culverts, retaining walls, back walls, road
drain, hump, crash barriers, pavements, asphalting, curb stones, traffic signs, road marking, street lightings etc., as per
COMPANY Standards
SAND/WASTE REMOVAL as Per Item # 5.1.8.2 of Schedule "B"
SAND STABILIZATION as Per Item # 5.1.8.3 of Schedule "B"
Supply, deliver and spreading crude oil to stabilize sand at the designated locations Around Substations/dip stations yard
Boundary and Access Roads
Supply, Deliver and Spreading diluted acrylic co-polymer (e.g. Soil Cement or equivalent) to stabilize sand at the
designated locations Around Substations/dip stations yard Boundary and Access Roads
SAND BACKFILLING as Per Item # 5.1.8.4 of Schedule "B"
Supply, deliver and backfilling sand areas at designated locations Around Substations/dip stations yard Boundary and
Access Roads
SUPPLY, SPREADING AND COMPACTION OF MARL as Per Item # 5.1.8.5 of Schedule "B"
Supply, deliver, spreading and compacting marl at designated locations Around Substations/dip stations yard Boundary
and Access Roads
SUB-GRADING AND LEVELING as Per Item # 5.1.8.6 of Schedule "B"
Sub-grading preparation prior to placing marl Around Substations/dip stations yard Boundary and Access Roads
BF-PA -12 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
I.1.8.7
I.1.8.7.1
I.1.8.7.2
I.2
Line type
Short Description
Description
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
Breakdown
Breakdown
Description
I.2.1
Description
I.2.1.1
Breakdown
I.2.1.2
Breakdown
I.2.1.3
Breakdown
I.2.1.4
Breakdown
I.2.1.5
Breakdown
I.2.1.6
Breakdown
I.2.2
Description
MECHANICAL
WORKS
MECHANICAL
WORKS
Quantity
Currency
Total
Take Samples to test quality of marl and take three (3) samples after compaction is completed to test quality and
strength of compaction
EA
10
330.75
SR
3,307.50
Unit Rate
Take an additional marl compaction sample
EA
3
330.75
SR
992.25
Unit Rate
Direct pumping to approve location by municipality
M3
550
9.97
SR
5,483.36
Unit Rate
Pump and transport using tankers
EA
300
179.55
SR
53,865.00
Unit Rate
M3
200
14.88
SR
2,976.75
Unit Rate
EA
10
425.25
SR
4,252.50
Unit Rate
MARL QUALITY AND COMPACTION TESTS as Per Item # 5.1.8.7 of Schedule "B"
MECHANICAL WORKS as Per Item # 5.2 of Schedule "B"
DEWATERING as Per Item # 5.2.1 of Schedule "B"
Remove water from the substation rooms using specialized electrical equipment that complies with company safety
regulations
Remove water from on/under the cables, trenches, manholes, handholes, conduits, link box manholes, and dip station at
various locations
Clean the power transformer oil retention pit using special materials designed to contain and absorb spilled oils, in
accordance with the company's specifications
Remove and clean oil from trenches, manholes, conduits, tunnels, and dip station at various locations
MECHANICAL
WORKS
Unit Price
Payment
Type
UOM
Long Description
EA
60
269.33
SR
16,159.50
Unit Rate
M3
110
174.83
SR
19,230.75
Unit Rate
PIPE WORKS as Per Item # 5.2.2 of Schedule "B"
I.2.2.1
Breakdown
Supply, install and lay PVC conduit, 100-150 MM I.D., excavation not included
M
550
46.78
SR
25,727.63
Unit Rate
I.2.2.2
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (0.5" - 1.0")
M
10
43.00
SR
429.98
Unit Rate
I.2.2.3
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (1.5" - 2.0")
M
10
59.54
SR
595.35
Unit Rate
I.2.2.4
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (3.0")
M
10
86.00
SR
859.95
Unit Rate
I.2.2.5
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (0.5" - 1.0")
M
450
29.11
SR
13,097.70
Unit Rate
I.2.2.6
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (1.5" - 3.0")
M
350
46.31
SR
16,206.75
Unit Rate
I.2.2.7
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (4" - 6")
M
110
65.49
SR
7,203.74
Unit Rate
I.2.2.8
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (0.5" - 1.0")
M
450
29.11
SR
13,097.70
Unit Rate
I.2.2.9
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (1.5" - 3.0")
M
170
46.31
SR
7,871.85
Unit Rate
I.2.2.10
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (4" - 6")
M
200
65.49
SR
13,097.70
Unit Rate
I.2.2.11
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for sewage water size (4")
M
300
72.77
SR
21,829.50
Unit Rate
I.2.2.12
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for sewage water size (6")
M
400
99.23
SR
39,690.00
Unit Rate
I.2.2.13
Breakdown
Lay PVC Conduit only
M
200
127.58
SR
25,515.00
Unit Rate
I.2.2.14
Breakdown
Lay Steel pipes only
M
10
174.83
SR
1,748.25
Unit Rate
I.2.2.15
Breakdown
Lay Plastic pipes only
M
110
118.13
SR
12,993.75
Unit Rate
EA
8
3,307.50
SR
26,460.00
Unit Rate
EA
8
3,307.50
SR
26,460.00
Unit Rate
EA
30
4,252.50
SR
127,575.00
Unit Rate
I.2.3
Description
I.2.3.1
Breakdown
I.2.3.2
Breakdown
I.2.3.3
Breakdown
MECHANICAL
WORKS
REPAIR OF WATER PUMPS as Per Item # 5.2.3 of Schedule "B"
Maintenance of electrical water pumps and replacement of faulty spare parts and damaged electrical wiring to ensure they
operate in good condition
Maintenance of electrical oil pumps and replacement of faulty spare parts and damaged electrical wiring to ensure they
operate in good condition
Supply and install Water transfer pump -Set-WTP 01 Motor Class F Insulation and 1 ph. x 230 volts, 60 Hz, 3450 RPM
BF-PA -13 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
I.2.3.4
Breakdown
I.2.3.5
Breakdown
I.2.3.6
Breakdown
I.2.3.7
Breakdown
I.2.3.8
Breakdown
I.2.3.9
I.2.4
Short Description
SR
127,575.00
Unit Rate
SR
70,875.00
Unit Rate
4,536.00
SR
136,080.00
Unit Rate
30
14,458.50
SR
433,755.00
Unit Rate
10
4,536.00
SR
45,360.00
Unit Rate
EA
30
4,536.00
SR
136,080.00
Unit Rate
Supply and install Water transfer pump -Set-WTP 01 Motor Class F Insulation and 1 ph. x 230 volts, 60 Hz, 3450 RPM
EA
30
4,252.50
Supply and install Water Booster pump set-WBP 01 (3 ph. x 380 volts, 60 Hz, 3450 RPM)
EA
10
7,087.50
EA
30
EA
EA
Supply and install Booster pump for domestic water one (1) Horsepower with pressurized tank
MECHANICAL
WORKS
Payment
Type
Quantity
Supply and install Basement sump pump SP-01 01 (Submersible motor IP 68, Class F rating 1.10 kw (1.5 HP), 1 PH x22
volts,60 Hz, and 3450 RPM
Supply and installation of Transfer sump pit pump TPP-01 (TEFC Motor IP 54, Class F rating 4.00 kw (5.50 HP),1 ph. x 230
Volts, 60 Hz and 1750 RPM
Breakdown
Description
Total
UOM
Long Description
Supply and install transformer pit pump having the following mechanical and electrical data:
1. Mechanical Data: Discharge Rate shall be 4 L/s (63.41gpm), 1750 rpm TEFC Enclosure
2. Electrical Data: 220volts/1-phase /60Hz, manually operated with auto stop
METALLIC WORKS as Per Item # 5.2.4 of Schedule "B"
Unit Price
Currency
Breakdown
Supply and erect 0.7 mm thick corrugated steel sheets (sandwich panel with 50 mm polystyrene foam), including all fixing
and erecting accessories, ridges, overlaps, and gutters. This also includes bottom-side insulation with a 2 cm thick rock
wool layer, compliant with U.S. standard ASTM C 168-80, covered on both sides with aluminum foil, and installation of
lightweight metal mesh to secure and protect the insulation
M2
700
338.07
SR
236,651.63
Unit Rate
I.2.4.2
Breakdown
Supply and erect double corrugated sheets for the surrounding wall between the block wall and the ceiling (external and
internal sheets), with rock wool insulation and tubes in between. This includes all fixings, assembly, and the top and
bottom “U” channels. Alternatively, ready-made sandwich corrugated sheet panels may be used. Transparent corrugated
sheets should be erected between every two columns to increase natural illumination, with no insulation required behind
the transparent sheets
M2
700
331.81
SR
232,269.19
Unit Rate
I.2.4.3
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 200 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
1,283.59
SR
25,671.87
Unit Rate
I.2.4.4
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 250 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
1,604.49
SR
32,089.84
Unit Rate
I.2.4.5
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 300 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
1,925.39
SR
38,507.81
Unit Rate
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 350 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
2,247.68
SR
44,953.65
Unit Rate
I.2.4.7
Breakdown
Supply and install 6-meter-long “U” steel beams 100 x 50 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
843.89
SR
16,877.70
Unit Rate
I.2.4.8
Breakdown
Supply and install 6-meter-long “U” steel beams 200 x 100 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
1,283.59
SR
25,671.87
Unit Rate
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 100 x 50 x 5 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
593.93
SR
11,878.65
Unit Rate
I.2.4.10
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 80 x 40 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
484.79
SR
9,695.70
Unit Rate
I.2.4.11
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 50 x 50 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
356.44
SR
7,128.70
Unit Rate
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 20 x 40 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
214.52
SR
4,290.30
Unit Rate
I.2.4.13
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 100 x 100 x 5 mm cross-section, including painting, welding,
and all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
1,187.87
SR
23,757.30
Unit Rate
I.2.4.14
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 80 x 80 x 5 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
969.57
SR
19,391.40
Unit Rate
Breakdown
Supply and install 6-meter-long "L" shape steel angles 100 x 100 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
1,069.66
SR
21,393.23
Unit Rate
I.2.4.16
Breakdown
Supply and install 6-meter-long "L" shape steel angles 50 x 50 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
534.83
SR
10,696.61
Unit Rate
I.2.4.17
Breakdown
Supply and install 6-meter-long "L" shape steel angles 40 x 40 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
20
458.33
SR
9,166.50
Unit Rate
Breakdown
Supply and install 6-meter-long flat bars 60 mm width and 6 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
20
427.86
SR
8,557.29
Unit Rate
I.2.4.19
Breakdown
Supply and install 6-meter-long flat bars 40 mm width and 4 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
20
396.90
SR
7,938.00
Unit Rate
I.2.4.20
Breakdown
Supply and install 6-meter-long flat bars 30 mm width and 3 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
20
365.72
SR
7,314.30
Unit Rate
Breakdown
Supply and install 6-meter-long flat bars 20 mm width and 2 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
20
274.29
SR
5,485.73
Unit Rate
I.2.4.1
I.2.4.6
I.2.4.9
I.2.4.12
I.2.4.15
I.2.4.18
I.2.4.21
BF-PA -14 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
I.2.4.22
Breakdown
Supply and install 6-meter-long flat sheet 20 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
20
10,881.68
SR
217,633.50
Unit Rate
I.2.4.23
Breakdown
Supply and install 6-meter-long flat sheet 14 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
20
7,583.86
SR
151,677.23
Unit Rate
Breakdown
Supply and install 6-meter-long flat sheet 10 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
20
5,440.84
SR
108,816.75
Unit Rate
I.2.4.25
Breakdown
Supply and install 6-meter-long flat sheet 6 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
20
3,358.88
SR
67,177.69
Unit Rate
I.2.4.26
Breakdown
Supply and install 6-meter-long flat sheet 3 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
20
1,679.44
SR
33,588.84
Unit Rate
EA
20
1,399.54
SR
27,990.70
Unit Rate
M2
170
491.35
SR
83,529.97
Unit Rate
I.2.4.24
Supply and install 6-meter-long flat sheet 2 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
Supply, install and replace 10 mm thick checkered plates inside the substation. This includes supplying the checkered
plates, cutting to size, fabricating and fitting lifting handles, welding frames and supports, painting, and removing and
returning unwanted old plates to the store, as per COMPANY Standards
I.2.4.27
Breakdown
I.2.4.28
Breakdown
I.2.4.29
Breakdown
Supply and install permanent steel access ladders (Emergency) fixed to the walls with safety cages, as per company
standard TA-800049, for accessing the roof. The design should conform to the standards followed in the transmission
substations
M
80
373.28
SR
29,862.00
Unit Rate
I.2.4.30
Breakdown
Supply and install steel channel supports for checkered plates or equipment in a substation room
M
60
174.83
SR
10,489.50
Unit Rate
I.2.4.31
Breakdown
Remove the existing chain link fencing, including the frame, and return it to the company scrub store. Supply and erect
expanded meshes at least 3 mm thick with proper steel supports and frame as required, and paint according to galvanized
paint specifications
M2
450
174.83
SR
78,671.25
Unit Rate
I.2.4.32
Breakdown
Supply and install steel grating for the transformer oil catch basin
M2
60
269.33
SR
16,159.50
Unit Rate
I.2.4.33
Breakdown
Supply and install hot-dip steel bridge over power cables in the cable room or Substation Basement
M2
60
127.58
SR
7,654.50
Unit Rate
I.2.4.34
Breakdown
Supply and install hot-dip galvanized steel Unistrut supports routing outgoing feeders
M2
60
127.58
SR
7,654.50
Unit Rate
I.2.4.35
Breakdown
Supply and install anchor bolts for fixing equipment structures, type-3, as per SEC Standard
EA
20
42.53
SR
850.50
Unit Rate
I.2.4.36
Breakdown
Supply, install and repair ladders at manholes different locations
M
30
222.08
SR
6,662.25
Unit Rate
I.2.4.37
Breakdown
Repair the existing car parking shed to adjust the top cloth and align with required welding and grinding
M2
80
174.83
SR
13,986.00
Unit Rate
Breakdown
Supply and install bollard post barriers with chains, including steel poles with concrete foundation, excavation, backfilling,
grounding, and re-asphalting as per NG standards. The poles and chains should maintain a 1.5 to 2 meters distance and
include yellow and black painting
EA
20
1,181.25
SR
23,625.00
Unit Rate
Supply and install air holes for ventilation fans, with fans installed at manholes in various locations
EA
20
1,559.25
SR
31,185.00
Unit Rate
I.2.4.38
I.2.4.39
I.2.5
Breakdown
Description
MECHANICAL
WORKS
AIR CONDITIONING WORK as Per Item # 5.2.5 of Schedule "B"
I.2.5.1
Breakdown
Supply and install new window air-conditioning units (12,000 BTU/1.5 HP/1 Ton) capacity
EA
6
1,559.25
SR
9,355.50
Unit Rate
I.2.5.2
Breakdown
Supply and install new window air-conditioning units (18,000 BTU/2.0 HP/1.5 Ton) capacity
EA
6
1,795.50
SR
10,773.00
Unit Rate
I.2.5.3
Breakdown
Supply and install new window air-conditioning units (24,000 BTU/2.5 HP/2 Ton) capacity
EA
6
2,079.00
SR
12,474.00
Unit Rate
I.2.5.4
Breakdown
Supply and install new split-type air-conditioning units (12,000 BTU/1.5 HP/1 Ton) capacity
EA
6
2,173.50
SR
13,041.00
Unit Rate
I.2.5.5
Breakdown
Supply and install new split-type air-conditioning units (18,000 BTU/2.0 HP/1.5 Ton) capacity
EA
10
2,646.00
SR
26,460.00
Unit Rate
I.2.5.6
Breakdown
Supply and install new split-type air-conditioning units (24,000 BTU/2.5 HP/2 Ton) capacity
EA
10
2,740.50
SR
27,405.00
Unit Rate
I.2.5.7
Breakdown
Supply and install new split-type air-conditioning units (30,000 BTU/3 HP/2.5 Ton) capacity
EA
10
3,213.00
SR
32,130.00
Unit Rate
I.2.5.8
Breakdown
Supply and install new split-type air-conditioning units (36,000 BTU/3.5 HP/3 Ton) capacity
EA
8
3,780.00
SR
30,240.00
Unit Rate
BF-PA -15 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Unit Price
Currency
Payment
Type
Long Description
UOM
Quantity
Total
M
110
441.32
SR
48,544.65
Unit Rate
I.2.5.9
Breakdown
Manufacturing supply and erect metal ducts for air conditioned, ducts shall be made of galvanized metal sheets (density
24Kg/sq. m) according to SMACANA & ASHRAE specifications, ducts will be externally insulated with fiberglass, wrapped
with aluminum foil, and then covered with galvanized metal sheets of the same specifications, and fitted with means for
suspension, fixations and air outlets
I.2.5.10
Breakdown
Dismantle the louvered steel sunshade transformer roofs. This item includes all necessary measures to carry out the job
without harming or damaging any components of the roof
M2
170
222.08
SR
37,752.75
Unit Rate
I.2.5.11
Breakdown
Re-erect the dismantled louvered steel sunshade transformer roofs. This item includes all necessary measures for
reinstatement
M2
170
222.08
SR
37,752.75
Unit Rate
I.2.5.12
Breakdown
Replace defective duct dampers and damper motors according to COMPANY standards
EA
60
826.88
SR
49,612.50
Unit Rate
I.2.5.13
Breakdown
Repair duct mechanical protection (cladding) according to SMACNA specifications
EA
60
448.88
SR
26,932.50
Unit Rate
Repair duct access door
EA
60
544.32
SR
32,659.20
Unit Rate
M3
550
99.23
SR
54,573.75
Unit Rate
99.23
SR
34,728.75
Unit Rate
6.14
SR
36.86
Unit Rate
I.2.5.14
I.2.6
Breakdown
Description
MECHANICAL
WORKS
SCAFFOLDING as Per Item # 5.2.6 of Schedule "B"
Supply, Erection & Dismantling of Fixed Type Scaffolding with sufficient working Platforms for inside/outside any facilities
of the Sub-station building or equipment.
Supply, Erection & Dismantling of Mobile Type Scaffolding with sufficient working Platforms for inside/outside any facilities
of the Sub-station building or equipment.
I.2.6.1
Breakdown
I.2.6.2
Breakdown
M3
350
I.2.6.3
Breakdown
Supply, mobilize and demobilize pipe with 1 m length
EA
6
I.2.6.4
Breakdown
Supply, mobilize and demobilize pipe with 2 m length
EA
6
8.03
SR
48.20
Unit Rate
I.2.6.5
Breakdown
Supply, mobilize and demobilize pipe with 3 m length
EA
6
10.87
SR
65.21
Unit Rate
I.2.6.6
Breakdown
Supply, mobilize and demobilize pipe with 4 m length
EA
6
12.76
SR
76.55
Unit Rate
I.2.6.7
Breakdown
Supply, mobilize and demobilize pipe with 6 m length
EA
6
14.65
SR
87.89
Unit Rate
I.2.6.8
Breakdown
Supply, mobilize and demobilize Wooden Plank with 2 m length
EA
3
6.14
SR
18.43
Unit Rate
I.2.6.9
Breakdown
Supply, mobilize and demobilize Wooden Plank with 3 m length
EA
3
8.03
SR
24.10
Unit Rate
I.2.6.10
Breakdown
Supply, mobilize and demobilize Wooden Plank with 4 m length
EA
3
10.87
SR
32.60
Unit Rate
I.2.6.11
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 3 m length
EA
6
12.76
SR
76.55
Unit Rate
I.2.6.12
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 4 m length
EA
6
14.65
SR
87.89
Unit Rate
I.2.6.13
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 6 m length
EA
6
330.75
SR
1,984.50
Unit Rate
I.2.6.14
Breakdown
Supply, mobilize and demobilize Base Plate
EA
6
6.14
SR
36.86
Unit Rate
I.2.6.15
Breakdown
Supply, mobilize and demobilize Adjustable Base Plate
EA
6
6.14
SR
36.86
Unit Rate
I.2.6.16
Breakdown
Supply, mobilize and demobilize Double Coupler
EA
10
8.03
SR
80.33
Unit Rate
I.2.6.17
Breakdown
Supply, mobilize and demobilize Universal Coupler
EA
10
8.03
SR
80.33
Unit Rate
I.2.6.18
Breakdown
Supply, mobilize and demobilize Putlog Coupler
EA
10
8.03
SR
80.33
Unit Rate
I.2.6.19
Breakdown
Supply, mobilize and demobilize Swivel Coupler
EA
10
8.03
SR
80.33
Unit Rate
I.2.6.20
Breakdown
Supply, mobilize and demobilize End to End Coupler
EA
10
8.03
SR
80.33
Unit Rate
I.2.6.21
Breakdown
Supply, mobilize and demobilize C- Clamp
EA
8
8.03
SR
64.26
Unit Rate
I.2.6.22
Breakdown
Supply, mobilize and demobilize Beam Clamp
EA
8
8.03
SR
64.26
Unit Rate
BF-PA -16 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
I.2.6.23
Breakdown
I.2.6.24
Breakdown
Supply, mobilize and demobilize Reveal Pin
EA
10
8.03
SR
80.33
Unit Rate
Supply, mobilize and demobilize Chain blocks
EA
6
425.25
SR
2,551.50
Unit Rate
I.2.6.25
I.2.6.26
Breakdown
Supply, mobilize and demobilize Metal/fabric Slings, hooks
EA
10
236.25
SR
2,362.50
Unit Rate
Breakdown
Supply, mobilize and demobilize approved Electrical cables extensions
EA
6
264.60
SR
1,587.60
Unit Rate
I.2.6.27
Breakdown
Supply, mobilize and demobilize Lighting
EA
3
302.40
SR
907.20
Unit Rate
I.2.6.28
Breakdown
Supply, mobilize and demobilize medium dumping container
EA
3
330.75
SR
992.25
Unit Rate
I.2.6.29
Breakdown
Supply, mobilize and demobilize large dumping container
EA
3
491.40
SR
1,474.20
Unit Rate
I.2.6.30
Breakdown
Provide load test certificates
EA
10
1,417.50
SR
14,175.00
Unit Rate
I.2.6.31
Breakdown
Provide inspection certificates
EA
10
1,417.50
SR
14,175.00
Unit Rate
M2
80
812.70
SR
65,016.00
Unit Rate
I.2.7
Description
MECHANICAL
WORKS
Long Description
Unit Price
Currency
Payment
Type
UOM
Short Description
Total
FIRE ZONING as Per Item # 5.2.7 of Schedule "B"
I.2.7.1
Breakdown
Closing the space between bus-ducts and the wall opening with COMPANY-approved fire-resistant material (sandwich
type) to prevent fire from spreading through the opening (complying with COMPANY-approved fire zoning procedures).
The gap closure should be designed to be easily removable and re-fixable for bus duct maintenance
I.2.7.2
Breakdown
Sealing the cable openings from both sides (or one side in case of a panel on top) with COMPANY-approved fire-resistant
sealant (3cm thick and 3cm deep). The remaining gap on the face shall be filled with HPM mortar (3cm deep) or any
equivalent approved material, and the gap between the two faces of the opening shall be filled with rock wool insulation
(minimum density 120kg/m³, melting point 1000°C)
EA
10
363.83
SR
3,638.25
Unit Rate
I.2.7.3
Breakdown
Coating the cables in the substation basement with COMPANY-approved fire-resistant paint at a minimum thickness of
1.5mm (2kg/m²) as instructed by COMPANY representative. Bunched control cables must be painted with COMPANYapproved fire-resistant paint at a minimum thickness of 1.5mm (2kg/m²)
M2
140
742.77
SR
103,987.80
Unit Rate
Breakdown
Sealing the power cable tunnels: one side of the tunnel must be sealed in a “sandwich” type sealing with two Fire Stop
Mortar layers (generally reinforced) of at least 5cm thick, intercalated with rock wool (5cm thick). PVC pipes must be
provided around the passing cables to maintain a gap of at least 3cm, to be removed after mortar setting. These gaps
must be sealed from both sides with COMPANY-approved fire-resistant sealant (3cm thick and 3cm deep), and the gap
between the two faces of the opening shall be filled with rock wool insulation (minimum density 120kg/m³, melting point
1000°C)
M2
140
812.70
SR
113,778.00
Unit Rate
I.2.7.4
I.3
Description
I.3.1
Description
ELECTRICAL
WORKS
ELECTRICAL
WORKS
ELECTRICAL WORKS as Per Item # 5.3 of Schedule "B"
LIGHTING SYSTEM WORK as Per Item # 5.3.1 of Schedule "B"
I.3.1.1
Breakdown
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V” and crisscross
aluminum slide diffuser, to be installed in the false ceiling, different size (60 x 120), rapid start type
EA
110
174.83
SR
19,230.75
Unit Rate
I.3.1.2
Breakdown
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V” and crisscross
aluminum slide diffuser, to be installed in the false ceiling, different size (60 x 60 cm), rapid start type
EA
110
174.83
SR
19,230.75
Unit Rate
I.3.1.3
Breakdown
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V”, to be installed in the
false ceiling, size 60 x 120 cm, rapid start type. The light diffuser must be impervious and have a protection factor of at
least IP40
EA
110
127.58
SR
14,033.25
Unit Rate
I.3.1.4
Breakdown
Supply and install a fluorescent lamp, 2x40 Watt, with a prismatic cover, rapid start type
EA
30
63.79
SR
1,913.63
Unit Rate
I.3.1.5
Breakdown
Supply and install a halogen spotlight, 250 Watt
EA
35
1,417.50
SR
49,612.50
Unit Rate
I.3.1.6
Breakdown
Repair, clean, and supply sodium lamp, 250/400-Watt flood light bulbs
EA
30
1,417.50
SR
42,525.00
Unit Rate
I.3.1.7
Breakdown
Supply and replace outside lighting pole fixture cover
EA
110
448.88
SR
49,376.25
Unit Rate
I.3.1.8
Breakdown
Supply, install, and operate a globe with a normal lamp, 100 Watt
EA
60
165.38
SR
9,922.50
Unit Rate
BF-PA -17 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
I.3.1.9
Breakdown
Supply and install a complete set of apparent emergency LED lights, operational for six to seven hours after DC shutdown.
The emergency unit includes a nickel-cadmium battery, a battery charger, an electronic frequency transformer, a
transformation detector, a plug, and a switch to check the battery. The emergency light unit operates on 220 V/60 Hz,
2x20 Watt, normal start at current shutdown
ST
60
614.25
SR
36,855.00
Unit Rate
I.3.1.10
Breakdown
Supply and install an emergency EXIT LED light unit (Green Color), operational for three hours after DC shutdown, to be
mounted on the ceiling or wall with a frame. The emergency EXIT unit includes a nickel-cadmium battery, a battery
charger, an electronic frequency transformer, a transformation detector, a plug, and a switch to check the battery. The
diffusing cover is transparent with an EXIT sign. The emergency EXIT light unit operates on 220 V/60 Hz, 1x8 Watt,
normal start at current shutdown
EA
35
259.88
SR
9,095.63
Unit Rate
I.3.1.11
Breakdown
Supply and install a sodium projector, 250 Watt, for outside lighting, fixed to allow orientation to light the front of the
building. Includes all necessary components for installation, testing, and operation as per COMPANY Representative's
instructions
EA
20
1,134.00
SR
22,680.00
Unit Rate
I.3.1.12
Breakdown
Supply and install LED light panel, 60 x 60 cm, white, operates on 220 V/60 Hz 70 Watt
EA
110
453.60
SR
49,896.00
Unit Rate
I.3.1.13
Breakdown
Supply and install LED tube light with frame, operates on 220 V/60 Hz, 2x40 Watt, size 10 x 120 cm
EA
110
269.33
SR
29,625.75
Unit Rate
I.3.1.14
Breakdown
Supply and install LED Floodlight, 250 Watt, white, for outdoor substation buildings
EA
110
930.83
SR
102,390.75
Unit Rate
I.3.1.15
Breakdown
Supply and install LED spotlight, 400 Watt, white, for outdoor substation buildings
EA
110
930.83
SR
102,390.75
Unit Rate
I.3.1.16
Breakdown
Supply and install LED spotlight, 400 Watt, white, ceiling-mounted for GIS room
EA
110
1,134.00
SR
124,740.00
Unit Rate
I.3.1.17
Breakdown
Supply and install LED bulb light, 20 Watt, white for DC lighting system
EA
110
113.40
SR
12,474.00
Unit Rate
I.3.1.18
Breakdown
Supply and install LED explosion-proof lighting fixture, operates on 220 V/60 Hz, 2x40 Watt, size 10 x 120 cm for the
battery room
EA
30
425.25
SR
12,757.50
Unit Rate
I.3.1.19
Breakdown
Supply and install explosion-proof lighting/exit lighting (Green Color) fixtures in the battery room
EA
15
340.20
SR
5,103.00
Unit Rate
I.3.1.20
Breakdown
Supply and install explosion-proof entrance/exit lighting fixtures in the battery room
EA
15
340.20
SR
5,103.00
Unit Rate
I.3.1.21
Breakdown
Supply and install explosion-proof emergency lighting fixtures for the battery room
EA
15
340.20
SR
5,103.00
Unit Rate
I.3.1.22
Breakdown
Supply and install explosion-proof DC lighting fixtures for the battery room
EA
15
340.20
SR
5,103.00
Unit Rate
I.3.1.23
Breakdown
Provide and install temporary explosion-proof lighting fixtures at dip stations and manholes at different locations
D
3
803.25
SR
2,409.75
Unit Rate
I.3.1.24
Breakdown
Supply and install lighting for steel monopoles as per SEC standard drawing
EA
60
1,134.00
SR
68,040.00
Unit Rate
I.3.1.25
Breakdown
Supply and install high bay LED light, pendent type, at the GIS buildings.
EA
30
803.25
SR
24,097.50
Unit Rate
EA
35
39.55
SR
1,384.19
Unit Rate
EA
35
79.10
SR
2,768.38
Unit Rate
EA
35
118.64
SR
4,152.57
Unit Rate
EA
35
118.64
SR
4,152.57
Unit Rate
I.3.2
Description
I.3.2.1
Breakdown
I.3.2.2
Breakdown
I.3.2.3
Breakdown
I.3.2.4
Breakdown
I.3.2.5
Breakdown
ELECTRICAL
WORKS
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
INSTALLATIONS WORKS as Per Item # 5.3.2 of Schedule "B"
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, single
switch, fixed 1.5 m above the tile floor level
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, double
switch, fixed 1.5 m above the tile floor level
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, triple
switch, fixed 1.5 m above the tile floor level
Supply and install a PHENOL compound switch for A/Cs and water heaters with a Bakelite cover, at least 30 Amp, with a
warning light, fixed 1.5 m above the tile floor level
Supply and erect fixtures that work automatically with a photocell, including all accessories and providing a DC source to
power the photocell
EA
35
308.07
SR
10,782.45
Unit Rate
EA
30
174.83
SR
5,244.75
Unit Rate
174.83
SR
5,244.75
Unit Rate
79.10
SR
474.58
Unit Rate
I.3.2.6
Breakdown
Supply and install a 220 V/13 Amp outlet, equipped with a switch, and a male plug, installed in the floor or wall at the
proper height from the tile level. Outlets for ventilating fans and emergency lights will be installed beside the unit
concerned
I.3.2.7
Breakdown
Supply and install a 220 V/13 Amp explosion-proof outlet, equipped with a switch, and a male plug, installed in the floor
or wall at the proper height from the tile level. Outlets for ventilating fans and emergency lights will be installed beside
the unit concerned
EA
30
I.3.2.8
Breakdown
Supply and install a telephone outlet made of thick Bakelite or cast iron coated with non-glossy chrome, fixed on a proper
box at the height of common outlets
EA
6
BF-PA -18 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
I.3.2.9
Breakdown
Supply and install a LAN outlet made of thick Bakelite or cast iron coated with non-glossy chrome, fixed on a proper box at
the height of common outlets
EA
6
79.10
SR
474.58
Unit Rate
I.3.2.10
Breakdown
Supply and install temporary power supply at dip stations and manholes at different locations
EA
6
4,583.25
SR
27,499.50
Unit Rate
I.3.2.11
Breakdown
Supply, install, and operate an 50 liter electrical water heater that heats water pipes without a tank as per specifications
EA
8
4,583.25
SR
36,666.00
Unit Rate
I.3.2.12
Breakdown
Supply, install, and operate an 100 liter electrical water heater that heats water pipes without a tank as per specifications
EA
8
6,218.10
SR
49,744.80
Unit Rate
I.3.2.13
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x25+16 mm
M
300
174.83
SR
52,447.50
Unit Rate
I.3.2.14
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x35+16 mm
M
300
212.63
SR
63,787.50
Unit Rate
I.3.2.15
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x50+16 mm
M
300
231.53
SR
69,457.50
Unit Rate
I.3.2.16
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x50+25 mm
M
300
240.98
SR
72,292.50
Unit Rate
I.3.2.17
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x70+16 mm
M
300
271.22
SR
81,364.50
Unit Rate
I.3.2.18
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x120+16 mm
M
300
288.23
SR
86,467.50
Unit Rate
I.3.2.19
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x185+16 mm
M
300
316.58
SR
94,972.50
Unit Rate
I.3.2.20
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x240+16 mm
M
300
363.83
SR
109,147.50
Unit Rate
I.3.2.21
Breakdown
Supply and lay telephonic cable, 4x0.6 mm², insulated with PVC, to be installed in an adequate tray
M
110
61.43
SR
6,756.75
Unit Rate
I.3.2.22
Breakdown
Supply and lay subsidiary LAN cable, insulated with PVC, to be installed in an adequate tray
I.3.2.23
Breakdown
Install cable tray as per COMPANY standards and specifications
I.3.2.24
Breakdown
I.3.2.25
Breakdown
I.3.2.26
M
110
61.43
SR
6,756.75
Unit Rate
M2
170
118.13
SR
20,081.25
Unit Rate
Install cable clamp as per COMPANY standards and specifications
EA
30
33.08
SR
992.25
Unit Rate
Transfer cable drum from company warehouse to site as directed
TON
6
212.63
SR
1,275.75
Unit Rate
Breakdown
Return existing/old cable system to company warehouse as directed
TON
10
212.63
SR
2,126.25
Unit Rate
I.3.2.27
Breakdown
Supply and install an explosion-proof exhaust fan in the battery room
EA
10
1,181.25
SR
11,812.50
Unit Rate
I.3.2.28
Breakdown
EA
15
803.25
SR
12,048.75
Unit Rate
I.3.2.29
Breakdown
EA
15
992.25
SR
14,883.75
Unit Rate
I.3.2.30
Breakdown
Supply and install ventilating fans ceiling capacity not less than 388 CF/Min
EA
15
2,693.25
SR
40,398.75
Unit Rate
I.3.2.31
Breakdown
Supply and install ventilating fans ceiling capacity not less than 311 CF/Min
EA
15
2,504.25
SR
37,563.75
Unit Rate
I.3.2.32
Breakdown
Supply and install ventilating fans ceiling capacity not less than 205 CF/Min
EA
15
2,220.75
SR
33,311.25
Unit Rate
2,646.00
SR
26,460.00
Unit Rate
I.3.3
Description
Supply and install wall/ceiling mounted ventilating fans, 20x20 cm, and capacities, including the evacuation flexible duct,
exterior cover, and all accessories for operation
Supply and install wall/ceiling mounted ventilating fans, 30x30 cm, and capacities, including the evacuation flexible duct,
exterior cover, and all accessories for operation
ELECTRICAL
WORKS
GROUNDING SYSTEM WORKS as Per Item # 5.3.3 of Schedule "B"
I.3.3.1
Breakdown
Conduct necessary inspections and tests for all ground systems in the substation according to COMPANY specifications and
standards and submit reports
EA
10
I.3.3.2
Breakdown
Supply and Erect Earthing copper rod 1.5mx¾ Dia according to COMPANY specifications
EA
6
330.75
SR
1,984.50
Unit Rate
I.3.3.3
Breakdown
Supply and Erect Earthing copper rod 3mx¾ Dia according to COMPANY specifications
EA
6
708.75
SR
4,252.50
Unit Rate
I.3.3.4
Breakdown
Supply and install a copper ground mat or plate (1 m x 1 m x 3 mm) in normal soil, including excavation, filling with
ground conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.), backfilling, reinstatement, and connection to all
equipment as per the current Code of Practice of the COMPANY
EA
6
7,418.25
SR
44,509.50
Unit Rate
I.3.3.5
Breakdown
Supply and install a copper ground mat or plate (1 m x 1 m x 3 mm) in rocky soil, including excavation, filling with ground
conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.), backfilling, reinstatement, and connection to all equipment
as per the current Code of Practice of the COMPANY
EA
6
7,418.25
SR
44,509.50
Unit Rate
BF-PA -19 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
I.3.3.6
Breakdown
I.3.3.7
Breakdown
I.3.3.8
Breakdown
I.3.3.9
Breakdown
I.3.3.10
Breakdown
I.3.3.11
Breakdown
I.3.3.12
Breakdown
I.3.3.13
Breakdown
I.3.3.14
Breakdown
I.3.3.15
Breakdown
Short Description
Install a grounding test pit, ensuring it meets all relevant specifications and standards. This includes excavation,
installation of the test pit, backfilling, and any necessary connections to the grounding system. The work should be carried
out as directed by the COMPANY REPRESENTATIVE and in accordance with the company's safety and quality requirements
I.4
Description
SUPPORT FACILITY
I.4.1
Description
SUPPORT FACILITY
I.4.1.1
I.4.2
SUPPORT FACILITY
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
EA
6
4,583.25
SR
27,499.50
Unit Rate
M
60
170.10
SR
10,206.00
Unit Rate
M
60
264.60
SR
15,876.00
Unit Rate
M
60
359.10
SR
21,546.00
Unit Rate
M
60
453.60
SR
27,216.00
Unit Rate
M
60
548.10
SR
32,886.00
Unit Rate
EA
6
1,304.10
SR
7,824.60
Unit Rate
EA
6
1,776.60
SR
10,659.60
Unit Rate
EA
6
2,154.60
SR
12,927.60
Unit Rate
EA
6
2,693.25
SR
16,159.50
Unit Rate
EA
20
74,466.00
SR
1,489,320.00
Unit Rate
EA
10
35,721.00
SR
357,210.00
Unit Rate
SUPPORT FACILITY as Per Item # 5.4 of Schedule "B"
SUPPLY AND ERECT PORTABLE CABINS as Per Item # 5.4.1 of Schedule "B"
deliver and erect a portable cabin with full water, power facilities, and furniture at Eastern Transmission Substation
locations. The portable cabin shall have dimensions of no less than 4x12 meters and be fully equipped with a toilet,
kitchen, power supply and MCB AC. Additionally, it shall include a water tank with a capacity of at least 3 cubic meters, to
be filled daily, and a temporary sewage pit with a volume of at least 3 cubic meters, to be discharged periodically as
needed
For the portable cabin base, stand legs with a 7mm plate shall be provided if the ground is solid. For unsuitable ground, a
40x40 cm concrete base shall be provided
Breakdown
Description
Long Description
Provide materials and set ground conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.) for one grounding pit to
improve earth resistance when required
Supply and lay a copper braid stranded cable, size 70 sq. mm, including all necessary components for connecting and
fixing
Supply and lay a copper braid stranded cable, size 120 sq. mm, including all necessary components for connecting and
fixing
Supply and lay a copper braid stranded cable, size 185 sq. mm, including all necessary components for connecting and
fixing
Supply and lay a copper braid stranded cable, size 240 sq. mm, including all necessary components for connecting and
fixing
Supply and lay a copper braid stranded cable, size 300 sq. mm, including all necessary components for connecting and
fixing
Supply and install an earthing bus bar, size 3.5 m x 25 mm x 5 mm, including all necessary components for fixing and
connecting
Supply and install an earthing bus bar, size 3.5 m x 40 mm x 5 mm, including all necessary components for fixing and
connecting
Supply and install an earthing bus bar, size 3.5 m x 50 mm x 5 mm, including all necessary components for fixing and
connecting
TELECOM SHELTERS AND TOWERS WORKS as Per Item # 5.2.2 of Schedule "B"
I.4.2.1
Breakdown
Supply and erection of a communication shelter with A/C at NG proposed locations for substations and transmission lines,
with dimensions (2.5x2.5 m). The shelter shall be equipped with two split air-conditioning units with a timer switch, cable
ladders, a power source, fire extinguishers, lights, power sockets, and the construction of a foundation for the
communication shelter, all as per COMPANY specifications
I.4.2.2
Breakdown
Supply and erection of a communication shelter with A/C at NG proposed locations for substations and transmission lines,
with dimensions (3x3 m). The shelter shall be equipped with two split air-conditioning units with a timer switch, cable
ladders, a power source, fire extinguishers, lights, power sockets, and the construction of a foundation for the
communication shelter, all as per COMPANY specifications
EA
10
40,446.00
SR
404,460.00
Unit Rate
I.4.2.3
Breakdown
Supply and install grounding on telecom towers and/or shelters
EA
15
803.25
SR
12,048.75
Unit Rate
I.4.2.4
Breakdown
Supply and install cable trays between telecom towers and shelters
EA
20
3,572.10
SR
71,442.00
Unit Rate
I.4.2.5
Breakdown
Remove old gravel, supply and fill new gravel for towers and shelters
M2
110
259.88
SR
28,586.25
Unit Rate
I.4.2.6
Breakdown
Removal of loose/old paint from telecom towers and repainting according to COMPANY instructions and specifications
M2
10
614.25
SR
6,142.50
Unit Rate
I.4.2.7
Breakdown
EA
15
3,572.10
SR
53,581.50
Unit Rate
EA
10
3,969.00
SR
39,690.00
Unit Rate
I.4.2.8
I.4.3
Repair of the Telecom tower aviation lighting system
Breakdown
Description
Supply and install an aviation lighting system on telecom towers
SUPPORT FACILITY
ADDITIONAL WORKS as Per Item # 5.4.3 of Schedule "B"
I.4.3.1
Breakdown
Supply, install and removal guard posts at the site, including complete formwork (four posts), concreting, and beaming
EA
6
64,212.75
SR
385,276.50
Unit Rate
I.4.3.2
Breakdown
Supply, install and removal an additional guard post
EA
6
14,175.00
SR
85,050.00
Unit Rate
BF-PA -20 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
I.4.3.3
Breakdown
I.4.3.4
Breakdown
Supply required materials and paint guard posts
EA
6
8,032.50
SR
48,195.00
Unit Rate
Prepare the site for the jointing of power cables by company technicians as directed, per joint bay
EA
6
3,657.15
SR
21,942.90
Unit Rate
I.4.3.5
Breakdown
Supply and Install nameplates for the circuits as directed
EA
30
330.75
SR
9,922.50
Unit Rate
I.4.3.6
Breakdown
Supply and install room identification signs
EA
30
165.38
SR
4,961.25
Unit Rate
I.4.3.7
Breakdown
Supply and install signs for Electrical, Mechanical, Protective Equipment, Symbolic Safety Signs in the Control Room, Relay
Room, Communication Room, Battery Room, HVAC Room, Basement, and Switch Yard
EA
30
354.38
SR
10,631.25
Unit Rate
I.4.3.8
Breakdown
Supply and install signboards on the Substation building
M2
80
803.25
SR
64,260.00
Unit Rate
I.4.3.9
Breakdown
Supply and install trash bins (1. Combustibles (Red Color), 2. Salvage (Orange Color), 3. Plastic & Paper (Blue Color), and
4. Trash (Yellow Color)
EA
60
519.75
SR
31,185.00
Unit Rate
I.4.3.10
Breakdown
Perform the required inspections of Water Pumps and Related Parts: controls and distribution panels to maintain them in
proper and good condition
EA
10
1,748.25
SR
17,482.50
Unit Rate
Breakdown
Perform the required inspections of Extract Ventilation and Exhaust Fans: for buildings, battery rooms, basements, etc. to
maintain them in proper and good condition
EA
10
1,748.25
SR
17,482.50
Unit Rate
I.4.3.12
Breakdown
Perform the required inspections of Lights and Related Parts: including exit lights, emergency lights, building lights,
floodlights, security lights, and related controls and distribution panels for building facilities to maintain them in proper
and good condition
EA
10
803.25
SR
8,032.50
Unit Rate
I.4.3.13
Breakdown
Perform the required inspections of Doors, Gates and Related Parts: for building facilities to maintain them in proper and
good condition
EA
10
1,275.75
SR
12,757.50
Unit Rate
I.4.3.14
Breakdown
Perform the required inspections of Toilets and Related Fittings and Consumables: for building facilities to maintain them
in proper and good condition
EA
10
1,275.75
SR
12,757.50
Unit Rate
I.4.3.15
Breakdown
Perform the required inspections of Floors, Walls, and Slabs: for building facilities to maintain them in proper and good
condition
EA
10
1,275.75
SR
12,757.50
Unit Rate
Breakdown
Perform the required inspections of Suspended/Dropped Ceilings: Including plywood/gypsum, aluminum boards for
building facilities to maintain them in proper and good condition
EA
10
1,275.75
SR
12,757.50
Unit Rate
I.4.3.11
I.4.3.16
I.5
Description
MANPOWER
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
PROVIDE THE MANPOWER TO PERFORM ANY ADDITIONAL WORK NOT COVERED IN THE WORK UNIT RATES
WHEN REQUESTED BY THE COMPANY as Per Item # 5.4.3.10 of Schedule "B"
I.5.1
Breakdown
Foreman or Technical Supervisor or Specialist
H
6
33.55
SR
201.29
Unit Rate
I.5.2
Breakdown
Certified scaffolder foreman/supervisor
H
6
33.55
SR
201.29
Unit Rate
I.5.3
Breakdown
Certified Scaffolder workers for erecting scaffolding systems
H
6
26.93
SR
161.60
Unit Rate
I.5.4
Breakdown
Operator/Programmer
H
6
33.55
SR
201.29
Unit Rate
I.5.5
Breakdown
Safety Officer
H
6
42.05
SR
252.32
Unit Rate
I.5.6
Breakdown
Safety Engineer
H
6
49.61
SR
297.68
Unit Rate
I.5.7
Breakdown
Civil/Mechanical/Electrical Engineer
H
6
49.61
SR
297.68
Unit Rate
I.5.8
Breakdown
Surveyor/Mechanic/Electrician/Instrument/Senior A/C Technician
H
6
24.76
SR
148.55
Unit Rate
I.5.9
Breakdown
Welder
H
6
24.76
SR
148.55
Unit Rate
I.5.10
Breakdown
Plumber/Carpenter/Mason/Painter/Roofer
H
6
24.76
SR
148.55
Unit Rate
I.5.11
Breakdown
Metal Fabricator/Metal Mechanic/Duct Fabricator
H
6
24.76
SR
148.55
Unit Rate
I.5.12
Breakdown
Insulator/refractory worker
H
6
24.76
SR
148.55
Unit Rate
I.5.13
Breakdown
Certified Lifting equipment driver
H
6
24.76
SR
148.55
Unit Rate
I.5.14
Breakdown
Heavy Equipment Operator
H
6
24.76
SR
148.55
Unit Rate
BF-PA -21 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
I.5.15
Breakdown
I.5.16
Breakdown
I.6
Description
Quantity
Heavy Truck Driver
H
6
24.76
SR
148.55
Unit Rate
Helper
H
9
15.59
SR
140.33
Unit Rate
EQUIPMENT
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
PROVIDE THE Equipment TO PERFORM ANY ADDITIONAL WORK NOT COVERED IN THE WORK UNIT RATES
WHEN REQUESTED BY THE COMPANY as Per Item # 7 of Schedule "B"
I.6.1
Breakdown
Dump Truck with 15 cubic meter capacity
H
8
165.38
SR
1,323.00
Unit Rate
I.6.2
Breakdown
Portable Oil Tanker with 15 cubic meter capacity, with all associated hoses
H
8
155.93
SR
1,247.40
Unit Rate
I.6.3
Breakdown
Portable Water Tanker with 15 cubic meter capacity, with all associated hoses
H
8
165.38
SR
1,323.00
Unit Rate
I.6.4
Breakdown
Portable Oil Pumps not less than 1 HP, with all associated hoses
H
8
94.50
SR
756.00
Unit Rate
I.6.5
Breakdown
Portable Water Pumps (1HP) with all associated hoses
H
8
113.40
SR
907.20
Unit Rate
I.6.6
Breakdown
Portable Water Pumps (2HP) with all associated hoses
H
8
132.30
SR
1,058.40
Unit Rate
I.6.7
Breakdown
Excavator including certified driver
H
8
212.63
SR
1,701.00
Unit Rate
I.6.8
Breakdown
Backhoe including certified driver
H
8
212.63
SR
1,701.00
Unit Rate
I.6.9
Breakdown
Pay loader Medium Size including certified driver
H
8
269.33
SR
2,154.60
Unit Rate
I.6.10
Breakdown
Bobcat including certified driver
H
8
141.75
SR
1,134.00
Unit Rate
I.6.11
Breakdown
Jack Hammer medium capacity including certified driver
H
8
165.38
SR
1,323.00
Unit Rate
I.6.12
Breakdown
Bulldozer including certified driver
H
8
425.25
SR
3,402.00
Unit Rate
I.6.13
Breakdown
Road Roller Medium Size
H
8
330.75
SR
2,646.00
Unit Rate
I.6.14
Breakdown
Asphalt Cutter with 12" diameter blade
H
8
141.75
SR
1,134.00
Unit Rate
I.6.15
Breakdown
Compactor Bottom Plate (18" x 18")
H
8
80.33
SR
642.60
Unit Rate
I.6.16
Breakdown
Bucket Truck
H
8
330.75
SR
2,646.00
Unit Rate
I.6.17
Breakdown
Crane, 10 Ton
H
8
330.75
SR
2,646.00
Unit Rate
I.6.18
Breakdown
Crane, 15 Ton
H
8
354.38
SR
2,835.00
Unit Rate
I.6.19
Breakdown
Crane, 20 Ton
H
8
425.25
SR
3,402.00
Unit Rate
I.6.20
Breakdown
Crane, 25 Ton
H
8
425.25
SR
3,402.00
Unit Rate
I.6.21
Breakdown
Forklift, 5 Ton
H
8
236.25
SR
1,890.00
Unit Rate
I.6.22
Breakdown
Forklift, 10 Ton
H
8
330.75
SR
2,646.00
Unit Rate
I.6.23
Breakdown
Heavy-duty industrial vacuum machine
H
8
330.75
SR
2,646.00
Unit Rate
I.6.24
Breakdown
Air Compressor (0.63 Mpa)
H
8
165.38
SR
1,323.00
Unit Rate
I.6.25
Breakdown
Mobile man lifter, portable type
H
8
165.38
SR
1,323.00
Unit Rate
M2
400
21.97
SR
8,788.00
Unit Rate
II
Description
AMD-Hassa
II.1
Description
CIVIL WORKS
II.1.1
Description
CIVIL WORKS
II.1.1.1
Breakdown
Asset Maintenance Department-Hassa (Uray’iyah, Ain Dar, Abqaiq, Qurayyah, Shedgum, Al Uqair Mubaraz,
Hofuf, Haradh, Wasia, Khurais, Uthmaniyah, Faras and Hawiyah)
CIVIL WORKS as Per Item # 5.1 of Schedule "B"
SURVEYING as Per Item # 5.1.1 of Schedule "B"
Land surveying of area, the boundaries of which shall be specified by the Company. Includes site surveying, preparation
of detailed topographical maps, showing all existing structures, roads, electrical and communication networks, etc.,
with scales (1:250) or (1:100). The maps shall be submitted in hard and softcopies
BF-PA -22 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
II.1.1.2
Breakdown
II.1.1.3
Breakdown
II.1.2
Description
Short Description
CIVIL WORKS
Quantity
EA
35
1,500.00
SR
52,500.00
Unit Rate
Preparation of construction drawing of as built drawings for civil, electrical, mechanical works.
EA
35
1,500.00
SR
52,500.00
Unit Rate
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Preparation of topographical maps only as explained in item 5.1.1 in Schedule "B" for a pre-surveyed area,
excluding collection of site data with scales (1:50) or (1:20)
EXCAVATION, BACKFILL AND COMPACTION SURVEYING as Per Item # 5.1.2 of Schedule "B"
II.1.2.1
Breakdown
Breaking and removal of asphalted top surface using adequate equipment and disposal to designated places
M3
550
118.00
SR
64,900.00
Unit Rate
II.1.2.2
Breakdown
Excavation in Rocky soil using all necessary equipment and dispose excavated material to dump areas
M3
500
86.00
SR
43,000.00
Unit Rate
II.1.2.3
Breakdown
Excavation in normal soil using all necessary equipment and dispose excavated material to dump areas
M3
400
67.00
SR
26,800.00
Unit Rate
II.1.2.4
Breakdown
Manual excavation using manual equipment in restricted area due to specialty of any areas specified by COMPANY
Engineers
M3
250
126.23
SR
31,556.25
Unit Rate
II.1.2.5
Breakdown
Shoring of trench wall(s) where necessary, using CONTRACTOR’s shoring gear. Work includes removal after job
completion. Rate per running meter of trenches shored up
M
250
140.25
SR
35,062.50
Unit Rate
II.1.2.6
Breakdown
Supply and backfill clean sand, general fill, select fill, source within 100 km from Work site
M3
200
51.43
SR
10,285.00
Unit Rate
II.1.2.7
Breakdown
Supply and backfill clean sand, general fill, select fill, source beyond 100 km from Work site
M3
200
II.1.2.8
Breakdown
Supply Backfilling material for sub-base course layer (under asphalt layer) as per COMPANY Specifications
M3
3,400
II.1.2.9
Breakdown
Supply Normal backfilling material as per COMPANY Specifications
M3
II.1.2.10
Breakdown
Supply and lay gravel, 10-15 cm thick layer, including leveling and compaction of selected area as per COMPANY
Standards
II.1.2.11
Breakdown
Supply and lay cable warning tapes and cement tiles 20x30cm dark red color
II.1.2.12
51.43
SR
10,285.00
Unit Rate
140.25
SR
476,850.00
Unit Rate
250
70.13
SR
17,531.25
Unit Rate
M3
250
70.13
SR
17,531.25
Unit Rate
M
400
23.00
SR
9,200.00
Unit Rate
Breakdown
Safety signs and equipment around excavation area (stand, warning tape, warning lights, caution warning plates, plastic
net orange color, cement blocks as required).
M
700
100.00
SR
70,000.00
Unit Rate
II.1.2.13
Breakdown
Supply and place sand as directed. When used to fill substation trenches this item includes skimming the surface with a
weak mix of sand and cement to a thickness of 5 cm. When this item is used in packing around 110 kV, 115 kV, 132 kV,
230 kV & 380 kV joints, the price includes placing the sand in bags and positioning them around the joint
M3
350
60.00
SR
21,000.00
Unit Rate
II.1.2.14
Breakdown
Perform soil investigation according to the company's approved specifications WI.GM- after any excavation
and backfilling
EA
35
1,475.00
SR
51,625.00
Unit Rate
II.1.2.15
Breakdown
Perform soil Conduct soil testing for compaction, bearing capacity, and soil resistivity
EA
35
1,475.00
SR
51,625.00
Unit Rate
II.1.2.16
Breakdown
Shallow Compaction: Using rollers, rammers, or vibratory plates to compact the soil at shallow depths
M3
30
60.78
SR
1,823.25
Unit Rate
II.1.2.17
Breakdown
Deep Compaction: Techniques like vibroflotation, dynamic compaction, and blasting compact soil at greater depths
M3
15
70.13
SR
1,051.88
Unit Rate
II.1.2.18
Breakdown
Permeation Grouting: Supply and injecting grout into the soil to fill voids and increase strength
M3
10
1,020.00
SR
10,200.00
Unit Rate
II.1.2.19
Breakdown
Compaction Grouting: Supply and injecting a stiff grout to displace and compact the surrounding soil
M3
7
691.90
SR
4,843.30
Unit Rate
II.1.2.20
Breakdown
Jet Grouting: Using high-pressure jets to mix grout with the soil, creating a solidified mass (including the injection
material)
M3
7
1,051.88
SR
7,363.13
Unit Rate
II.1.2.21
Breakdown
Chemical Stabilization: Supply and Adding lime, cement, or other chemicals to improve soil properties
M3
3
327.25
SR
981.75
Unit Rate
II.1.2.22
Breakdown
Mechanical Stabilization: Mixing soil with aggregates or geosynthetics to enhance strength and stability (including supply
of the aggregates)
M3
3
444.13
SR
1,332.38
Unit Rate
Breakdown
Geosynthetics: Using geotextiles, geogrids, or geomembranes to reinforce and stabilize the soil (including supplying the
material)
M3
3
303.88
SR
911.63
Unit Rate
Soil Nailing: supply and Install steel bars (nails) into the soil to provide additional support and stability
M3
3
154.28
SR
462.84
Unit Rate
M2
3,400
65.45
SR
222,530.00
Unit Rate
II.1.2.23
II.1.2.24
II.1.3
II.1.3.1
Breakdown
Description
Breakdown
CIVIL WORKS
ASPHALTING SURVEYING as Per Item # 5.1.3 of Schedule "B"
Supply, deliver to site and lay tarmac, asphalt or other tar surface to a thickness of 10 cm including spray of liquid asphalt
(MC1) on final soil layer
BF-PA -23 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
II.1.3.2
Breakdown
Grind and remove top surface of asphalt to the required thickness using milling machine, Supply and deliver approved
asphalt to site and lay to restore the required level (Max 10 cm thick) using planner Asphalt Paper (Faraday)
M2
2,800
25.25
SR
70,686.00
Unit Rate
II.1.3.3
Breakdown
Supply and lay a layer of sub-base to a thickness not less than 20 cm composed from clean material, free from organic
material or clay and aspersion of water and compacting to reach required compaction, also supply, deliver to site and lay
asphalt areas at a thickness not less than 8 cm including preparation of surfaces to be cleaned from dust with air
compressor after removing all loose material from sub-base and spreading MC1 coat
M2
3,200
114.00
SR
364,800.00
Unit Rate
II.1.3.4
Breakdown
Road limit on both sides, left and right marking lanes with yellow color, shall be 15 cm and thickness not less than 0.3
mm
M
700
8.70
SR
6,086.85
Unit Rate
II.1.3.5
Breakdown
Paint road pavement (footpath) by black and yellow paint, 0.3 mm
M
700
II.1.3.6
Breakdown
Caution warning plate included plate pole shall be provided
EA
70
II.1.3.7
Breakdown
Road middle line white color 15 cm, 0.3 mm thickness
M
II.1.4
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
8.70
SR
6,086.85
Unit Rate
495.00
SR
34,650.00
Unit Rate
700
8.70
SR
6,086.85
Unit Rate
Description
CIVIL WORKS
SIDEWALKS SURVEYING as Per Item # 5.1.4 of Schedule "B"
II.1.4.1
Breakdown
Supply and Lay
Paving Only
Supply and lay paving tiles. All materials to be supplied by CONTRACTOR. Item includes bedding the tiles but not
construction foundation
M2
900
46.00
SR
41,400.00
Unit Rate
II.1.4.2
Breakdown
Walkways Works
Supply and erect curbstones 15x15x30cm with toggle joint 15cm (shape L) and backfilling with clean sand and immersion
with water, then lay lean concrete 10cm thick with reinforcement steel (4mm) and erect pathway tiles as per sample
approved by the Company Representative and making dilation joints and slope for drainage
M2
350
48.35
SR
16,922.50
Unit Rate
II.1.4.3
Breakdown
Curbstones
M
200
48.35
SR
9,670.00
Unit Rate
II.1.4.4
Breakdown
Reinstall existing Marbled tiles or special tiles work includes concrete base laying, jointing paving
M2
140
28.00
SR
3,920.00
Unit Rate
II.1.4.5
Breakdown
Reinstatement of Asphalted Sidewalk using Hot Asphalt includes base preparation according to site Conditions
M2
400
35.00
SR
14,000.00
Unit Rate
II.1.4.6
Breakdown
Reinstatement of plain concrete sidewalk according to site Conditions
M2
350
36.00
SR
12,600.00
Unit Rate
II.1.4.7
Breakdown
Reinstatement of reinforced concrete sidewalks according to site Conditions
M2
350
36.00
SR
12,600.00
Unit Rate
II.1.4.8
Breakdown
Reinstatement of graveled sidewalks according to site Conditions, thick 5-10cm
M2
2,000
28.00
SR
56,000.00
Unit Rate
II.1.4.9
Breakdown
Painting of curbstone around the sidewalk
M
700
16.00
SR
11,200.00
Unit Rate
II.1.4.10
Breakdown
Laying Cement tiles on sidewalks
M2
700
35.15
SR
24,605.00
Unit Rate
II.1.4.11
Breakdown
Supply and Construct reinforced concrete sidewalks with welded wire mesh
M2
700
42.00
SR
29,400.00
Unit Rate
II.1.5
Description
CIVIL WORKS
II.1.5.1
Description
CONSTRUCTION
CIVIL WORK
Supply and lay curbstones, Item includes all work needed to cut , fit and bed curbstone on an existing cement mortar
layer at a thickness of not less than 5cm
CONSTRUCTION CIVIL WORK SURVEYING as Per Item # 5.1.5 of Schedule "B"
FENCING as Per Item # 5.1.5.1 of Schedule "B"
II.1.5.1.1
Breakdown
Supply and installation of perimeter fence with concrete posts as per COMPANY Standards (70-TMSS-02 and TCS-M112.01)
M
550
947.00
SR
520,850.00
Unit Rate
II.1.5.1.2
Breakdown
Removal of existing fence and supply and erect of PVC coated mesh 4mm thick at a height of 2.45m with all accessories,
fixation and bottom flat bar to be fixed to the posts, including all necessary for erection as per COMPANY standards.
M
550
229.08
SR
125,991.25
Unit Rate
II.1.5.1.3
Breakdown
Supply and erection of one set of precast boundary walls consisting of two column grad beams and one wall panel having
dimension (3x3 MT as per SEC. Standard TA-800144, TA-800012 and AT-800013
M
700
1,255.00
SR
878,500.00
Unit Rate
II.1.5.1.4
Breakdown
Supply and Install of decorative steel fence on top of boundary as per Sec-Standard TA-800112
M
350
219.73
SR
76,903.75
Unit Rate
II.1.5.1.5
Breakdown
Supply and install perimeter fence with concrete posts as per SEC standard at dip station and around tower OHL different
locations
M
100
949.03
SR
94,902.50
Unit Rate
II.1.5.1.6
Breakdown
Supply and install personnel fence gate- mm Wide
EA
100
1,680.45
SR
168,045.00
Unit Rate
II.1.5.1.7
Breakdown
Supply and installation door for fence above as per COMPANY Standards.
EA
15
4,200.00
SR
63,000.00
Unit Rate
BF-PA -24 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
II.1.5.1.8
Breakdown
II.1.5.1.9
Breakdown
Breakdown
II.1.5.1.10
II.1.5.1.11
II.1.5.2
Short Description
Breakdown
Description
CONSTRUCTION
CIVIL WORK
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
Supply and install metal barriers to raise the Substation boundary in areas facing equipment that poses a danger
M
140
217.00
SR
30,380.00
Unit Rate
Removal of existing barbed wire and erection of 3 barbed wires and flat bar in between 2 posts to fix these wires.
M
550
31.00
SR
17,050.00
Unit Rate
Additional cost to be added to item (II.1.5.1.9) when supplying and erection of spiral barbed wire instead of the 3 barbed
wires.
M
250
144.00
SR
36,000.00
Unit Rate
Removal of existing barbed wire and erection of spiral barbed wires and flat bar in between 2 posts to fix these wires
M
250
170.00
SR
42,500.00
Unit Rate
EA
40
4,100.00
SR
164,000.00
Unit Rate
Long Description
DOOR AND WINDOW WORKS as Per Item # 5.1.5.2 of Schedule "B"
II.1.5.2.1
Breakdown
Supply and erection of steel door with all required accessories including frames, anchors, hinges, dust proof strips, the
thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant paint at least
0.5mm thick with primer and final paint as per COMPANY specifications, with inside size of 100 x 220cm
II.1.5.2.2
Breakdown
Supply and erection of steel sliding door size 400 x 500cm with all required accessories including frames, anchors, wheels
& sliding channels, dust proof strips, the thickness of the metal sheets is 2mm, filled-in with insulation, fire rated with a
coat of fire-resistant paint at least 0.5mm thick with primer and final paint as per company specifications. COMPANY
representative may request a single door 100 x 220cm in one of the leaves if needed
EA
15
28,850.00
SR
432,750.00
Unit Rate
II.1.5.2.3
Breakdown
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant
paint at least 0.5mm thick with primer and final paint as per company specifications, with inside size of 200 x 220 cm.
EA
40
5,780.00
SR
231,200.00
Unit Rate
II.1.5.2.4
Breakdown
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant
paint at least 0.5mm thick with primer and final paint as per company specifications, with inside size of 400 x 300 cm.
EA
20
18,513.00
SR
370,260.00
Unit Rate
II.1.5.2.5
Breakdown
EA
15
30,300.00
SR
454,500.00
Unit Rate
II.1.5.2.6
Breakdown
EA
20
4,295.00
SR
85,900.00
Unit Rate
II.1.5.2.7
Breakdown
EA
20
4,295.00
SR
85,900.00
Unit Rate
II.1.5.2.8
Breakdown
Supply and installation of a metal double leaf door of 200 × 220cm (100×220cm each leaf) with all accessories including
Framing, fixtures, Hinges, Handles, locks and arm-closer and dust proof strips, type steel artwork and painted with
furnace electrostatic powder, form and color to be determined by the company Representative and provide number (3)
Keys “Master Key”
EA
20
8,760.00
SR
175,200.00
Unit Rate
II.1.5.2.9
Breakdown
Supply and install aluminum doors with all the accessories including Framings, fixtures, Hinges, arm closer, handles, locks
and dust proof strips, the thickness of the fiber sheet must be 3mm filled in between with insulation materials and the
size 100×220cm, catalogs must be presented for approval of the door and choose the color. Note that COMPANY
Representative may request to leave a ventilation gap at the bottom of the door of approximate size 15 × 40cm segments
with filter and rips for ventilation
EA
20
5,700.00
SR
114,000.00
Unit Rate
II.1.5.2.10
Breakdown
Supply and install wooden doors size 100×220cm with all accessories including Framings, fixtures, Hinges, Handles, locks,
arm closer, and in this regard the CONTRACTOR must provide samples for the initial choice of colors from all variety of
colors and finishes available in the factory to decide the finishing of doors and frames, these samples must come in the
form of angled section of about 15cm2 at the same thickness and material of the WORK in its final form
EA
20
2,470.00
SR
49,400.00
Unit Rate
II.1.5.2.11
Breakdown
EA
15
67,500.00
SR
1,012,500.00
Unit Rate
II.1.5.2.12
Breakdown
EA
15
2,620.00
SR
39,300.00
Unit Rate
II.1.5.2.13
Breakdown
EA
15
1,250.00
SR
18,750.00
Unit Rate
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, fire rated with a coat of fire-resistant paint at least 0.5mm thick with primer and final paint as per company
specifications, with inside size of 500 x 420 cm.
Supply and erection of single steel door with all required accessories including frames, anchors, hinges, dust proof strips,
the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire resistant paint at
least 0.5mm thick with primer and final paint as per company specifications, with inside size of 100 x 220cm (emergency
door), equipped with anti-panic arm to open and the arm closer
Supply and installation of a metal door of 100 × 220cm with all accessories including Framing, fixtures, Hinges, Handles,
locks and arm-closer and dust proof strips, type steel artwork and painted with furnace electrostatic powder, form and
color to be determined by the company Representative and provide number (3) Keys “Master Key”
Supply and erection of a roll-up door with all required accessories including frames, anchors, hinges, fire rated with a coat
of fire-resistant paint with a three-hour fire rating, with size of 500 x 600 cm
Supply and installation of bird screen doors with all accessories including the bird screen mesh 3mm thick and size
100×200cm with the appropriate metal supports and Framings, fixtures, Hinges, Handles, locks in accordance with the
COMPANY Specifications
Supply and installation of aluminum window, section with thickness not less than 3mm to be fixed in the openings
adequately by sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any
leak of dust and water, and double glass isolated (6/8/6)mm to be well fixed and surrounded by rubber entirely
continuous from both sides, and all the accessories such as handles and wheels must be of high quality, and the color of
glass as determined by the Company Representative with the installation of a sliding wire mesh, the size 60x80cm twist
type and a single glass reinforced with wire mesh for toilets, and a sample of these windows must be provided for
approval. Also supply and erect external metal grids to protect the windows with squared bars 1.5 cm # 15 x 15cm, to be
painted with primer coat and final coat same as paint specifications of the outer walls
BF-PA -25 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Quantity
Breakdown
Supply and installation of aluminum, section with thickness not less than 3 mm to be fixed in the openings adequately by
sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any leak of dust
and water, and double glass isolated (6/8/6 ) mm to be well fixed and surrounded by rubber entirely continuous from both
sides, and all the accessories such as handles and wheels must be of high quality, and the color of glass as determined by
the Company Representative with the installation of a sliding wire mesh, the size 120x100cm, and a sample of these
windows must be provided for approval. Also supply and erect external metal grids to protect the windows with squared
bars 1.5 cm # 15 x 15 cm, to be painted with primer coat and final coat same as paint specifications of the outer walls.
EA
15
3,455.76
SR
51,836.40
Unit Rate
II.1.5.2.15
Breakdown
Supply and installation of aluminum window, section with thickness not less than 3 mm to be fixed in the openings
adequately by sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any
leak of dust and water, and double glass isolated (6/8/6 ) mm to be well fixed and surrounded by rubber entirely
continuous from both sides, and all the accessories such as handles and wheels must be of high quality, and the color of
glass as determined by the Company Representative with the installation of a sliding wire mesh, the size 60x80cm twist
type and a single glass reinforced with wire mesh for toilets, and a sample of these windows must be provided for
approval. Also supply and erect external metal grids to protect the windows with squared bars 1.5 cm # 15 x 15 cm, to be
painted with primer coat and final coat same as paint specifications of the outer walls.
EA
15
1,350.00
SR
20,250.00
Unit Rate
II.1.5.2.16
Breakdown
Supply and install substation drive gate 6-meters width as per company standard drawing SA-036272
EA
15
24,600.00
SR
369,000.00
Unit Rate
II.1.5.2.17
Breakdown
Supply and install personnel gate for substation 1-meter-wide as per company Sec-Standard SA-036272
EA
15
6,200.00
SR
93,000.00
Unit Rate
II.1.5.2.18
Breakdown
Supply and install gates at dip stations at different locations Sec-Standard
EA
7
14,160.00
SR
99,120.00
Unit Rate
II.1.5.2.19
Breakdown
Supply and install gates of fence with concrete posts as per SEC standard at dip station and OHTL tower at different
locations
EA
15
15,850.00
SR
237,750.00
Unit Rate
II.1.5.2.20
Breakdown
Supply and install steel handrails (2-inch G.I. pipe) for stairways as per NFPA101 requirements, painted canary yellow
M
140
135.58
SR
18,980.50
Unit Rate
II.1.5.2.21
Breakdown
Supply and install exit safety devices for all exterior doors as per SEC standard TES-P-119.19
EA
15
980.00
SR
14,700.00
Unit Rate
II.1.5.2.22
Breakdown
Supply and install canopy above door and windows frame
EA
15
820.00
SR
12,300.00
Unit Rate
II.1.5.2.23
Breakdown
Supply and install clear anodized aluminum window curtains
M2
350
120.00
SR
42,000.00
Unit Rate
II.1.5.3
Description
Short Description
CONSTRUCTION
CIVIL WORK
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
II.1.5.2.14
Line type
Building Works as Per Item # 5.1.5.3 of Schedule "B"
II.1.5.3.1
Breakdown
Concrete block wall thickness 20 cm
M2
140
152.99
SR
21,419.17
Unit Rate
II.1.5.3.2
Breakdown
Concrete block wall thickness 15 cm
M2
140
118.03
SR
16,523.51
Unit Rate
II.1.5.3.3
Breakdown
Concrete block wall thickness 10 cm
M2
140
87.42
SR
12,239.15
Unit Rate
II.1.5.3.4
Breakdown
Sand lime block wall thickness 20 cm
M2
70
160.64
SR
11,244.96
Unit Rate
II.1.5.3.5
Breakdown
Sand lime block wall thickness 15 cm
M2
70
123.92
SR
8,674.74
Unit Rate
II.1.5.3.6
Breakdown
Construction of decorative block wall (rock type) 20cm thick.
M2
70
II.1.5.3.7
Breakdown
Work of the repair of walls
M2
350
II.1.5.3.8
Breakdown
Construct a substation security guard house as per company construction standard drawings TA 800039, TA 800040, TA
800041, and TA 800042
EA
3
II.1.5.3.9
Breakdown
Supply and install Substation signboard on the Substation Building as per Sec-Standard TC-800003
EA
15
Supply and install Substation signboard on the Gate House as per Sec-Standard TA-800111
EA
M3
II.1.5.3.10
II.1.5.4
II.1.5.4.1
Breakdown
Description
Breakdown
CONSTRUCTION
CIVIL WORK
91.80
SR
6,425.88
Unit Rate
128.00
SR
44,800.00
Unit Rate
130,000.00
SR
390,000.00
Unit Rate
3,250.00
SR
48,750.00
Unit Rate
15
3,000.00
SR
45,000.00
Unit Rate
140
1,185.00
SR
165,900.00
Unit Rate
Concrete Works as Per Item # 5.1.5.4 of Schedule "B"
Supply and deliver to site and lay concrete for slabs with a mix of 1:2:4, the cement must not be less than 350kg/m3,
item includes covering the background lean concrete or backfilling with polyethylene sheet 200 micron thick and
reinforcement steel mesh #15x15cm 8mm dia., to be doubled (two layers) on at least 1m from the grade beam
centerlines.
BF-PA -26 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Total
Payment
Type
SR
312,500.00
Unit Rate
40.49
SR
5,667.97
Unit Rate
100
190.00
SR
19,000.00
Unit Rate
M3
35
294.53
SR
10,308.38
Unit Rate
Raise the level of the cable trench side walls by at least 10 cm. This item includes supplying and delivering to the site
concrete with a mix of 1:2:4, including reinforcement steel, which must be fixed after drilling the top of trench walls with
epoxy grout (glue). Also, fix a steel angle 5x5 cm on the internal edge of trench walls
M3
70
336.60
SR
23,562.00
Unit Rate
Breakdown
Cover the cable trenches with tight covers to avoid infiltration of water and oil. The covers should be in the form of steel
frames (frame with steel angles 5x5 cm and closing the frame from the bottom with a 2 mm thick steel plate) to be
poured with lightweight foam concrete (450 kg/m³) reinforced with #15x15 cm steel mesh, 4 mm diameter at least. The
joints between the covers (8 mm) will be filled with polyurethane sealant
M2
100
143.06
SR
14,305.50
Unit Rate
II.1.5.4.8
Breakdown
Repair and replace damaged or weak cable trench covers according to the COMPANY Specifications
M2
70
135.58
SR
9,490.25
Unit Rate
II.1.5.4.9
Breakdown
Supply and erect covers for cable trenches according to the COMPANY Specifications
M2
70
169.47
SR
11,862.81
Unit Rate
Item
Line type
UOM
Quantity
II.1.5.4.2
Breakdown
Supply and deliver to site and lay concrete including reinforcement steelwork for foundations, grade beams, beams and
columns, with a mix of 1:2:4, the cement must not be less than 350kg/m3 and the reinforcement steel not less than 100
kg, unless specifically indicated in drawings or directed by the Company Representative. It is required to paint the
underground portion of the reinforced concrete with an approved waterproofing material to prevent corrosion. The
contactor must use a vibrator (50mm dia. And speed 3000tr/Min) sufficiently during concreting as directed.
M3
250
1,250.00
II.1.5.4.3
Breakdown
Supply and deliver to site 50 kg of cement additional to normal concrete mix design of 1:2:4
EA
140
II.1.5.4.4
Breakdown
Supply and deliver to site and lay lean concrete without reinforcement steel with a mix of 200kg/m3. The underground
portion must be painted with an approved waterproofing material to prevent water infiltration into the reinforced concrete
as directed by the Company Representative. Concrete strength should be 2500 Psi
M3
II.1.5.4.5
Breakdown
Supply and erect on site pre-cast reinforced concrete pits according to the company specifications. Item include
installation and supply cover for pit and also excavation and restoration of site to original
II.1.5.4.6
Breakdown
II.1.5.4.7
II.1.5.5
Description
Short Description
CONSTRUCTION
CIVIL WORK
Long Description
Unit Price
Currency
Flooring Works and finishing as Per Item # 5.1.5.5 of Schedule "B"
II.1.5.5.1
Breakdown
Supply and lay ceramic tiles with a minimum thickness of 4 mm for walls and 9.5 mm for floors, including all necessary
materials for execution and the skirting at the foot of the wall, implemented as per technical standards. A sample of these
tiles should be provided for approval by the COMPANY Representative before implementation
M2
200
170.17
SR
34,034.00
Unit Rate
II.1.5.5.2
Breakdown
Supply and lay Acid-resistant ceramic tiles with a minimum thickness of 4 mm for walls and 9.5 mm for floors at the
battery room, including all necessary materials for execution and the skirting at the foot of the wall, implemented as per
technical standards. A sample of these tiles should be provided for approval by the COMPANY Representative before
implementation
M2
100
170.17
SR
17,017.00
Unit Rate
II.1.5.5.3
Breakdown
M2
200
170.17
SR
34,034.00
Unit Rate
II.1.5.5.4
Breakdown
M2
200
170.17
SR
34,034.00
Unit Rate
II.1.5.5.5
Breakdown
M2
170
224.40
SR
38,148.00
Unit Rate
II.1.5.5.6
Breakdown
Supply, install and replace damaged baseboards, 100 mm thick, matching the existing ones over telecommunication cable
trenches
M2
170
88.83
SR
15,100.25
Unit Rate
II.1.5.5.7
Breakdown
Supply and lay un-scratchable granite tiles, dimensions 30x60 cm and 2 cm thick, for floors and walls. Fix with white
cement, wire mesh, and mortar for wall fixing. The granite must be sorted before fixing, and non-assorted samples should
be rejected
M2
200
219.73
SR
43,945.00
Unit Rate
II.1.5.5.8
Breakdown
Supply and lay granite tiles for steps, 3 cm thick, with two rubber strips for each step, implemented as per company
specifications
M2
140
172.98
SR
24,216.50
Unit Rate
II.1.5.5.9
Breakdown
Supply and lay epoxy flooring resistant to scratches and chemical wear, with a thickness of 1000 microns and 300 microns
M2
350
158.00
SR
55,300.00
Unit Rate
II.1.5.5.10
Breakdown
Plaster with epoxy screed mortar, which must have low susceptibility to expansion and good compressive strength. An
epoxy primer coat may be required for bonding with existing concrete. The surface must be completely leveled to the final
required level, with a thickness varying from 10 to 15 mm
M2
250
201.03
SR
50,256.25
Unit Rate
II.1.5.5.11
Breakdown
Build Substation steps, including materials and labor according to company specifications. This includes plastering the
steps, compacting the soil, reinforcement steel, paint, and all materials provided at a height of 15 cm
M2
140
229.08
SR
32,070.50
Unit Rate
Supply and lay tiles, including spreading clean sand under the tiles at the required thickness for final finishing with an
average slope of 5 to 8 cm. Fix the tiles with cement mortar and sand, with a mix of 300 kg of cement per cubic meter of
sand at a thickness of not less than 3 cm, and joint with white cement
Supply and fix rubber tiles, size 30x30 cm, with glue after cleaning the existing surface with a brush, implemented as per
technical standards. A sample of these tiles must be provided for approval by the COMPANY Representative before
implementation
Supply, install and replace damaged raised floor tiles, matching the existing ones in the Control Room, Optical Fiber
Room, AC/DC Room, and PLC Room (without jack)
BF-PA -27 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
M2
140
219.73
SR
30,761.50
Unit Rate
II.1.5.5.12
Breakdown
Supply and fix natural rock aspects. This item includes providing tools, labor, equipment, and materials to fix vertical rock
tiles with thickness not exceeding 75 mm, including the inside of the tiles and oblique planes. Fixtures must be adjustable
in three directions for proper fixing. Lay marble tiles at the bottom of the aspects at a height of 60 cm, implemented as
per the specifications for fixing marble tiles. It is preferable to finish the faces of the marble tiles with a light gloss or
almost faded finish, as the marble tiles may lose glossiness under weather conditions
II.1.5.5.13
Breakdown
Supply and erect ceiling tiles, including metal frames, steel supports, and all necessary accessories. A sample of the tiles
must be submitted for approval by the COMPANY Representative
M2
140
172.98
SR
24,216.50
Unit Rate
II.1.5.5.14
Breakdown
Supply and erect stainless-steel slides, including steel supports and all necessary accessories. A sample of the slides must
be submitted for approval by the COMPANY Representative
M2
70
163.63
SR
11,453.75
Unit Rate
II.1.5.5.15
Breakdown
Supply and erect a surrounding crown on the top part of buildings with brick tiles (GUERMID), including supplying and
erecting a steel structure to support the bricks (1.5x1.5 m) and fixing the bricks as per usual technical standards. Also,
erect the false ceiling for this crown with all supports and frames and all necessary works
M
70
201.03
SR
14,071.75
Unit Rate
II.1.5.5.16
Breakdown
Supply and install vinyl tiles with skirting in offices and corridors
M2
100
104.72
SR
10,472.00
Unit Rate
II.1.5.5.17
Breakdown
Apply epoxy on the manhole's ground at various locations
M2
70
91.63
SR
6,414.10
Unit Rate
II.1.5.5.18
Breakdown
Supply and apply an epoxy coating system for the S/S floor building, stone grey color RAL7030
M2
140
91.63
SR
12,828.20
Unit Rate
II.1.5.6
Description
CONSTRUCTION
CIVIL WORK
Plumbing and Sanitary Works as Per Item # 5.1.5.6 of Schedule "B"
II.1.5.6.1
Breakdown
Supply and erect a kitchen washing basin with all accessories, including alimentation, sewage, and mixers
EA
15
4,850.00
SR
72,750.00
Unit Rate
II.1.5.6.2
Breakdown
Supply and erect a WC oriental chair (Saudi ceramic or similar), including all installation and necessary components for
operation
EA
30
2,950.00
SR
88,500.00
Unit Rate
Breakdown
Supply and erect a WC Frank chair (“American type one piece” or similar), including all installation and necessary
components for operation
EA
20
2,980.00
SR
59,600.00
Unit Rate
II.1.5.6.4
Breakdown
Supply and erect lavatories made from artificial marble, Corian material, or similar, in one piece, as per the color and form
approved by the COMPANY Representative. The lavatories shall be solid surface type and un-scratchable, including all
accessories, mirrors, etc
EA
20
4,650.00
SR
93,000.00
Unit Rate
II.1.5.6.5
Breakdown
Supply and replace water closets, including all accessories, in the toilet
EA
20
3,950.00
SR
79,000.00
Unit Rate
II.1.5.6.6
Breakdown
Supply and construct a septic tank as per SEC construction standard drawing TA-800134
EA
15
15,750.00
SR
236,250.00
Unit Rate
II.1.5.6.7
Breakdown
Supply and construct a disposal system and seepage as per SEC Standard TA-800135
EA
15
6,850.00
SR
102,750.00
Unit Rate
II.1.5.6.8
Breakdown
Supply and construct a sanitary sewer manhole as per SEC Standard TA-800137
EA
20
7,800.00
SR
156,000.00
Unit Rate
II.1.5.6.9
Breakdown
Supply and install a sewer manhole cover as per SEC Standard TA-800138
EA
20
1,160.00
SR
23,200.00
Unit Rate
II.1.5.6.10
Breakdown
Supply and install acid-resistant floor drains in the battery room
M
140
215.00
SR
30,100.00
Unit Rate
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 1500 liters
EA
7
1,898.05
SR
13,286.35
Unit Rate
II.1.5.6.12
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 2000 liters
EA
7
2,575.93
SR
18,031.48
Unit Rate
II.1.5.6.13
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 3000 liters
EA
7
4,745.13
SR
33,215.88
Unit Rate
II.1.5.6.14
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 4000 liters
EA
7
4,796.55
SR
33,575.85
Unit Rate
II.1.5.6.15
Breakdown
Supply and install a flush tank for the WC oriental chair, with all required materials, such as glue and solvent
EA
20
701.25
SR
14,025.00
Unit Rate
II.1.5.6.16
Breakdown
Supply and install a flush tank for the WC Frank chair, with all required materials, such as glue and solvent
EA
15
701.25
SR
10,518.75
Unit Rate
II.1.5.6.17
Breakdown
Supply and install a washing basin mixer, including all installation and necessary materials
EA
15
640.00
SR
9,600.00
Unit Rate
Supply and install a shower mixer, including all installation and necessary materials
EA
15
740.00
SR
11,100.00
Unit Rate
II.1.5.6.3
II.1.5.6.11
II.1.5.6.18
II.1.6
Breakdown
Description
CIVIL WORKS
MAINTENANCE CIVIL WORK SURVEYING as Per Item # 5.1.6 of Schedule "B"
BF-PA -28 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
II.1.6.1
Line type
Short Description
Description
MAINTENANCE
CIVIL WORK
II.1.6.1.1
Breakdown
II.1.6.1.2
Breakdown
Long Description
Total
Payment
Type
SR
212,800.00
Unit Rate
170.00
SR
68,000.00
Unit Rate
700
168.00
SR
117,600.00
Unit Rate
M2
550
180.00
SR
99,000.00
Unit Rate
UOM
Quantity
Unit Price
M2
1,400
152.00
M2
400
M2
Currency
Waterproofing of Substation Roof and Treatment of Water Leakage as Per Item # 5.1.6.1 of Schedule "B"
Removal of old waterproofing and cleaning of the roof from all detachable parts, the gar coating and material that may
compose a weak separating layer, also removal of the concrete layer if it is loose or totally fissured, without damaging
parapets or evacuation downspouts. WORK includes removal of debris to approved dumping area as directed by COMPANY
REPRESENTATIVE
Repair of deep cracks by opening them in “V” shape to be sealed with chemical crack filler, and the hair cracks with epoxy
putty, also sandpapering the repaired area and cleaning dust, as directed by COMPANY REPRESENTATIVE
Concrete the roof at a minimum thickness of 5cm (at least 5cm on top of highest corrugation in case of steel roof),
reinforced with steel mesh # 15x15, dia. 6mm
Supply workshops insulator aqueous and thermal system urinary (polyurethane) foam thickness and average 4cm and the
intensity of 40-45 kg/m3 directly above the face of the bishop concrete or top slalom surfaces metal or insulation layer old
reformed, with the WORK and vertical height of 20cm on all Aldoara vertical surrounding bishop. Maintain proper slopes
during the application of waterproofing material towards the drain
II.1.6.1.3
Breakdown
II.1.6.1.4
Breakdown
II.1.6.1.5
Breakdown
supply and paint with 3 layers of paint, Acrylic Foam Type Shield thickness of each layer after drought 300 microns with
the WORK of arming the network for paint textured fiber weight of 160 g/m2 to strengthen the Paint
M2
350
41.00
SR
14,350.00
Unit Rate
II.1.6.1.6
Breakdown
Supply and install Thermoplastic Single Ply Roofing Membrane, 1.5 mm thick, 1500 WMR UV PVC waterproofing
membrane, including wall corners
M2
350
105.00
SR
36,750.00
Unit Rate
II.1.6.1.7
Breakdown
Supply and install 40 x 40 cm cement tiles
M2
350
75.00
SR
26,250.00
Unit Rate
II.1.6.1.8
Breakdown
Supply and install 60 x 60 cm cement tiles
M2
350
180.00
SR
63,000.00
Unit Rate
II.1.6.1.9
Breakdown
Supply and Install 50 mm thick thermal insulation
M2
700
132.00
SR
92,400.00
Unit Rate
II.1.6.1.10
Breakdown
Carry out waterproofing paint (acrylic) on sloping deck sheeted roof using fiber mesh to reinforce the overlapping of steel
corrugated sheets and polyurethane sealant on fixing screws, implementation conform to the COMPANY specifications and
the technical procedure indicated in material catalogs
M2
700
152.00
SR
106,400.00
Unit Rate
II.1.6.1.11
Breakdown
Prevent leakage of water from the passing through external cable openings as per Item 5.1.6.1.8. of Schedule B
M2
350
134.00
SR
46,900.00
Unit Rate
II.1.6.1.12
Breakdown
Prevent leakage of water from dilation joints or cracks of the basement or cable trenches as per Item 5.1.6.1.9. of
Schedule B
M2
700
134.00
SR
93,800.00
Unit Rate
II.1.6.1.13
Breakdown
Opening dilation joints every 5m in all directions 1.5cm thick & 2.0 cm depth to fill with polyurethane sealant
M
550
60.00
SR
33,000.00
Unit Rate
II.1.6.1.14
Breakdown
Supply and install Aluminum sheet Gutter to drain the water
M
200
120.00
SR
24,000.00
Unit Rate
II.1.6.1.15
Breakdown
Supply and install Roof Drain 100 mm schedule 80
M
200
154.00
SR
30,800.00
Unit Rate
II.1.6.1.16
Breakdown
Supply and install roof Dom and concrete splash down
M3
70
170.00
SR
11,900.00
Unit Rate
II.1.6.1.17
Breakdown
Supply and install new flushing on roof parapet. With sealant
M
200
78.00
SR
15,600.00
Unit Rate
II.1.6.1.18
Breakdown
Supply and install water ingress insulation at basement as per Sec-Standard
M2
140
170.00
SR
23,800.00
Unit Rate
Supply and install Insu-wrap PVC waterproofing membrane (2000 Flee Back-UV) ultra violet membrane
M2
200
170.00
SR
34,000.00
Unit Rate
L
3,400
41.00
SR
139,400.00
Unit Rate
II.1.6.1.19
II.1.6.2
Breakdown
Description
MAINTENANCE
CIVIL WORK
Repair expansion joints in concrete structures as Per Item # 5.1.6.2 of Schedule "B"
II.1.6.2.1
Breakdown
Supply and refill the joints with flexible and waterproof materials such as polyurethane, or flexible epoxy compounds
II.1.6.2.2
Breakdown
Supply and install metal or rubber covers to protect the joints from future damage
II.1.6.2.3
Breakdown
Supply and replace the filler board for construction expansion joints as needed
II.1.6.2.4
Breakdown
II.1.6.3
II.1.6.3.1
Description
Breakdown
Supply and install protective covers over the expansion joints
MAINTENANCE
CIVIL WORK
M
700
32.00
SR
22,400.00
Unit Rate
M2
700
68.00
SR
47,600.00
Unit Rate
M
700
68.00
SR
47,600.00
Unit Rate
M2
700
60.00
SR
42,000.00
Unit Rate
Painting Works as Per Item # 5.1.6.3 of Schedule "B"
Removal of loose old paint using all the means used in this regard and without damaging the integrity of equipment and
devices inside and outside the substation as instructed by the company representative, and repairing the deep cracks by
opening them in "V" shape to be filled with crack filler and tiny cracks by filling with Epoxy putty, And ends of this
preparatory WORK by sanding walls or floors and cleaning from dust so that it will not be allowed any scratches or
BF-PA -29 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
II.1.6.3.2
Breakdown
II.1.6.3.3
Breakdown
Removal white aunt and fill back all damage area
M2
200
32.00
SR
6,400.00
Unit Rate
Painting for First Aid/Emergency Equipment/Medical Supplies/Oxygen Station etc. Stacking and Storage, Stairs, Doors,
and Reflector stickers at basement
M2
350
40.50
SR
14,175.00
Unit Rate
II.1.6.3.4
Breakdown
Wall paint with a primer coat and a final coat, with the color to be determined by the Company Representative. The paint
must be resistant to carbon, moisture, weather factors, chemicals, acids, and oils, and must be cleanable and expandable,
with a solid content proportion of not less than 70%. The type of paint should be Acrylic Aliphatic Polyurethane Paint
M2
1,400
31.50
SR
44,100.00
Unit Rate
II.1.6.3.5
Breakdown
Coating of insulators and fire protection coating for cables, with the color to be determined by the Company Standards.
The coating must be resistant to fire and heat, moisture, weather factors, chemicals, and acids
M
700
78.50
SR
54,950.00
Unit Rate
Breakdown
Sand blasting of steel doors as needed, followed by painting with a primer coat and a final coat of polyurethane paint with
a solid content ratio of not less than 70%
M2
1,800
31.00
SR
55,800.00
Unit Rate
Breakdown
Epoxy paint work for the flooring includes:
1. Repair of cracks of concrete floors by opening the deep cracks in the form of "V" and filling with chemical filler (CRACK
FILLER) and the hair cracks by filling with Epoxy putty.
2. Epoxy floor paint (solid content 100%) 200 microns thickness, the WORK carried on two layers at a thickness of not
less than 0.1mm each layer. And the execution in accordance with the method indicated in the catalogues, any change of
color will not be allowed, and the CONTRACTOR must respect the thickness and method of implementation instructed by
the company representative.
M2
2,000
125.00
SR
250,000.00
Unit Rate
II.1.6.3.8
Breakdown
Self-leveling painting work for flooring including:
1. Completely clean the concrete slab of any residue of glue and detachable parts, and then Repair of cracks of concrete
floors by opening the deep cracks in the form of "V" and filling with chemical filler (CRACK FILLER) and the hair cracks by
filling with Epoxy putty.
2. Apply a self-leveling paint (SELF LEVELING FLOOR PAINT) 4mm thick, including the primer coat in accordance with the
specifications of the company and method of execution indicated in the catalogues
M2
2,000
87.50
SR
175,000.00
Unit Rate
II.1.6.3.9
Breakdown
Apply self-leveling paint in accordance with the specifications of the item above but at a thickness of 3 mm
M2
350
78.50
SR
27,475.00
Unit Rate
II.1.6.3.10
Breakdown
Apply self-leveling paint in accordance with the specifications of the item above but at a thickness of 2 mm
M2
350
60.00
SR
21,000.00
Unit Rate
II.1.6.3.11
Breakdown
M2
140
16.50
SR
2,310.00
Unit Rate
II.1.6.3.12
Breakdown
M2
700
69.20
SR
48,440.00
Unit Rate
M2
2,000
106.00
SR
212,000.00
Unit Rate
II.1.6.3.6
II.1.6.3.7
II.1.6.3.13
II.1.6.4
Apply white & Black PU on exposed steel structure foundation
Apply cementitious cutting material at oil catch basin interior wall face
Epoxy coating system for floors in substation, epoxy coating color –stone grey–ral-7030 for GIS Room, Control Room,
switchgear Room, workshop, and relay rooms.
Work required as follows:
1. 1mm epoxy past for repairing cracks and floor levelling.
2. Master Top 1200 Resin: Primer
3. Master top 1230 -2-4mm self levelling epoxy coating
Breakdown
Description
Long Description
MAINTENANCE
CIVIL WORK
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
Repair Works as Per Item # 5.1.6.4 of Schedule "B"
II.1.6.4.1
Breakdown
Break of foundation layer & cable trench
M3
700
339.50
SR
237,650.00
Unit Rate
II.1.6.4.2
Breakdown
Repair of minor crack in wall and plaster defects
M2
1,000
134.00
SR
134,000.00
Unit Rate
II.1.6.4.3
Breakdown
Repair of major wall crack in wall and plaster defects
M2
1,000
245.00
SR
245,000.00
Unit Rate
II.1.6.4.4
Breakdown
Seal rodent and reptile entry holes to substations.
EA
170
79.00
SR
13,430.00
Unit Rate
II.1.6.4.5
Breakdown
Reconstruct collapsed/sagged floor
M2
1,000
134.00
SR
134,000.00
Unit Rate
II.1.6.4.6
Breakdown
Repair of crack due to corrosion of reinforcement
M2
250
245.00
SR
61,250.00
Unit Rate
II.1.6.4.7
Breakdown
Coring in R.C.C / block walls
EA
40
110.00
SR
4,400.00
Unit Rate
II.1.6.4.8
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 4" in thick wall
EA
35
110.00
SR
3,850.00
Unit Rate
II.1.6.4.9
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 8" in thick wall
EA
35
135.00
SR
4,725.00
Unit Rate
II.1.6.4.10
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 12" in thick wall
EA
35
148.00
SR
5,180.00
Unit Rate
BF-PA -30 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
II.1.6.4.11
Breakdown
II.1.6.4.12
Breakdown
Install duct plug on empty duct in manhole/ hand hole
EA
60
48.00
SR
2,880.00
Unit Rate
Civil work repair of the opening of manhole/ handhole cover
EA
60
760.00
SR
45,600.00
Unit Rate
Breakdown
Exposing Buried Manhole to clear out and exposed buried manhole. The excavated excess soil shall be scraped and
leveled to the existing ground.
II.1.6.4.13
EA
70
1,150.00
SR
80,500.00
Unit Rate
II.1.6.4.14
Breakdown
Replacement of damaged manhole/handhole cover or frame
EA
35
1,240.00
SR
43,400.00
Unit Rate
II.1.6.4.15
Breakdown
Raising of Manhole & Hand Hole Roof Slab: Raise the roof slab with cover and frame 50 mm from the asphalt yard level to
prevent water infiltration
EA
15
3,250.00
SR
48,750.00
Unit Rate
II.1.6.4.16
Breakdown
Supply& install protective barrier (cement Blocks), as per COMPANY Standards
EA
15
1,200.00
SR
18,000.00
Unit Rate
II.1.6.4.17
Breakdown
Relocation only, protective barrier (cement Blocks), same site.
EA
15
600.00
SR
9,000.00
Unit Rate
II.1.6.4.18
Breakdown
Supply and install concrete splash block size (1.00 x 0.20 M).
EA
60
225.00
SR
13,500.00
Unit Rate
II.1.6.4.19
Breakdown
Supply and Install Eyewash with Shower at battery room.
EA
60
2,850.00
SR
171,000.00
Unit Rate
II.1.6.4.20
Breakdown
Supply and install first aid kit at control room.
EA
70
450.00
SR
31,500.00
Unit Rate
II.1.6.4.21
Breakdown
Supply and install cabinet stand galvanized steel with roller (500 mm x 1400 mm at battery room).
EA
70
1,680.00
SR
117,600.00
Unit Rate
II.1.6.4.22
Breakdown
Supply and Install Link Box Manhole Heavy Duty Covers: At different locations
EA
15
600.00
SR
9,000.00
Unit Rate
Supply and Repair Link Box Manhole Concrete: At different locations
EA
15
1,500.00
SR
22,500.00
Unit Rate
II.1.6.4.23
II.1.6.5
Breakdown
Description
MAINTENANCE
CIVIL WORK
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
REPAIR OF DOORS as Per Item # 5.1.6.5 of Schedule "B"
II.1.6.5.1
Breakdown
Repair of Any Defects or Damages to Substation and Dip Stations Doors: Includes skew leaves doors, hard closing doors,
repair of hinges, increasing their number, changing them in case of spoilage, dismantling door leaves, balancing door
leaves, re-erecting instantly, and any necessary materials for the repair, including welding works and assembling
EA
80
1,480.00
SR
118,400.00
Unit Rate
II.1.6.5.2
Breakdown
Repair and Re-fixing Latches or Any Type of Substation and Dip Stations Door Lock Systems: Includes welding works,
dismantling and re-erecting doors, changing latches and locks to ensure proper operation
EA
140
1,150.00
SR
161,000.00
Unit Rate
II.1.6.5.3
Breakdown
Repair and re-fix latches or any type of door lock systems for the internal doors in the substations. This includes
dismantling and re-erecting doors, changing latches, locks, and hinges to ensure proper operation
EA
140
1,150.00
SR
161,000.00
Unit Rate
II.1.6.5.4
Breakdown
Repair of Locks, Door Handle, and Arm-Closer of Substation and Dip Stations Doors: Includes replacing them in case of
spoilage as per COMPANY specifications, ensuring their operation in good condition, and necessary greasing of hinges and
locks
EA
140
1,150.00
SR
161,000.00
Unit Rate
II.1.6.5.5
Breakdown
Repair or Change Door Lock Cylinders: As per COMPANY standard
EA
160
600.00
SR
96,000.00
Unit Rate
Breakdown
Supply and Erect Dustproof Weather Straps for Substation External Doors: As per COMPANY specifications, including
removing worn-out existing straps
EA
100
600.00
SR
60,000.00
Unit Rate
II.1.6.5.7
Breakdown
Supply and Erect Anti-Panic Arm for Emergency Doors: Includes all necessary for erection as per technical code of practice
and corresponding modifications to door frames
EA
100
750.00
SR
75,000.00
Unit Rate
II.1.6.5.8
Breakdown
Supply and Apply Steel Sheet (2 mm): Includes welding work for any small part of the door damaged by corrosion and
repainting the part with the same door color
EA
100
600.00
SR
60,000.00
Unit Rate
Breakdown
Maintenance and Cleaning of the Roller of Shutter Rolling Doors: Includes greasing and repair of its electrical motor (for
electrical doors) and/or truss (for manual doors) gears to ensure proper operation
EA
15
3,150.00
SR
47,250.00
Unit Rate
II.1.6.5.10
Breakdown
Supply, Erect, and Replace Dustproof Weather Straps for Shutter Rolling Doors: Same specifications and size as initially
erected straps
EA
15
1,100.00
SR
16,500.00
Unit Rate
II.1.6.5.11
Breakdown
Supply, Erect, and Replace Worn-Out Steel Slides of Shutter Rolling Doors: Same specifications and size as existing slides,
including all necessary for dismantling damaged slides and erecting new ones
EA
70
3,000.00
SR
210,000.00
Unit Rate
II.1.6.5.12
Breakdown
Replacement of All Damaged Door Rubber: Around the door itself or around the door frame and door strap, especially
important for halls protected by firefighting systems
EA
100
1,130.00
SR
113,000.00
Unit Rate
II.1.6.5.13
Breakdown
Supply and Install Door Threshold: Outdoor/indoor type to prevent water and dust infiltration
EA
35
750.00
SR
26,250.00
Unit Rate
II.1.6.5.14
Breakdown
Supply and Install Heavy Duty Door Closer
EA
70
1,150.00
SR
80,500.00
Unit Rate
II.1.6.5.6
II.1.6.5.9
BF-PA -31 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
II.1.6.5.15
II.1.7
Line type
Short Description
Breakdown
Description
Long Description
Supply and install glass for the internal doors in the substations (6 mm thickness)
CIVIL WORKS
Total
Payment
Type
SR
239,750.00
Unit Rate
150.00
SR
52,500.00
Unit Rate
UOM
Quantity
Unit Price
M2
350
685.00
M
350
Currency
CIVIL WORK DEMOLITION AND REMOVAL SURVEYING as Per Item # 5.1.7 of Schedule "B"
II.1.7.1
Breakdown
Removal of fence including gate and all fittings.
II.1.7.2
Breakdown
Removal of concrete block walls and its structure.
M2
800
140.00
SR
112,000.00
Unit Rate
II.1.7.3
Breakdown
Removal and Disposal of Concrete Structure/Debris/Surplus Materials: Includes breaking and clearing
M3
200
135.00
SR
27,000.00
Unit Rate
M
700
3,285.00
SR
2,299,500.00
Unit Rate
II.1.8
II.1.8.1
II.1.8.1.1
II.1.8.2
Description
CIVIL WORKS
Description
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
Breakdown
Description
II.1.8.2.1
Breakdown
II.1.8.2.2
Breakdown
II.1.8.2.3
Breakdown
II.1.8.2.4
Breakdown
II.1.8.2.5
Breakdown
II.1.8.2.6
Breakdown
II.1.8.2.7
Breakdown
II.1.8.3
Description
II.1.8.3.1
Breakdown
II.1.8.3.2
Breakdown
II.1.8.4
II.1.8.4.1
II.1.8.5
II.1.8.5.1
II.1.8.6
II.1.8.6.1
Description
Breakdown
Description
Breakdown
Description
Breakdown
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
By Sweeping /
Pushing
By Sweeping /
Pushing
By Sweeping /
Pushing
By Loading /
Unloading
By Loading /
Unloading
By Loading /
Unloading
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE SUBSTATIONS ACCESS ROADS AND SAND REMOVAL SURVEYING as Per Item # 5.1.8 of
Schedule "B"
SUBSTATIONS/NG FACILITIES ACCESS ROADS as Per Item # 5.1.8.1 of Schedule "B"
Design, supply and construction of 8m width service road with suitable structures which is essentially to fulfill the
requirements of service roads such as, site preparation, soil test, site survey, culverts, retaining walls, back walls, road
drain, hump, crash barriers, pavements, asphalting, curb stones, traffic signs, road marking, street lightings etc., as per
COMPANY Standards
-
SAND/WASTE REMOVAL as Per Item # 5.1.8.2 of Schedule "B"
Around Substations/dip stations yard Boundary and Access Roads
M3
6,800
40.00
SR
272,000.00
Unit Rate
Around Substation/dip stations yard Equipment using brooms and Bobcats or suitable loader
M3
6,800
40.00
SR
272,000.00
Unit Rate
Under or beneath disconnect platforms without damaging or loosening the ground cables or connections by using brooms
only
M3
700
58.00
SR
40,600.00
Unit Rate
Around Substations/dip stations yard Boundary and Access Roads
M3
6,800
40.00
SR
272,000.00
Unit Rate
Around Substation/dip stations yard Equipment using brooms and Bobcats or suitable loader
M3
6,800
40.00
SR
272,000.00
Unit Rate
Under or beneath disconnect platforms without damaging or loosening the ground cables or connections by using brooms
only
Removal of Accumulated Sand Inside and Outside the Surface of Manhole/Hand Hole or Its Cover: Excess soil shall be
removed and leveled to the existing ground
M3
700
60.00
SR
42,000.00
Unit Rate
M3
700
60.00
SR
42,000.00
Unit Rate
M2
200
14.03
SR
2,805.00
Unit Rate
M2
200
20.90
SR
4,179.45
Unit Rate
M3
700
86.02
SR
60,214.00
Unit Rate
M3
1,400
98.18
SR
137,452.00
Unit Rate
M2
350
107.00
SR
37,450.00
Unit Rate
SAND STABILIZATION as Per Item # 5.1.8.3 of Schedule "B"
Supply, deliver and spreading crude oil to stabilize sand at the designated locations Around Substations/dip stations yard
Boundary and Access Roads
Supply, Deliver and Spreading diluted acrylic co-polymer (e.g. Soil Cement or equivalent) to stabilize sand at the
designated locations Around Substations/dip stations yard Boundary and Access Roads
SAND BACKFILLING as Per Item # 5.1.8.4 of Schedule "B"
Supply, deliver and backfilling sand areas at designated locations Around Substations/dip stations yard Boundary and
Access Roads
SUPPLY, SPREADING AND COMPACTION OF MARL as Per Item # 5.1.8.5 of Schedule "B"
Supply, deliver, spreading and compacting marl at designated locations Around Substations/dip stations yard Boundary
and Access Roads
SUB-GRADING AND LEVELING as Per Item # 5.1.8.6 of Schedule "B"
Sub-grading preparation prior to placing marl Around Substations/dip stations yard Boundary and Access Roads
BF-PA -32 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
II.1.8.7
Line type
Short Description
Description
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
II.1.8.7.1
Breakdown
II.1.8.7.2
Breakdown
II.2
Description
II.2.1
Description
MECHANICAL
WORKS
MECHANICAL
WORKS
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
Take Samples to test quality of marl and take three (3) samples after compaction is completed to test quality and
strength of compaction
EA
15
310.00
SR
4,650.00
Unit Rate
Take an additional marl compaction sample
EA
3
310.00
SR
930.00
Unit Rate
M3
700
9.00
SR
6,300.00
Unit Rate
Long Description
MARL QUALITY AND COMPACTION TESTS as Per Item # 5.1.8.7 of Schedule "B"
MECHANICAL WORKS as Per Item # 5.2 of Schedule "B"
DEWATERING as Per Item # 5.2.1 of Schedule "B"
II.2.1.1
Breakdown
Direct pumping to approve location by municipality
II.2.1.2
Breakdown
Pump and transport using tankers
EA
350
175.00
SR
61,250.00
Unit Rate
II.2.1.3
Breakdown
Remove water from the substation rooms using specialized electrical equipment that complies with company safety
regulations
M3
250
14.00
SR
3,500.00
Unit Rate
Breakdown
Remove water from on/under the cables, trenches, manholes, handholes, conduits, link box manholes, and dip station at
various locations
EA
15
418.00
SR
6,270.00
Unit Rate
II.2.1.5
Breakdown
Clean the power transformer oil retention pit using special materials designed to contain and absorb spilled oils, in
accordance with the company's specifications
EA
70
250.00
SR
17,500.00
Unit Rate
II.2.1.6
Breakdown
Remove and clean oil from trenches, manholes, conduits, tunnels, and dip station at various locations
M3
140
168.00
SR
23,520.00
Unit Rate
II.2.1.4
II.2.2
Description
MECHANICAL
WORKS
PIPE WORKS as Per Item # 5.2.2 of Schedule "B"
II.2.2.1
Breakdown
Supply, install and lay PVC conduit, 100-150 MM I.D., excavation not included
M
700
45.00
SR
31,500.00
Unit Rate
II.2.2.2
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (0.5" - 1.0")
M
15
42.00
SR
630.00
Unit Rate
II.2.2.3
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (1.5" - 2.0")
M
15
57.00
SR
855.00
Unit Rate
II.2.2.4
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (3.0")
M
15
84.00
SR
1,260.00
Unit Rate
II.2.2.5
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (0.5" - 1.0")
M
550
27.50
SR
15,125.00
Unit Rate
II.2.2.6
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (1.5" - 3.0")
M
400
45.00
SR
18,000.00
Unit Rate
II.2.2.7
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (4" - 6")
M
140
64.00
SR
8,960.00
Unit Rate
II.2.2.8
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (0.5" - 1.0")
M
550
28.00
SR
15,400.00
Unit Rate
II.2.2.9
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (1.5" - 3.0")
M
200
45.00
SR
9,000.00
Unit Rate
II.2.2.10
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (4" - 6")
M
250
64.00
SR
16,000.00
Unit Rate
II.2.2.11
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for sewage water size (4")
M
350
72.00
SR
25,198.25
Unit Rate
II.2.2.12
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for sewage water size (6")
M
500
96.00
SR
48,000.00
Unit Rate
II.2.2.13
Breakdown
Lay PVC Conduit only
M
250
123.00
SR
30,750.00
Unit Rate
II.2.2.14
Breakdown
Lay Steel pipes only
M
15
168.00
SR
2,520.00
Unit Rate
II.2.2.15
Breakdown
Lay Plastic pipes only
M
140
114.00
SR
15,960.00
Unit Rate
II.2.3
II.2.3.1
II.2.3.2
Description
MECHANICAL
WORKS
REPAIR OF WATER PUMPS as Per Item # 5.2.3 of Schedule "B"
Breakdown
Maintenance of electrical water pumps and replacement of faulty spare parts and damaged electrical wiring to ensure they
operate in good condition
EA
10
3,150.00
SR
31,500.00
Unit Rate
Breakdown
Maintenance of electrical oil pumps and replacement of faulty spare parts and damaged electrical wiring to ensure they
operate in good condition
EA
10
3,150.00
SR
31,500.00
Unit Rate
BF-PA -33 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
II.2.3.3
Breakdown
II.2.3.4
Breakdown
II.2.3.5
Total
Payment
Type
SR
141,750.00
Unit Rate
SR
141,750.00
Unit Rate
6,850.00
SR
102,750.00
Unit Rate
35
4,250.00
SR
148,750.00
Unit Rate
35
13,300.00
SR
465,500.00
Unit Rate
EA
15
4,100.00
SR
61,500.00
Unit Rate
EA
35
4,100.00
SR
143,500.00
Unit Rate
M2
800
328.00
SR
262,400.00
Unit Rate
M2
800
310.00
SR
248,000.00
Unit Rate
UOM
Quantity
Supply and install Water transfer pump -Set-WTP 01 Motor Class F Insulation and 1 ph. x 230 volts, 60 Hz, 3450 RPM
EA
35
4,050.00
Supply and install Water transfer pump -Set-WTP 01 Motor Class F Insulation and 1 ph. x 230 volts, 60 Hz, 3450 RPM
EA
35
4,050.00
Breakdown
Supply and install Water Booster pump set-WBP 01 (3 ph. x 380 volts, 60 Hz, 3450 RPM)
EA
15
II.2.3.6
Breakdown
Supply and install Basement sump pump SP-01 01 (Submersible motor IP 68, Class F rating 1.10 kw (1.5 HP), 1 PH x22
volts,60 Hz, and 3450 RPM
EA
II.2.3.7
Breakdown
Supply and installation of Transfer sump pit pump TPP-01 (TEFC Motor IP 54, Class F rating 4.00 kw (5.50 HP),1 ph. x 230
Volts, 60 Hz and 1750 RPM
EA
II.2.3.8
Breakdown
Supply and install Booster pump for domestic water one (1) Horsepower with pressurized tank
II.2.3.9
II.2.4
Short Description
Breakdown
Description
II.2.4.1
Breakdown
II.2.4.2
Breakdown
II.2.4.3
Breakdown
MECHANICAL
WORKS
Long Description
Supply and install transformer pit pump having the following mechanical and electrical data:
1. Mechanical Data: Discharge Rate shall be 4 L/s (63.41gpm), 1750 rpm TEFC Enclosure
2. Electrical Data: 220volts/1-phase /60Hz, manually operated with auto stop
METALLIC WORKS as Per Item # 5.2.4 of Schedule "B"
Supply and erect 0.7 mm thick corrugated steel sheets (sandwich panel with 50 mm polystyrene foam), including all fixing
and erecting accessories, ridges, overlaps, and gutters. This also includes bottom-side insulation with a 2 cm thick rock
wool layer, compliant with U.S. standard ASTM C 168-80, covered on both sides with aluminum foil, and installation of
lightweight metal mesh to secure and protect the insulation
Supply and erect double corrugated sheets for the surrounding wall between the block wall and the ceiling (external and
internal sheets), with rock wool insulation and tubes in between. This includes all fixings, assembly, and the top and
bottom “U” channels. Alternatively, ready-made sandwich corrugated sheet panels may be used. Transparent corrugated
sheets should be erected between every two columns to increase natural illumination, with no insulation required behind
the transparent sheets
Supply and install 6-meter-long "I" or "H" steel beams 200 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
Unit Price
Currency
EA
30
1,250.00
SR
37,500.00
Unit Rate
II.2.4.4
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 250 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
1,500.00
SR
45,000.00
Unit Rate
II.2.4.5
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 300 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
1,850.00
SR
55,500.00
Unit Rate
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 350 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
2,180.00
SR
65,400.00
Unit Rate
II.2.4.7
Breakdown
Supply and install 6-meter-long “U” steel beams 100 x 50 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
815.00
SR
24,450.00
Unit Rate
II.2.4.8
Breakdown
Supply and install 6-meter-long “U” steel beams 200 x 100 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
1,170.00
SR
35,100.00
Unit Rate
II.2.4.9
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 100 x 50 x 5 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
550.00
SR
16,500.00
Unit Rate
II.2.4.10
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 80 x 40 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
460.00
SR
13,800.00
Unit Rate
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 50 x 50 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
350.00
SR
10,500.00
Unit Rate
II.2.4.12
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 20 x 40 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
208.00
SR
6,240.00
Unit Rate
II.2.4.13
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 100 x 100 x 5 mm cross-section, including painting, welding,
and all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
950.00
SR
28,500.00
Unit Rate
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 80 x 80 x 5 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
850.00
SR
25,500.00
Unit Rate
II.2.4.15
Breakdown
Supply and install 6-meter-long "L" shape steel angles 100 x 100 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
1,020.00
SR
30,600.00
Unit Rate
II.2.4.16
Breakdown
Supply and install 6-meter-long "L" shape steel angles 50 x 50 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
515.00
SR
15,450.00
Unit Rate
Breakdown
Supply and install 6-meter-long "L" shape steel angles 40 x 40 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
30
445.00
SR
13,350.00
Unit Rate
II.2.4.18
Breakdown
Supply and install 6-meter-long flat bars 60 mm width and 6 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
30
400.00
SR
12,000.00
Unit Rate
II.2.4.19
Breakdown
Supply and install 6-meter-long flat bars 40 mm width and 4 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
30
380.00
SR
11,400.00
Unit Rate
Breakdown
Supply and install 6-meter-long flat bars 30 mm width and 3 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
30
350.00
SR
10,500.00
Unit Rate
II.2.4.6
II.2.4.11
II.2.4.14
II.2.4.17
II.2.4.20
BF-PA -34 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
II.2.4.21
Breakdown
Supply and install 6-meter-long flat bars 20 mm width and 2 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
30
261.00
SR
7,830.00
Unit Rate
II.2.4.22
Breakdown
Supply and install 6-meter-long flat sheet 20 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
30
9,750.00
SR
292,500.00
Unit Rate
Breakdown
Supply and install 6-meter-long flat sheet 14 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
30
6,850.00
SR
205,500.00
Unit Rate
II.2.4.24
Breakdown
Supply and install 6-meter-long flat sheet 10 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
30
4,850.00
SR
145,500.00
Unit Rate
II.2.4.25
Breakdown
Supply and install 6-meter-long flat sheet 6 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
30
2,850.00
SR
85,500.00
Unit Rate
Breakdown
Supply and install 6-meter-long flat sheet 3 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
30
1,350.00
SR
40,500.00
Unit Rate
Breakdown
Supply and install 6-meter-long flat sheet 2 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
30
1,150.00
SR
34,500.00
Unit Rate
II.2.4.28
Breakdown
Supply, install and replace 10 mm thick checkered plates inside the substation. This includes supplying the checkered
plates, cutting to size, fabricating and fitting lifting handles, welding frames and supports, painting, and removing and
returning unwanted old plates to the store, as per COMPANY Standards
M2
200
450.00
SR
90,000.00
Unit Rate
II.2.4.29
Breakdown
Supply and install permanent steel access ladders (Emergency) fixed to the walls with safety cages, as per company
standard TA-800049, for accessing the roof. The design should conform to the standards followed in the transmission
substations
M
100
350.00
SR
35,000.00
Unit Rate
II.2.4.30
Breakdown
Supply and install steel channel supports for checkered plates or equipment in a substation room
M
70
165.00
SR
11,550.00
Unit Rate
II.2.4.31
Breakdown
Remove the existing chain link fencing, including the frame, and return it to the company scrub store. Supply and erect
expanded meshes at least 3 mm thick with proper steel supports and frame as required, and paint according to galvanized
paint specifications
M2
550
145.00
SR
79,750.00
Unit Rate
II.2.4.32
Breakdown
Supply and install steel grating for the transformer oil catch basin
M2
70
250.00
SR
17,500.00
Unit Rate
II.2.4.33
Breakdown
Supply and install hot-dip steel bridge over power cables in the cable room or Substation Basement
M2
70
125.00
SR
8,750.00
Unit Rate
II.2.4.34
Breakdown
Supply and install hot-dip galvanized steel Unistrut supports routing outgoing feeders
M2
70
125.00
SR
8,750.00
Unit Rate
II.2.4.35
Breakdown
Supply and install anchor bolts for fixing equipment structures, type-3, as per SEC Standard
EA
30
42.00
SR
1,260.00
Unit Rate
II.2.4.36
Breakdown
Supply, install and repair ladders at manholes different locations
M
35
215.00
SR
7,525.00
Unit Rate
II.2.4.37
Breakdown
Repair the existing car parking shed to adjust the top cloth and align with required welding and grinding
M2
100
170.00
SR
17,000.00
Unit Rate
Breakdown
Supply and install bollard post barriers with chains, including steel poles with concrete foundation, excavation, backfilling,
grounding, and re-asphalting as per NG standards. The poles and chains should maintain a 1.5 to 2 meters distance and
include yellow and black painting
EA
30
1,150.00
SR
34,500.00
Unit Rate
Supply and install air holes for ventilation fans, with fans installed at manholes in various locations
EA
30
1,450.00
SR
43,500.00
Unit Rate
II.2.4.23
II.2.4.26
II.2.4.27
II.2.4.38
II.2.4.39
II.2.5
Breakdown
Description
MECHANICAL
WORKS
AIR CONDITIONING WORK as Per Item # 5.2.5 of Schedule "B"
II.2.5.1
Breakdown
Supply and install new window air-conditioning units (12,000 BTU/1.5 HP/1 Ton) capacity
EA
7
1,500.00
SR
10,500.00
Unit Rate
II.2.5.2
Breakdown
Supply and install new window air-conditioning units (18,000 BTU/2.0 HP/1.5 Ton) capacity
EA
7
1,700.00
SR
11,900.00
Unit Rate
II.2.5.3
Breakdown
Supply and install new window air-conditioning units (24,000 BTU/2.5 HP/2 Ton) capacity
EA
7
2,000.00
SR
14,000.00
Unit Rate
II.2.5.4
Breakdown
Supply and install new split-type air-conditioning units (12,000 BTU/1.5 HP/1 Ton) capacity
EA
7
2,050.00
SR
14,350.00
Unit Rate
II.2.5.5
Breakdown
Supply and install new split-type air-conditioning units (18,000 BTU/2.0 HP/1.5 Ton) capacity
EA
15
2,520.00
SR
37,800.00
Unit Rate
II.2.5.6
Breakdown
Supply and install new split-type air-conditioning units (24,000 BTU/2.5 HP/2 Ton) capacity
EA
15
2,680.00
SR
40,200.00
Unit Rate
II.2.5.7
Breakdown
Supply and install new split-type air-conditioning units (30,000 BTU/3 HP/2.5 Ton) capacity
EA
15
3,015.00
SR
45,225.00
Unit Rate
II.2.5.8
Breakdown
Supply and install new split-type air-conditioning units (36,000 BTU/3.5 HP/3 Ton) capacity
EA
10
3,650.00
SR
36,500.00
Unit Rate
BF-PA -35 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
Manufacturing supply and erect metal ducts for air conditioned, ducts shall be made of galvanized metal sheets (density
24Kg/sq. m) according to SMACANA & ASHRAE specifications, ducts will be externally insulated with fiberglass, wrapped
with aluminum foil, and then covered with galvanized metal sheets of the same specifications, and fitted with means for
suspension, fixations and air outlets
Dismantle the louvered steel sunshade transformer roofs. This item includes all necessary measures to carry out the job
without harming or damaging any components of the roof
Unit Price
Currency
Payment
Type
UOM
Quantity
Total
M
140
435.00
SR
60,900.00
Unit Rate
II.2.5.9
Breakdown
II.2.5.10
Breakdown
M2
200
215.00
SR
43,000.00
Unit Rate
II.2.5.11
Breakdown
Re-erect the dismantled louvered steel sunshade transformer roofs. This item includes all necessary measures for
reinstatement
M2
200
215.00
SR
43,000.00
Unit Rate
II.2.5.12
Breakdown
Replace defective duct dampers and damper motors according to COMPANY standards
EA
70
805.00
SR
56,350.00
Unit Rate
II.2.5.13
Breakdown
Repair duct mechanical protection (cladding) according to SMACNA specifications
EA
70
415.00
SR
29,050.00
Unit Rate
II.2.5.14
Breakdown
Repair duct access door
EA
70
520.00
SR
36,400.00
Unit Rate
II.2.6
Description
MECHANICAL
WORKS
SCAFFOLDING as Per Item # 5.2.6 of Schedule "B"
Breakdown
Supply, Erection & Dismantling of Fixed Type Scaffolding with sufficient working Platforms for inside/outside any facilities
of the Sub-station building or equipment.
M3
700
88.00
SR
61,600.00
Unit Rate
II.2.6.2
Breakdown
Supply, Erection & Dismantling of Mobile Type Scaffolding with sufficient working Platforms for inside/outside any facilities
of the Sub-station building or equipment.
M3
400
95.00
SR
38,000.00
Unit Rate
II.2.6.3
Breakdown
Supply, mobilize and demobilize pipe with 1 m length
EA
7
6.08
SR
42.54
Unit Rate
II.2.6.4
Breakdown
Supply, mobilize and demobilize pipe with 2 m length
EA
7
7.95
SR
55.63
Unit Rate
II.2.6.5
Breakdown
Supply, mobilize and demobilize pipe with 3 m length
EA
7
10.75
SR
75.27
Unit Rate
II.2.6.6
Breakdown
Supply, mobilize and demobilize pipe with 4 m length
EA
7
12.62
SR
88.36
Unit Rate
II.2.6.7
Breakdown
Supply, mobilize and demobilize pipe with 6 m length
EA
7
14.49
SR
101.45
Unit Rate
II.2.6.8
Breakdown
Supply, mobilize and demobilize Wooden Plank with 2 m length
EA
4
6.08
SR
24.31
Unit Rate
II.2.6.1
II.2.6.9
Breakdown
Supply, mobilize and demobilize Wooden Plank with 3 m length
EA
4
7.95
SR
31.79
Unit Rate
II.2.6.10
Breakdown
Supply, mobilize and demobilize Wooden Plank with 4 m length
EA
4
10.75
SR
43.01
Unit Rate
II.2.6.11
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 3 m length
EA
7
12.62
SR
88.36
Unit Rate
II.2.6.12
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 4 m length
EA
7
14.49
SR
101.45
Unit Rate
II.2.6.13
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 6 m length
EA
7
327.25
SR
2,290.75
Unit Rate
II.2.6.14
Breakdown
Supply, mobilize and demobilize Base Plate
EA
7
6.08
SR
42.54
Unit Rate
II.2.6.15
Breakdown
Supply, mobilize and demobilize Adjustable Base Plate
EA
7
6.08
SR
42.54
Unit Rate
II.2.6.16
Breakdown
Supply, mobilize and demobilize Double Coupler
EA
15
7.95
SR
119.21
Unit Rate
II.2.6.17
Breakdown
Supply, mobilize and demobilize Universal Coupler
EA
15
7.95
SR
119.21
Unit Rate
II.2.6.18
Breakdown
Supply, mobilize and demobilize Putlog Coupler
EA
15
7.95
SR
119.21
Unit Rate
II.2.6.19
Breakdown
Supply, mobilize and demobilize Swivel Coupler
EA
15
7.95
SR
119.21
Unit Rate
II.2.6.20
Breakdown
Supply, mobilize and demobilize End to End Coupler
EA
15
7.95
SR
119.21
Unit Rate
II.2.6.21
Breakdown
Supply, mobilize and demobilize C- Clamp
EA
10
7.95
SR
79.48
Unit Rate
II.2.6.22
Breakdown
Supply, mobilize and demobilize Beam Clamp
EA
10
7.95
SR
79.48
Unit Rate
BF-PA -36 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
II.2.6.23
Breakdown
II.2.6.24
Breakdown
Supply, mobilize and demobilize Reveal Pin
EA
15
7.95
SR
119.21
Unit Rate
Supply, mobilize and demobilize Chain blocks
EA
7
415.00
SR
2,905.00
Unit Rate
II.2.6.25
Breakdown
Supply, mobilize and demobilize Metal/fabric Slings, hooks
EA
15
230.00
SR
3,450.00
Unit Rate
II.2.6.26
Breakdown
Supply, mobilize and demobilize approved Electrical cables extensions
EA
7
258.00
SR
1,806.00
Unit Rate
II.2.6.27
Breakdown
Supply, mobilize and demobilize Lighting
EA
3
280.00
SR
840.00
Unit Rate
II.2.6.28
Breakdown
Supply, mobilize and demobilize medium dumping container
EA
3
327.25
SR
981.75
Unit Rate
II.2.6.29
Breakdown
Supply, mobilize and demobilize large dumping container
EA
3
486.20
SR
1,458.60
Unit Rate
II.2.6.30
Breakdown
Provide load test certificates
EA
15
1,402.50
SR
21,037.50
Unit Rate
II.2.6.31
Breakdown
Provide inspection certificates
EA
15
1,350.00
SR
20,250.00
Unit Rate
II.2.7
Description
MECHANICAL
WORKS
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
FIRE ZONING as Per Item # 5.2.7 of Schedule "B"
II.2.7.1
Breakdown
Closing the space between bus-ducts and the wall opening with COMPANY-approved fire-resistant material (sandwich
type) to prevent fire from spreading through the opening (complying with COMPANY-approved fire zoning procedures).
The gap closure should be designed to be easily removable and re-fixable for bus duct maintenance
M2
100
700.00
SR
70,000.00
Unit Rate
II.2.7.2
Breakdown
Sealing the cable openings from both sides (or one side in case of a panel on top) with COMPANY-approved fire-resistant
sealant (3cm thick and 3cm deep). The remaining gap on the face shall be filled with HPM mortar (3cm deep) or any
equivalent approved material, and the gap between the two faces of the opening shall be filled with rock wool insulation
(minimum density 120kg/m³, melting point 1000°C)
EA
15
350.00
SR
5,250.00
Unit Rate
II.2.7.3
Breakdown
Coating the cables in the substation basement with COMPANY-approved fire-resistant paint at a minimum thickness of
1.5mm (2kg/m²) as instructed by COMPANY representative. Bunched control cables must be painted with COMPANYapproved fire-resistant paint at a minimum thickness of 1.5mm (2kg/m²)
M2
170
720.00
SR
122,400.00
Unit Rate
Breakdown
Sealing the power cable tunnels: one side of the tunnel must be sealed in a “sandwich” type sealing with two Fire Stop
Mortar layers (generally reinforced) of at least 5cm thick, intercalated with rock wool (5cm thick). PVC pipes must be
provided around the passing cables to maintain a gap of at least 3cm, to be removed after mortar setting. These gaps
must be sealed from both sides with COMPANY-approved fire-resistant sealant (3cm thick and 3cm deep), and the gap
between the two faces of the opening shall be filled with rock wool insulation (minimum density 120kg/m³, melting point
1000°C)
M2
170
795.00
SR
135,150.00
Unit Rate
II.2.7.4
II.3
Description
II.3.1
Description
ELECTRICAL
WORKS
ELECTRICAL
WORKS
ELECTRICAL WORKS as Per Item # 5.3 of Schedule "B"
LIGHTING SYSTEM WORK as Per Item # 5.3.1 of Schedule "B"
II.3.1.1
Breakdown
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V” and crisscross
aluminum slide diffuser, to be installed in the false ceiling, different size (60 x 120), rapid start type
EA
140
168.00
SR
23,520.00
Unit Rate
II.3.1.2
Breakdown
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V” and crisscross
aluminum slide diffuser, to be installed in the false ceiling, different size (60 x 60 cm), rapid start type
EA
140
170.00
SR
23,800.00
Unit Rate
II.3.1.3
Breakdown
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V”, to be installed in the
false ceiling, size 60 x 120 cm, rapid start type. The light diffuser must be impervious and have a protection factor of at
least IP40
EA
140
124.00
SR
17,360.00
Unit Rate
II.3.1.4
Breakdown
Supply and install a fluorescent lamp, 2x40 Watt, with a prismatic cover, rapid start type
EA
35
64.00
SR
2,240.00
Unit Rate
II.3.1.5
Breakdown
Supply and install a halogen spotlight, 250 Watt
EA
40
1,350.00
SR
54,000.00
Unit Rate
II.3.1.6
Breakdown
Repair, clean, and supply sodium lamp, 250/400-Watt flood light bulbs
EA
35
1,350.00
SR
47,250.00
Unit Rate
II.3.1.7
Breakdown
Supply and replace outside lighting pole fixture cover
EA
140
420.00
SR
58,800.00
Unit Rate
II.3.1.8
Breakdown
Supply, install, and operate a globe with a normal lamp, 100 Watt
EA
70
158.00
SR
11,060.00
Unit Rate
BF-PA -37 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
Supply and install a complete set of apparent emergency LED lights, operational for six to seven hours after DC shutdown.
The emergency unit includes a nickel-cadmium battery, a battery charger, an electronic frequency transformer, a
transformation detector, a plug, and a switch to check the battery. The emergency light unit operates on 220 V/60 Hz,
2x20 Watt, normal start at current shutdown
Supply and install an emergency EXIT LED light unit (Green Color), operational for three hours after DC shutdown, to be
mounted on the ceiling or wall with a frame. The emergency EXIT unit includes a nickel-cadmium battery, a battery
charger, an electronic frequency transformer, a transformation detector, a plug, and a switch to check the battery. The
diffusing cover is transparent with an EXIT sign. The emergency EXIT light unit operates on 220 V/60 Hz, 1x8 Watt,
normal start at current shutdown
Supply and install a sodium projector, 250 Watt, for outside lighting, fixed to allow orientation to light the front of the
building. Includes all necessary components for installation, testing, and operation as per COMPANY Representative's
instructions
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
ST
70
580.00
SR
40,600.00
Unit Rate
EA
40
250.00
SR
10,000.00
Unit Rate
EA
30
1,150.00
SR
34,500.00
Unit Rate
60,900.00
Unit Rate
II.3.1.9
Breakdown
II.3.1.10
Breakdown
II.3.1.11
Breakdown
II.3.1.12
Breakdown
Supply and install LED light panel, 60 x 60 cm, white, operates on 220 V/60 Hz 70 Watt
EA
140
435.00
SR
II.3.1.13
Breakdown
Supply and install LED tube light with frame, operates on 220 V/60 Hz, 2x40 Watt, size 10 x 120 cm
EA
140
250.00
SR
35,000.00
Unit Rate
II.3.1.14
Breakdown
Supply and install LED Floodlight, 250 Watt, white, for outdoor substation buildings
EA
140
850.00
SR
119,000.00
Unit Rate
II.3.1.15
Breakdown
Supply and install LED spotlight, 400 Watt, white, for outdoor substation buildings
EA
140
880.00
SR
123,200.00
Unit Rate
II.3.1.16
Breakdown
Supply and install LED spotlight, 400 Watt, white, ceiling-mounted for GIS room
EA
140
1,095.00
SR
153,300.00
Unit Rate
II.3.1.17
Breakdown
Supply and install LED bulb light, 20 Watt, white for DC lighting system
EA
140
110.00
SR
15,400.00
Unit Rate
II.3.1.18
Breakdown
Supply and install LED explosion-proof lighting fixture, operates on 220 V/60 Hz, 2x40 Watt, size 10 x 120 cm for the
battery room
EA
35
450.00
SR
15,750.00
Unit Rate
II.3.1.19
Breakdown
Supply and install explosion-proof lighting/exit lighting (Green Color) fixtures in the battery room
EA
20
350.00
SR
7,000.00
Unit Rate
II.3.1.20
Breakdown
Supply and install explosion-proof entrance/exit lighting fixtures in the battery room
EA
20
350.00
SR
7,000.00
Unit Rate
II.3.1.21
Breakdown
Supply and install explosion-proof emergency lighting fixtures for the battery room
EA
20
350.00
SR
7,000.00
Unit Rate
II.3.1.22
Breakdown
Supply and install explosion-proof DC lighting fixtures for the battery room
EA
20
350.00
SR
7,000.00
Unit Rate
II.3.1.23
Breakdown
Provide and install temporary explosion-proof lighting fixtures at dip stations and manholes at different locations
D
3
795.00
SR
2,385.00
Unit Rate
II.3.1.24
Breakdown
Supply and install lighting for steel monopoles as per SEC standard drawing
EA
70
1,650.00
SR
115,500.00
Unit Rate
Supply and install high bay LED light, pendent type, at the GIS buildings.
EA
35
780.00
SR
27,300.00
Unit Rate
38.00
SR
1,520.00
Unit Rate
II.3.1.25
II.3.2
Breakdown
Description
ELECTRICAL
WORKS
INSTALLATIONS WORKS as Per Item # 5.3.2 of Schedule "B"
Breakdown
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, single
switch, fixed 1.5 m above the tile floor level
EA
40
II.3.2.2
Breakdown
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, double
switch, fixed 1.5 m above the tile floor level
EA
40
78.00
SR
3,120.00
Unit Rate
II.3.2.3
Breakdown
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, triple
switch, fixed 1.5 m above the tile floor level
EA
40
115.00
SR
4,600.00
Unit Rate
Breakdown
Supply and install a PHENOL compound switch for A/Cs and water heaters with a Bakelite cover, at least 30 Amp, with a
warning light, fixed 1.5 m above the tile floor level
EA
30
115.00
SR
3,450.00
Unit Rate
EA
40
300.00
SR
12,000.00
Unit Rate
EA
35
170.00
SR
5,950.00
Unit Rate
EA
35
170.00
SR
5,950.00
Unit Rate
II.3.2.1
II.3.2.4
Supply and erect fixtures that work automatically with a photocell, including all accessories and providing a DC source to
power the photocell
Supply and install a 220 V/13 Amp outlet, equipped with a switch, and a male plug, installed in the floor or wall at the
proper height from the tile level. Outlets for ventilating fans and emergency lights will be installed beside the unit
concerned
Supply and install a 220 V/13 Amp explosion-proof outlet, equipped with a switch, and a male plug, installed in the floor
or wall at the proper height from the tile level. Outlets for ventilating fans and emergency lights will be installed beside
the unit concerned
II.3.2.5
Breakdown
II.3.2.6
Breakdown
II.3.2.7
Breakdown
II.3.2.8
Breakdown
Supply and install a telephone outlet made of thick Bakelite or cast iron coated with non-glossy chrome, fixed on a proper
box at the height of common outlets
EA
7
78.00
SR
546.00
Unit Rate
II.3.2.9
Breakdown
Supply and install a LAN outlet made of thick Bakelite or cast iron coated with non-glossy chrome, fixed on a proper box at
the height of common outlets
EA
7
78.00
SR
546.00
Unit Rate
BF-PA -38 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Line type
II.3.2.10
Breakdown
Supply and install temporary power supply at dip stations and manholes at different locations
EA
7
4,150.00
SR
29,050.00
Unit Rate
II.3.2.11
Breakdown
Supply, install, and operate an 50 liter electrical water heater that heats water pipes without a tank as per specifications
EA
10
4,250.00
SR
42,500.00
Unit Rate
II.3.2.12
Breakdown
Supply, install, and operate an 100 liter electrical water heater that heats water pipes without a tank as per specifications
EA
10
5,950.00
SR
59,500.00
Unit Rate
II.3.2.13
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x25+16 mm
M
350
168.00
SR
58,800.00
Unit Rate
II.3.2.14
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x35+16 mm
M
350
208.00
SR
72,800.00
Unit Rate
II.3.2.15
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x50+16 mm
M
350
225.00
SR
78,750.00
Unit Rate
II.3.2.16
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x50+25 mm
M
350
235.00
SR
82,250.00
Unit Rate
II.3.2.17
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x70+16 mm
M
350
265.00
SR
92,750.00
Unit Rate
II.3.2.18
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x120+16 mm
M
350
285.00
SR
99,750.00
Unit Rate
II.3.2.19
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x185+16 mm
M
350
305.00
SR
106,750.00
Unit Rate
II.3.2.20
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x240+16 mm
M
350
350.00
SR
122,500.00
Unit Rate
II.3.2.21
Breakdown
Supply and lay telephonic cable, 4x0.6 mm², insulated with PVC, to be installed in an adequate tray
M
140
60.00
SR
8,400.00
Unit Rate
II.3.2.22
Breakdown
Supply and lay subsidiary LAN cable, insulated with PVC, to be installed in an adequate tray
M
140
60.00
SR
8,400.00
Unit Rate
II.3.2.23
Breakdown
Install cable tray as per COMPANY standards and specifications
M2
200
115.00
SR
23,000.00
Unit Rate
II.3.2.24
Breakdown
Install cable clamp as per COMPANY standards and specifications
EA
35
31.00
SR
1,085.00
Unit Rate
II.3.2.25
Breakdown
Transfer cable drum from company warehouse to site as directed
TON
7
210.00
SR
1,470.00
Unit Rate
II.3.2.26
Breakdown
Return existing/old cable system to company warehouse as directed
TON
15
210.00
SR
3,150.00
Unit Rate
II.3.2.27
Breakdown
Supply and install an explosion-proof exhaust fan in the battery room
EA
15
1,100.00
SR
16,500.00
Unit Rate
II.3.2.28
Breakdown
Supply and install wall/ceiling mounted ventilating fans, 20x20 cm, and capacities, including the evacuation flexible duct,
exterior cover, and all accessories for operation
EA
15
750.00
SR
11,250.00
Unit Rate
II.3.2.29
Breakdown
Supply and install wall/ceiling mounted ventilating fans, 30x30 cm, and capacities, including the evacuation flexible duct,
exterior cover, and all accessories for operation
EA
15
880.00
SR
13,200.00
Unit Rate
II.3.2.30
Breakdown
Supply and install ventilating fans ceiling capacity not less than 388 CF/Min
EA
15
2,480.00
SR
37,200.00
Unit Rate
II.3.2.31
Breakdown
Supply and install ventilating fans ceiling capacity not less than 311 CF/Min
EA
15
2,280.00
SR
34,200.00
Unit Rate
II.3.2.32
Breakdown
Supply and install ventilating fans ceiling capacity not less than 205 CF/Min
EA
15
1,980.00
SR
29,700.00
Unit Rate
II.3.3
Description
Short Description
ELECTRICAL
WORKS
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
Item
GROUNDING SYSTEM WORKS as Per Item # 5.3.3 of Schedule "B"
II.3.3.1
Breakdown
Conduct necessary inspections and tests for all ground systems in the substation according to COMPANY specifications and
standards and submit reports
EA
15
1,800.00
SR
27,000.00
Unit Rate
II.3.3.2
Breakdown
Supply and Erect Earthing copper rod 1.5mx¾ Dia according to COMPANY specifications
EA
7
315.00
SR
2,205.00
Unit Rate
II.3.3.3
Breakdown
Supply and Erect Earthing copper rod 3mx¾ Dia according to COMPANY specifications
EA
7
695.00
SR
4,865.00
Unit Rate
II.3.3.4
Breakdown
Supply and install a copper ground mat or plate (1 m x 1 m x 3 mm) in normal soil, including excavation, filling with
ground conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.), backfilling, reinstatement, and connection to all
equipment as per the current Code of Practice of the COMPANY
EA
7
6,500.00
SR
45,500.00
Unit Rate
II.3.3.5
Breakdown
Supply and install a copper ground mat or plate (1 m x 1 m x 3 mm) in rocky soil, including excavation, filling with ground
conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.), backfilling, reinstatement, and connection to all equipment
as per the current Code of Practice of the COMPANY
EA
7
6,500.00
SR
45,500.00
Unit Rate
BF-PA -39 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
II.3.3.6
Breakdown
Provide materials and set ground conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.) for one grounding pit to
improve earth resistance when required
EA
7
4,350.00
SR
30,450.00
Unit Rate
II.3.3.7
Breakdown
Supply and lay a copper braid stranded cable, size 70 sq. mm, including all necessary components for connecting and
fixing
M
70
165.00
SR
11,550.00
Unit Rate
Breakdown
Supply and lay a copper braid stranded cable, size 120 sq. mm, including all necessary components for connecting and
fixing
M
70
258.00
SR
18,060.00
Unit Rate
II.3.3.9
Breakdown
Supply and lay a copper braid stranded cable, size 185 sq. mm, including all necessary components for connecting and
fixing
M
70
350.00
SR
24,500.00
Unit Rate
II.3.3.10
Breakdown
Supply and lay a copper braid stranded cable, size 240 sq. mm, including all necessary components for connecting and
fixing
M
70
450.00
SR
31,500.00
Unit Rate
Breakdown
Supply and lay a copper braid stranded cable, size 300 sq. mm, including all necessary components for connecting and
fixing
M
70
540.00
SR
37,800.00
Unit Rate
II.3.3.12
Breakdown
Supply and install an earthing bus bar, size 3.5 m x 25 mm x 5 mm, including all necessary components for fixing and
connecting
EA
7
1,150.00
SR
8,050.00
Unit Rate
II.3.3.13
Breakdown
Supply and install an earthing bus bar, size 3.5 m x 40 mm x 5 mm, including all necessary components for fixing and
connecting
EA
7
1,450.00
SR
10,150.00
Unit Rate
II.3.3.14
Breakdown
Supply and install an earthing bus bar, size 3.5 m x 50 mm x 5 mm, including all necessary components for fixing and
connecting
EA
7
1,850.00
SR
12,950.00
Unit Rate
II.3.3.15
Breakdown
Install a grounding test pit, ensuring it meets all relevant specifications and standards. This includes excavation,
installation of the test pit, backfilling, and any necessary connections to the grounding system. The work should be carried
out as directed by the COMPANY REPRESENTATIVE and in accordance with the company's safety and quality requirements
EA
7
2,150.00
SR
15,050.00
Unit Rate
EA
20
66,650.00
SR
1,333,000.00
Unit Rate
EA
15
34,850.00
SR
522,750.00
Unit Rate
II.3.3.8
II.3.3.11
II.4
Description
SUPPORT FACILITY
II.4.1
Description
SUPPORT FACILITY
II.4.1.1
II.4.2
SUPPLY AND ERECT PORTABLE CABINS as Per Item # 5.4.1 of Schedule "B"
deliver and erect a portable cabin with full water, power facilities, and furniture at Eastern Transmission Substation
locations. The portable cabin shall have dimensions of no less than 4x12 meters and be fully equipped with a toilet,
kitchen, power supply and MCB AC. Additionally, it shall include a water tank with a capacity of at least 3 cubic meters, to
be filled daily, and a temporary sewage pit with a volume of at least 3 cubic meters, to be discharged periodically as
needed
For the portable cabin base, stand legs with a 7mm plate shall be provided if the ground is solid. For unsuitable ground, a
40x40 cm concrete base shall be provided
Breakdown
Description
SUPPORT FACILITY as Per Item # 5.4 of Schedule "B"
SUPPORT FACILITY
TELECOM SHELTERS AND TOWERS WORKS as Per Item # 5.2.2 of Schedule "B"
II.4.2.1
Breakdown
Supply and erection of a communication shelter with A/C at NG proposed locations for substations and transmission lines,
with dimensions (2.5x2.5 m). The shelter shall be equipped with two split air-conditioning units with a timer switch, cable
ladders, a power source, fire extinguishers, lights, power sockets, and the construction of a foundation for the
communication shelter, all as per COMPANY specifications
II.4.2.2
Breakdown
Supply and erection of a communication shelter with A/C at NG proposed locations for substations and transmission lines,
with dimensions (3x3 m). The shelter shall be equipped with two split air-conditioning units with a timer switch, cable
ladders, a power source, fire extinguishers, lights, power sockets, and the construction of a foundation for the
communication shelter, all as per COMPANY specifications
EA
15
38,850.00
SR
582,750.00
Unit Rate
II.4.2.3
Breakdown
Supply and install grounding on telecom towers and/or shelters
EA
20
680.00
SR
13,600.00
Unit Rate
II.4.2.4
Breakdown
Supply and install cable trays between telecom towers and shelters
EA
30
2,950.00
SR
88,500.00
Unit Rate
II.4.2.5
Breakdown
Remove old gravel, supply and fill new gravel for towers and shelters
M2
140
250.00
SR
35,000.00
Unit Rate
II.4.2.6
Breakdown
Removal of loose/old paint from telecom towers and repainting according to COMPANY instructions and specifications
M2
15
600.00
SR
9,000.00
Unit Rate
II.4.2.7
Breakdown
EA
20
3,450.00
SR
69,000.00
Unit Rate
EA
15
3,650.00
SR
54,750.00
Unit Rate
II.4.2.8
II.4.3
Repair of the Telecom tower aviation lighting system
Breakdown
Description
Supply and install an aviation lighting system on telecom towers
SUPPORT FACILITY
ADDITIONAL WORKS as Per Item # 5.4.3 of Schedule "B"
II.4.3.1
Breakdown
Supply, install and removal guard posts at the site, including complete formwork (four posts), concreting, and beaming
EA
7
57,850.00
SR
404,950.00
Unit Rate
II.4.3.2
Breakdown
Supply, install and removal an additional guard post
EA
7
13,850.00
SR
96,950.00
Unit Rate
BF-PA -40 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
II.4.3.3
Breakdown
II.4.3.4
Breakdown
Supply required materials and paint guard posts
EA
7
6,980.00
SR
48,860.00
Unit Rate
Prepare the site for the jointing of power cables by company technicians as directed, per joint bay
EA
7
3,500.00
SR
24,500.00
Unit Rate
II.4.3.5
Breakdown
Supply and Install nameplates for the circuits as directed
EA
35
325.00
SR
11,375.00
Unit Rate
II.4.3.6
Breakdown
Supply and install room identification signs
EA
35
160.00
SR
5,600.00
Unit Rate
II.4.3.7
Breakdown
Supply and install signs for Electrical, Mechanical, Protective Equipment, Symbolic Safety Signs in the Control Room, Relay
Room, Communication Room, Battery Room, HVAC Room, Basement, and Switch Yard
EA
35
350.00
SR
12,250.00
Unit Rate
II.4.3.8
Breakdown
Supply and install signboards on the Substation building
M2
100
750.00
SR
75,000.00
Unit Rate
II.4.3.9
Breakdown
Supply and install trash bins (1. Combustibles (Red Color), 2. Salvage (Orange Color), 3. Plastic & Paper (Blue Color), and
4. Trash (Yellow Color)
EA
70
510.00
SR
35,700.00
Unit Rate
II.4.3.10
Breakdown
Perform the required inspections of Water Pumps and Related Parts: controls and distribution panels to maintain them in
proper and good condition
EA
15
1,450.00
SR
21,750.00
Unit Rate
Breakdown
Perform the required inspections of Extract Ventilation and Exhaust Fans: for buildings, battery rooms, basements, etc. to
maintain them in proper and good condition
EA
15
1,450.00
SR
21,750.00
Unit Rate
II.4.3.12
Breakdown
Perform the required inspections of Lights and Related Parts: including exit lights, emergency lights, building lights,
floodlights, security lights, and related controls and distribution panels for building facilities to maintain them in proper
and good condition
EA
15
780.00
SR
11,700.00
Unit Rate
II.4.3.13
Breakdown
Perform the required inspections of Doors, Gates and Related Parts: for building facilities to maintain them in proper and
good condition
EA
15
1,100.00
SR
16,500.00
Unit Rate
II.4.3.14
Breakdown
Perform the required inspections of Toilets and Related Fittings and Consumables: for building facilities to maintain them
in proper and good condition
EA
15
1,100.00
SR
16,500.00
Unit Rate
Breakdown
Perform the required inspections of Floors, Walls, and Slabs: for building facilities to maintain them in proper and good
condition
EA
15
1,100.00
SR
16,500.00
Unit Rate
Breakdown
Perform the required inspections of Suspended/Dropped Ceilings: Including plywood/gypsum, aluminum boards for
building facilities to maintain them in proper and good condition
EA
15
1,100.00
SR
16,500.00
Unit Rate
II.4.3.11
II.4.3.15
II.4.3.16
II.5
Description
MANPOWER
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
PROVIDE THE MANPOWER TO PERFORM ANY ADDITIONAL WORK NOT COVERED IN THE WORK UNIT RATES
WHEN REQUESTED BY THE COMPANY as Per Item # 5.4.3.10 of Schedule "B"
II.5.1
Breakdown
Foreman or Technical Supervisor or Specialist
H
7
33.19
SR
232.35
Unit Rate
II.5.2
Breakdown
Certified scaffolder foreman/supervisor
H
7
33.19
SR
232.35
Unit Rate
II.5.3
Breakdown
Certified Scaffolder workers for erecting scaffolding systems
H
7
26.65
SR
186.53
Unit Rate
II.5.4
Breakdown
Operator/Programmer
H
7
33.19
SR
232.35
Unit Rate
II.5.5
Breakdown
Safety Officer
H
7
41.61
SR
291.25
Unit Rate
II.5.6
Breakdown
Safety Engineer
H
7
49.09
SR
343.61
Unit Rate
II.5.7
Breakdown
Civil/Mechanical/Electrical Engineer
H
7
49.09
SR
343.61
Unit Rate
II.5.8
Breakdown
Surveyor/Mechanic/Electrician/Instrument/Senior A/C Technician
H
7
24.50
SR
171.48
Unit Rate
II.5.9
Breakdown
Welder
H
7
24.50
SR
171.48
Unit Rate
II.5.10
Breakdown
Plumber/Carpenter/Mason/Painter/Roofer
H
7
24.50
SR
171.48
Unit Rate
II.5.11
Breakdown
Metal Fabricator/Metal Mechanic/Duct Fabricator
H
7
24.50
SR
171.48
Unit Rate
II.5.12
Breakdown
Insulator/refractory worker
H
7
24.50
SR
171.48
Unit Rate
II.5.13
Breakdown
Certified Lifting equipment driver
H
7
24.50
SR
171.48
Unit Rate
II.5.14
Breakdown
Heavy Equipment Operator
H
7
24.50
SR
171.48
Unit Rate
BF-PA -41 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
II.5.15
Breakdown
II.5.16
Breakdown
II.6
Description
Short Description
EQUIPMENT
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
Heavy Truck Driver
H
7
24.50
SR
171.48
Unit Rate
Helper
H
10
15.43
SR
154.28
Unit Rate
PROVIDE THE Equipment TO PERFORM ANY ADDITIONAL WORK NOT COVERED IN THE WORK UNIT RATES
WHEN REQUESTED BY THE COMPANY as Per Item # 7 of Schedule "B"
II.6.1
Breakdown
Dump Truck with 15 cubic meter capacity
H
10
163.63
SR
1,636.25
Unit Rate
II.6.2
Breakdown
Portable Oil Tanker with 15 cubic meter capacity, with all associated hoses
H
10
154.28
SR
1,542.75
Unit Rate
II.6.3
Breakdown
Portable Water Tanker with 15 cubic meter capacity, with all associated hoses
H
10
163.63
SR
1,636.25
Unit Rate
II.6.4
Breakdown
Portable Oil Pumps not less than 1 HP, with all associated hoses
H
10
93.50
SR
935.00
Unit Rate
II.6.5
Breakdown
Portable Water Pumps (1HP) with all associated hoses
H
10
112.20
SR
1,122.00
Unit Rate
II.6.6
Breakdown
Portable Water Pumps (2HP) with all associated hoses
H
10
130.90
SR
1,309.00
Unit Rate
II.6.7
Breakdown
Excavator including certified driver
H
10
210.38
SR
2,103.75
Unit Rate
II.6.8
Breakdown
Backhoe including certified driver
H
10
210.38
SR
2,103.75
Unit Rate
II.6.9
Breakdown
Pay loader Medium Size including certified driver
H
10
266.48
SR
2,664.75
Unit Rate
II.6.10
Breakdown
Bobcat including certified driver
H
10
140.25
SR
1,402.50
Unit Rate
II.6.11
Breakdown
Jack Hammer medium capacity including certified driver
H
10
163.63
SR
1,636.25
Unit Rate
II.6.12
Breakdown
Bulldozer including certified driver
H
10
420.75
SR
4,207.50
Unit Rate
II.6.13
Breakdown
Road Roller Medium Size
H
10
327.25
SR
3,272.50
Unit Rate
II.6.14
Breakdown
Asphalt Cutter with 12" diameter blade
H
10
140.25
SR
1,402.50
Unit Rate
II.6.15
Breakdown
Compactor Bottom Plate (18" x 18")
H
10
79.48
SR
794.75
Unit Rate
II.6.16
Breakdown
Bucket Truck
H
10
327.25
SR
3,272.50
Unit Rate
II.6.17
Breakdown
Crane, 10 Ton
H
10
327.25
SR
3,272.50
Unit Rate
II.6.18
Breakdown
Crane, 15 Ton
H
10
350.63
SR
3,506.25
Unit Rate
II.6.19
Breakdown
Crane, 20 Ton
H
10
420.75
SR
4,207.50
Unit Rate
II.6.20
Breakdown
Crane, 25 Ton
H
10
420.75
SR
4,207.50
Unit Rate
II.6.21
Breakdown
Forklift, 5 Ton
H
10
233.75
SR
2,337.50
Unit Rate
II.6.22
Breakdown
Forklift, 10 Ton
H
10
327.25
SR
3,272.50
Unit Rate
II.6.23
Breakdown
Heavy-duty industrial vacuum machine
H
10
327.25
SR
3,272.50
Unit Rate
II.6.24
Breakdown
Air Compressor (0.63 Mpa)
H
10
163.63
SR
1,636.25
Unit Rate
Mobile man lifter, portable type
H
10
163.63
SR
1,636.25
Unit Rate
II.6.25
Breakdown
III
Description
AMD-North
III.1
Description
CIVIL WORKS
Asset Maintenance Department-North (Khursaniyah, Jubail Industrial City, Jubail City, Berri, Ghazlan, Rahimah
and Ras Tanurah)
CIVIL WORKS as Per Item # 5.1 of Schedule "B"
BF-PA -42 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
III.1.1
Line type
Short Description
Description
CIVIL WORKS
Long Description
UOM
Quantity
M2
250
III.1.1.1
Breakdown
III.1.1.2
Breakdown
Preparation of topographical maps only as explained in item 5.1.1 in Schedule "B" for a pre-surveyed area,
excluding collection of site data with scales (1:50) or (1:20)
EA
III.1.1.3
Breakdown
Preparation of construction drawing of as built drawings for civil, electrical, mechanical works.
Description
CIVIL WORKS
Currency
Total
Payment
Type
SURVEYING as Per Item # 5.1.1 of Schedule "B"
Land surveying of area, the boundaries of which shall be specified by the Company. Includes site surveying, preparation
of detailed topographical maps, showing all existing structures, roads, electrical and communication networks, etc.,
with scales (1:250) or (1:100). The maps shall be submitted in hard and softcopies
III.1.2
Unit Price
23.50
SR
5,875.00
Unit Rate
20
1,850.00
SR
37,000.00
Unit Rate
EA
20
1,850.00
SR
37,000.00
Unit Rate
EXCAVATION, BACKFILL AND COMPACTION SURVEYING as Per Item # 5.1.2 of Schedule "B"
III.1.2.1
Breakdown
Breaking and removal of asphalted top surface using adequate equipment and disposal to designated places
M3
300
128.25
SR
38,475.00
Unit Rate
III.1.2.2
Breakdown
Excavation in Rocky soil using all necessary equipment and dispose excavated material to dump areas
M3
250
90.25
SR
22,562.50
Unit Rate
III.1.2.3
Breakdown
Excavation in normal soil using all necessary equipment and dispose excavated material to dump areas
M3
250
72.00
SR
18,000.00
Unit Rate
III.1.2.4
Breakdown
Manual excavation using manual equipment in restricted area due to specialty of any areas specified by COMPANY
Engineers
M3
150
135.00
SR
20,250.00
Unit Rate
III.1.2.5
Breakdown
Shoring of trench wall(s) where necessary, using CONTRACTOR’s shoring gear. Work includes removal after job
completion. Rate per running meter of trenches shored up
M
150
150.00
SR
22,500.00
Unit Rate
III.1.2.6
Breakdown
Supply and backfill clean sand, general fill, select fill, source within 100 km from Work site
M3
110
55.00
SR
6,050.00
Unit Rate
III.1.2.7
Breakdown
Supply and backfill clean sand, general fill, select fill, source beyond 100 km from Work site
M3
110
55.00
SR
6,050.00
Unit Rate
III.1.2.8
Breakdown
Supply Backfilling material for sub-base course layer (under asphalt layer) as per COMPANY Specifications
M3
2,000
150.00
SR
300,000.00
Unit Rate
III.1.2.9
Breakdown
Supply Normal backfilling material as per COMPANY Specifications
M3
150
75.00
SR
11,250.00
Unit Rate
III.1.2.10
Breakdown
Supply and lay gravel, 10-15 cm thick layer, including leveling and compaction of selected area as per COMPANY
Standards
M3
150
75.00
SR
11,250.00
Unit Rate
III.1.2.11
Breakdown
Supply and lay cable warning tapes and cement tiles 20x30cm dark red color
M
250
25.00
SR
6,250.00
Unit Rate
Breakdown
Safety signs and equipment around excavation area (stand, warning tape, warning lights, caution warning plates, plastic
net orange color, cement blocks as required).
M
400
110.00
SR
44,000.00
Unit Rate
III.1.2.13
Breakdown
Supply and place sand as directed. When used to fill substation trenches this item includes skimming the surface with a
weak mix of sand and cement to a thickness of 5 cm. When this item is used in packing around 110 kV, 115 kV, 132 kV,
230 kV & 380 kV joints, the price includes placing the sand in bags and positioning them around the joint
M3
190
65.00
SR
12,350.00
Unit Rate
III.1.2.14
Breakdown
Perform soil investigation according to the company's approved specifications WI.GM- after any excavation
and backfilling
EA
20
1,650.00
SR
33,000.00
Unit Rate
III.1.2.15
Breakdown
Perform soil Conduct soil testing for compaction, bearing capacity, and soil resistivity
EA
20
1,650.00
SR
33,000.00
Unit Rate
III.1.2.16
Breakdown
Shallow Compaction: Using rollers, rammers, or vibratory plates to compact the soil at shallow depths
M3
15
65.00
SR
975.00
Unit Rate
III.1.2.17
Breakdown
Deep Compaction: Techniques like vibroflotation, dynamic compaction, and blasting compact soil at greater depths
M3
8
75.00
SR
600.00
Unit Rate
III.1.2.18
Breakdown
Permeation Grouting: Supply and injecting grout into the soil to fill voids and increase strength
M3
6
1,125.00
SR
6,750.00
Unit Rate
III.1.2.19
Breakdown
Compaction Grouting: Supply and injecting a stiff grout to displace and compact the surrounding soil
M3
4
740.00
SR
2,960.00
Unit Rate
III.1.2.20
Breakdown
Jet Grouting: Using high-pressure jets to mix grout with the soil, creating a solidified mass (including the injection
material)
M3
4
1,125.00
SR
4,500.00
Unit Rate
III.1.2.21
Breakdown
Chemical Stabilization: Supply and Adding lime, cement, or other chemicals to improve soil properties
M3
2
350.00
SR
700.00
Unit Rate
III.1.2.22
Breakdown
Mechanical Stabilization: Mixing soil with aggregates or geosynthetics to enhance strength and stability (including supply
of the aggregates)
M3
2
475.00
SR
950.00
Unit Rate
III.1.2.23
Breakdown
Geosynthetics: Using geotextiles, geogrids, or geomembranes to reinforce and stabilize the soil (including supplying the
material)
M3
2
325.00
SR
650.00
Unit Rate
III.1.2.12
BF-PA -43 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
III.1.2.24
III.1.3
Line type
Short Description
Breakdown
Description
Long Description
Soil Nailing: supply and Install steel bars (nails) into the soil to provide additional support and stability
CIVIL WORKS
UOM
Quantity
M3
2
Unit Price
Currency
Total
Payment
Type
165.00
SR
330.00
Unit Rate
ASPHALTING SURVEYING as Per Item # 5.1.3 of Schedule "B"
III.1.3.1
Breakdown
Supply, deliver to site and lay tarmac, asphalt or other tar surface to a thickness of 10 cm including spray of liquid asphalt
(MC1) on final soil layer
M2
2,000
70.00
SR
140,000.00
Unit Rate
III.1.3.2
Breakdown
Grind and remove top surface of asphalt to the required thickness using milling machine, Supply and deliver approved
asphalt to site and lay to restore the required level (Max 10 cm thick) using planner Asphalt Paper (Faraday)
M2
1,600
27.00
SR
43,200.00
Unit Rate
III.1.3.3
Breakdown
Supply and lay a layer of sub-base to a thickness not less than 20 cm composed from clean material, free from organic
material or clay and aspersion of water and compacting to reach required compaction, also supply, deliver to site and lay
asphalt areas at a thickness not less than 8 cm including preparation of surfaces to be cleaned from dust with air
compressor after removing all loose material from sub-base and spreading MC1 coat
M2
1,800
125.00
SR
225,000.00
Unit Rate
III.1.3.4
Breakdown
Road limit on both sides, left and right marking lanes with yellow color, shall be 15 cm and thickness not less than 0.3
mm
M
400
9.30
SR
3,720.00
Unit Rate
III.1.3.5
Breakdown
Paint road pavement (footpath) by black and yellow paint, 0.3 mm
M
400
III.1.3.6
Breakdown
Caution warning plate included plate pole shall be provided
EA
40
III.1.3.7
Breakdown
Road middle line white color 15 cm, 0.3 mm thickness
M
III.1.4
9.30
SR
3,720.00
Unit Rate
560.00
SR
22,400.00
Unit Rate
400
9.30
SR
3,720.00
Unit Rate
Description
CIVIL WORKS
SIDEWALKS SURVEYING as Per Item # 5.1.4 of Schedule "B"
III.1.4.1
Breakdown
Supply and Lay
Paving Only
Supply and lay paving tiles. All materials to be supplied by CONTRACTOR. Item includes bedding the tiles but not
construction foundation
M2
500
46.00
SR
23,000.00
Unit Rate
III.1.4.2
Breakdown
Walkways Works
Supply and erect curbstones 15x15x30cm with toggle joint 15cm (shape L) and backfilling with clean sand and immersion
with water, then lay lean concrete 10cm thick with reinforcement steel (4mm) and erect pathway tiles as per sample
approved by the Company Representative and making dilation joints and slope for drainage
M2
190
48.35
SR
9,186.50
Unit Rate
III.1.4.3
Breakdown
Curbstones
M
110
48.35
SR
5,318.50
Unit Rate
III.1.4.4
Breakdown
Reinstall existing Marbled tiles or special tiles work includes concrete base laying, jointing paving
M2
80
28.00
SR
2,240.00
Unit Rate
III.1.4.5
Breakdown
Reinstatement of Asphalted Sidewalk using Hot Asphalt includes base preparation according to site Conditions
M2
250
35.00
SR
8,750.00
Unit Rate
III.1.4.6
Breakdown
Reinstatement of plain concrete sidewalk according to site Conditions
M2
190
36.00
SR
6,840.00
Unit Rate
III.1.4.7
Breakdown
Reinstatement of reinforced concrete sidewalks according to site Conditions
M2
190
36.00
SR
6,840.00
Unit Rate
III.1.4.8
Breakdown
Reinstatement of graveled sidewalks according to site Conditions, thick 5-10cm
M2
1,200
28.00
SR
33,600.00
Unit Rate
III.1.4.9
Breakdown
Painting of curbstone around the sidewalk
M
400
16.00
SR
6,400.00
Unit Rate
III.1.4.10
Breakdown
Laying Cement tiles on sidewalks
M2
400
35.15
SR
14,060.00
Unit Rate
III.1.4.11
Breakdown
Supply and Construct reinforced concrete sidewalks with welded wire mesh
M2
400
42.00
SR
16,800.00
Unit Rate
III.1.5
III.1.5.1
Description
CIVIL WORKS
Description
CONSTRUCTION
CIVIL WORK
Supply and lay curbstones, Item includes all work needed to cut , fit and bed curbstone on an existing cement mortar
layer at a thickness of not less than 5cm
CONSTRUCTION CIVIL WORK SURVEYING as Per Item # 5.1.5 of Schedule "B"
FENCING as Per Item # 5.1.5.1 of Schedule "B"
III.1.5.1.1
Breakdown
Supply and installation of perimeter fence with concrete posts as per COMPANY Standards (70-TMSS-02 and TCS-M112.01)
M
300
1,015.00
SR
304,500.00
Unit Rate
III.1.5.1.2
Breakdown
Removal of existing fence and supply and erect of PVC coated mesh 4mm thick at a height of 2.45m with all accessories,
fixation and bottom flat bar to be fixed to the posts, including all necessary for erection as per COMPANY standards.
M
300
245.00
SR
73,500.00
Unit Rate
III.1.5.1.3
Breakdown
Supply and erection of one set of precast boundary walls consisting of two column grad beams and one wall panel having
dimension (3x3 MT as per SEC. Standard TA-800144, TA-800012 and AT-800013
M
400
1,350.00
SR
540,000.00
Unit Rate
III.1.5.1.4
Breakdown
Supply and Install of decorative steel fence on top of boundary as per Sec-Standard TA-800112
M
190
235.00
SR
44,650.00
Unit Rate
BF-PA -44 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Quantity
M
60
1,015.00
SR
60,900.00
Unit Rate
60
1,870.00
SR
112,200.00
Unit Rate
8
4,500.00
SR
36,000.00
Unit Rate
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Supply and install perimeter fence with concrete posts as per SEC standard at dip station and around tower OHL different
locations
III.1.5.1.5
Breakdown
III.1.5.1.6
Breakdown
Supply and install personnel fence gate- mm Wide
EA
III.1.5.1.7
Breakdown
Supply and installation door for fence above as per COMPANY Standards.
EA
III.1.5.1.8
Breakdown
Supply and install metal barriers to raise the Substation boundary in areas facing equipment that poses a danger
M
80
235.00
SR
18,800.00
Unit Rate
III.1.5.1.9
Breakdown
Removal of existing barbed wire and erection of 3 barbed wires and flat bar in between 2 posts to fix these wires.
M
300
35.00
SR
10,500.00
Unit Rate
Breakdown
Additional cost to be added to item (III.1.5.1.9) when supplying and erection of spiral barbed wire instead of the 3 barbed
wires.
M
150
155.00
SR
23,250.00
Unit Rate
Removal of existing barbed wire and erection of spiral barbed wires and flat bar in between 2 posts to fix these wires
M
150
185.00
SR
27,750.00
Unit Rate
EA
25
4,478.10
SR
111,952.50
Unit Rate
33,000.00
SR
264,000.00
Unit Rate
III.1.5.1.10
III.1.5.1.11
III.1.5.2
Breakdown
Description
CONSTRUCTION
CIVIL WORK
DOOR AND WINDOW WORKS as Per Item # 5.1.5.2 of Schedule "B"
III.1.5.2.1
Breakdown
Supply and erection of steel door with all required accessories including frames, anchors, hinges, dust proof strips, the
thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant paint at least
0.5mm thick with primer and final paint as per COMPANY specifications, with inside size of 100 x 220cm
III.1.5.2.2
Breakdown
Supply and erection of steel sliding door size 400 x 500cm with all required accessories including frames, anchors, wheels
& sliding channels, dust proof strips, the thickness of the metal sheets is 2mm, filled-in with insulation, fire rated with a
coat of fire-resistant paint at least 0.5mm thick with primer and final paint as per company specifications. COMPANY
representative may request a single door 100 x 220cm in one of the leaves if needed
EA
8
III.1.5.2.3
Breakdown
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant
paint at least 0.5mm thick with primer and final paint as per company specifications, with inside size of 200 x 220 cm.
EA
25
7,260.00
SR
181,500.00
Unit Rate
III.1.5.2.4
Breakdown
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant
paint at least 0.5mm thick with primer and final paint as per company specifications, with inside size of 400 x 300 cm.
EA
10
19,800.00
SR
198,000.00
Unit Rate
III.1.5.2.5
Breakdown
EA
8
34,650.00
SR
277,200.00
Unit Rate
III.1.5.2.6
Breakdown
EA
10
4,700.00
SR
47,000.00
Unit Rate
III.1.5.2.7
Breakdown
EA
10
4,700.00
SR
47,000.00
Unit Rate
III.1.5.2.8
Breakdown
EA
10
9,588.00
SR
95,880.00
Unit Rate
III.1.5.2.9
Breakdown
EA
10
7,150.00
SR
71,500.00
Unit Rate
III.1.5.2.10
Breakdown
EA
10
2,750.00
SR
27,500.00
Unit Rate
III.1.5.2.11
Breakdown
EA
8
79,500.00
SR
636,000.00
Unit Rate
III.1.5.2.12
Breakdown
EA
8
3,190.00
SR
25,520.00
Unit Rate
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, fire rated with a coat of fire-resistant paint at least 0.5mm thick with primer and final paint as per company
specifications, with inside size of 500 x 420 cm.
Supply and erection of single steel door with all required accessories including frames, anchors, hinges, dust proof strips,
the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire resistant paint at
least 0.5mm thick with primer and final paint as per company specifications, with inside size of 100 x 220cm (emergency
door), equipped with anti-panic arm to open and the arm closer
Supply and installation of a metal door of 100 × 220cm with all accessories including Framing, fixtures, Hinges, Handles,
locks and arm-closer and dust proof strips, type steel artwork and painted with furnace electrostatic powder, form and
color to be determined by the company Representative and provide number (3) Keys “Master Key”
Supply and installation of a metal double leaf door of 200 × 220cm (100×220cm each leaf) with all accessories including
Framing, fixtures, Hinges, Handles, locks and arm-closer and dust proof strips, type steel artwork and painted with
furnace electrostatic powder, form and color to be determined by the company Representative and provide number (3)
Keys “Master Key”
Supply and install aluminum doors with all the accessories including Framings, fixtures, Hinges, arm closer, handles, locks
and dust proof strips, the thickness of the fiber sheet must be 3mm filled in between with insulation materials and the
size 100×220cm, catalogs must be presented for approval of the door and choose the color. Note that COMPANY
Representative may request to leave a ventilation gap at the bottom of the door of approximate size 15 × 40cm segments
with filter and rips for ventilation
Supply and install wooden doors size 100×220cm with all accessories including Framings, fixtures, Hinges, Handles, locks,
arm closer, and in this regard the CONTRACTOR must provide samples for the initial choice of colors from all variety of
colors and finishes available in the factory to decide the finishing of doors and frames, these samples must come in the
form of angled section of about 15cm2 at the same thickness and material of the WORK in its final form
Supply and erection of a roll-up door with all required accessories including frames, anchors, hinges, fire rated with a coat
of fire-resistant paint with a three-hour fire rating, with size of 500 x 600 cm
Supply and installation of bird screen doors with all accessories including the bird screen mesh 3mm thick and size
100×200cm with the appropriate metal supports and Framings, fixtures, Hinges, Handles, locks in accordance with the
COMPANY Specifications
BF-PA -45 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Quantity
Breakdown
EA
8
1,478.00
SR
11,824.00
Unit Rate
Breakdown
Supply and installation of aluminum, section with thickness not less than 3 mm to be fixed in the openings adequately by
sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any leak of dust
and water, and double glass isolated (6/8/6 ) mm to be well fixed and surrounded by rubber entirely continuous from both
sides, and all the accessories such as handles and wheels must be of high quality, and the color of glass as determined by
the Company Representative with the installation of a sliding wire mesh, the size 120x100cm, and a sample of these
windows must be provided for approval. Also supply and erect external metal grids to protect the windows with squared
bars 1.5 cm # 15 x 15 cm, to be painted with primer coat and final coat same as paint specifications of the outer walls.
EA
8
3,696.00
SR
29,568.00
Unit Rate
III.1.5.2.15
Breakdown
Supply and installation of aluminum window, section with thickness not less than 3 mm to be fixed in the openings
adequately by sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any
leak of dust and water, and double glass isolated (6/8/6 ) mm to be well fixed and surrounded by rubber entirely
continuous from both sides, and all the accessories such as handles and wheels must be of high quality, and the color of
glass as determined by the Company Representative with the installation of a sliding wire mesh, the size 60x80cm twist
type and a single glass reinforced with wire mesh for toilets, and a sample of these windows must be provided for
approval. Also supply and erect external metal grids to protect the windows with squared bars 1.5 cm # 15 x 15 cm, to be
painted with primer coat and final coat same as paint specifications of the outer walls.
EA
8
1,478.00
SR
11,824.00
Unit Rate
III.1.5.2.16
Breakdown
Supply and install substation drive gate 6-meters width as per company standard drawing SA-036272
EA
8
29,700.00
SR
237,600.00
Unit Rate
III.1.5.2.17
Breakdown
Supply and install personnel gate for substation 1-meter-wide as per company Sec-Standard SA-036272
EA
8
7,700.00
SR
61,600.00
Unit Rate
III.1.5.2.18
Breakdown
Supply and install gates at dip stations at different locations Sec-Standard
EA
4
18,350.00
SR
73,400.00
Unit Rate
III.1.5.2.19
Breakdown
Supply and install gates of fence with concrete posts as per SEC standard at dip station and OHTL tower at different
locations
EA
8
18,350.00
SR
146,800.00
Unit Rate
III.1.5.2.20
Breakdown
Supply and install steel handrails (2-inch G.I. pipe) for stairways as per NFPA101 requirements, painted canary yellow
M
80
145.00
SR
11,600.00
Unit Rate
III.1.5.2.21
Breakdown
Supply and install exit safety devices for all exterior doors as per SEC standard TES-P-119.19
EA
8
1,080.00
SR
8,640.00
Unit Rate
III.1.5.2.22
Breakdown
Supply and install canopy above door and windows frame
EA
8
985.00
SR
7,880.00
Unit Rate
Supply and install clear anodized aluminum window curtains
M2
190
135.00
SR
25,650.00
Unit Rate
III.1.5.2.14
III.1.5.2.23
III.1.5.3
Short Description
Breakdown
Description
CONSTRUCTION
CIVIL WORK
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Supply and installation of aluminum window, section with thickness not less than 3mm to be fixed in the openings
adequately by sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any
leak of dust and water, and double glass isolated (6/8/6)mm to be well fixed and surrounded by rubber entirely
continuous from both sides, and all the accessories such as handles and wheels must be of high quality, and the color of
glass as determined by the Company Representative with the installation of a sliding wire mesh, the size 60x80cm twist
type and a single glass reinforced with wire mesh for toilets, and a sample of these windows must be provided for
approval. Also supply and erect external metal grids to protect the windows with squared bars 1.5 cm # 15 x 15cm, to be
painted with primer coat and final coat same as paint specifications of the outer walls
III.1.5.2.13
Line type
Building Works as Per Item # 5.1.5.3 of Schedule "B"
III.1.5.3.1
Breakdown
Concrete block wall thickness 20 cm
M2
80
163.63
SR
13,090.40
Unit Rate
III.1.5.3.2
Breakdown
Concrete block wall thickness 15 cm
M2
80
126.23
SR
10,098.40
Unit Rate
III.1.5.3.3
Breakdown
Concrete block wall thickness 10 cm
M2
80
93.50
SR
7,480.00
Unit Rate
III.1.5.3.4
Breakdown
Sand lime block wall thickness 20 cm
M2
40
171.81
SR
6,872.40
Unit Rate
III.1.5.3.5
Breakdown
Sand lime block wall thickness 15 cm
M2
40
132.54
SR
5,301.60
Unit Rate
III.1.5.3.6
Breakdown
Construction of decorative block wall (rock type) 20cm thick.
M2
40
98.18
SR
3,927.20
Unit Rate
III.1.5.3.7
Breakdown
Work of the repair of walls
M2
190
III.1.5.3.8
Breakdown
Construct a substation security guard house as per company construction standard drawings TA 800039, TA 800040, TA
800041, and TA 800042
EA
III.1.5.3.9
Breakdown
Supply and install Substation signboard on the Substation Building as per Sec-Standard TC-800003
EA
III.1.5.3.10
Breakdown
Supply and install Substation signboard on the Gate House as per Sec-Standard TA-800111
EA
BF-PA -46 of 104
143.00
SR
27,170.00
Unit Rate
2
146,680.00
SR
293,360.00
Unit Rate
8
3,850.00
SR
30,800.00
Unit Rate
8
3,850.00
SR
30,800.00
Unit Rate
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
III.1.5.4
Line type
Short Description
Description
CONSTRUCTION
CIVIL WORK
Long Description
Total
Payment
Type
SR
116,000.00
Unit Rate
1,450.00
SR
188,500.00
Unit Rate
UOM
Quantity
Unit Price
M3
80
1,450.00
Currency
Concrete Works as Per Item # 5.1.5.4 of Schedule "B"
III.1.5.4.1
Breakdown
Supply and deliver to site and lay concrete for slabs with a mix of 1:2:4, the cement must not be less than 350kg/m3,
item includes covering the background lean concrete or backfilling with polyethylene sheet 200 micron thick and
reinforcement steel mesh #15x15cm 8mm dia., to be doubled (two layers) on at least 1m from the grade beam
centerlines.
III.1.5.4.2
Breakdown
Supply and deliver to site and lay concrete including reinforcement steelwork for foundations, grade beams, beams and
columns, with a mix of 1:2:4, the cement must not be less than 350kg/m3 and the reinforcement steel not less than 100
kg, unless specifically indicated in drawings or directed by the Company Representative. It is required to paint the
underground portion of the reinforced concrete with an approved waterproofing material to prevent corrosion. The
contactor must use a vibrator (50mm dia. And speed 3000tr/Min) sufficiently during concreting as directed.
M3
130
III.1.5.4.3
Breakdown
Supply and deliver to site 50 kg of cement additional to normal concrete mix design of 1:2:4
EA
80
43.30
SR
3,464.00
Unit Rate
III.1.5.4.4
Breakdown
Supply and deliver to site and lay lean concrete without reinforcement steel with a mix of 200kg/m3. The underground
portion must be painted with an approved waterproofing material to prevent water infiltration into the reinforced concrete
as directed by the Company Representative. Concrete strength should be 2500 Psi
M3
60
209.00
SR
12,540.00
Unit Rate
III.1.5.4.5
Breakdown
Supply and erect on site pre-cast reinforced concrete pits according to the company specifications. Item include
installation and supply cover for pit and also excavation and restoration of site to original
M3
20
315.00
SR
6,300.00
Unit Rate
III.1.5.4.6
Breakdown
Raise the level of the cable trench side walls by at least 10 cm. This item includes supplying and delivering to the site
concrete with a mix of 1:2:4, including reinforcement steel, which must be fixed after drilling the top of trench walls with
epoxy grout (glue). Also, fix a steel angle 5x5 cm on the internal edge of trench walls
M3
40
360.00
SR
14,400.00
Unit Rate
III.1.5.4.7
Breakdown
Cover the cable trenches with tight covers to avoid infiltration of water and oil. The covers should be in the form of steel
frames (frame with steel angles 5x5 cm and closing the frame from the bottom with a 2 mm thick steel plate) to be
poured with lightweight foam concrete (450 kg/m³) reinforced with #15x15 cm steel mesh, 4 mm diameter at least. The
joints between the covers (8 mm) will be filled with polyurethane sealant
M2
60
153.00
SR
9,180.00
Unit Rate
III.1.5.4.8
Breakdown
Repair and replace damaged or weak cable trench covers according to the COMPANY Specifications
M2
40
145.00
SR
5,800.00
Unit Rate
III.1.5.4.9
Breakdown
Supply and erect covers for cable trenches according to the COMPANY Specifications
M2
40
181.25
SR
7,250.00
Unit Rate
M2
110
182.00
SR
20,020.00
Unit Rate
III.1.5.5
Description
CONSTRUCTION
CIVIL WORK
Flooring Works and finishing as Per Item # 5.1.5.5 of Schedule "B"
III.1.5.5.1
Breakdown
Supply and lay ceramic tiles with a minimum thickness of 4 mm for walls and 9.5 mm for floors, including all necessary
materials for execution and the skirting at the foot of the wall, implemented as per technical standards. A sample of these
tiles should be provided for approval by the COMPANY Representative before implementation
III.1.5.5.2
Breakdown
Supply and lay Acid-resistant ceramic tiles with a minimum thickness of 4 mm for walls and 9.5 mm for floors at the
battery room, including all necessary materials for execution and the skirting at the foot of the wall, implemented as per
technical standards. A sample of these tiles should be provided for approval by the COMPANY Representative before
implementation
M2
60
182.00
SR
10,920.00
Unit Rate
III.1.5.5.3
Breakdown
Supply and lay tiles, including spreading clean sand under the tiles at the required thickness for final finishing with an
average slope of 5 to 8 cm. Fix the tiles with cement mortar and sand, with a mix of 300 kg of cement per cubic meter of
sand at a thickness of not less than 3 cm, and joint with white cement
M2
110
182.00
SR
20,020.00
Unit Rate
III.1.5.5.4
Breakdown
Supply and fix rubber tiles, size 30x30 cm, with glue after cleaning the existing surface with a brush, implemented as per
technical standards. A sample of these tiles must be provided for approval by the COMPANY Representative before
implementation
M2
110
182.00
SR
20,020.00
Unit Rate
III.1.5.5.5
Breakdown
Supply, install and replace damaged raised floor tiles, matching the existing ones in the Control Room, Optical Fiber
Room, AC/DC Room, and PLC Room (without jack)
M2
100
240.00
SR
24,000.00
Unit Rate
Breakdown
Supply, install and replace damaged baseboards, 100 mm thick, matching the existing ones over telecommunication cable
trenches
M2
100
95.00
SR
9,500.00
Unit Rate
III.1.5.5.7
Breakdown
Supply and lay un-scratchable granite tiles, dimensions 30x60 cm and 2 cm thick, for floors and walls. Fix with white
cement, wire mesh, and mortar for wall fixing. The granite must be sorted before fixing, and non-assorted samples should
be rejected
M2
110
235.00
SR
25,850.00
Unit Rate
III.1.5.5.8
Breakdown
Supply and lay granite tiles for steps, 3 cm thick, with two rubber strips for each step, implemented as per company
specifications
M2
80
185.00
SR
14,800.00
Unit Rate
III.1.5.5.9
Breakdown
Supply and lay epoxy flooring resistant to scratches and chemical wear, with a thickness of 1000 microns and 300 microns
M2
190
175.00
SR
33,250.00
Unit Rate
III.1.5.5.6
BF-PA -47 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
M2
150
215.00
SR
32,250.00
Unit Rate
III.1.5.5.10
Breakdown
Plaster with epoxy screed mortar, which must have low susceptibility to expansion and good compressive strength. An
epoxy primer coat may be required for bonding with existing concrete. The surface must be completely leveled to the final
required level, with a thickness varying from 10 to 15 mm
III.1.5.5.11
Breakdown
Build Substation steps, including materials and labor according to company specifications. This includes plastering the
steps, compacting the soil, reinforcement steel, paint, and all materials provided at a height of 15 cm
M2
80
245.00
SR
19,600.00
Unit Rate
III.1.5.5.12
Breakdown
Supply and fix natural rock aspects. This item includes providing tools, labor, equipment, and materials to fix vertical rock
tiles with thickness not exceeding 75 mm, including the inside of the tiles and oblique planes. Fixtures must be adjustable
in three directions for proper fixing. Lay marble tiles at the bottom of the aspects at a height of 60 cm, implemented as
per the specifications for fixing marble tiles. It is preferable to finish the faces of the marble tiles with a light gloss or
almost faded finish, as the marble tiles may lose glossiness under weather conditions
M2
80
235.00
SR
18,800.00
Unit Rate
III.1.5.5.13
Breakdown
Supply and erect ceiling tiles, including metal frames, steel supports, and all necessary accessories. A sample of the tiles
must be submitted for approval by the COMPANY Representative
M2
80
185.00
SR
14,800.00
Unit Rate
III.1.5.5.14
Breakdown
Supply and erect stainless-steel slides, including steel supports and all necessary accessories. A sample of the slides must
be submitted for approval by the COMPANY Representative
M2
40
175.00
SR
7,000.00
Unit Rate
III.1.5.5.15
Breakdown
Supply and erect a surrounding crown on the top part of buildings with brick tiles (GUERMID), including supplying and
erecting a steel structure to support the bricks (1.5x1.5 m) and fixing the bricks as per usual technical standards. Also,
erect the false ceiling for this crown with all supports and frames and all necessary works
M
40
215.00
SR
8,600.00
Unit Rate
III.1.5.5.16
Breakdown
Supply and install vinyl tiles with skirting in offices and corridors
M2
60
112.00
SR
6,720.00
Unit Rate
III.1.5.5.17
Breakdown
Apply epoxy on the manhole's ground at various locations
M2
40
98.00
SR
3,920.00
Unit Rate
Supply and apply an epoxy coating system for the S/S floor building, stone grey color RAL7030
M2
80
98.00
SR
7,840.00
Unit Rate
5,750.00
SR
46,000.00
Unit Rate
III.1.5.5.18
III.1.5.6
III.1.5.6.1
Breakdown
Description
CONSTRUCTION
CIVIL WORK
Plumbing and Sanitary Works as Per Item # 5.1.5.6 of Schedule "B"
Breakdown
Supply and erect a kitchen washing basin with all accessories, including alimentation, sewage, and mixers
EA
8
III.1.5.6.2
Breakdown
Supply and erect a WC oriental chair (Saudi ceramic or similar), including all installation and necessary components for
operation
EA
15
3,322.00
SR
49,830.00
Unit Rate
III.1.5.6.3
Breakdown
Supply and erect a WC Frank chair (“American type one piece” or similar), including all installation and necessary
components for operation
EA
10
3,618.00
SR
36,180.00
Unit Rate
III.1.5.6.4
Breakdown
Supply and erect lavatories made from artificial marble, Corian material, or similar, in one piece, as per the color and form
approved by the COMPANY Representative. The lavatories shall be solid surface type and un-scratchable, including all
accessories, mirrors, etc
EA
10
5,875.00
SR
58,750.00
Unit Rate
III.1.5.6.5
Breakdown
Supply and replace water closets, including all accessories, in the toilet
EA
10
4,572.00
SR
45,720.00
Unit Rate
III.1.5.6.6
Breakdown
Supply and construct a septic tank as per SEC construction standard drawing TA-800134
EA
8
17,860.00
SR
142,880.00
Unit Rate
III.1.5.6.7
Breakdown
Supply and construct a disposal system and seepage as per SEC Standard TA-800135
EA
8
9,500.00
SR
76,000.00
Unit Rate
III.1.5.6.8
Breakdown
Supply and construct a sanitary sewer manhole as per SEC Standard TA-800137
EA
10
9,500.00
SR
95,000.00
Unit Rate
III.1.5.6.9
Breakdown
Supply and install a sewer manhole cover as per SEC Standard TA-800138
EA
10
1,350.00
SR
13,500.00
Unit Rate
III.1.5.6.10
Breakdown
Supply and install acid-resistant floor drains in the battery room
M
80
245.00
SR
19,600.00
Unit Rate
III.1.5.6.11
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 1500 liters
EA
4
2,030.00
SR
8,120.00
Unit Rate
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 2000 liters
EA
4
2,755.00
SR
11,020.00
Unit Rate
III.1.5.6.13
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 3000 liters
EA
4
5,075.00
SR
20,300.00
Unit Rate
III.1.5.6.14
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 4000 liters
EA
4
5,130.00
SR
20,520.00
Unit Rate
III.1.5.6.15
Breakdown
Supply and install a flush tank for the WC oriental chair, with all required materials, such as glue and solvent
EA
10
750.00
SR
7,500.00
Unit Rate
III.1.5.6.12
BF-PA -48 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
III.1.5.6.16
Breakdown
III.1.5.6.17
Breakdown
III.1.5.6.18
Breakdown
Quantity
Supply and install a flush tank for the WC Frank chair, with all required materials, such as glue and solvent
EA
8
750.00
SR
6,000.00
Unit Rate
Supply and install a washing basin mixer, including all installation and necessary materials
EA
8
695.00
SR
5,560.00
Unit Rate
Supply and install a shower mixer, including all installation and necessary materials
EA
8
840.00
SR
6,720.00
Unit Rate
III.1.6
Description
CIVIL WORKS
III.1.6.1
Description
MAINTENANCE
CIVIL WORK
M2
800
165.00
SR
132,000.00
Unit Rate
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
MAINTENANCE CIVIL WORK SURVEYING as Per Item # 5.1.6 of Schedule "B"
Waterproofing of Substation Roof and Treatment of Water Leakage as Per Item # 5.1.6.1 of Schedule "B"
III.1.6.1.1
Breakdown
Removal of old waterproofing and cleaning of the roof from all detachable parts, the gar coating and material that may
compose a weak separating layer, also removal of the concrete layer if it is loose or totally fissured, without damaging
parapets or evacuation downspouts. WORK includes removal of debris to approved dumping area as directed by COMPANY
REPRESENTATIVE
III.1.6.1.2
Breakdown
Repair of deep cracks by opening them in “V” shape to be sealed with chemical crack filler, and the hair cracks with epoxy
putty, also sandpapering the repaired area and cleaning dust, as directed by COMPANY REPRESENTATIVE
M2
250
185.00
SR
46,250.00
Unit Rate
III.1.6.1.3
Breakdown
Concrete the roof at a minimum thickness of 5cm (at least 5cm on top of highest corrugation in case of steel roof),
reinforced with steel mesh # 15x15, dia. 6mm
M2
400
185.00
SR
74,000.00
Unit Rate
III.1.6.1.4
Breakdown
Supply workshops insulator aqueous and thermal system urinary (polyurethane) foam thickness and average 4cm and the
intensity of 40-45 kg/m3 directly above the face of the bishop concrete or top slalom surfaces metal or insulation layer old
reformed, with the WORK and vertical height of 20cm on all Aldoara vertical surrounding bishop. Maintain proper slopes
during the application of waterproofing material towards the drain
M2
300
195.00
SR
58,500.00
Unit Rate
III.1.6.1.5
Breakdown
supply and paint with 3 layers of paint, Acrylic Foam Type Shield thickness of each layer after drought 300 microns with
the WORK of arming the network for paint textured fiber weight of 160 g/m2 to strengthen the Paint
M2
190
44.00
SR
8,360.00
Unit Rate
III.1.6.1.6
Breakdown
Supply and install Thermoplastic Single Ply Roofing Membrane, 1.5 mm thick, 1500 WMR UV PVC waterproofing
membrane, including wall corners
M2
190
115.00
SR
21,850.00
Unit Rate
III.1.6.1.7
Breakdown
Supply and install 40 x 40 cm cement tiles
M2
190
82.00
SR
15,580.00
Unit Rate
III.1.6.1.8
Breakdown
Supply and install 60 x 60 cm cement tiles
M2
190
195.00
SR
37,050.00
Unit Rate
III.1.6.1.9
Breakdown
Supply and Install 50 mm thick thermal insulation
M2
400
145.00
SR
58,000.00
Unit Rate
III.1.6.1.10
Breakdown
Carry out waterproofing paint (acrylic) on sloping deck sheeted roof using fiber mesh to reinforce the overlapping of steel
corrugated sheets and polyurethane sealant on fixing screws, implementation conform to the COMPANY specifications and
the technical procedure indicated in material catalogs
M2
400
165.00
SR
66,000.00
Unit Rate
III.1.6.1.11
Breakdown
Prevent leakage of water from the passing through external cable openings as per Item 5.1.6.1.8. of Schedule B
M2
190
145.00
SR
27,550.00
Unit Rate
III.1.6.1.12
Breakdown
Prevent leakage of water from dilation joints or cracks of the basement or cable trenches as per Item 5.1.6.1.9. of
Schedule B
M2
400
145.00
SR
58,000.00
Unit Rate
III.1.6.1.13
Breakdown
Opening dilation joints every 5m in all directions 1.5cm thick & 2.0 cm depth to fill with polyurethane sealant
M
300
65.00
SR
19,500.00
Unit Rate
III.1.6.1.14
Breakdown
Supply and install Aluminum sheet Gutter to drain the water
M
110
75.00
SR
8,250.00
Unit Rate
III.1.6.1.15
Breakdown
Supply and install Roof Drain 100 mm schedule 80
M
110
167.00
SR
18,370.00
Unit Rate
III.1.6.1.16
Breakdown
Supply and install roof Dom and concrete splash down
M3
40
185.00
SR
7,400.00
Unit Rate
III.1.6.1.17
Breakdown
Supply and install new flushing on roof parapet. With sealant
M
110
85.00
SR
9,350.00
Unit Rate
III.1.6.1.18
Breakdown
Supply and install water ingress insulation at basement as per Sec-Standard
M2
80
185.00
SR
14,800.00
Unit Rate
Supply and install Insu-wrap PVC waterproofing membrane (2000 Flee Back-UV) ultra violet membrane
M2
110
185.00
SR
20,350.00
Unit Rate
L
2,000
45.00
SR
90,000.00
Unit Rate
III.1.6.1.19
III.1.6.2
III.1.6.2.1
Breakdown
Description
Breakdown
MAINTENANCE
CIVIL WORK
Repair expansion joints in concrete structures as Per Item # 5.1.6.2 of Schedule "B"
Supply and refill the joints with flexible and waterproof materials such as polyurethane, or flexible epoxy compounds
BF-PA -49 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
III.1.6.2.2
Breakdown
III.1.6.2.3
Breakdown
III.1.6.2.4
Breakdown
III.1.6.3
Description
Short Description
Long Description
Supply and install metal or rubber covers to protect the joints from future damage
Supply and replace the filler board for construction expansion joints as needed
Supply and install protective covers over the expansion joints
MAINTENANCE
CIVIL WORK
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
M
400
35.00
SR
14,000.00
Unit Rate
M2
400
75.00
SR
30,000.00
Unit Rate
M
400
75.00
SR
30,000.00
Unit Rate
M2
400
65.00
SR
26,000.00
Unit Rate
Painting Works as Per Item # 5.1.6.3 of Schedule "B"
III.1.6.3.1
Breakdown
Removal of loose old paint using all the means used in this regard and without damaging the integrity of equipment and
devices inside and outside the substation as instructed by the company representative, and repairing the deep cracks by
opening them in "V" shape to be filled with crack filler and tiny cracks by filling with Epoxy putty, And ends of this
preparatory WORK by sanding walls or floors and cleaning from dust so that it will not be allowed any scratches or
unleveled surface or for any defects that could be observed, and these WORKs should be approved by COMPANY
REPRESENTATIVE before starting the paint, and CONTRACTOR has to follow up 5-Star Safety & Health Management
System Specification of Color Coding for Plant, Pipelines, floor and walls Epoxy Paint applications as per Safety Manual
titled "1.10 Color Coding Plant and Pipelines”
III.1.6.3.2
Breakdown
Removal white aunt and fill back all damage area
M2
110
35.00
SR
3,850.00
Unit Rate
III.1.6.3.3
Breakdown
Painting for First Aid/Emergency Equipment/Medical Supplies/Oxygen Station etc. Stacking and Storage, Stairs, Doors,
and Reflector stickers at basement
M2
190
44.00
SR
8,360.00
Unit Rate
III.1.6.3.4
Breakdown
Wall paint with a primer coat and a final coat, with the color to be determined by the Company Representative. The paint
must be resistant to carbon, moisture, weather factors, chemicals, acids, and oils, and must be cleanable and expandable,
with a solid content proportion of not less than 70%. The type of paint should be Acrylic Aliphatic Polyurethane Paint
M2
800
35.00
SR
28,000.00
Unit Rate
III.1.6.3.5
Breakdown
Coating of insulators and fire protection coating for cables, with the color to be determined by the Company Standards.
The coating must be resistant to fire and heat, moisture, weather factors, chemicals, and acids
M
400
85.00
SR
34,000.00
Unit Rate
Breakdown
Sand blasting of steel doors as needed, followed by painting with a primer coat and a final coat of polyurethane paint with
a solid content ratio of not less than 70%
M2
1,000
35.00
SR
35,000.00
Unit Rate
Breakdown
Epoxy paint work for the flooring includes:
1. Repair of cracks of concrete floors by opening the deep cracks in the form of "V" and filling with chemical filler (CRACK
FILLER) and the hair cracks by filling with Epoxy putty.
2. Epoxy floor paint (solid content 100%) 200 microns thickness, the WORK carried on two layers at a thickness of not
less than 0.1mm each layer. And the execution in accordance with the method indicated in the catalogues, any change of
color will not be allowed, and the CONTRACTOR must respect the thickness and method of implementation instructed by
the company representative.
M2
1,200
135.00
SR
162,000.00
Unit Rate
III.1.6.3.8
Breakdown
Self-leveling painting work for flooring including:
1. Completely clean the concrete slab of any residue of glue and detachable parts, and then Repair of cracks of concrete
floors by opening the deep cracks in the form of "V" and filling with chemical filler (CRACK FILLER) and the hair cracks by
filling with Epoxy putty.
2. Apply a self-leveling paint (SELF LEVELING FLOOR PAINT) 4mm thick, including the primer coat in accordance with the
specifications of the company and method of execution indicated in the catalogues
M2
1,200
95.00
SR
114,000.00
Unit Rate
III.1.6.3.6
III.1.6.3.7
III.1.6.3.9
Breakdown
Apply self-leveling paint in accordance with the specifications of the item above but at a thickness of 3 mm
M2
190
85.00
SR
16,150.00
Unit Rate
III.1.6.3.10
Breakdown
Apply self-leveling paint in accordance with the specifications of the item above but at a thickness of 2 mm
M2
190
65.00
SR
12,350.00
Unit Rate
III.1.6.3.11
Breakdown
M2
80
18.00
SR
1,440.00
Unit Rate
III.1.6.3.12
Breakdown
M2
400
75.00
SR
30,000.00
Unit Rate
M2
1,200
115.00
SR
138,000.00
Unit Rate
M3
400
365.00
SR
146,000.00
Unit Rate
III.1.6.3.13
III.1.6.4
III.1.6.4.1
Apply white & Black PU on exposed steel structure foundation
Apply cementitious cutting material at oil catch basin interior wall face
Epoxy coating system for floors in substation, epoxy coating color –stone grey–ral-7030 for GIS Room, Control Room,
switchgear Room, workshop, and relay rooms.
Work required as follows:
1. 1mm epoxy past for repairing cracks and floor levelling.
2. Master Top 1200 Resin: Primer
3. Master top 1230 -2-4mm self levelling epoxy coating
Breakdown
Description
Breakdown
MAINTENANCE
CIVIL WORK
Repair Works as Per Item # 5.1.6.4 of Schedule "B"
Break of foundation layer & cable trench
BF-PA -50 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
III.1.6.4.2
Breakdown
III.1.6.4.3
Breakdown
Repair of minor crack in wall and plaster defects
M2
550
145.00
SR
79,750.00
Unit Rate
Repair of major wall crack in wall and plaster defects
M2
550
265.00
SR
145,750.00
Unit Rate
III.1.6.4.4
Breakdown
Seal rodent and reptile entry holes to substations.
EA
100
85.00
SR
8,500.00
Unit Rate
III.1.6.4.5
Breakdown
Reconstruct collapsed/sagged floor
M2
550
145.00
SR
79,750.00
Unit Rate
III.1.6.4.6
Breakdown
Repair of crack due to corrosion of reinforcement
M2
150
265.00
SR
39,750.00
Unit Rate
III.1.6.4.7
Breakdown
Coring in R.C.C / block walls
EA
25
120.00
SR
3,000.00
Unit Rate
III.1.6.4.8
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 4" in thick wall
EA
20
120.00
SR
2,400.00
Unit Rate
III.1.6.4.9
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 8" in thick wall
EA
20
160.00
SR
3,200.00
Unit Rate
III.1.6.4.10
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 12" in thick wall
EA
20
180.00
SR
3,600.00
Unit Rate
III.1.6.4.11
Breakdown
Install duct plug on empty duct in manhole/ hand hole
EA
30
55.00
SR
1,650.00
Unit Rate
III.1.6.4.12
Breakdown
Civil work repair of the opening of manhole/ handhole cover
EA
30
850.00
SR
25,500.00
Unit Rate
III.1.6.4.13
Breakdown
Exposing Buried Manhole to clear out and exposed buried manhole. The excavated excess soil shall be scraped and
leveled to the existing ground.
EA
40
1,350.00
SR
54,000.00
Unit Rate
III.1.6.4.14
Breakdown
Replacement of damaged manhole/handhole cover or frame
EA
20
1,350.00
SR
27,000.00
Unit Rate
III.1.6.4.15
Breakdown
Raising of Manhole & Hand Hole Roof Slab: Raise the roof slab with cover and frame 50 mm from the asphalt yard level to
prevent water infiltration
EA
8
3,650.00
SR
29,200.00
Unit Rate
III.1.6.4.16
Breakdown
Supply& install protective barrier (cement Blocks), as per COMPANY Standards
EA
8
1,350.00
SR
10,800.00
Unit Rate
III.1.6.4.17
Breakdown
Relocation only, protective barrier (cement Blocks), same site.
EA
8
650.00
SR
5,200.00
Unit Rate
III.1.6.4.18
Breakdown
Supply and install concrete splash block size (1.00 x 0.20 M).
EA
30
245.00
SR
7,350.00
Unit Rate
III.1.6.4.19
Breakdown
Supply and Install Eyewash with Shower at battery room.
EA
30
3,250.00
SR
97,500.00
Unit Rate
III.1.6.4.20
Breakdown
Supply and install first aid kit at control room.
EA
40
485.00
SR
19,400.00
Unit Rate
III.1.6.4.21
Breakdown
Supply and install cabinet stand galvanized steel with roller (500 mm x 1400 mm at battery room).
EA
40
1,850.00
SR
74,000.00
Unit Rate
III.1.6.4.22
Breakdown
Supply and Install Link Box Manhole Heavy Duty Covers: At different locations
EA
8
650.00
SR
5,200.00
Unit Rate
Supply and Repair Link Box Manhole Concrete: At different locations
EA
8
1,650.00
SR
13,200.00
Unit Rate
III.1.6.4.23
III.1.6.5
Breakdown
Description
MAINTENANCE
CIVIL WORK
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
REPAIR OF DOORS as Per Item # 5.1.6.5 of Schedule "B"
III.1.6.5.1
Breakdown
Repair of Any Defects or Damages to Substation and Dip Stations Doors: Includes skew leaves doors, hard closing doors,
repair of hinges, increasing their number, changing them in case of spoilage, dismantling door leaves, balancing door
leaves, re-erecting instantly, and any necessary materials for the repair, including welding works and assembling
EA
50
1,650.00
SR
82,500.00
Unit Rate
III.1.6.5.2
Breakdown
Repair and Re-fixing Latches or Any Type of Substation and Dip Stations Door Lock Systems: Includes welding works,
dismantling and re-erecting doors, changing latches and locks to ensure proper operation
EA
80
1,250.00
SR
100,000.00
Unit Rate
III.1.6.5.3
Breakdown
Repair and re-fix latches or any type of door lock systems for the internal doors in the substations. This includes
dismantling and re-erecting doors, changing latches, locks, and hinges to ensure proper operation
EA
80
1,250.00
SR
100,000.00
Unit Rate
III.1.6.5.4
Breakdown
Repair of Locks, Door Handle, and Arm-Closer of Substation and Dip Stations Doors: Includes replacing them in case of
spoilage as per COMPANY specifications, ensuring their operation in good condition, and necessary greasing of hinges and
locks
EA
80
1,250.00
SR
100,000.00
Unit Rate
III.1.6.5.5
Breakdown
Repair or Change Door Lock Cylinders: As per COMPANY standard
EA
90
650.00
SR
58,500.00
Unit Rate
BF-PA -51 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
III.1.6.5.6
Breakdown
Supply and Erect Dustproof Weather Straps for Substation External Doors: As per COMPANY specifications, including
removing worn-out existing straps
EA
60
650.00
SR
39,000.00
Unit Rate
III.1.6.5.7
Breakdown
Supply and Erect Anti-Panic Arm for Emergency Doors: Includes all necessary for erection as per technical code of practice
and corresponding modifications to door frames
EA
60
850.00
SR
51,000.00
Unit Rate
Breakdown
Supply and Apply Steel Sheet (2 mm): Includes welding work for any small part of the door damaged by corrosion and
repainting the part with the same door color
EA
60
650.00
SR
39,000.00
Unit Rate
III.1.6.5.9
Breakdown
Maintenance and Cleaning of the Roller of Shutter Rolling Doors: Includes greasing and repair of its electrical motor (for
electrical doors) and/or truss (for manual doors) gears to ensure proper operation
EA
8
3,500.00
SR
28,000.00
Unit Rate
III.1.6.5.10
Breakdown
Supply, Erect, and Replace Dustproof Weather Straps for Shutter Rolling Doors: Same specifications and size as initially
erected straps
EA
8
1,250.00
SR
10,000.00
Unit Rate
Breakdown
Supply, Erect, and Replace Worn-Out Steel Slides of Shutter Rolling Doors: Same specifications and size as existing slides,
including all necessary for dismantling damaged slides and erecting new ones
EA
40
3,500.00
SR
140,000.00
Unit Rate
III.1.6.5.12
Breakdown
Replacement of All Damaged Door Rubber: Around the door itself or around the door frame and door strap, especially
important for halls protected by firefighting systems
EA
60
1,350.00
SR
81,000.00
Unit Rate
III.1.6.5.13
Breakdown
Supply and Install Door Threshold: Outdoor/indoor type to prevent water and dust infiltration
EA
20
850.00
SR
17,000.00
Unit Rate
III.1.6.5.14
Breakdown
Supply and Install Heavy Duty Door Closer
EA
40
1,350.00
SR
54,000.00
Unit Rate
Breakdown
Supply and install glass for the internal doors in the substations (6 mm thickness)
M2
190
750.00
SR
142,500.00
Unit Rate
M
190
180.00
SR
34,200.00
Unit Rate
III.1.6.5.8
III.1.6.5.11
III.1.6.5.15
III.1.7
Description
CIVIL WORKS
CIVIL WORK DEMOLITION AND REMOVAL SURVEYING as Per Item # 5.1.7 of Schedule "B"
III.1.7.1
Breakdown
Removal of fence including gate and all fittings.
III.1.7.2
Breakdown
Removal of concrete block walls and its structure.
M2
450
155.00
SR
69,750.00
Unit Rate
III.1.7.3
Breakdown
Removal and Disposal of Concrete Structure/Debris/Surplus Materials: Includes breaking and clearing
M3
110
150.00
SR
16,500.00
Unit Rate
M
400
3,730.00
SR
1,492,000.00
Unit Rate
Around Substations/dip stations yard Boundary and Access Roads
M3
3,800
44.00
SR
167,200.00
Unit Rate
Around Substation/dip stations yard Equipment using brooms and Bobcats or suitable loader
M3
3,800
44.00
SR
167,200.00
Unit Rate
Under or beneath disconnect platforms without damaging or loosening the ground cables or connections by using brooms
only
M3
400
65.00
SR
26,000.00
Unit Rate
Around Substations/dip stations yard Boundary and Access Roads
M3
3,800
44.00
SR
167,200.00
Unit Rate
Around Substation/dip stations yard Equipment using brooms and Bobcats or suitable loader
M3
3,800
44.00
SR
167,200.00
Unit Rate
Under or beneath disconnect platforms without damaging or loosening the ground cables or connections by using brooms
only
Removal of Accumulated Sand Inside and Outside the Surface of Manhole/Hand Hole or Its Cover: Excess soil shall be
removed and leveled to the existing ground
M3
400
65.00
SR
26,000.00
Unit Rate
M3
400
65.00
SR
26,000.00
Unit Rate
M2
110
15.00
SR
1,650.00
Unit Rate
M2
110
22.35
SR
2,458.50
Unit Rate
III.1.8
III.1.8.1
III.1.8.1.1
III.1.8.2
Description
CIVIL WORKS
Description
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
Breakdown
Description
III.1.8.2.1
Breakdown
III.1.8.2.2
Breakdown
III.1.8.2.3
Breakdown
III.1.8.2.4
Breakdown
III.1.8.2.5
Breakdown
III.1.8.2.6
Breakdown
III.1.8.2.7
Breakdown
III.1.8.3
Description
III.1.8.3.1
Breakdown
III.1.8.3.2
Breakdown
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
By Sweeping /
Pushing
By Sweeping /
Pushing
By Sweeping /
Pushing
By Loading /
Unloading
By Loading /
Unloading
By Loading /
Unloading
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE SUBSTATIONS ACCESS ROADS AND SAND REMOVAL SURVEYING as Per Item # 5.1.8 of
Schedule "B"
SUBSTATIONS/NG FACILITIES ACCESS ROADS as Per Item # 5.1.8.1 of Schedule "B"
Design, supply and construction of 8m width service road with suitable structures which is essentially to fulfill the
requirements of service roads such as, site preparation, soil test, site survey, culverts, retaining walls, back walls, road
drain, hump, crash barriers, pavements, asphalting, curb stones, traffic signs, road marking, street lightings etc., as per
COMPANY Standards
SAND/WASTE REMOVAL as Per Item # 5.1.8.2 of Schedule "B"
SAND STABILIZATION as Per Item # 5.1.8.3 of Schedule "B"
Supply, deliver and spreading crude oil to stabilize sand at the designated locations Around Substations/dip stations yard
Boundary and Access Roads
Supply, Deliver and Spreading diluted acrylic co-polymer (e.g. Soil Cement or equivalent) to stabilize sand at the
designated locations Around Substations/dip stations yard Boundary and Access Roads
BF-PA -52 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
III.1.8.4
III.1.8.4.1
III.1.8.5
III.1.8.5.1
III.1.8.6
III.1.8.6.1
III.1.8.7
Line type
Short Description
Description
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
Breakdown
Description
Breakdown
Description
Breakdown
Description
III.1.8.7.1
Breakdown
III.1.8.7.2
Breakdown
III.2
Description
III.2.1
Description
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
Long Description
MECHANICAL
WORKS
MECHANICAL
WORKS
Quantity
Currency
Total
M3
400
92.00
SR
36,800.00
Unit Rate
M3
800
105.00
SR
84,000.00
Unit Rate
M2
190
115.00
SR
21,850.00
Unit Rate
EA
8
350.00
SR
2,800.00
Unit Rate
EA
2
350.00
SR
700.00
Unit Rate
SAND BACKFILLING as Per Item # 5.1.8.4 of Schedule "B"
Supply, deliver and backfilling sand areas at designated locations Around Substations/dip stations yard Boundary and
Access Roads
SUPPLY, SPREADING AND COMPACTION OF MARL as Per Item # 5.1.8.5 of Schedule "B"
Supply, deliver, spreading and compacting marl at designated locations Around Substations/dip stations yard Boundary
and Access Roads
SUB-GRADING AND LEVELING as Per Item # 5.1.8.6 of Schedule "B"
Sub-grading preparation prior to placing marl Around Substations/dip stations yard Boundary and Access Roads
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
Unit Price
Payment
Type
UOM
MARL QUALITY AND COMPACTION TESTS as Per Item # 5.1.8.7 of Schedule "B"
Take Samples to test quality of marl and take three (3) samples after compaction is completed to test quality and
strength of compaction
Take an additional marl compaction sample
MECHANICAL WORKS as Per Item # 5.2 of Schedule "B"
DEWATERING as Per Item # 5.2.1 of Schedule "B"
III.2.1.1
Breakdown
Direct pumping to approve location by municipality
M3
400
10.55
SR
4,220.00
Unit Rate
III.2.1.2
Breakdown
Pump and transport using tankers
EA
190
190.00
SR
36,100.00
Unit Rate
III.2.1.3
Breakdown
M3
150
15.75
SR
2,362.50
Unit Rate
III.2.1.4
Breakdown
III.2.1.5
Breakdown
III.2.1.6
Breakdown
Remove water from the substation rooms using specialized electrical equipment that complies with company safety
regulations
Remove water from on/under the cables, trenches, manholes, handholes, conduits, link box manholes, and dip station at
various locations
Clean the power transformer oil retention pit using special materials designed to contain and absorb spilled oils, in
accordance with the company's specifications
Remove and clean oil from trenches, manholes, conduits, tunnels, and dip station at various locations
III.2.2
Description
MECHANICAL
WORKS
EA
8
450.00
SR
3,600.00
Unit Rate
EA
40
285.00
SR
11,400.00
Unit Rate
M3
80
185.00
SR
14,800.00
Unit Rate
PIPE WORKS as Per Item # 5.2.2 of Schedule "B"
III.2.2.1
Breakdown
Supply, install and lay PVC conduit, 100-150 MM I.D., excavation not included
M
400
49.50
SR
19,800.00
Unit Rate
III.2.2.2
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (0.5" - 1.0")
M
8
45.50
SR
364.00
Unit Rate
III.2.2.3
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (1.5" - 2.0")
M
8
63.00
SR
504.00
Unit Rate
III.2.2.4
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (3.0")
M
8
91.00
SR
728.00
Unit Rate
III.2.2.5
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (0.5" - 1.0")
M
300
30.80
SR
9,240.00
Unit Rate
III.2.2.6
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (1.5" - 3.0")
M
250
49.00
SR
12,250.00
Unit Rate
III.2.2.7
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (4" - 6")
M
80
69.30
SR
5,544.00
Unit Rate
III.2.2.8
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (0.5" - 1.0")
M
300
30.80
SR
9,240.00
Unit Rate
III.2.2.9
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (1.5" - 3.0")
M
110
49.00
SR
5,390.00
Unit Rate
III.2.2.10
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (4" - 6")
M
150
69.30
SR
10,395.00
Unit Rate
III.2.2.11
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for sewage water size (4")
M
190
77.00
SR
14,630.00
Unit Rate
BF-PA -53 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
III.2.2.12
Breakdown
III.2.2.13
Breakdown
III.2.2.14
Breakdown
III.2.2.15
III.2.3
Breakdown
Description
Quantity
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for sewage water size (6")
M
250
105.00
SR
26,250.00
Unit Rate
Lay PVC Conduit only
M
150
135.00
SR
20,250.00
Unit Rate
Lay Steel pipes only
M
8
185.00
SR
1,480.00
Unit Rate
MECHANICAL
WORKS
Lay Plastic pipes only
M
80
125.00
SR
10,000.00
Unit Rate
6
3,500.00
SR
21,000.00
Unit Rate
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
REPAIR OF WATER PUMPS as Per Item # 5.2.3 of Schedule "B"
Breakdown
Maintenance of electrical water pumps and replacement of faulty spare parts and damaged electrical wiring to ensure they
operate in good condition
EA
III.2.3.2
Breakdown
Maintenance of electrical oil pumps and replacement of faulty spare parts and damaged electrical wiring to ensure they
operate in good condition
EA
6
3,500.00
SR
21,000.00
Unit Rate
III.2.3.3
Breakdown
Supply and install Water transfer pump -Set-WTP 01 Motor Class F Insulation and 1 ph. x 230 volts, 60 Hz, 3450 RPM
EA
20
4,500.00
SR
90,000.00
Unit Rate
III.2.3.4
Breakdown
Supply and install Water transfer pump -Set-WTP 01 Motor Class F Insulation and 1 ph. x 230 volts, 60 Hz, 3450 RPM
EA
20
4,500.00
SR
90,000.00
Unit Rate
III.2.3.5
Breakdown
Supply and install Water Booster pump set-WBP 01 (3 ph. x 380 volts, 60 Hz, 3450 RPM)
EA
8
7,500.00
SR
60,000.00
Unit Rate
III.2.3.6
Breakdown
Supply and install Basement sump pump SP-01 01 (Submersible motor IP 68, Class F rating 1.10 kw (1.5 HP), 1 PH x22
volts,60 Hz, and 3450 RPM
EA
20
4,800.00
SR
96,000.00
Unit Rate
III.2.3.7
Breakdown
Supply and installation of Transfer sump pit pump TPP-01 (TEFC Motor IP 54, Class F rating 4.00 kw (5.50 HP),1 ph. x 230
Volts, 60 Hz and 1750 RPM
EA
20
15,000.00
SR
300,000.00
Unit Rate
III.2.3.8
Breakdown
Supply and install Booster pump for domestic water one (1) Horsepower with pressurized tank
EA
8
4,800.00
SR
38,400.00
Unit Rate
III.2.3.9
Breakdown
EA
20
4,800.00
SR
96,000.00
Unit Rate
III.2.3.1
III.2.4
Description
MECHANICAL
WORKS
Supply and install transformer pit pump having the following mechanical and electrical data:
1. Mechanical Data: Discharge Rate shall be 4 L/s (63.41gpm), 1750 rpm TEFC Enclosure
2. Electrical Data: 220volts/1-phase /60Hz, manually operated with auto stop
METALLIC WORKS as Per Item # 5.2.4 of Schedule "B"
III.2.4.1
Breakdown
Supply and erect 0.7 mm thick corrugated steel sheets (sandwich panel with 50 mm polystyrene foam), including all fixing
and erecting accessories, ridges, overlaps, and gutters. This also includes bottom-side insulation with a 2 cm thick rock
wool layer, compliant with U.S. standard ASTM C 168-80, covered on both sides with aluminum foil, and installation of
lightweight metal mesh to secure and protect the insulation
M2
450
357.75
SR
160,987.50
Unit Rate
III.2.4.2
Breakdown
Supply and erect double corrugated sheets for the surrounding wall between the block wall and the ceiling (external and
internal sheets), with rock wool insulation and tubes in between. This includes all fixings, assembly, and the top and
bottom “U” channels. Alternatively, ready-made sandwich corrugated sheet panels may be used. Transparent corrugated
sheets should be erected between every two columns to increase natural illumination, with no insulation required behind
the transparent sheets
M2
450
351.13
SR
158,006.25
Unit Rate
III.2.4.3
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 200 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
1,358.30
SR
20,374.50
Unit Rate
III.2.4.4
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 250 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
1,697.88
SR
25,468.13
Unit Rate
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 300 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
2,037.45
SR
30,561.75
Unit Rate
III.2.4.6
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 350 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
2,378.50
SR
35,677.50
Unit Rate
III.2.4.7
Breakdown
Supply and install 6-meter-long “U” steel beams 100 x 50 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
893.00
SR
13,395.00
Unit Rate
III.2.4.8
Breakdown
Supply and install 6-meter-long “U” steel beams 200 x 100 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
1,358.30
SR
20,374.50
Unit Rate
III.2.4.9
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 100 x 50 x 5 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
628.50
SR
9,427.50
Unit Rate
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 80 x 40 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
513.00
SR
7,695.00
Unit Rate
III.2.4.11
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 50 x 50 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
377.18
SR
5,657.70
Unit Rate
III.2.4.12
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 20 x 40 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
227.00
SR
3,405.00
Unit Rate
III.2.4.5
III.2.4.10
BF-PA -54 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
III.2.4.13
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 100 x 100 x 5 mm cross-section, including painting, welding,
and all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
1,257.00
SR
18,855.00
Unit Rate
III.2.4.14
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 80 x 80 x 5 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
1,026.00
SR
15,390.00
Unit Rate
Breakdown
Supply and install 6-meter-long "L" shape steel angles 100 x 100 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
1,131.92
SR
16,978.75
Unit Rate
III.2.4.16
Breakdown
Supply and install 6-meter-long "L" shape steel angles 50 x 50 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
565.96
SR
8,489.38
Unit Rate
III.2.4.17
Breakdown
Supply and install 6-meter-long "L" shape steel angles 40 x 40 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
485.00
SR
7,275.00
Unit Rate
Breakdown
Supply and install 6-meter-long flat bars 60 mm width and 6 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
15
452.77
SR
6,791.50
Unit Rate
III.2.4.19
Breakdown
Supply and install 6-meter-long flat bars 40 mm width and 4 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
15
420.00
SR
6,300.00
Unit Rate
III.2.4.20
Breakdown
Supply and install 6-meter-long flat bars 30 mm width and 3 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
15
387.00
SR
5,805.00
Unit Rate
Breakdown
Supply and install 6-meter-long flat bars 20 mm width and 2 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
15
290.25
SR
4,353.75
Unit Rate
III.2.4.22
Breakdown
Supply and install 6-meter-long flat sheet 20 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
15
11,515.00
SR
172,725.00
Unit Rate
III.2.4.23
Breakdown
Supply and install 6-meter-long flat sheet 14 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
15
8,025.25
SR
120,378.75
Unit Rate
Breakdown
Supply and install 6-meter-long flat sheet 10 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
15
5,757.50
SR
86,362.50
Unit Rate
III.2.4.25
Breakdown
Supply and install 6-meter-long flat sheet 6 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
15
3,554.38
SR
53,315.63
Unit Rate
III.2.4.26
Breakdown
Supply and install 6-meter-long flat sheet 3 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
15
1,777.19
SR
26,657.81
Unit Rate
EA
15
1,480.99
SR
22,214.84
Unit Rate
M2
110
519.95
SR
57,194.50
Unit Rate
III.2.4.15
III.2.4.18
III.2.4.21
III.2.4.24
Supply and install 6-meter-long flat sheet 2 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
Supply, install and replace 10 mm thick checkered plates inside the substation. This includes supplying the checkered
plates, cutting to size, fabricating and fitting lifting handles, welding frames and supports, painting, and removing and
returning unwanted old plates to the store, as per COMPANY Standards
III.2.4.27
Breakdown
III.2.4.28
Breakdown
III.2.4.29
Breakdown
Supply and install permanent steel access ladders (Emergency) fixed to the walls with safety cages, as per company
standard TA-800049, for accessing the roof. The design should conform to the standards followed in the transmission
substations
M
60
395.00
SR
23,700.00
Unit Rate
III.2.4.30
Breakdown
Supply and install steel channel supports for checkered plates or equipment in a substation room
M
40
185.00
SR
7,400.00
Unit Rate
III.2.4.31
Breakdown
Remove the existing chain link fencing, including the frame, and return it to the company scrub store. Supply and erect
expanded meshes at least 3 mm thick with proper steel supports and frame as required, and paint according to galvanized
paint specifications
M2
300
185.00
SR
55,500.00
Unit Rate
III.2.4.32
Breakdown
Supply and install steel grating for the transformer oil catch basin
M2
40
285.00
SR
11,400.00
Unit Rate
III.2.4.33
Breakdown
Supply and install hot-dip steel bridge over power cables in the cable room or Substation Basement
M2
40
135.00
SR
5,400.00
Unit Rate
III.2.4.34
Breakdown
Supply and install hot-dip galvanized steel Unistrut supports routing outgoing feeders
M2
40
135.00
SR
5,400.00
Unit Rate
III.2.4.35
Breakdown
Supply and install anchor bolts for fixing equipment structures, type-3, as per SEC Standard
EA
15
45.00
SR
675.00
Unit Rate
III.2.4.36
Breakdown
Supply, install and repair ladders at manholes different locations
M
20
235.00
SR
4,700.00
Unit Rate
III.2.4.37
Breakdown
Repair the existing car parking shed to adjust the top cloth and align with required welding and grinding
M2
60
185.00
SR
11,100.00
Unit Rate
III.2.4.38
Breakdown
Supply and install bollard post barriers with chains, including steel poles with concrete foundation, excavation, backfilling,
grounding, and re-asphalting as per NG standards. The poles and chains should maintain a 1.5 to 2 meters distance and
include yellow and black painting
EA
15
1,250.00
SR
18,750.00
Unit Rate
III.2.4.39
Breakdown
Supply and install air holes for ventilation fans, with fans installed at manholes in various locations
EA
15
1,650.00
SR
24,750.00
Unit Rate
III.2.5
Description
MECHANICAL
WORKS
AIR CONDITIONING WORK as Per Item # 5.2.5 of Schedule "B"
BF-PA -55 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
III.2.5.1
Breakdown
III.2.5.2
Breakdown
Supply and install new window air-conditioning units (12,000 BTU/1.5 HP/1 Ton) capacity
EA
4
1,650.00
SR
6,600.00
Unit Rate
Supply and install new window air-conditioning units (18,000 BTU/2.0 HP/1.5 Ton) capacity
EA
4
1,900.00
SR
7,600.00
Unit Rate
III.2.5.3
Breakdown
Supply and install new window air-conditioning units (24,000 BTU/2.5 HP/2 Ton) capacity
EA
4
2,200.00
SR
8,800.00
Unit Rate
III.2.5.4
Breakdown
Supply and install new split-type air-conditioning units (12,000 BTU/1.5 HP/1 Ton) capacity
EA
4
2,300.00
SR
9,200.00
Unit Rate
III.2.5.5
Breakdown
Supply and install new split-type air-conditioning units (18,000 BTU/2.0 HP/1.5 Ton) capacity
EA
8
2,800.00
SR
22,400.00
Unit Rate
III.2.5.6
Breakdown
Supply and install new split-type air-conditioning units (24,000 BTU/2.5 HP/2 Ton) capacity
EA
8
2,900.00
SR
23,200.00
Unit Rate
III.2.5.7
Breakdown
Supply and install new split-type air-conditioning units (30,000 BTU/3 HP/2.5 Ton) capacity
EA
8
3,400.00
SR
27,200.00
Unit Rate
III.2.5.8
Breakdown
Supply and install new split-type air-conditioning units (36,000 BTU/3.5 HP/3 Ton) capacity
EA
6
4,000.00
SR
24,000.00
Unit Rate
III.2.5.9
Breakdown
Manufacturing supply and erect metal ducts for air conditioned, ducts shall be made of galvanized metal sheets (density
24Kg/sq. m) according to SMACANA & ASHRAE specifications, ducts will be externally insulated with fiberglass, wrapped
with aluminum foil, and then covered with galvanized metal sheets of the same specifications, and fitted with means for
suspension, fixations and air outlets
M
80
467.00
SR
37,360.00
Unit Rate
III.2.5.10
Breakdown
Dismantle the louvered steel sunshade transformer roofs. This item includes all necessary measures to carry out the job
without harming or damaging any components of the roof
M2
110
235.00
SR
25,850.00
Unit Rate
III.2.5.11
Breakdown
Re-erect the dismantled louvered steel sunshade transformer roofs. This item includes all necessary measures for
reinstatement
M2
110
235.00
SR
25,850.00
Unit Rate
III.2.5.12
Breakdown
Replace defective duct dampers and damper motors according to COMPANY standards
EA
40
875.00
SR
35,000.00
Unit Rate
III.2.5.13
Breakdown
Repair duct mechanical protection (cladding) according to SMACNA specifications
EA
40
475.00
SR
19,000.00
Unit Rate
III.2.5.14
Breakdown
Repair duct access door
EA
40
576.00
SR
23,040.00
Unit Rate
III.2.6
Description
MECHANICAL
WORKS
Long Description
Unit Price
Currency
Payment
Type
UOM
Short Description
Total
SCAFFOLDING as Per Item # 5.2.6 of Schedule "B"
III.2.6.1
Breakdown
Supply, Erection & Dismantling of Fixed Type Scaffolding with sufficient working Platforms for inside/outside any facilities
of the Sub-station building or equipment.
M3
400
105.00
SR
42,000.00
Unit Rate
III.2.6.2
Breakdown
Supply, Erection & Dismantling of Mobile Type Scaffolding with sufficient working Platforms for inside/outside any facilities
of the Sub-station building or equipment.
M3
250
105.00
SR
26,250.00
Unit Rate
III.2.6.3
Breakdown
Supply, mobilize and demobilize pipe with 1 m length
EA
4
6.50
SR
26.00
Unit Rate
III.2.6.4
Breakdown
Supply, mobilize and demobilize pipe with 2 m length
EA
4
8.50
SR
34.00
Unit Rate
III.2.6.5
Breakdown
Supply, mobilize and demobilize pipe with 3 m length
EA
4
11.50
SR
46.00
Unit Rate
III.2.6.6
Breakdown
Supply, mobilize and demobilize pipe with 4 m length
EA
4
13.50
SR
54.00
Unit Rate
III.2.6.7
Breakdown
Supply, mobilize and demobilize pipe with 6 m length
EA
4
15.50
SR
62.00
Unit Rate
III.2.6.8
Breakdown
Supply, mobilize and demobilize Wooden Plank with 2 m length
EA
2
6.50
SR
13.00
Unit Rate
III.2.6.9
Breakdown
Supply, mobilize and demobilize Wooden Plank with 3 m length
EA
2
8.50
SR
17.00
Unit Rate
III.2.6.10
Breakdown
Supply, mobilize and demobilize Wooden Plank with 4 m length
EA
2
11.50
SR
23.00
Unit Rate
III.2.6.11
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 3 m length
EA
4
13.50
SR
54.00
Unit Rate
III.2.6.12
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 4 m length
EA
4
15.50
SR
62.00
Unit Rate
III.2.6.13
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 6 m length
EA
4
350.00
SR
1,400.00
Unit Rate
III.2.6.14
Breakdown
Supply, mobilize and demobilize Base Plate
EA
4
6.50
SR
26.00
Unit Rate
BF-PA -56 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
III.2.6.15
Breakdown
III.2.6.16
Breakdown
Supply, mobilize and demobilize Adjustable Base Plate
EA
4
6.50
SR
26.00
Unit Rate
Supply, mobilize and demobilize Double Coupler
EA
8
8.50
SR
68.00
Unit Rate
III.2.6.17
Breakdown
Supply, mobilize and demobilize Universal Coupler
EA
8
8.50
SR
68.00
Unit Rate
III.2.6.18
Breakdown
Supply, mobilize and demobilize Putlog Coupler
EA
8
8.50
SR
68.00
Unit Rate
III.2.6.19
Breakdown
Supply, mobilize and demobilize Swivel Coupler
EA
8
8.50
SR
68.00
Unit Rate
III.2.6.20
Breakdown
Supply, mobilize and demobilize End to End Coupler
EA
8
8.50
SR
68.00
Unit Rate
III.2.6.21
Breakdown
Supply, mobilize and demobilize C- Clamp
EA
6
8.50
SR
51.00
Unit Rate
III.2.6.22
Breakdown
Supply, mobilize and demobilize Beam Clamp
EA
6
8.50
SR
51.00
Unit Rate
III.2.6.23
Breakdown
Supply, mobilize and demobilize Reveal Pin
EA
8
8.50
SR
68.00
Unit Rate
III.2.6.24
Breakdown
Supply, mobilize and demobilize Chain blocks
EA
4
450.00
SR
1,800.00
Unit Rate
III.2.6.25
Breakdown
Supply, mobilize and demobilize Metal/fabric Slings, hooks
EA
8
250.00
SR
2,000.00
Unit Rate
III.2.6.26
Breakdown
Supply, mobilize and demobilize approved Electrical cables extensions
EA
4
280.00
SR
1,120.00
Unit Rate
III.2.6.27
Breakdown
Supply, mobilize and demobilize Lighting
EA
2
320.00
SR
640.00
Unit Rate
III.2.6.28
Breakdown
Supply, mobilize and demobilize medium dumping container
EA
2
350.00
SR
700.00
Unit Rate
III.2.6.29
Breakdown
Supply, mobilize and demobilize large dumping container
EA
2
520.00
SR
1,040.00
Unit Rate
III.2.6.30
Breakdown
Provide load test certificates
EA
8
1,500.00
SR
12,000.00
Unit Rate
III.2.6.31
Breakdown
Provide inspection certificates
EA
8
1,500.00
SR
12,000.00
Unit Rate
III.2.7
Description
MECHANICAL
WORKS
Long Description
Unit Price
Currency
Payment
Type
UOM
Short Description
Total
FIRE ZONING as Per Item # 5.2.7 of Schedule "B"
III.2.7.1
Breakdown
Closing the space between bus-ducts and the wall opening with COMPANY-approved fire-resistant material (sandwich
type) to prevent fire from spreading through the opening (complying with COMPANY-approved fire zoning procedures).
The gap closure should be designed to be easily removable and re-fixable for bus duct maintenance
M2
60
860.00
SR
51,600.00
Unit Rate
III.2.7.2
Breakdown
Sealing the cable openings from both sides (or one side in case of a panel on top) with COMPANY-approved fire-resistant
sealant (3cm thick and 3cm deep). The remaining gap on the face shall be filled with HPM mortar (3cm deep) or any
equivalent approved material, and the gap between the two faces of the opening shall be filled with rock wool insulation
(minimum density 120kg/m³, melting point 1000°C)
EA
8
385.00
SR
3,080.00
Unit Rate
III.2.7.3
Breakdown
Coating the cables in the substation basement with COMPANY-approved fire-resistant paint at a minimum thickness of
1.5mm (2kg/m²) as instructed by COMPANY representative. Bunched control cables must be painted with COMPANYapproved fire-resistant paint at a minimum thickness of 1.5mm (2kg/m²)
M2
100
786.00
SR
78,600.00
Unit Rate
Breakdown
Sealing the power cable tunnels: one side of the tunnel must be sealed in a “sandwich” type sealing with two Fire Stop
Mortar layers (generally reinforced) of at least 5cm thick, intercalated with rock wool (5cm thick). PVC pipes must be
provided around the passing cables to maintain a gap of at least 3cm, to be removed after mortar setting. These gaps
must be sealed from both sides with COMPANY-approved fire-resistant sealant (3cm thick and 3cm deep), and the gap
between the two faces of the opening shall be filled with rock wool insulation (minimum density 120kg/m³, melting point
1000°C)
M2
100
860.00
SR
86,000.00
Unit Rate
EA
80
185.00
SR
14,800.00
Unit Rate
III.2.7.4
III.3
Description
III.3.1
Description
III.3.1.1
Breakdown
ELECTRICAL
WORKS
ELECTRICAL
WORKS
ELECTRICAL WORKS as Per Item # 5.3 of Schedule "B"
LIGHTING SYSTEM WORK as Per Item # 5.3.1 of Schedule "B"
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V” and crisscross
aluminum slide diffuser, to be installed in the false ceiling, different size (60 x 120), rapid start type
BF-PA -57 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
III.3.1.2
Breakdown
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V” and crisscross
aluminum slide diffuser, to be installed in the false ceiling, different size (60 x 60 cm), rapid start type
EA
80
185.00
SR
14,800.00
Unit Rate
Breakdown
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V”, to be installed in the
false ceiling, size 60 x 120 cm, rapid start type. The light diffuser must be impervious and have a protection factor of at
least IP40
III.3.1.3
EA
80
135.00
SR
10,800.00
Unit Rate
III.3.1.4
Breakdown
Supply and install a fluorescent lamp, 2x40 Watt, with a prismatic cover, rapid start type
EA
20
67.50
SR
1,350.00
Unit Rate
III.3.1.5
Breakdown
Supply and install a halogen spotlight, 250 Watt
EA
25
1,500.00
SR
37,500.00
Unit Rate
III.3.1.6
Breakdown
Repair, clean, and supply sodium lamp, 250/400-Watt flood light bulbs
EA
20
1,500.00
SR
30,000.00
Unit Rate
III.3.1.7
Breakdown
Supply and replace outside lighting pole fixture cover
EA
80
475.00
SR
38,000.00
Unit Rate
III.3.1.8
Breakdown
Supply, install, and operate a globe with a normal lamp, 100 Watt
EA
40
175.00
SR
7,000.00
Unit Rate
ST
40
650.00
SR
26,000.00
Unit Rate
EA
25
275.00
SR
6,875.00
Unit Rate
EA
15
1,200.00
SR
18,000.00
Unit Rate
Long Description
Supply and install a complete set of apparent emergency LED lights, operational for six to seven hours after DC shutdown.
The emergency unit includes a nickel-cadmium battery, a battery charger, an electronic frequency transformer, a
transformation detector, a plug, and a switch to check the battery. The emergency light unit operates on 220 V/60 Hz,
2x20 Watt, normal start at current shutdown
Supply and install an emergency EXIT LED light unit (Green Color), operational for three hours after DC shutdown, to be
mounted on the ceiling or wall with a frame. The emergency EXIT unit includes a nickel-cadmium battery, a battery
charger, an electronic frequency transformer, a transformation detector, a plug, and a switch to check the battery. The
diffusing cover is transparent with an EXIT sign. The emergency EXIT light unit operates on 220 V/60 Hz, 1x8 Watt,
normal start at current shutdown
Supply and install a sodium projector, 250 Watt, for outside lighting, fixed to allow orientation to light the front of the
building. Includes all necessary components for installation, testing, and operation as per COMPANY Representative's
instructions
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
III.3.1.9
Breakdown
III.3.1.10
Breakdown
III.3.1.11
Breakdown
III.3.1.12
Breakdown
Supply and install LED light panel, 60 x 60 cm, white, operates on 220 V/60 Hz 70 Watt
EA
80
480.00
SR
38,400.00
Unit Rate
III.3.1.13
Breakdown
Supply and install LED tube light with frame, operates on 220 V/60 Hz, 2x40 Watt, size 10 x 120 cm
EA
80
285.00
SR
22,800.00
Unit Rate
III.3.1.14
Breakdown
Supply and install LED Floodlight, 250 Watt, white, for outdoor substation buildings
EA
80
985.00
SR
78,800.00
Unit Rate
III.3.1.15
Breakdown
Supply and install LED spotlight, 400 Watt, white, for outdoor substation buildings
EA
80
985.00
SR
78,800.00
Unit Rate
III.3.1.16
Breakdown
Supply and install LED spotlight, 400 Watt, white, ceiling-mounted for GIS room
EA
80
1,200.00
SR
96,000.00
Unit Rate
III.3.1.17
Breakdown
Supply and install LED bulb light, 20 Watt, white for DC lighting system
EA
80
120.00
SR
9,600.00
Unit Rate
III.3.1.18
Breakdown
Supply and install LED explosion-proof lighting fixture, operates on 220 V/60 Hz, 2x40 Watt, size 10 x 120 cm for the
battery room
EA
20
450.00
SR
9,000.00
Unit Rate
III.3.1.19
Breakdown
Supply and install explosion-proof lighting/exit lighting (Green Color) fixtures in the battery room
EA
10
360.00
SR
3,600.00
Unit Rate
III.3.1.20
Breakdown
Supply and install explosion-proof entrance/exit lighting fixtures in the battery room
EA
10
360.00
SR
3,600.00
Unit Rate
III.3.1.21
Breakdown
Supply and install explosion-proof emergency lighting fixtures for the battery room
EA
10
360.00
SR
3,600.00
Unit Rate
III.3.1.22
Breakdown
Supply and install explosion-proof DC lighting fixtures for the battery room
EA
10
360.00
SR
3,600.00
Unit Rate
III.3.1.23
Breakdown
Provide and install temporary explosion-proof lighting fixtures at dip stations and manholes at different locations
D
2
850.00
SR
1,700.00
Unit Rate
III.3.1.24
Breakdown
Supply and install lighting for steel monopoles as per SEC standard drawing
EA
40
1,200.00
SR
48,000.00
Unit Rate
Supply and install high bay LED light, pendent type, at the GIS buildings.
EA
20
850.00
SR
17,000.00
Unit Rate
III.3.1.25
III.3.2
III.3.2.1
III.3.2.2
Breakdown
Description
ELECTRICAL
WORKS
INSTALLATIONS WORKS as Per Item # 5.3.2 of Schedule "B"
Breakdown
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, single
switch, fixed 1.5 m above the tile floor level
EA
25
41.85
SR
1,046.25
Unit Rate
Breakdown
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, double
switch, fixed 1.5 m above the tile floor level
EA
25
83.70
SR
2,092.50
Unit Rate
BF-PA -58 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
III.3.2.3
Breakdown
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, triple
switch, fixed 1.5 m above the tile floor level
EA
25
125.55
SR
3,138.75
Unit Rate
III.3.2.4
Breakdown
Supply and install a PHENOL compound switch for A/Cs and water heaters with a Bakelite cover, at least 30 Amp, with a
warning light, fixed 1.5 m above the tile floor level
EA
15
125.55
SR
1,883.25
Unit Rate
Breakdown
Supply and erect fixtures that work automatically with a photocell, including all accessories and providing a DC source to
power the photocell
EA
25
326.00
SR
8,150.00
Unit Rate
III.3.2.6
Breakdown
Supply and install a 220 V/13 Amp outlet, equipped with a switch, and a male plug, installed in the floor or wall at the
proper height from the tile level. Outlets for ventilating fans and emergency lights will be installed beside the unit
concerned
EA
20
185.00
SR
3,700.00
Unit Rate
III.3.2.7
Breakdown
Supply and install a 220 V/13 Amp explosion-proof outlet, equipped with a switch, and a male plug, installed in the floor
or wall at the proper height from the tile level. Outlets for ventilating fans and emergency lights will be installed beside
the unit concerned
EA
20
185.00
SR
3,700.00
Unit Rate
III.3.2.8
Breakdown
Supply and install a telephone outlet made of thick Bakelite or cast iron coated with non-glossy chrome, fixed on a proper
box at the height of common outlets
EA
4
83.70
SR
334.80
Unit Rate
III.3.2.9
Breakdown
Supply and install a LAN outlet made of thick Bakelite or cast iron coated with non-glossy chrome, fixed on a proper box at
the height of common outlets
EA
4
83.70
SR
334.80
Unit Rate
III.3.2.10
Breakdown
Supply and install temporary power supply at dip stations and manholes at different locations
EA
4
4,850.00
SR
19,400.00
Unit Rate
III.3.2.11
Breakdown
Supply, install, and operate an 50 liter electrical water heater that heats water pipes without a tank as per specifications
EA
6
4,850.00
SR
29,100.00
Unit Rate
III.3.2.12
Breakdown
Supply, install, and operate an 100 liter electrical water heater that heats water pipes without a tank as per specifications
EA
6
6,580.00
SR
39,480.00
Unit Rate
III.3.2.13
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x25+16 mm
M
190
185.00
SR
35,150.00
Unit Rate
III.3.2.14
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x35+16 mm
M
190
225.00
SR
42,750.00
Unit Rate
III.3.2.15
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x50+16 mm
M
190
245.00
SR
46,550.00
Unit Rate
III.3.2.16
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x50+25 mm
M
190
255.00
SR
48,450.00
Unit Rate
III.3.2.17
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x70+16 mm
M
190
287.00
SR
54,530.00
Unit Rate
III.3.2.18
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x120+16 mm
M
190
305.00
SR
57,950.00
Unit Rate
III.3.2.19
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x185+16 mm
M
190
335.00
SR
63,650.00
Unit Rate
III.3.2.20
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x240+16 mm
M
190
385.00
SR
73,150.00
Unit Rate
III.3.2.21
Breakdown
Supply and lay telephonic cable, 4x0.6 mm², insulated with PVC, to be installed in an adequate tray
M
80
65.00
SR
5,200.00
Unit Rate
III.3.2.22
Breakdown
Supply and lay subsidiary LAN cable, insulated with PVC, to be installed in an adequate tray
M
80
III.3.2.23
Breakdown
Install cable tray as per COMPANY standards and specifications
M2
110
III.3.2.24
Breakdown
Install cable clamp as per COMPANY standards and specifications
EA
20
III.3.2.25
Breakdown
Transfer cable drum from company warehouse to site as directed
TON
III.3.2.26
Breakdown
Return existing/old cable system to company warehouse as directed
TON
III.3.2.27
Breakdown
Supply and install an explosion-proof exhaust fan in the battery room
III.3.2.28
Breakdown
Supply and install wall/ceiling mounted ventilating fans, 20x20 cm, and capacities, including the evacuation flexible duct,
exterior cover, and all accessories for operation
III.3.2.29
Breakdown
Supply and install wall/ceiling mounted ventilating fans, 30x30 cm, and capacities, including the evacuation flexible duct,
exterior cover, and all accessories for operation
III.3.2.30
Breakdown
III.3.2.31
Breakdown
III.3.2.5
65.00
SR
5,200.00
Unit Rate
125.00
SR
13,750.00
Unit Rate
35.00
SR
700.00
Unit Rate
4
225.00
SR
900.00
Unit Rate
8
225.00
SR
1,800.00
Unit Rate
EA
8
1,250.00
SR
10,000.00
Unit Rate
EA
10
850.00
SR
8,500.00
Unit Rate
EA
10
1,050.00
SR
10,500.00
Unit Rate
Supply and install ventilating fans ceiling capacity not less than 388 CF/Min
EA
10
2,850.00
SR
28,500.00
Unit Rate
Supply and install ventilating fans ceiling capacity not less than 311 CF/Min
EA
10
2,650.00
SR
26,500.00
Unit Rate
BF-PA -59 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
III.3.2.32
III.3.3
Line type
Short Description
Breakdown
Description
Long Description
Supply and install ventilating fans ceiling capacity not less than 205 CF/Min
ELECTRICAL
WORKS
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
EA
10
2,350.00
SR
23,500.00
Unit Rate
GROUNDING SYSTEM WORKS as Per Item # 5.3.3 of Schedule "B"
III.3.3.1
Breakdown
Conduct necessary inspections and tests for all ground systems in the substation according to COMPANY specifications and
standards and submit reports
EA
8
2,800.00
SR
22,400.00
Unit Rate
III.3.3.2
Breakdown
Supply and Erect Earthing copper rod 1.5mx¾ Dia according to COMPANY specifications
EA
4
350.00
SR
1,400.00
Unit Rate
III.3.3.3
Breakdown
Supply and Erect Earthing copper rod 3mx¾ Dia according to COMPANY specifications
EA
4
750.00
SR
3,000.00
Unit Rate
III.3.3.4
Breakdown
Supply and install a copper ground mat or plate (1 m x 1 m x 3 mm) in normal soil, including excavation, filling with
ground conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.), backfilling, reinstatement, and connection to all
equipment as per the current Code of Practice of the COMPANY
EA
4
7,850.00
SR
31,400.00
Unit Rate
III.3.3.5
Breakdown
Supply and install a copper ground mat or plate (1 m x 1 m x 3 mm) in rocky soil, including excavation, filling with ground
conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.), backfilling, reinstatement, and connection to all equipment
as per the current Code of Practice of the COMPANY
EA
4
7,850.00
SR
31,400.00
Unit Rate
III.3.3.6
Breakdown
Provide materials and set ground conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.) for one grounding pit to
improve earth resistance when required
EA
4
4,850.00
SR
19,400.00
Unit Rate
III.3.3.7
Breakdown
Supply and lay a copper braid stranded cable, size 70 sq. mm, including all necessary components for connecting and
fixing
M
40
180.00
SR
7,200.00
Unit Rate
Breakdown
Supply and lay a copper braid stranded cable, size 120 sq. mm, including all necessary components for connecting and
fixing
M
40
280.00
SR
11,200.00
Unit Rate
III.3.3.9
Breakdown
Supply and lay a copper braid stranded cable, size 185 sq. mm, including all necessary components for connecting and
fixing
M
40
380.00
SR
15,200.00
Unit Rate
III.3.3.10
Breakdown
Supply and lay a copper braid stranded cable, size 240 sq. mm, including all necessary components for connecting and
fixing
M
40
480.00
SR
19,200.00
Unit Rate
Breakdown
Supply and lay a copper braid stranded cable, size 300 sq. mm, including all necessary components for connecting and
fixing
M
40
580.00
SR
23,200.00
Unit Rate
III.3.3.12
Breakdown
Supply and install an earthing bus bar, size 3.5 m x 25 mm x 5 mm, including all necessary components for fixing and
connecting
EA
4
1,380.00
SR
5,520.00
Unit Rate
III.3.3.13
Breakdown
Supply and install an earthing bus bar, size 3.5 m x 40 mm x 5 mm, including all necessary components for fixing and
connecting
EA
4
1,880.00
SR
7,520.00
Unit Rate
III.3.3.14
Breakdown
Supply and install an earthing bus bar, size 3.5 m x 50 mm x 5 mm, including all necessary components for fixing and
connecting
EA
4
2,280.00
SR
9,120.00
Unit Rate
III.3.3.15
Breakdown
Install a grounding test pit, ensuring it meets all relevant specifications and standards. This includes excavation,
installation of the test pit, backfilling, and any necessary connections to the grounding system. The work should be carried
out as directed by the COMPANY REPRESENTATIVE and in accordance with the company's safety and quality requirements
EA
4
2,850.00
SR
11,400.00
Unit Rate
EA
20
78,800.00
SR
1,576,000.00
Unit Rate
EA
8
37,800.00
SR
302,400.00
Unit Rate
EA
8
42,800.00
SR
342,400.00
Unit Rate
III.3.3.8
III.3.3.11
III.4
Description
SUPPORT FACILITY
SUPPORT FACILITY as Per Item # 5.4 of Schedule "B"
III.4.1
Description
SUPPORT FACILITY
SUPPLY AND ERECT PORTABLE CABINS as Per Item # 5.4.1 of Schedule "B"
III.4.1.1
III.4.2
deliver and erect a portable cabin with full water, power facilities, and furniture at Eastern Transmission Substation
locations. The portable cabin shall have dimensions of no less than 4x12 meters and be fully equipped with a toilet,
kitchen, power supply and MCB AC. Additionally, it shall include a water tank with a capacity of at least 3 cubic meters, to
be filled daily, and a temporary sewage pit with a volume of at least 3 cubic meters, to be discharged periodically as
needed
For the portable cabin base, stand legs with a 7mm plate shall be provided if the ground is solid. For unsuitable ground, a
40x40 cm concrete base shall be provided
Breakdown
Description
SUPPORT FACILITY
TELECOM SHELTERS AND TOWERS WORKS as Per Item # 5.2.2 of Schedule "B"
III.4.2.1
Breakdown
Supply and erection of a communication shelter with A/C at NG proposed locations for substations and transmission lines,
with dimensions (2.5x2.5 m). The shelter shall be equipped with two split air-conditioning units with a timer switch, cable
ladders, a power source, fire extinguishers, lights, power sockets, and the construction of a foundation for the
communication shelter, all as per COMPANY specifications
III.4.2.2
Breakdown
Supply and erection of a communication shelter with A/C at NG proposed locations for substations and transmission lines,
with dimensions (3x3 m). The shelter shall be equipped with two split air-conditioning units with a timer switch, cable
ladders, a power source, fire extinguishers, lights, power sockets, and the construction of a foundation for the
communication shelter, all as per COMPANY specifications
BF-PA -60 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
III.4.2.3
Breakdown
III.4.2.4
Breakdown
Supply and install grounding on telecom towers and/or shelters
EA
10
850.00
SR
8,500.00
Unit Rate
Supply and install cable trays between telecom towers and shelters
EA
15
3,780.00
SR
56,700.00
III.4.2.5
Unit Rate
Breakdown
Remove old gravel, supply and fill new gravel for towers and shelters
M2
80
275.00
SR
22,000.00
Unit Rate
III.4.2.6
Breakdown
Removal of loose/old paint from telecom towers and repainting according to COMPANY instructions and specifications
M2
8
650.00
SR
5,200.00
Unit Rate
III.4.2.7
Breakdown
EA
10
3,780.00
SR
37,800.00
Unit Rate
EA
8
4,200.00
SR
33,600.00
Unit Rate
III.4.2.8
III.4.3
Repair of the Telecom tower aviation lighting system
Breakdown
Description
Long Description
Supply and install an aviation lighting system on telecom towers
SUPPORT FACILITY
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
ADDITIONAL WORKS as Per Item # 5.4.3 of Schedule "B"
III.4.3.1
Breakdown
Supply, install and removal guard posts at the site, including complete formwork (four posts), concreting, and beaming
EA
4
67,950.00
SR
271,800.00
Unit Rate
III.4.3.2
Breakdown
Supply, install and removal an additional guard post
EA
4
15,000.00
SR
60,000.00
Unit Rate
III.4.3.3
Breakdown
Supply required materials and paint guard posts
EA
4
8,500.00
SR
34,000.00
Unit Rate
III.4.3.4
Breakdown
Prepare the site for the jointing of power cables by company technicians as directed, per joint bay
EA
4
3,870.00
SR
15,480.00
Unit Rate
III.4.3.5
Breakdown
Supply and Install nameplates for the circuits as directed
EA
20
350.00
SR
7,000.00
Unit Rate
III.4.3.6
Breakdown
Supply and install room identification signs
EA
20
175.00
SR
3,500.00
Unit Rate
III.4.3.7
Breakdown
Supply and install signs for Electrical, Mechanical, Protective Equipment, Symbolic Safety Signs in the Control Room, Relay
Room, Communication Room, Battery Room, HVAC Room, Basement, and Switch Yard
EA
20
375.00
SR
7,500.00
Unit Rate
III.4.3.8
Breakdown
Supply and install signboards on the Substation building
M2
60
850.00
SR
51,000.00
Unit Rate
EA
40
550.00
SR
22,000.00
Unit Rate
EA
8
1,850.00
SR
14,800.00
Unit Rate
EA
8
1,850.00
SR
14,800.00
Unit Rate
EA
8
850.00
SR
6,800.00
Unit Rate
EA
8
1,350.00
SR
10,800.00
Unit Rate
EA
8
1,350.00
SR
10,800.00
Unit Rate
EA
8
1,350.00
SR
10,800.00
Unit Rate
EA
8
1,350.00
SR
10,800.00
Unit Rate
III.4.3.9
Breakdown
III.4.3.10
Breakdown
III.4.3.11
Breakdown
III.4.3.12
Breakdown
III.4.3.13
Breakdown
III.4.3.14
Breakdown
III.4.3.15
Breakdown
III.4.3.16
III.5
Supply and install trash bins (1. Combustibles (Red Color), 2. Salvage (Orange Color), 3. Plastic & Paper (Blue Color), and
4. Trash (Yellow Color)
Perform the required inspections of Water Pumps and Related Parts: controls and distribution panels to maintain them in
proper and good condition
Perform the required inspections of Extract Ventilation and Exhaust Fans: for buildings, battery rooms, basements, etc. to
maintain them in proper and good condition
Perform the required inspections of Lights and Related Parts: including exit lights, emergency lights, building lights,
floodlights, security lights, and related controls and distribution panels for building facilities to maintain them in proper
and good condition
Perform the required inspections of Doors, Gates and Related Parts: for building facilities to maintain them in proper and
good condition
Perform the required inspections of Toilets and Related Fittings and Consumables: for building facilities to maintain them
in proper and good condition
Perform the required inspections of Floors, Walls, and Slabs: for building facilities to maintain them in proper and good
condition
Perform the required inspections of Suspended/Dropped Ceilings: Including plywood/gypsum, aluminum boards for
building facilities to maintain them in proper and good condition
Breakdown
Description
MANPOWER
PROVIDE THE MANPOWER TO PERFORM ANY ADDITIONAL WORK NOT COVERED IN THE WORK UNIT RATES
WHEN REQUESTED BY THE COMPANY as Per Item # 5.4.3.10 of Schedule "B"
III.5.1
Breakdown
Foreman or Technical Supervisor or Specialist
H
4
35.50
SR
142.00
Unit Rate
III.5.2
Breakdown
Certified scaffolder foreman/supervisor
H
4
35.50
SR
142.00
Unit Rate
III.5.3
Breakdown
Certified Scaffolder workers for erecting scaffolding systems
H
4
28.50
SR
114.00
Unit Rate
III.5.4
Breakdown
Operator/Programmer
H
4
35.50
SR
142.00
Unit Rate
III.5.5
Breakdown
Safety Officer
H
4
44.50
SR
178.00
Unit Rate
III.5.6
Breakdown
Safety Engineer
H
4
52.50
SR
210.00
Unit Rate
III.5.7
Breakdown
Civil/Mechanical/Electrical Engineer
H
4
52.50
SR
210.00
Unit Rate
BF-PA -61 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
III.5.8
Breakdown
III.5.9
Breakdown
Surveyor/Mechanic/Electrician/Instrument/Senior A/C Technician
H
4
26.20
SR
104.80
Unit Rate
Welder
H
4
26.20
SR
104.80
III.5.10
Unit Rate
Breakdown
Plumber/Carpenter/Mason/Painter/Roofer
H
4
26.20
SR
104.80
Unit Rate
III.5.11
Breakdown
Metal Fabricator/Metal Mechanic/Duct Fabricator
H
4
26.20
SR
104.80
Unit Rate
III.5.12
Breakdown
Insulator/refractory worker
H
4
26.20
SR
104.80
Unit Rate
III.5.13
Breakdown
Certified Lifting equipment driver
H
4
26.20
SR
104.80
Unit Rate
III.5.14
Breakdown
Heavy Equipment Operator
H
4
26.20
SR
104.80
Unit Rate
III.5.15
Breakdown
Heavy Truck Driver
H
4
26.20
SR
104.80
Unit Rate
Helper
H
6
16.50
SR
99.00
Unit Rate
III.5.16
III.6
Breakdown
Description
EQUIPMENT
Long Description
Unit Price
Currency
Payment
Type
UOM
Short Description
Total
PROVIDE THE Equipment TO PERFORM ANY ADDITIONAL WORK NOT COVERED IN THE WORK UNIT RATES
WHEN REQUESTED BY THE COMPANY as Per Item # 7 of Schedule "B"
III.6.1
Breakdown
Dump Truck with 15 cubic meter capacity
H
6
175.00
SR
1,050.00
Unit Rate
III.6.2
Breakdown
Portable Oil Tanker with 15 cubic meter capacity, with all associated hoses
H
6
165.00
SR
990.00
Unit Rate
III.6.3
Breakdown
Portable Water Tanker with 15 cubic meter capacity, with all associated hoses
H
6
175.00
SR
1,050.00
Unit Rate
III.6.4
Breakdown
Portable Oil Pumps not less than 1 HP, with all associated hoses
H
6
100.00
SR
600.00
Unit Rate
III.6.5
Breakdown
Portable Water Pumps (1HP) with all associated hoses
H
6
120.00
SR
720.00
Unit Rate
III.6.6
Breakdown
Portable Water Pumps (2HP) with all associated hoses
H
6
140.00
SR
840.00
Unit Rate
III.6.7
Breakdown
Excavator including certified driver
H
6
225.00
SR
1,350.00
Unit Rate
III.6.8
Breakdown
Backhoe including certified driver
H
6
225.00
SR
1,350.00
Unit Rate
III.6.9
Breakdown
Pay loader Medium Size including certified driver
H
6
285.00
SR
1,710.00
Unit Rate
III.6.10
Breakdown
Bobcat including certified driver
H
6
150.00
SR
900.00
Unit Rate
III.6.11
Breakdown
Jack Hammer medium capacity including certified driver
H
6
175.00
SR
1,050.00
Unit Rate
III.6.12
Breakdown
Bulldozer including certified driver
H
6
450.00
SR
2,700.00
Unit Rate
III.6.13
Breakdown
Road Roller Medium Size
H
6
350.00
SR
2,100.00
Unit Rate
III.6.14
Breakdown
Asphalt Cutter with 12" diameter blade
H
6
150.00
SR
900.00
Unit Rate
III.6.15
Breakdown
Compactor Bottom Plate (18" x 18")
H
6
85.00
SR
510.00
Unit Rate
III.6.16
Breakdown
Bucket Truck
H
6
350.00
SR
2,100.00
Unit Rate
III.6.17
Breakdown
Crane, 10 Ton
H
6
350.00
SR
2,100.00
Unit Rate
III.6.18
Breakdown
Crane, 15 Ton
H
6
375.00
SR
2,250.00
Unit Rate
III.6.19
Breakdown
Crane, 20 Ton
H
6
450.00
SR
2,700.00
Unit Rate
III.6.20
Breakdown
Crane, 25 Ton
H
6
450.00
SR
2,700.00
Unit Rate
III.6.21
Breakdown
Forklift, 5 Ton
H
6
250.00
SR
1,500.00
Unit Rate
III.6.22
Breakdown
Forklift, 10 Ton
H
6
350.00
SR
2,100.00
Unit Rate
BF-PA -62 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
III.6.23
Breakdown
III.6.24
Breakdown
III.6.25
Breakdown
Quantity
Heavy-duty industrial vacuum machine
H
6
350.00
SR
2,100.00
Unit Rate
Air Compressor (0.63 Mpa)
H
6
175.00
SR
1,050.00
Unit Rate
Mobile man lifter, portable type
H
6
175.00
SR
1,050.00
Unit Rate
IV
Description
AMD-Northeast
IV.1
IV.1.1
Description
Description
CIVIL WORKS
CIVIL WORKS
23.50
SR
3,760.00
Unit Rate
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
Asset Maintenance Department-North East (Al Jouf, Sakaka, Domat Al Jundol, Abu Ajaram, Zalloum, Al
Qurayyat, Taburjel, Turaif, Wa’ad Al Shamal, Arar, Al Awaiqilah and Rafha)
CIVIL WORKS as Per Item # 5.1 of Schedule "B"
SURVEYING as Per Item # 5.1.1 of Schedule "B"
IV.1.1.1
Breakdown
Land surveying of area, the boundaries of which shall be specified by the Company. Includes site surveying, preparation
of detailed topographical maps, showing all existing structures, roads, electrical and communication networks, etc.,
with scales (1:250) or (1:100). The maps shall be submitted in hard and softcopies
M2
160
IV.1.1.2
Breakdown
Preparation of topographical maps only as explained in item 5.1.1 in Schedule "B" for a pre-surveyed area,
excluding collection of site data with scales (1:50) or (1:20)
EA
15
1,850.00
SR
27,750.00
Unit Rate
IV.1.1.3
Breakdown
Preparation of construction drawing of as built drawings for civil, electrical, mechanical works.
EA
15
1,850.00
SR
27,750.00
Unit Rate
IV.1.2
Description
CIVIL WORKS
EXCAVATION, BACKFILL AND COMPACTION SURVEYING as Per Item # 5.1.2 of Schedule "B"
IV.1.2.1
Breakdown
Breaking and removal of asphalted top surface using adequate equipment and disposal to designated places
M3
200
128.25
SR
25,650.00
Unit Rate
IV.1.2.2
Breakdown
Excavation in Rocky soil using all necessary equipment and dispose excavated material to dump areas
M3
180
90.25
SR
16,245.00
Unit Rate
IV.1.2.3
Breakdown
Excavation in normal soil using all necessary equipment and dispose excavated material to dump areas
M3
160
72.00
SR
11,520.00
Unit Rate
IV.1.2.4
Breakdown
Manual excavation using manual equipment in restricted area due to specialty of any areas specified by COMPANY
Engineers
M3
100
135.00
SR
13,500.00
Unit Rate
IV.1.2.5
Breakdown
Shoring of trench wall(s) where necessary, using CONTRACTOR’s shoring gear. Work includes removal after job
completion. Rate per running meter of trenches shored up
M
100
150.00
SR
15,000.00
Unit Rate
IV.1.2.6
Breakdown
Supply and backfill clean sand, general fill, select fill, source within 100 km from Work site
M3
80
55.00
SR
4,400.00
Unit Rate
IV.1.2.7
Breakdown
Supply and backfill clean sand, general fill, select fill, source beyond 100 km from Work site
M3
80
55.00
SR
4,400.00
Unit Rate
IV.1.2.8
Breakdown
Supply Backfilling material for sub-base course layer (under asphalt layer) as per COMPANY Specifications
M3
1,400
150.00
SR
210,000.00
Unit Rate
IV.1.2.9
Breakdown
Supply Normal backfilling material as per COMPANY Specifications
M3
100
75.00
SR
7,500.00
Unit Rate
IV.1.2.10
Breakdown
Supply and lay gravel, 10-15 cm thick layer, including leveling and compaction of selected area as per COMPANY
Standards
M3
100
75.00
SR
7,500.00
Unit Rate
IV.1.2.11
Breakdown
Supply and lay cable warning tapes and cement tiles 20x30cm dark red color
M
160
25.00
SR
4,000.00
Unit Rate
IV.1.2.12
Breakdown
Safety signs and equipment around excavation area (stand, warning tape, warning lights, caution warning plates, plastic
net orange color, cement blocks as required).
M
250
110.00
SR
27,500.00
Unit Rate
IV.1.2.13
Breakdown
Supply and place sand as directed. When used to fill substation trenches this item includes skimming the surface with a
weak mix of sand and cement to a thickness of 5 cm. When this item is used in packing around 110 kV, 115 kV, 132 kV,
230 kV & 380 kV joints, the price includes placing the sand in bags and positioning them around the joint
M3
130
65.00
SR
8,450.00
Unit Rate
IV.1.2.14
Breakdown
Perform soil investigation according to the company's approved specifications WI.GM- after any excavation
and backfilling
EA
15
1,650.00
SR
24,750.00
Unit Rate
IV.1.2.15
Breakdown
Perform soil Conduct soil testing for compaction, bearing capacity, and soil resistivity
EA
15
1,650.00
SR
24,750.00
Unit Rate
IV.1.2.16
Breakdown
Shallow Compaction: Using rollers, rammers, or vibratory plates to compact the soil at shallow depths
M3
10
65.00
SR
650.00
Unit Rate
IV.1.2.17
Breakdown
Deep Compaction: Techniques like vibroflotation, dynamic compaction, and blasting compact soil at greater depths
M3
5
75.00
SR
375.00
Unit Rate
IV.1.2.18
Breakdown
Permeation Grouting: Supply and injecting grout into the soil to fill voids and increase strength
M3
4
1,125.00
SR
4,500.00
Unit Rate
IV.1.2.19
Breakdown
Compaction Grouting: Supply and injecting a stiff grout to displace and compact the surrounding soil
M3
3
740.00
SR
2,220.00
Unit Rate
BF-PA -63 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
M3
3
1,125.00
SR
3,375.00
Unit Rate
1
350.00
SR
350.00
Unit Rate
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Jet Grouting: Using high-pressure jets to mix grout with the soil, creating a solidified mass (including the injection
material)
Short Description
IV.1.2.20
Breakdown
IV.1.2.21
Breakdown
Chemical Stabilization: Supply and Adding lime, cement, or other chemicals to improve soil properties
M3
Breakdown
Mechanical Stabilization: Mixing soil with aggregates or geosynthetics to enhance strength and stability (including supply
of the aggregates)
M3
1
475.00
SR
475.00
Unit Rate
IV.1.2.23
Breakdown
Geosynthetics: Using geotextiles, geogrids, or geomembranes to reinforce and stabilize the soil (including supplying the
material)
M3
1
325.00
SR
325.00
Unit Rate
IV.1.2.24
Breakdown
Soil Nailing: supply and Install steel bars (nails) into the soil to provide additional support and stability
M3
1
165.00
SR
165.00
Unit Rate
M2
1,400
70.00
SR
98,000.00
Unit Rate
IV.1.2.22
IV.1.3
Description
CIVIL WORKS
ASPHALTING SURVEYING as Per Item # 5.1.3 of Schedule "B"
IV.1.3.1
Breakdown
Supply, deliver to site and lay tarmac, asphalt or other tar surface to a thickness of 10 cm including spray of liquid asphalt
(MC1) on final soil layer
IV.1.3.2
Breakdown
Grind and remove top surface of asphalt to the required thickness using milling machine, Supply and deliver approved
asphalt to site and lay to restore the required level (Max 10 cm thick) using planner Asphalt Paper (Faraday)
M2
1,000
27.00
SR
27,000.00
Unit Rate
IV.1.3.3
Breakdown
Supply and lay a layer of sub-base to a thickness not less than 20 cm composed from clean material, free from organic
material or clay and aspersion of water and compacting to reach required compaction, also supply, deliver to site and lay
asphalt areas at a thickness not less than 8 cm including preparation of surfaces to be cleaned from dust with air
compressor after removing all loose material from sub-base and spreading MC1 coat
M2
1,200
125.00
SR
150,000.00
Unit Rate
IV.1.3.4
Breakdown
Road limit on both sides, left and right marking lanes with yellow color, shall be 15 cm and thickness not less than 0.3
mm
M
250
9.30
SR
2,325.00
Unit Rate
IV.1.3.5
Breakdown
Paint road pavement (footpath) by black and yellow paint, 0.3 mm
M
250
9.30
SR
2,325.00
Unit Rate
IV.1.3.6
Breakdown
Caution warning plate included plate pole shall be provided
EA
25
560.00
SR
14,000.00
Unit Rate
IV.1.3.7
Breakdown
Road middle line white color 15 cm, 0.3 mm thickness
M
250
9.30
SR
2,325.00
Unit Rate
IV.1.4
IV.1.4.1
Description
CIVIL WORKS
SIDEWALKS SURVEYING as Per Item # 5.1.4 of Schedule "B"
Breakdown
Supply and Lay
Paving Only
Supply and lay paving tiles. All materials to be supplied by CONTRACTOR. Item includes bedding the tiles but not
construction foundation
M2
350
46.00
SR
16,100.00
Unit Rate
Supply and erect curbstones 15x15x30cm with toggle joint 15cm (shape L) and backfilling with clean sand and immersion
with water, then lay lean concrete 10cm thick with reinforcement steel (4mm) and erect pathway tiles as per sample
approved by the Company Representative and making dilation joints and slope for drainage
M2
130
48.35
SR
6,285.50
Unit Rate
IV.1.4.2
Breakdown
Walkways Works
IV.1.4.3
Breakdown
Curbstones
M
80
48.35
SR
3,868.00
Unit Rate
IV.1.4.4
Breakdown
Reinstall existing Marbled tiles or special tiles work includes concrete base laying, jointing paving
M2
50
28.00
SR
1,400.00
Unit Rate
IV.1.4.5
Breakdown
Reinstatement of Asphalted Sidewalk using Hot Asphalt includes base preparation according to site Conditions
M2
160
35.00
SR
5,600.00
Unit Rate
IV.1.4.6
Breakdown
Reinstatement of plain concrete sidewalk according to site Conditions
M2
130
36.00
SR
4,680.00
Unit Rate
IV.1.4.7
Breakdown
Reinstatement of reinforced concrete sidewalks according to site Conditions
M2
130
36.00
SR
4,680.00
Unit Rate
IV.1.4.8
Breakdown
Reinstatement of graveled sidewalks according to site Conditions, thick 5-10cm
M2
800
28.00
SR
22,400.00
Unit Rate
Supply and lay curbstones, Item includes all work needed to cut , fit and bed curbstone on an existing cement mortar
layer at a thickness of not less than 5cm
IV.1.4.9
Breakdown
Painting of curbstone around the sidewalk
M
250
16.00
SR
4,000.00
Unit Rate
IV.1.4.10
Breakdown
Laying Cement tiles on sidewalks
M2
250
35.15
SR
8,787.50
Unit Rate
IV.1.4.11
Breakdown
Supply and Construct reinforced concrete sidewalks with welded wire mesh
M2
250
42.00
SR
10,500.00
Unit Rate
M
200
1,015.00
SR
203,000.00
Unit Rate
IV.1.5
Description
CIVIL WORKS
IV.1.5.1
Description
CONSTRUCTION
CIVIL WORK
IV.1.5.1.1
Breakdown
CONSTRUCTION CIVIL WORK SURVEYING as Per Item # 5.1.5 of Schedule "B"
FENCING as Per Item # 5.1.5.1 of Schedule "B"
Supply and installation of perimeter fence with concrete posts as per COMPANY Standards (70-TMSS-02 and TCS-M112.01)
BF-PA -64 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
IV.1.5.1.2
UOM
Quantity
Breakdown
Removal of existing fence and supply and erect of PVC coated mesh 4mm thick at a height of 2.45m with all accessories,
fixation and bottom flat bar to be fixed to the posts, including all necessary for erection as per COMPANY standards.
M
200
245.00
SR
49,000.00
Unit Rate
IV.1.5.1.3
Breakdown
Supply and erection of one set of precast boundary walls consisting of two column grad beams and one wall panel having
dimension (3x3 MT as per SEC. Standard TA-800144, TA-800012 and AT-800013
M
250
1,350.00
SR
337,500.00
Unit Rate
IV.1.5.1.4
Breakdown
Supply and Install of decorative steel fence on top of boundary as per Sec-Standard TA-800112
M
130
235.00
SR
30,550.00
Unit Rate
IV.1.5.1.5
Breakdown
Supply and install perimeter fence with concrete posts as per SEC standard at dip station and around tower OHL different
locations
M
40
1,015.00
SR
40,600.00
Unit Rate
IV.1.5.1.6
Breakdown
Supply and install personnel fence gate- mm Wide
EA
40
1,870.00
SR
74,800.00
Unit Rate
IV.1.5.1.7
Breakdown
Supply and installation door for fence above as per COMPANY Standards.
EA
5
4,500.00
SR
22,500.00
Unit Rate
IV.1.5.1.8
Breakdown
Supply and install metal barriers to raise the Substation boundary in areas facing equipment that poses a danger
M
50
235.00
SR
11,750.00
Unit Rate
IV.1.5.1.9
Breakdown
Removal of existing barbed wire and erection of 3 barbed wires and flat bar in between 2 posts to fix these wires.
M
200
35.00
SR
7,000.00
Unit Rate
Breakdown
Additional cost to be added to item (IV.1.5.1.9) when supplying and erection of spiral barbed wire instead of the 3 barbed
wires.
M
100
155.00
SR
15,500.00
Unit Rate
Removal of existing barbed wire and erection of spiral barbed wires and flat bar in between 2 posts to fix these wires
M
100
185.00
SR
18,500.00
Unit Rate
4,478.10
SR
67,171.50
Unit Rate
33,000.00
SR
165,000.00
Unit Rate
7,260.00
SR
108,900.00
Unit Rate
IV.1.5.1.10
IV.1.5.1.11
IV.1.5.2
Breakdown
Description
CONSTRUCTION
CIVIL WORK
Unit Price
Currency
Total
Payment
Type
Long Description
Short Description
DOOR AND WINDOW WORKS as Per Item # 5.1.5.2 of Schedule "B"
IV.1.5.2.1
Breakdown
Supply and erection of steel door with all required accessories including frames, anchors, hinges, dust proof strips, the
thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant paint at least
0.5mm thick with primer and final paint as per COMPANY specifications, with inside size of 100 x 220cm
EA
15
IV.1.5.2.2
Breakdown
Supply and erection of steel sliding door size 400 x 500cm with all required accessories including frames, anchors, wheels
& sliding channels, dust proof strips, the thickness of the metal sheets is 2mm, filled-in with insulation, fire rated with a
coat of fire-resistant paint at least 0.5mm thick with primer and final paint as per company specifications. COMPANY
representative may request a single door 100 x 220cm in one of the leaves if needed
EA
5
IV.1.5.2.3
Breakdown
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant
paint at least 0.5mm thick with primer and final paint as per company specifications, with inside size of 200 x 220 cm.
EA
15
IV.1.5.2.4
Breakdown
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant
paint at least 0.5mm thick with primer and final paint as per company specifications, with inside size of 400 x 300 cm.
EA
8
19,800.00
SR
158,400.00
Unit Rate
IV.1.5.2.5
Breakdown
EA
5
34,650.00
SR
173,250.00
Unit Rate
IV.1.5.2.6
Breakdown
EA
8
4,700.00
SR
37,600.00
Unit Rate
IV.1.5.2.7
Breakdown
EA
8
4,700.00
SR
37,600.00
Unit Rate
IV.1.5.2.8
Breakdown
Supply and installation of a metal double leaf door of 200 × 220cm (100×220cm each leaf) with all accessories including
Framing, fixtures, Hinges, Handles, locks and arm-closer and dust proof strips, type steel artwork and painted with
furnace electrostatic powder, form and color to be determined by the company Representative and provide number (3)
Keys “Master Key”
EA
8
9,588.00
SR
76,704.00
Unit Rate
Breakdown
Supply and install aluminum doors with all the accessories including Framings, fixtures, Hinges, arm closer, handles, locks
and dust proof strips, the thickness of the fiber sheet must be 3mm filled in between with insulation materials and the
size 100×220cm, catalogs must be presented for approval of the door and choose the color. Note that COMPANY
Representative may request to leave a ventilation gap at the bottom of the door of approximate size 15 × 40cm segments
with filter and rips for ventilation
EA
8
7,150.00
SR
57,200.00
Unit Rate
IV.1.5.2.9
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, fire rated with a coat of fire-resistant paint at least 0.5mm thick with primer and final paint as per company
specifications, with inside size of 500 x 420 cm.
Supply and erection of single steel door with all required accessories including frames, anchors, hinges, dust proof strips,
the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire resistant paint at
least 0.5mm thick with primer and final paint as per company specifications, with inside size of 100 x 220cm (emergency
door), equipped with anti-panic arm to open and the arm closer
Supply and installation of a metal door of 100 × 220cm with all accessories including Framing, fixtures, Hinges, Handles,
locks and arm-closer and dust proof strips, type steel artwork and painted with furnace electrostatic powder, form and
color to be determined by the company Representative and provide number (3) Keys “Master Key”
BF-PA -65 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
IV.1.5.2.10
Breakdown
Supply and install wooden doors size 100×220cm with all accessories including Framings, fixtures, Hinges, Handles, locks,
arm closer, and in this regard the CONTRACTOR must provide samples for the initial choice of colors from all variety of
colors and finishes available in the factory to decide the finishing of doors and frames, these samples must come in the
form of angled section of about 15cm2 at the same thickness and material of the WORK in its final form
EA
8
2,750.00
SR
22,000.00
Unit Rate
IV.1.5.2.11
Breakdown
Supply and erection of a roll-up door with all required accessories including frames, anchors, hinges, fire rated with a coat
of fire-resistant paint with a three-hour fire rating, with size of 500 x 600 cm
EA
5
79,500.00
SR
397,500.00
Unit Rate
Breakdown
Supply and installation of bird screen doors with all accessories including the bird screen mesh 3mm thick and size
100×200cm with the appropriate metal supports and Framings, fixtures, Hinges, Handles, locks in accordance with the
COMPANY Specifications
EA
5
3,190.00
SR
15,950.00
Unit Rate
Breakdown
Supply and installation of aluminum window, section with thickness not less than 3mm to be fixed in the openings
adequately by sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any
leak of dust and water, and double glass isolated (6/8/6)mm to be well fixed and surrounded by rubber entirely
continuous from both sides, and all the accessories such as handles and wheels must be of high quality, and the color of
glass as determined by the Company Representative with the installation of a sliding wire mesh, the size 60x80cm twist
type and a single glass reinforced with wire mesh for toilets, and a sample of these windows must be provided for
approval. Also supply and erect external metal grids to protect the windows with squared bars 1.5 cm # 15 x 15cm, to be
painted with primer coat and final coat same as paint specifications of the outer walls
EA
5
1,478.00
SR
7,390.00
Unit Rate
Breakdown
Supply and installation of aluminum, section with thickness not less than 3 mm to be fixed in the openings adequately by
sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any leak of dust
and water, and double glass isolated (6/8/6 ) mm to be well fixed and surrounded by rubber entirely continuous from both
sides, and all the accessories such as handles and wheels must be of high quality, and the color of glass as determined by
the Company Representative with the installation of a sliding wire mesh, the size 120x100cm, and a sample of these
windows must be provided for approval. Also supply and erect external metal grids to protect the windows with squared
bars 1.5 cm # 15 x 15 cm, to be painted with primer coat and final coat same as paint specifications of the outer walls.
EA
5
3,696.00
SR
18,480.00
Unit Rate
IV.1.5.2.15
Breakdown
Supply and installation of aluminum window, section with thickness not less than 3 mm to be fixed in the openings
adequately by sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any
leak of dust and water, and double glass isolated (6/8/6 ) mm to be well fixed and surrounded by rubber entirely
continuous from both sides, and all the accessories such as handles and wheels must be of high quality, and the color of
glass as determined by the Company Representative with the installation of a sliding wire mesh, the size 60x80cm twist
type and a single glass reinforced with wire mesh for toilets, and a sample of these windows must be provided for
approval. Also supply and erect external metal grids to protect the windows with squared bars 1.5 cm # 15 x 15 cm, to be
painted with primer coat and final coat same as paint specifications of the outer walls.
EA
5
1,478.00
SR
7,390.00
Unit Rate
IV.1.5.2.16
Breakdown
Supply and install substation drive gate 6-meters width as per company standard drawing SA-036272
EA
5
29,700.00
SR
148,500.00
Unit Rate
IV.1.5.2.17
Breakdown
Supply and install personnel gate for substation 1-meter-wide as per company Sec-Standard SA-036272
EA
5
7,700.00
SR
38,500.00
Unit Rate
IV.1.5.2.18
Breakdown
Supply and install gates at dip stations at different locations Sec-Standard
EA
3
18,350.00
SR
55,050.00
Unit Rate
IV.1.5.2.19
Breakdown
Supply and install gates of fence with concrete posts as per SEC standard at dip station and OHTL tower at different
locations
EA
5
18,350.00
SR
91,750.00
Unit Rate
IV.1.5.2.20
Breakdown
Supply and install steel handrails (2-inch G.I. pipe) for stairways as per NFPA101 requirements, painted canary yellow
M
50
145.00
SR
7,250.00
Unit Rate
IV.1.5.2.21
Breakdown
Supply and install exit safety devices for all exterior doors as per SEC standard TES-P-119.19
EA
5
1,080.00
SR
5,400.00
Unit Rate
IV.1.5.2.22
Breakdown
Supply and install canopy above door and windows frame
EA
5
985.00
SR
4,925.00
Unit Rate
IV.1.5.2.23
Breakdown
Supply and install clear anodized aluminum window curtains
M2
130
135.00
SR
17,550.00
Unit Rate
IV.1.5.2.12
IV.1.5.2.13
IV.1.5.2.14
IV.1.5.3
Description
CONSTRUCTION
CIVIL WORK
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
Building Works as Per Item # 5.1.5.3 of Schedule "B"
IV.1.5.3.1
Breakdown
Concrete block wall thickness 20 cm
M2
50
163.63
SR
8,181.50
Unit Rate
IV.1.5.3.2
Breakdown
Concrete block wall thickness 15 cm
M2
50
126.23
SR
6,311.50
Unit Rate
IV.1.5.3.3
Breakdown
Concrete block wall thickness 10 cm
M2
50
93.50
SR
4,675.00
Unit Rate
IV.1.5.3.4
Breakdown
Sand lime block wall thickness 20 cm
M2
25
171.81
SR
4,295.25
Unit Rate
BF-PA -66 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
IV.1.5.3.5
Breakdown
IV.1.5.3.6
Breakdown
Sand lime block wall thickness 15 cm
M2
25
132.54
SR
3,313.50
Unit Rate
Construction of decorative block wall (rock type) 20cm thick.
M2
25
98.18
SR
2,454.50
Unit Rate
IV.1.5.3.7
Breakdown
Work of the repair of walls
M2
130
143.00
SR
18,590.00
Unit Rate
IV.1.5.3.8
Breakdown
Construct a substation security guard house as per company construction standard drawings TA 800039, TA 800040, TA
800041, and TA 800042
EA
1
146,680.00
SR
146,680.00
Unit Rate
IV.1.5.3.9
Breakdown
Supply and install Substation signboard on the Substation Building as per Sec-Standard TC-800003
EA
5
3,850.00
SR
19,250.00
Unit Rate
IV.1.5.3.10
Breakdown
Supply and install Substation signboard on the Gate House as per Sec-Standard TA-800111
EA
5
3,850.00
SR
19,250.00
Unit Rate
M3
50
1,450.00
SR
72,500.00
Unit Rate
IV.1.5.4
Description
CONSTRUCTION
CIVIL WORK
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
Concrete Works as Per Item # 5.1.5.4 of Schedule "B"
IV.1.5.4.1
Breakdown
Supply and deliver to site and lay concrete for slabs with a mix of 1:2:4, the cement must not be less than 350kg/m3,
item includes covering the background lean concrete or backfilling with polyethylene sheet 200 micron thick and
reinforcement steel mesh #15x15cm 8mm dia., to be doubled (two layers) on at least 1m from the grade beam
centerlines.
IV.1.5.4.2
Breakdown
Supply and deliver to site and lay concrete including reinforcement steelwork for foundations, grade beams, beams and
columns, with a mix of 1:2:4, the cement must not be less than 350kg/m3 and the reinforcement steel not less than 100
kg, unless specifically indicated in drawings or directed by the Company Representative. It is required to paint the
underground portion of the reinforced concrete with an approved waterproofing material to prevent corrosion. The
contactor must use a vibrator (50mm dia. And speed 3000tr/Min) sufficiently during concreting as directed.
M3
90
1,450.00
SR
130,500.00
Unit Rate
IV.1.5.4.3
Breakdown
Supply and deliver to site 50 kg of cement additional to normal concrete mix design of 1:2:4
EA
50
43.30
SR
2,165.00
Unit Rate
IV.1.5.4.4
Breakdown
Supply and deliver to site and lay lean concrete without reinforcement steel with a mix of 200kg/m3. The underground
portion must be painted with an approved waterproofing material to prevent water infiltration into the reinforced concrete
as directed by the Company Representative. Concrete strength should be 2500 Psi
M3
40
209.00
SR
8,360.00
Unit Rate
IV.1.5.4.5
Breakdown
Supply and erect on site pre-cast reinforced concrete pits according to the company specifications. Item include
installation and supply cover for pit and also excavation and restoration of site to original
M3
15
315.00
SR
4,725.00
Unit Rate
IV.1.5.4.6
Breakdown
Raise the level of the cable trench side walls by at least 10 cm. This item includes supplying and delivering to the site
concrete with a mix of 1:2:4, including reinforcement steel, which must be fixed after drilling the top of trench walls with
epoxy grout (glue). Also, fix a steel angle 5x5 cm on the internal edge of trench walls
M3
25
360.00
SR
9,000.00
Unit Rate
IV.1.5.4.7
Breakdown
Cover the cable trenches with tight covers to avoid infiltration of water and oil. The covers should be in the form of steel
frames (frame with steel angles 5x5 cm and closing the frame from the bottom with a 2 mm thick steel plate) to be
poured with lightweight foam concrete (450 kg/m³) reinforced with #15x15 cm steel mesh, 4 mm diameter at least. The
joints between the covers (8 mm) will be filled with polyurethane sealant
M2
40
153.00
SR
6,120.00
Unit Rate
IV.1.5.4.8
Breakdown
Repair and replace damaged or weak cable trench covers according to the COMPANY Specifications
M2
25
145.00
SR
3,625.00
Unit Rate
IV.1.5.4.9
Breakdown
Supply and erect covers for cable trenches according to the COMPANY Specifications
M2
25
181.25
SR
4,531.25
Unit Rate
M2
80
182.00
SR
14,560.00
Unit Rate
M2
40
182.00
SR
7,280.00
Unit Rate
M2
80
182.00
SR
14,560.00
Unit Rate
M2
80
182.00
SR
14,560.00
Unit Rate
M2
70
240.00
SR
16,800.00
Unit Rate
M2
70
95.00
SR
6,650.00
Unit Rate
IV.1.5.5
Description
IV.1.5.5.1
Breakdown
IV.1.5.5.2
Breakdown
IV.1.5.5.3
Breakdown
IV.1.5.5.4
Breakdown
IV.1.5.5.5
Breakdown
IV.1.5.5.6
Breakdown
CONSTRUCTION
CIVIL WORK
Flooring Works and finishing as Per Item # 5.1.5.5 of Schedule "B"
Supply and lay ceramic tiles with a minimum thickness of 4 mm for walls and 9.5 mm for floors, including all necessary
materials for execution and the skirting at the foot of the wall, implemented as per technical standards. A sample of these
tiles should be provided for approval by the COMPANY Representative before implementation
Supply and lay Acid-resistant ceramic tiles with a minimum thickness of 4 mm for walls and 9.5 mm for floors at the
battery room, including all necessary materials for execution and the skirting at the foot of the wall, implemented as per
technical standards. A sample of these tiles should be provided for approval by the COMPANY Representative before
implementation
Supply and lay tiles, including spreading clean sand under the tiles at the required thickness for final finishing with an
average slope of 5 to 8 cm. Fix the tiles with cement mortar and sand, with a mix of 300 kg of cement per cubic meter of
sand at a thickness of not less than 3 cm, and joint with white cement
Supply and fix rubber tiles, size 30x30 cm, with glue after cleaning the existing surface with a brush, implemented as per
technical standards. A sample of these tiles must be provided for approval by the COMPANY Representative before
implementation
Supply, install and replace damaged raised floor tiles, matching the existing ones in the Control Room, Optical Fiber
Room, AC/DC Room, and PLC Room (without jack)
Supply, install and replace damaged baseboards, 100 mm thick, matching the existing ones over telecommunication cable
trenches
BF-PA -67 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
M2
80
235.00
SR
18,800.00
Unit Rate
IV.1.5.5.7
Breakdown
Supply and lay un-scratchable granite tiles, dimensions 30x60 cm and 2 cm thick, for floors and walls. Fix with white
cement, wire mesh, and mortar for wall fixing. The granite must be sorted before fixing, and non-assorted samples should
be rejected
IV.1.5.5.8
Breakdown
Supply and lay granite tiles for steps, 3 cm thick, with two rubber strips for each step, implemented as per company
specifications
M2
50
185.00
SR
9,250.00
Unit Rate
IV.1.5.5.9
Breakdown
Supply and lay epoxy flooring resistant to scratches and chemical wear, with a thickness of 1000 microns and 300 microns
M2
130
175.00
SR
22,750.00
Unit Rate
IV.1.5.5.10
Breakdown
Plaster with epoxy screed mortar, which must have low susceptibility to expansion and good compressive strength. An
epoxy primer coat may be required for bonding with existing concrete. The surface must be completely leveled to the final
required level, with a thickness varying from 10 to 15 mm
M2
100
215.00
SR
21,500.00
Unit Rate
IV.1.5.5.11
Breakdown
Build Substation steps, including materials and labor according to company specifications. This includes plastering the
steps, compacting the soil, reinforcement steel, paint, and all materials provided at a height of 15 cm
M2
50
245.00
SR
12,250.00
Unit Rate
IV.1.5.5.12
Breakdown
Supply and fix natural rock aspects. This item includes providing tools, labor, equipment, and materials to fix vertical rock
tiles with thickness not exceeding 75 mm, including the inside of the tiles and oblique planes. Fixtures must be adjustable
in three directions for proper fixing. Lay marble tiles at the bottom of the aspects at a height of 60 cm, implemented as
per the specifications for fixing marble tiles. It is preferable to finish the faces of the marble tiles with a light gloss or
almost faded finish, as the marble tiles may lose glossiness under weather conditions
M2
50
235.00
SR
11,750.00
Unit Rate
IV.1.5.5.13
Breakdown
Supply and erect ceiling tiles, including metal frames, steel supports, and all necessary accessories. A sample of the tiles
must be submitted for approval by the COMPANY Representative
M2
50
185.00
SR
9,250.00
Unit Rate
Breakdown
Supply and erect stainless-steel slides, including steel supports and all necessary accessories. A sample of the slides must
be submitted for approval by the COMPANY Representative
M2
25
175.00
SR
4,375.00
Unit Rate
IV.1.5.5.15
Breakdown
Supply and erect a surrounding crown on the top part of buildings with brick tiles (GUERMID), including supplying and
erecting a steel structure to support the bricks (1.5x1.5 m) and fixing the bricks as per usual technical standards. Also,
erect the false ceiling for this crown with all supports and frames and all necessary works
M
25
215.00
SR
5,375.00
Unit Rate
IV.1.5.5.16
Breakdown
Supply and install vinyl tiles with skirting in offices and corridors
M2
40
112.00
SR
4,480.00
Unit Rate
IV.1.5.5.17
Breakdown
Apply epoxy on the manhole's ground at various locations
M2
25
98.00
SR
2,450.00
Unit Rate
Supply and apply an epoxy coating system for the S/S floor building, stone grey color RAL7030
M2
50
98.00
SR
4,900.00
Unit Rate
IV.1.5.5.14
IV.1.5.5.18
IV.1.5.6
Breakdown
Description
IV.1.5.6.1
Breakdown
IV.1.5.6.2
Breakdown
IV.1.5.6.3
Breakdown
CONSTRUCTION
CIVIL WORK
Plumbing and Sanitary Works as Per Item # 5.1.5.6 of Schedule "B"
Supply and erect a kitchen washing basin with all accessories, including alimentation, sewage, and mixers
Supply and erect a WC oriental chair (Saudi ceramic or similar), including all installation and necessary components for
operation
Supply and erect a WC Frank chair (“American type one piece” or similar), including all installation and necessary
components for operation
EA
5
5,750.00
SR
28,750.00
Unit Rate
EA
10
3,322.00
SR
33,220.00
Unit Rate
EA
8
3,618.00
SR
28,944.00
Unit Rate
EA
8
5,875.00
SR
47,000.00
Unit Rate
IV.1.5.6.4
Breakdown
Supply and erect lavatories made from artificial marble, Corian material, or similar, in one piece, as per the color and form
approved by the COMPANY Representative. The lavatories shall be solid surface type and un-scratchable, including all
accessories, mirrors, etc
IV.1.5.6.5
Breakdown
Supply and replace water closets, including all accessories, in the toilet
EA
8
4,572.00
SR
36,576.00
Unit Rate
IV.1.5.6.6
Breakdown
Supply and construct a septic tank as per SEC construction standard drawing TA-800134
EA
5
17,860.00
SR
89,300.00
Unit Rate
IV.1.5.6.7
Breakdown
Supply and construct a disposal system and seepage as per SEC Standard TA-800135
EA
5
9,500.00
SR
47,500.00
Unit Rate
IV.1.5.6.8
Breakdown
Supply and construct a sanitary sewer manhole as per SEC Standard TA-800137
EA
8
9,500.00
SR
76,000.00
Unit Rate
IV.1.5.6.9
Breakdown
Supply and install a sewer manhole cover as per SEC Standard TA-800138
EA
8
1,350.00
SR
10,800.00
Unit Rate
IV.1.5.6.10
Breakdown
Supply and install acid-resistant floor drains in the battery room
IV.1.5.6.11
Breakdown
IV.1.5.6.12
Breakdown
IV.1.5.6.13
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 1500 liters
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 2000 liters
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 3000 liters
BF-PA -68 of 104
M
50
245.00
SR
12,250.00
Unit Rate
EA
3
2,030.00
SR
6,090.00
Unit Rate
EA
3
2,755.00
SR
8,265.00
Unit Rate
EA
3
5,075.00
SR
15,225.00
Unit Rate
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
IV.1.5.6.14
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 4000 liters
EA
3
5,130.00
SR
15,390.00
Unit Rate
IV.1.5.6.15
Breakdown
Supply and install a flush tank for the WC oriental chair, with all required materials, such as glue and solvent
EA
8
750.00
SR
6,000.00
Unit Rate
IV.1.5.6.16
Breakdown
Supply and install a flush tank for the WC Frank chair, with all required materials, such as glue and solvent
EA
5
750.00
SR
3,750.00
Unit Rate
IV.1.5.6.17
Breakdown
Supply and install a washing basin mixer, including all installation and necessary materials
EA
5
695.00
SR
3,475.00
Unit Rate
Supply and install a shower mixer, including all installation and necessary materials
EA
5
840.00
SR
4,200.00
Unit Rate
M2
500
165.00
SR
82,500.00
Unit Rate
IV.1.5.6.18
Breakdown
IV.1.6
Description
IV.1.6.1
Description
CIVIL WORKS
MAINTENANCE
CIVIL WORK
MAINTENANCE CIVIL WORK SURVEYING as Per Item # 5.1.6 of Schedule "B"
Waterproofing of Substation Roof and Treatment of Water Leakage as Per Item # 5.1.6.1 of Schedule "B"
IV.1.6.1.1
Breakdown
Removal of old waterproofing and cleaning of the roof from all detachable parts, the gar coating and material that may
compose a weak separating layer, also removal of the concrete layer if it is loose or totally fissured, without damaging
parapets or evacuation downspouts. WORK includes removal of debris to approved dumping area as directed by COMPANY
REPRESENTATIVE
IV.1.6.1.2
Breakdown
Repair of deep cracks by opening them in “V” shape to be sealed with chemical crack filler, and the hair cracks with epoxy
putty, also sandpapering the repaired area and cleaning dust, as directed by COMPANY REPRESENTATIVE
M2
160
185.00
SR
29,600.00
Unit Rate
IV.1.6.1.3
Breakdown
Concrete the roof at a minimum thickness of 5cm (at least 5cm on top of highest corrugation in case of steel roof),
reinforced with steel mesh # 15x15, dia. 6mm
M2
250
185.00
SR
46,250.00
Unit Rate
IV.1.6.1.4
Breakdown
Supply workshops insulator aqueous and thermal system urinary (polyurethane) foam thickness and average 4cm and the
intensity of 40-45 kg/m3 directly above the face of the bishop concrete or top slalom surfaces metal or insulation layer old
reformed, with the WORK and vertical height of 20cm on all Aldoara vertical surrounding bishop. Maintain proper slopes
during the application of waterproofing material towards the drain
M2
200
195.00
SR
39,000.00
Unit Rate
IV.1.6.1.5
Breakdown
supply and paint with 3 layers of paint, Acrylic Foam Type Shield thickness of each layer after drought 300 microns with
the WORK of arming the network for paint textured fiber weight of 160 g/m2 to strengthen the Paint
M2
130
44.00
SR
5,720.00
Unit Rate
IV.1.6.1.6
Breakdown
Supply and install Thermoplastic Single Ply Roofing Membrane, 1.5 mm thick, 1500 WMR UV PVC waterproofing
membrane, including wall corners
M2
130
115.00
SR
14,950.00
Unit Rate
IV.1.6.1.7
Breakdown
Supply and install 40 x 40 cm cement tiles
M2
130
82.00
SR
10,660.00
Unit Rate
IV.1.6.1.8
Breakdown
Supply and install 60 x 60 cm cement tiles
M2
130
195.00
SR
25,350.00
Unit Rate
IV.1.6.1.9
Breakdown
Supply and Install 50 mm thick thermal insulation
M2
250
145.00
SR
36,250.00
Unit Rate
IV.1.6.1.10
Breakdown
Carry out waterproofing paint (acrylic) on sloping deck sheeted roof using fiber mesh to reinforce the overlapping of steel
corrugated sheets and polyurethane sealant on fixing screws, implementation conform to the COMPANY specifications and
the technical procedure indicated in material catalogs
M2
250
165.00
SR
41,250.00
Unit Rate
IV.1.6.1.11
Breakdown
Prevent leakage of water from the passing through external cable openings as per Item 5.1.6.1.8. of Schedule B
M2
130
145.00
SR
18,850.00
Unit Rate
IV.1.6.1.12
Breakdown
Prevent leakage of water from dilation joints or cracks of the basement or cable trenches as per Item 5.1.6.1.9. of
Schedule B
M2
250
145.00
SR
36,250.00
Unit Rate
IV.1.6.1.13
Breakdown
Opening dilation joints every 5m in all directions 1.5cm thick & 2.0 cm depth to fill with polyurethane sealant
M
200
65.00
SR
13,000.00
Unit Rate
IV.1.6.1.14
Breakdown
Supply and install Aluminum sheet Gutter to drain the water
M
80
75.00
SR
6,000.00
Unit Rate
IV.1.6.1.15
Breakdown
Supply and install Roof Drain 100 mm schedule 80
M
80
167.00
SR
13,360.00
Unit Rate
IV.1.6.1.16
Breakdown
Supply and install roof Dom and concrete splash down
M3
25
185.00
SR
4,625.00
Unit Rate
IV.1.6.1.17
Breakdown
Supply and install new flushing on roof parapet. With sealant
M
80
85.00
SR
6,800.00
Unit Rate
IV.1.6.1.18
Breakdown
Supply and install water ingress insulation at basement as per Sec-Standard
M2
50
185.00
SR
9,250.00
Unit Rate
IV.1.6.1.19
Breakdown
Supply and install Insu-wrap PVC waterproofing membrane (2000 Flee Back-UV) ultra violet membrane
M2
80
185.00
SR
14,800.00
Unit Rate
IV.1.6.2
Description
MAINTENANCE
CIVIL WORK
Repair expansion joints in concrete structures as Per Item # 5.1.6.2 of Schedule "B"
BF-PA -69 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
IV.1.6.2.1
Breakdown
IV.1.6.2.2
Breakdown
IV.1.6.2.3
Breakdown
Supply and replace the filler board for construction expansion joints as needed
IV.1.6.2.4
IV.1.6.3
Breakdown
Description
Quantity
Supply and refill the joints with flexible and waterproof materials such as polyurethane, or flexible epoxy compounds
L
1,400
45.00
SR
63,000.00
Unit Rate
Supply and install metal or rubber covers to protect the joints from future damage
M
250
35.00
SR
8,750.00
Unit Rate
M2
250
75.00
SR
18,750.00
Unit Rate
M
250
75.00
SR
18,750.00
Unit Rate
M2
250
65.00
SR
16,250.00
Unit Rate
Long Description
Supply and install protective covers over the expansion joints
MAINTENANCE
CIVIL WORK
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
Painting Works as Per Item # 5.1.6.3 of Schedule "B"
IV.1.6.3.1
Breakdown
Removal of loose old paint using all the means used in this regard and without damaging the integrity of equipment and
devices inside and outside the substation as instructed by the company representative, and repairing the deep cracks by
opening them in "V" shape to be filled with crack filler and tiny cracks by filling with Epoxy putty, And ends of this
preparatory WORK by sanding walls or floors and cleaning from dust so that it will not be allowed any scratches or
unleveled surface or for any defects that could be observed, and these WORKs should be approved by COMPANY
REPRESENTATIVE before starting the paint, and CONTRACTOR has to follow up 5-Star Safety & Health Management
System Specification of Color Coding for Plant, Pipelines, floor and walls Epoxy Paint applications as per Safety Manual
titled "1.10 Color Coding Plant and Pipelines”
IV.1.6.3.2
Breakdown
Removal white aunt and fill back all damage area
M2
80
35.00
SR
2,800.00
Unit Rate
Breakdown
Painting for First Aid/Emergency Equipment/Medical Supplies/Oxygen Station etc. Stacking and Storage, Stairs, Doors,
and Reflector stickers at basement
M2
130
44.00
SR
5,720.00
Unit Rate
IV.1.6.3.4
Breakdown
Wall paint with a primer coat and a final coat, with the color to be determined by the Company Representative. The paint
must be resistant to carbon, moisture, weather factors, chemicals, acids, and oils, and must be cleanable and expandable,
with a solid content proportion of not less than 70%. The type of paint should be Acrylic Aliphatic Polyurethane Paint
M2
500
35.00
SR
17,500.00
Unit Rate
IV.1.6.3.5
Breakdown
IV.1.6.3.6
Breakdown
IV.1.6.3.7
Breakdown
IV.1.6.3.8
Breakdown
IV.1.6.3.3
Coating of insulators and fire protection coating for cables, with the color to be determined by the Company Standards.
The coating must be resistant to fire and heat, moisture, weather factors, chemicals, and acids
Sand blasting of steel doors as needed, followed by painting with a primer coat and a final coat of polyurethane paint with
a solid content ratio of not less than 70%
Epoxy paint work for the flooring includes:
1. Repair of cracks of concrete floors by opening the deep cracks in the form of "V" and filling with chemical filler (CRACK
FILLER) and the hair cracks by filling with Epoxy putty.
2. Epoxy floor paint (solid content 100%) 200 microns thickness, the WORK carried on two layers at a thickness of not
less than 0.1mm each layer. And the execution in accordance with the method indicated in the catalogues, any change of
color will not be allowed, and the CONTRACTOR must respect the thickness and method of implementation instructed by
the company representative.
Self-leveling painting work for flooring including:
1. Completely clean the concrete slab of any residue of glue and detachable parts, and then Repair of cracks of concrete
floors by opening the deep cracks in the form of "V" and filling with chemical filler (CRACK FILLER) and the hair cracks by
filling with Epoxy putty.
2. Apply a self-leveling paint (SELF LEVELING FLOOR PAINT) 4mm thick, including the primer coat in accordance with the
specifications of the company and method of execution indicated in the catalogues
M
250
85.00
SR
21,250.00
Unit Rate
M2
700
35.00
SR
24,500.00
Unit Rate
M2
800
135.00
SR
108,000.00
Unit Rate
M2
800
95.00
SR
76,000.00
Unit Rate
IV.1.6.3.9
Breakdown
Apply self-leveling paint in accordance with the specifications of the item above but at a thickness of 3 mm
M2
130
85.00
SR
11,050.00
Unit Rate
IV.1.6.3.10
Breakdown
Apply self-leveling paint in accordance with the specifications of the item above but at a thickness of 2 mm
M2
130
65.00
SR
8,450.00
Unit Rate
IV.1.6.3.11
Breakdown
Apply white & Black PU on exposed steel structure foundation
M2
50
18.00
SR
900.00
Unit Rate
IV.1.6.3.12
Breakdown
Apply cementitious cutting material at oil catch basin interior wall face
M2
250
75.00
SR
18,750.00
Unit Rate
Breakdown
Epoxy coating system for floors in substation, epoxy coating color –stone grey–ral-7030 for GIS Room, Control Room,
switchgear Room, workshop, and relay rooms.
Work required as follows:
1. 1mm epoxy past for repairing cracks and floor levelling.
2. Master Top 1200 Resin: Primer
3. Master top 1230 -2-4mm self levelling epoxy coating
M2
800
115.00
SR
92,000.00
Unit Rate
Break of foundation layer & cable trench
M3
250
365.00
SR
91,250.00
Unit Rate
Repair of minor crack in wall and plaster defects
M2
400
145.00
SR
58,000.00
Unit Rate
IV.1.6.3.13
IV.1.6.4
Description
IV.1.6.4.1
Breakdown
IV.1.6.4.2
Breakdown
MAINTENANCE
CIVIL WORK
Repair Works as Per Item # 5.1.6.4 of Schedule "B"
BF-PA -70 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
UOM
Quantity
IV.1.6.4.3
Breakdown
IV.1.6.4.4
Breakdown
Repair of major wall crack in wall and plaster defects
M2
400
Seal rodent and reptile entry holes to substations.
EA
70
IV.1.6.4.5
Breakdown
Reconstruct collapsed/sagged floor
M2
IV.1.6.4.6
Breakdown
Repair of crack due to corrosion of reinforcement
IV.1.6.4.7
Breakdown
IV.1.6.4.8
Short Description
Long Description
Unit Price
Currency
Total
Payment
Type
265.00
SR
106,000.00
Unit Rate
85.00
SR
5,950.00
Unit Rate
400
145.00
SR
58,000.00
Unit Rate
M2
100
265.00
SR
26,500.00
Unit Rate
Coring in R.C.C / block walls
EA
15
120.00
SR
1,800.00
Unit Rate
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 4" in thick wall
EA
15
120.00
SR
1,800.00
Unit Rate
IV.1.6.4.9
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 8" in thick wall
EA
15
160.00
SR
2,400.00
Unit Rate
IV.1.6.4.10
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 12" in thick wall
EA
15
180.00
SR
2,700.00
Unit Rate
IV.1.6.4.11
Breakdown
Install duct plug on empty duct in manhole/ hand hole
EA
20
55.00
SR
1,100.00
Unit Rate
IV.1.6.4.12
Breakdown
Civil work repair of the opening of manhole/ handhole cover
EA
20
850.00
SR
17,000.00
Unit Rate
IV.1.6.4.13
Breakdown
Exposing Buried Manhole to clear out and exposed buried manhole. The excavated excess soil shall be scraped and
leveled to the existing ground.
EA
25
1,350.00
SR
33,750.00
Unit Rate
IV.1.6.4.14
Breakdown
Replacement of damaged manhole/handhole cover or frame
EA
15
1,350.00
SR
20,250.00
Unit Rate
IV.1.6.4.15
Breakdown
Raising of Manhole & Hand Hole Roof Slab: Raise the roof slab with cover and frame 50 mm from the asphalt yard level to
prevent water infiltration
EA
5
3,650.00
SR
18,250.00
Unit Rate
IV.1.6.4.16
Breakdown
Supply& install protective barrier (cement Blocks), as per COMPANY Standards
EA
5
1,350.00
SR
6,750.00
Unit Rate
IV.1.6.4.17
Breakdown
Relocation only, protective barrier (cement Blocks), same site.
EA
5
650.00
SR
3,250.00
Unit Rate
IV.1.6.4.18
Breakdown
Supply and install concrete splash block size (1.00 x 0.20 M).
EA
20
245.00
SR
4,900.00
Unit Rate
IV.1.6.4.19
Breakdown
Supply and Install Eyewash with Shower at battery room.
EA
20
3,250.00
SR
65,000.00
Unit Rate
IV.1.6.4.20
Breakdown
Supply and install first aid kit at control room.
EA
25
485.00
SR
12,125.00
Unit Rate
IV.1.6.4.21
Breakdown
Supply and install cabinet stand galvanized steel with roller (500 mm x 1400 mm at battery room).
EA
25
1,850.00
SR
46,250.00
Unit Rate
IV.1.6.4.22
Breakdown
Supply and Install Link Box Manhole Heavy Duty Covers: At different locations
EA
5
650.00
SR
3,250.00
Unit Rate
IV.1.6.4.23
Breakdown
Supply and Repair Link Box Manhole Concrete: At different locations
EA
5
1,650.00
SR
8,250.00
Unit Rate
EA
30
1,650.00
SR
49,500.00
Unit Rate
IV.1.6.5
Description
MAINTENANCE
CIVIL WORK
REPAIR OF DOORS as Per Item # 5.1.6.5 of Schedule "B"
IV.1.6.5.1
Breakdown
Repair of Any Defects or Damages to Substation and Dip Stations Doors: Includes skew leaves doors, hard closing doors,
repair of hinges, increasing their number, changing them in case of spoilage, dismantling door leaves, balancing door
leaves, re-erecting instantly, and any necessary materials for the repair, including welding works and assembling
IV.1.6.5.2
Breakdown
Repair and Re-fixing Latches or Any Type of Substation and Dip Stations Door Lock Systems: Includes welding works,
dismantling and re-erecting doors, changing latches and locks to ensure proper operation
EA
50
1,250.00
SR
62,500.00
Unit Rate
IV.1.6.5.3
Breakdown
Repair and re-fix latches or any type of door lock systems for the internal doors in the substations. This includes
dismantling and re-erecting doors, changing latches, locks, and hinges to ensure proper operation
EA
50
1,250.00
SR
62,500.00
Unit Rate
IV.1.6.5.4
Breakdown
Repair of Locks, Door Handle, and Arm-Closer of Substation and Dip Stations Doors: Includes replacing them in case of
spoilage as per COMPANY specifications, ensuring their operation in good condition, and necessary greasing of hinges and
locks
EA
50
1,250.00
SR
62,500.00
Unit Rate
IV.1.6.5.5
Breakdown
Repair or Change Door Lock Cylinders: As per COMPANY standard
EA
60
650.00
SR
39,000.00
Unit Rate
EA
40
650.00
SR
26,000.00
Unit Rate
EA
40
850.00
SR
34,000.00
Unit Rate
IV.1.6.5.6
Breakdown
IV.1.6.5.7
Breakdown
Supply and Erect Dustproof Weather Straps for Substation External Doors: As per COMPANY specifications, including
removing worn-out existing straps
Supply and Erect Anti-Panic Arm for Emergency Doors: Includes all necessary for erection as per technical code of practice
and corresponding modifications to door frames
BF-PA -71 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
Supply and Apply Steel Sheet (2 mm): Includes welding work for any small part of the door damaged by corrosion and
repainting the part with the same door color
Maintenance and Cleaning of the Roller of Shutter Rolling Doors: Includes greasing and repair of its electrical motor (for
electrical doors) and/or truss (for manual doors) gears to ensure proper operation
Supply, Erect, and Replace Dustproof Weather Straps for Shutter Rolling Doors: Same specifications and size as initially
erected straps
Supply, Erect, and Replace Worn-Out Steel Slides of Shutter Rolling Doors: Same specifications and size as existing slides,
including all necessary for dismantling damaged slides and erecting new ones
Replacement of All Damaged Door Rubber: Around the door itself or around the door frame and door strap, especially
important for halls protected by firefighting systems
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
EA
40
650.00
SR
26,000.00
Unit Rate
EA
5
3,500.00
SR
17,500.00
Unit Rate
EA
5
1,250.00
SR
6,250.00
Unit Rate
EA
25
3,500.00
SR
87,500.00
Unit Rate
EA
40
1,350.00
SR
54,000.00
Unit Rate
15
850.00
SR
12,750.00
Unit Rate
1,350.00
SR
33,750.00
Unit Rate
IV.1.6.5.8
Breakdown
IV.1.6.5.9
Breakdown
IV.1.6.5.10
Breakdown
IV.1.6.5.11
Breakdown
IV.1.6.5.12
Breakdown
IV.1.6.5.13
Breakdown
Supply and Install Door Threshold: Outdoor/indoor type to prevent water and dust infiltration
EA
IV.1.6.5.14
Breakdown
Supply and Install Heavy Duty Door Closer
EA
25
Supply and install glass for the internal doors in the substations (6 mm thickness)
M2
130
750.00
SR
97,500.00
Unit Rate
IV.1.6.5.15
IV.1.7
Breakdown
Description
CIVIL WORKS
CIVIL WORK DEMOLITION AND REMOVAL SURVEYING as Per Item # 5.1.7 of Schedule "B"
IV.1.7.1
Breakdown
Removal of fence including gate and all fittings.
M
130
180.00
SR
23,400.00
Unit Rate
IV.1.7.2
Breakdown
Removal of concrete block walls and its structure.
M2
300
155.00
SR
46,500.00
Unit Rate
Removal and Disposal of Concrete Structure/Debris/Surplus Materials: Includes breaking and clearing
M3
80
150.00
SR
12,000.00
Unit Rate
M
250
3,730.00
SR
932,500.00
Unit Rate
Around Substations/dip stations yard Boundary and Access Roads
M3
2,600
44.00
SR
114,400.00
Unit Rate
Around Substation/dip stations yard Equipment using brooms and Bobcats or suitable loader
M3
2,600
44.00
SR
114,400.00
Unit Rate
Under or beneath disconnect platforms without damaging or loosening the ground cables or connections by using brooms
only
M3
250
65.00
SR
16,250.00
Unit Rate
Around Substations/dip stations yard Boundary and Access Roads
M3
2,600
44.00
SR
114,400.00
Unit Rate
Around Substation/dip stations yard Equipment using brooms and Bobcats or suitable loader
M3
2,600
44.00
SR
114,400.00
Unit Rate
M3
250
65.00
SR
16,250.00
Unit Rate
M3
250
65.00
SR
16,250.00
Unit Rate
IV.1.7.3
Breakdown
IV.1.8
Description
CIVIL WORKS
IV.1.8.1
Description
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
IV.1.8.1.1
IV.1.8.2
Breakdown
Description
IV.1.8.2.1
Breakdown
IV.1.8.2.2
Breakdown
IV.1.8.2.3
Breakdown
IV.1.8.2.4
Breakdown
IV.1.8.2.5
Breakdown
IV.1.8.2.6
Breakdown
IV.1.8.2.7
Breakdown
IV.1.8.3
IV.1.8.3.1
IV.1.8.3.2
Description
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
By Sweeping /
Pushing
By Sweeping /
Pushing
By Sweeping /
Pushing
By Loading /
Unloading
By Loading /
Unloading
By Loading /
Unloading
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE SUBSTATIONS ACCESS ROADS AND SAND REMOVAL SURVEYING as Per Item # 5.1.8 of
Schedule "B"
SUBSTATIONS/NG FACILITIES ACCESS ROADS as Per Item # 5.1.8.1 of Schedule "B"
Design, supply and construction of 8m width service road with suitable structures which is essentially to fulfill the
requirements of service roads such as, site preparation, soil test, site survey, culverts, retaining walls, back walls, road
drain, hump, crash barriers, pavements, asphalting, curb stones, traffic signs, road marking, street lightings etc., as per
COMPANY Standards
SAND/WASTE REMOVAL as Per Item # 5.1.8.2 of Schedule "B"
Under or beneath disconnect platforms without damaging or loosening the ground cables or connections by using brooms
only
Removal of Accumulated Sand Inside and Outside the Surface of Manhole/Hand Hole or Its Cover: Excess soil shall be
removed and leveled to the existing ground
SAND STABILIZATION as Per Item # 5.1.8.3 of Schedule "B"
Breakdown
Supply, deliver and spreading crude oil to stabilize sand at the designated locations Around Substations/dip stations yard
Boundary and Access Roads
M2
80
15.00
SR
1,200.00
Unit Rate
Breakdown
Supply, Deliver and Spreading diluted acrylic co-polymer (e.g. Soil Cement or equivalent) to stabilize sand at the
designated locations Around Substations/dip stations yard Boundary and Access Roads
M2
80
22.35
SR
1,788.00
Unit Rate
BF-PA -72 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
IV.1.8.4
IV.1.8.4.1
IV.1.8.5
IV.1.8.5.1
IV.1.8.6
IV.1.8.6.1
IV.1.8.7
Line type
Short Description
Description
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
Breakdown
Description
Breakdown
Description
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
Breakdown
Description
IV.1.8.7.1
Breakdown
IV.1.8.7.2
Breakdown
IV.2
Description
IV.2.1
Description
Long Description
MECHANICAL
WORKS
MECHANICAL
WORKS
Quantity
Currency
Total
M3
250
92.00
SR
23,000.00
Unit Rate
M3
500
105.00
SR
52,500.00
Unit Rate
M2
130
115.00
SR
14,950.00
Unit Rate
EA
5
350.00
SR
1,750.00
Unit Rate
EA
1
350.00
SR
350.00
Unit Rate
M3
250
10.55
SR
2,637.50
Unit Rate
SAND BACKFILLING as Per Item # 5.1.8.4 of Schedule "B"
Supply, deliver and backfilling sand areas at designated locations Around Substations/dip stations yard Boundary and
Access Roads
SUPPLY, SPREADING AND COMPACTION OF MARL as Per Item # 5.1.8.5 of Schedule "B"
Supply, deliver, spreading and compacting marl at designated locations Around Substations/dip stations yard Boundary
and Access Roads
SUB-GRADING AND LEVELING as Per Item # 5.1.8.6 of Schedule "B"
Sub-grading preparation prior to placing marl Around Substations/dip stations yard Boundary and Access Roads
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
Unit Price
Payment
Type
UOM
MARL QUALITY AND COMPACTION TESTS as Per Item # 5.1.8.7 of Schedule "B"
Take Samples to test quality of marl and take three (3) samples after compaction is completed to test quality and
strength of compaction
Take an additional marl compaction sample
MECHANICAL WORKS as Per Item # 5.2 of Schedule "B"
DEWATERING as Per Item # 5.2.1 of Schedule "B"
IV.2.1.1
Breakdown
Direct pumping to approve location by municipality
IV.2.1.2
Breakdown
Pump and transport using tankers
EA
130
190.00
SR
24,700.00
Unit Rate
IV.2.1.3
Breakdown
Remove water from the substation rooms using specialized electrical equipment that complies with company safety
regulations
M3
100
15.75
SR
1,575.00
Unit Rate
Breakdown
Remove water from on/under the cables, trenches, manholes, handholes, conduits, link box manholes, and dip station at
various locations
EA
5
450.00
SR
2,250.00
Unit Rate
IV.2.1.5
Breakdown
Clean the power transformer oil retention pit using special materials designed to contain and absorb spilled oils, in
accordance with the company's specifications
EA
25
285.00
SR
7,125.00
Unit Rate
IV.2.1.6
Breakdown
Remove and clean oil from trenches, manholes, conduits, tunnels, and dip station at various locations
M3
50
185.00
SR
9,250.00
Unit Rate
IV.2.1.4
IV.2.2
Description
MECHANICAL
WORKS
PIPE WORKS as Per Item # 5.2.2 of Schedule "B"
IV.2.2.1
Breakdown
Supply, install and lay PVC conduit, 100-150 MM I.D., excavation not included
M
250
49.50
SR
12,375.00
Unit Rate
IV.2.2.2
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (0.5" - 1.0")
M
5
45.50
SR
227.50
Unit Rate
IV.2.2.3
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (1.5" - 2.0")
M
5
63.00
SR
315.00
Unit Rate
IV.2.2.4
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (3.0")
M
5
91.00
SR
455.00
Unit Rate
IV.2.2.5
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (0.5" - 1.0")
M
200
30.80
SR
6,160.00
Unit Rate
IV.2.2.6
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (1.5" - 3.0")
M
160
49.00
SR
7,840.00
Unit Rate
IV.2.2.7
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (4" - 6")
M
50
69.30
SR
3,465.00
Unit Rate
IV.2.2.8
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (0.5" - 1.0")
M
200
30.80
SR
6,160.00
Unit Rate
IV.2.2.9
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (1.5" - 3.0")
M
80
49.00
SR
3,920.00
Unit Rate
BF-PA -73 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
IV.2.2.10
Breakdown
IV.2.2.11
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (4" - 6")
M
100
69.30
SR
6,930.00
Unit Rate
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for sewage water size (4")
M
130
77.00
SR
10,010.00
Unit Rate
IV.2.2.12
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for sewage water size (6")
M
180
105.00
SR
18,900.00
Unit Rate
IV.2.2.13
Breakdown
Lay PVC Conduit only
M
100
135.00
SR
13,500.00
Unit Rate
IV.2.2.14
Breakdown
Lay Steel pipes only
M
5
185.00
SR
925.00
Unit Rate
IV.2.2.15
Breakdown
Lay Plastic pipes only
M
50
125.00
SR
6,250.00
Unit Rate
IV.2.3
Description
MECHANICAL
WORKS
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
REPAIR OF WATER PUMPS as Per Item # 5.2.3 of Schedule "B"
Breakdown
Maintenance of electrical water pumps and replacement of faulty spare parts and damaged electrical wiring to ensure they
operate in good condition
EA
4
3,500.00
SR
14,000.00
Unit Rate
IV.2.3.2
Breakdown
Maintenance of electrical oil pumps and replacement of faulty spare parts and damaged electrical wiring to ensure they
operate in good condition
EA
4
3,500.00
SR
14,000.00
Unit Rate
IV.2.3.3
Breakdown
Supply and install Water transfer pump -Set-WTP 01 Motor Class F Insulation and 1 ph. x 230 volts, 60 Hz, 3450 RPM
EA
15
4,500.00
SR
67,500.00
Unit Rate
IV.2.3.4
Breakdown
Supply and install Water transfer pump -Set-WTP 01 Motor Class F Insulation and 1 ph. x 230 volts, 60 Hz, 3450 RPM
EA
15
4,500.00
SR
67,500.00
Unit Rate
IV.2.3.5
Breakdown
Supply and install Water Booster pump set-WBP 01 (3 ph. x 380 volts, 60 Hz, 3450 RPM)
EA
5
7,500.00
SR
37,500.00
Unit Rate
IV.2.3.6
Breakdown
Supply and install Basement sump pump SP-01 01 (Submersible motor IP 68, Class F rating 1.10 kw (1.5 HP), 1 PH x22
volts,60 Hz, and 3450 RPM
EA
15
4,800.00
SR
72,000.00
Unit Rate
IV.2.3.7
Breakdown
Supply and installation of Transfer sump pit pump TPP-01 (TEFC Motor IP 54, Class F rating 4.00 kw (5.50 HP),1 ph. x 230
Volts, 60 Hz and 1750 RPM
EA
15
15,000.00
SR
225,000.00
Unit Rate
IV.2.3.8
Breakdown
Supply and install Booster pump for domestic water one (1) Horsepower with pressurized tank
EA
5
4,800.00
SR
24,000.00
Unit Rate
Breakdown
Supply and install transformer pit pump having the following mechanical and electrical data:
1. Mechanical Data: Discharge Rate shall be 4 L/s (63.41gpm), 1750 rpm TEFC Enclosure
2. Electrical Data: 220volts/1-phase /60Hz, manually operated with auto stop
EA
15
4,800.00
SR
72,000.00
Unit Rate
Breakdown
Supply and erect 0.7 mm thick corrugated steel sheets (sandwich panel with 50 mm polystyrene foam), including all fixing
and erecting accessories, ridges, overlaps, and gutters. This also includes bottom-side insulation with a 2 cm thick rock
wool layer, compliant with U.S. standard ASTM C 168-80, covered on both sides with aluminum foil, and installation of
lightweight metal mesh to secure and protect the insulation
M2
300
357.75
SR
107,325.00
Unit Rate
IV.2.4.2
Breakdown
Supply and erect double corrugated sheets for the surrounding wall between the block wall and the ceiling (external and
internal sheets), with rock wool insulation and tubes in between. This includes all fixings, assembly, and the top and
bottom “U” channels. Alternatively, ready-made sandwich corrugated sheet panels may be used. Transparent corrugated
sheets should be erected between every two columns to increase natural illumination, with no insulation required behind
the transparent sheets
M2
300
351.13
SR
105,337.50
Unit Rate
IV.2.4.3
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 200 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
1,358.30
SR
13,583.00
Unit Rate
IV.2.4.4
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 250 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
1,697.88
SR
16,978.75
Unit Rate
IV.2.4.5
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 300 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
2,037.45
SR
20,374.50
Unit Rate
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 350 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
2,378.50
SR
23,785.00
Unit Rate
IV.2.4.7
Breakdown
Supply and install 6-meter-long “U” steel beams 100 x 50 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
893.00
SR
8,930.00
Unit Rate
IV.2.4.8
Breakdown
Supply and install 6-meter-long “U” steel beams 200 x 100 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
1,358.30
SR
13,583.00
Unit Rate
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 100 x 50 x 5 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
628.50
SR
6,285.00
Unit Rate
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 80 x 40 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
513.00
SR
5,130.00
Unit Rate
IV.2.3.1
IV.2.3.9
IV.2.4
IV.2.4.1
IV.2.4.6
IV.2.4.9
IV.2.4.10
Description
MECHANICAL
WORKS
METALLIC WORKS as Per Item # 5.2.4 of Schedule "B"
BF-PA -74 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
IV.2.4.11
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 50 x 50 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
377.18
SR
3,771.80
Unit Rate
IV.2.4.12
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 20 x 40 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
227.00
SR
2,270.00
Unit Rate
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 100 x 100 x 5 mm cross-section, including painting, welding,
and all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
1,257.00
SR
12,570.00
Unit Rate
IV.2.4.14
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 80 x 80 x 5 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
1,026.00
SR
10,260.00
Unit Rate
IV.2.4.15
Breakdown
Supply and install 6-meter-long "L" shape steel angles 100 x 100 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
1,131.92
SR
11,319.17
Unit Rate
Breakdown
Supply and install 6-meter-long "L" shape steel angles 50 x 50 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
565.96
SR
5,659.58
Unit Rate
IV.2.4.17
Breakdown
Supply and install 6-meter-long "L" shape steel angles 40 x 40 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
10
485.00
SR
4,850.00
Unit Rate
IV.2.4.18
Breakdown
Supply and install 6-meter-long flat bars 60 mm width and 6 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
10
452.77
SR
4,527.67
Unit Rate
Breakdown
Supply and install 6-meter-long flat bars 40 mm width and 4 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
10
420.00
SR
4,200.00
Unit Rate
IV.2.4.20
Breakdown
Supply and install 6-meter-long flat bars 30 mm width and 3 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
10
387.00
SR
3,870.00
Unit Rate
IV.2.4.21
Breakdown
Supply and install 6-meter-long flat bars 20 mm width and 2 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
10
290.25
SR
2,902.50
Unit Rate
Breakdown
Supply and install 6-meter-long flat sheet 20 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
10
11,515.00
SR
115,150.00
Unit Rate
IV.2.4.23
Breakdown
Supply and install 6-meter-long flat sheet 14 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
10
8,025.25
SR
80,252.50
Unit Rate
IV.2.4.24
Breakdown
Supply and install 6-meter-long flat sheet 10 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
10
5,757.50
SR
57,575.00
Unit Rate
Breakdown
Supply and install 6-meter-long flat sheet 6 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
10
3,554.38
SR
35,543.75
Unit Rate
IV.2.4.26
Breakdown
Supply and install 6-meter-long flat sheet 3 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
10
1,777.19
SR
17,771.88
Unit Rate
IV.2.4.27
Breakdown
EA
10
1,480.99
SR
14,809.90
Unit Rate
IV.2.4.28
Breakdown
IV.2.4.13
IV.2.4.16
IV.2.4.19
IV.2.4.22
IV.2.4.25
Supply and install 6-meter-long flat sheet 2 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
Supply, install and replace 10 mm thick checkered plates inside the substation. This includes supplying the checkered
plates, cutting to size, fabricating and fitting lifting handles, welding frames and supports, painting, and removing and
returning unwanted old plates to the store, as per COMPANY Standards
M2
80
519.95
SR
41,596.00
Unit Rate
M
40
395.00
SR
15,800.00
Unit Rate
IV.2.4.29
Breakdown
Supply and install permanent steel access ladders (Emergency) fixed to the walls with safety cages, as per company
standard TA-800049, for accessing the roof. The design should conform to the standards followed in the transmission
substations
IV.2.4.30
Breakdown
Supply and install steel channel supports for checkered plates or equipment in a substation room
M
25
185.00
SR
4,625.00
Unit Rate
IV.2.4.31
Breakdown
Remove the existing chain link fencing, including the frame, and return it to the company scrub store. Supply and erect
expanded meshes at least 3 mm thick with proper steel supports and frame as required, and paint according to galvanized
paint specifications
M2
200
185.00
SR
37,000.00
Unit Rate
IV.2.4.32
Breakdown
Supply and install steel grating for the transformer oil catch basin
M2
25
285.00
SR
7,125.00
Unit Rate
IV.2.4.33
Breakdown
Supply and install hot-dip steel bridge over power cables in the cable room or Substation Basement
M2
25
135.00
SR
3,375.00
Unit Rate
IV.2.4.34
Breakdown
Supply and install hot-dip galvanized steel Unistrut supports routing outgoing feeders
M2
25
135.00
SR
3,375.00
Unit Rate
IV.2.4.35
Breakdown
Supply and install anchor bolts for fixing equipment structures, type-3, as per SEC Standard
EA
10
45.00
SR
450.00
Unit Rate
IV.2.4.36
Breakdown
Supply, install and repair ladders at manholes different locations
M
15
235.00
SR
3,525.00
Unit Rate
IV.2.4.37
Breakdown
Repair the existing car parking shed to adjust the top cloth and align with required welding and grinding
M2
40
185.00
SR
7,400.00
Unit Rate
Breakdown
Supply and install bollard post barriers with chains, including steel poles with concrete foundation, excavation, backfilling,
grounding, and re-asphalting as per NG standards. The poles and chains should maintain a 1.5 to 2 meters distance and
include yellow and black painting
EA
10
1,250.00
SR
12,500.00
Unit Rate
IV.2.4.38
BF-PA -75 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
IV.2.4.39
IV.2.5
Line type
Short Description
Breakdown
Description
Long Description
Supply and install air holes for ventilation fans, with fans installed at manholes in various locations
MECHANICAL
WORKS
Unit Price
Currency
Payment
Type
UOM
Quantity
Total
EA
10
1,650.00
SR
16,500.00
Unit Rate
AIR CONDITIONING WORK as Per Item # 5.2.5 of Schedule "B"
IV.2.5.1
Breakdown
Supply and install new window air-conditioning units (12,000 BTU/1.5 HP/1 Ton) capacity
EA
3
1,650.00
SR
4,950.00
Unit Rate
IV.2.5.2
Breakdown
Supply and install new window air-conditioning units (18,000 BTU/2.0 HP/1.5 Ton) capacity
EA
3
1,900.00
SR
5,700.00
Unit Rate
IV.2.5.3
Breakdown
Supply and install new window air-conditioning units (24,000 BTU/2.5 HP/2 Ton) capacity
EA
3
2,200.00
SR
6,600.00
Unit Rate
IV.2.5.4
Breakdown
Supply and install new split-type air-conditioning units (12,000 BTU/1.5 HP/1 Ton) capacity
EA
3
2,300.00
SR
6,900.00
Unit Rate
IV.2.5.5
Breakdown
Supply and install new split-type air-conditioning units (18,000 BTU/2.0 HP/1.5 Ton) capacity
EA
5
2,800.00
SR
14,000.00
Unit Rate
IV.2.5.6
Breakdown
Supply and install new split-type air-conditioning units (24,000 BTU/2.5 HP/2 Ton) capacity
EA
5
2,900.00
SR
14,500.00
Unit Rate
IV.2.5.7
Breakdown
Supply and install new split-type air-conditioning units (30,000 BTU/3 HP/2.5 Ton) capacity
EA
5
3,400.00
SR
17,000.00
Unit Rate
IV.2.5.8
Breakdown
Supply and install new split-type air-conditioning units (36,000 BTU/3.5 HP/3 Ton) capacity
EA
4
4,000.00
SR
16,000.00
Unit Rate
IV.2.5.9
Breakdown
Manufacturing supply and erect metal ducts for air conditioned, ducts shall be made of galvanized metal sheets (density
24Kg/sq. m) according to SMACANA & ASHRAE specifications, ducts will be externally insulated with fiberglass, wrapped
with aluminum foil, and then covered with galvanized metal sheets of the same specifications, and fitted with means for
suspension, fixations and air outlets
M
50
467.00
SR
23,350.00
Unit Rate
IV.2.5.10
Breakdown
Dismantle the louvered steel sunshade transformer roofs. This item includes all necessary measures to carry out the job
without harming or damaging any components of the roof
M2
80
235.00
SR
18,800.00
Unit Rate
IV.2.5.11
Breakdown
Re-erect the dismantled louvered steel sunshade transformer roofs. This item includes all necessary measures for
reinstatement
M2
80
235.00
SR
18,800.00
Unit Rate
IV.2.5.12
Breakdown
Replace defective duct dampers and damper motors according to COMPANY standards
EA
25
875.00
SR
21,875.00
Unit Rate
IV.2.5.13
Breakdown
Repair duct mechanical protection (cladding) according to SMACNA specifications
EA
25
475.00
SR
11,875.00
Unit Rate
IV.2.5.14
Breakdown
Repair duct access door
EA
25
576.00
SR
14,400.00
Unit Rate
IV.2.6
Description
MECHANICAL
WORKS
SCAFFOLDING as Per Item # 5.2.6 of Schedule "B"
Breakdown
Supply, Erection & Dismantling of Fixed Type Scaffolding with sufficient working Platforms for inside/outside any facilities
of the Sub-station building or equipment.
M3
250
105.00
SR
26,250.00
Unit Rate
IV.2.6.2
Breakdown
Supply, Erection & Dismantling of Mobile Type Scaffolding with sufficient working Platforms for inside/outside any facilities
of the Sub-station building or equipment.
M3
160
105.00
SR
16,800.00
Unit Rate
IV.2.6.3
Breakdown
Supply, mobilize and demobilize pipe with 1 m length
EA
3
6.50
SR
19.50
Unit Rate
IV.2.6.4
Breakdown
Supply, mobilize and demobilize pipe with 2 m length
EA
3
8.50
SR
25.50
Unit Rate
IV.2.6.5
Breakdown
Supply, mobilize and demobilize pipe with 3 m length
EA
3
11.50
SR
34.50
Unit Rate
IV.2.6.6
Breakdown
Supply, mobilize and demobilize pipe with 4 m length
EA
3
13.50
SR
40.50
Unit Rate
IV.2.6.7
Breakdown
Supply, mobilize and demobilize pipe with 6 m length
EA
3
15.50
SR
46.50
Unit Rate
IV.2.6.8
Breakdown
Supply, mobilize and demobilize Wooden Plank with 2 m length
EA
2
6.50
SR
13.00
Unit Rate
IV.2.6.1
IV.2.6.9
Breakdown
Supply, mobilize and demobilize Wooden Plank with 3 m length
EA
2
8.50
SR
17.00
Unit Rate
IV.2.6.10
Breakdown
Supply, mobilize and demobilize Wooden Plank with 4 m length
EA
2
11.50
SR
23.00
Unit Rate
IV.2.6.11
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 3 m length
EA
3
13.50
SR
40.50
Unit Rate
IV.2.6.12
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 4 m length
EA
3
15.50
SR
46.50
Unit Rate
BF-PA -76 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
IV.2.6.13
Breakdown
IV.2.6.14
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 6 m length
EA
3
350.00
SR
1,050.00
Unit Rate
Supply, mobilize and demobilize Base Plate
EA
3
6.50
SR
19.50
Unit Rate
IV.2.6.15
Breakdown
Supply, mobilize and demobilize Adjustable Base Plate
EA
3
6.50
SR
19.50
Unit Rate
IV.2.6.16
Breakdown
Supply, mobilize and demobilize Double Coupler
EA
5
8.50
SR
42.50
Unit Rate
IV.2.6.17
Breakdown
Supply, mobilize and demobilize Universal Coupler
EA
5
8.50
SR
42.50
Unit Rate
IV.2.6.18
Breakdown
Supply, mobilize and demobilize Putlog Coupler
EA
5
8.50
SR
42.50
Unit Rate
IV.2.6.19
Breakdown
Supply, mobilize and demobilize Swivel Coupler
EA
5
8.50
SR
42.50
Unit Rate
IV.2.6.20
Breakdown
Supply, mobilize and demobilize End to End Coupler
EA
5
8.50
SR
42.50
Unit Rate
IV.2.6.21
Breakdown
Supply, mobilize and demobilize C- Clamp
EA
4
8.50
SR
34.00
Unit Rate
IV.2.6.22
Breakdown
Supply, mobilize and demobilize Beam Clamp
EA
4
8.50
SR
34.00
Unit Rate
IV.2.6.23
Breakdown
Supply, mobilize and demobilize Reveal Pin
EA
5
8.50
SR
42.50
Unit Rate
IV.2.6.24
Breakdown
Supply, mobilize and demobilize Chain blocks
EA
3
450.00
SR
1,350.00
Unit Rate
IV.2.6.25
Breakdown
Supply, mobilize and demobilize Metal/fabric Slings, hooks
EA
5
250.00
SR
1,250.00
Unit Rate
IV.2.6.26
Breakdown
Supply, mobilize and demobilize approved Electrical cables extensions
EA
3
280.00
SR
840.00
Unit Rate
IV.2.6.27
Breakdown
Supply, mobilize and demobilize Lighting
EA
1
320.00
SR
320.00
Unit Rate
IV.2.6.28
Breakdown
Supply, mobilize and demobilize medium dumping container
EA
1
350.00
SR
350.00
Unit Rate
IV.2.6.29
Breakdown
Supply, mobilize and demobilize large dumping container
EA
1
520.00
SR
520.00
Unit Rate
IV.2.6.30
Breakdown
Provide load test certificates
EA
5
1,500.00
SR
7,500.00
Unit Rate
Provide inspection certificates
EA
5
1,500.00
SR
7,500.00
Unit Rate
IV.2.6.31
IV.2.7
Breakdown
Description
MECHANICAL
WORKS
Long Description
Unit Price
Currency
Payment
Type
UOM
Short Description
Total
FIRE ZONING as Per Item # 5.2.7 of Schedule "B"
IV.2.7.1
Breakdown
Closing the space between bus-ducts and the wall opening with COMPANY-approved fire-resistant material (sandwich
type) to prevent fire from spreading through the opening (complying with COMPANY-approved fire zoning procedures).
The gap closure should be designed to be easily removable and re-fixable for bus duct maintenance
M2
40
860.00
SR
34,400.00
Unit Rate
IV.2.7.2
Breakdown
Sealing the cable openings from both sides (or one side in case of a panel on top) with COMPANY-approved fire-resistant
sealant (3cm thick and 3cm deep). The remaining gap on the face shall be filled with HPM mortar (3cm deep) or any
equivalent approved material, and the gap between the two faces of the opening shall be filled with rock wool insulation
(minimum density 120kg/m³, melting point 1000°C)
EA
5
385.00
SR
1,925.00
Unit Rate
IV.2.7.3
Breakdown
Coating the cables in the substation basement with COMPANY-approved fire-resistant paint at a minimum thickness of
1.5mm (2kg/m²) as instructed by COMPANY representative. Bunched control cables must be painted with COMPANYapproved fire-resistant paint at a minimum thickness of 1.5mm (2kg/m²)
M2
70
786.00
SR
55,020.00
Unit Rate
Breakdown
Sealing the power cable tunnels: one side of the tunnel must be sealed in a “sandwich” type sealing with two Fire Stop
Mortar layers (generally reinforced) of at least 5cm thick, intercalated with rock wool (5cm thick). PVC pipes must be
provided around the passing cables to maintain a gap of at least 3cm, to be removed after mortar setting. These gaps
must be sealed from both sides with COMPANY-approved fire-resistant sealant (3cm thick and 3cm deep), and the gap
between the two faces of the opening shall be filled with rock wool insulation (minimum density 120kg/m³, melting point
1000°C)
M2
70
860.00
SR
60,200.00
Unit Rate
IV.2.7.4
IV.3
Description
IV.3.1
Description
ELECTRICAL
WORKS
ELECTRICAL
WORKS
ELECTRICAL WORKS as Per Item # 5.3 of Schedule "B"
LIGHTING SYSTEM WORK as Per Item # 5.3.1 of Schedule "B"
BF-PA -77 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
IV.3.1.1
Breakdown
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V” and crisscross
aluminum slide diffuser, to be installed in the false ceiling, different size (60 x 120), rapid start type
EA
50
185.00
SR
9,250.00
Unit Rate
IV.3.1.2
Breakdown
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V” and crisscross
aluminum slide diffuser, to be installed in the false ceiling, different size (60 x 60 cm), rapid start type
EA
50
185.00
SR
9,250.00
Unit Rate
IV.3.1.3
Breakdown
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V”, to be installed in the
false ceiling, size 60 x 120 cm, rapid start type. The light diffuser must be impervious and have a protection factor of at
least IP40
EA
50
135.00
SR
6,750.00
Unit Rate
IV.3.1.4
Breakdown
Supply and install a fluorescent lamp, 2x40 Watt, with a prismatic cover, rapid start type
EA
15
67.50
SR
1,012.50
Unit Rate
IV.3.1.5
Breakdown
Supply and install a halogen spotlight, 250 Watt
EA
15
1,500.00
SR
22,500.00
Unit Rate
IV.3.1.6
Breakdown
Repair, clean, and supply sodium lamp, 250/400-Watt flood light bulbs
EA
15
1,500.00
SR
22,500.00
Unit Rate
IV.3.1.7
Breakdown
Supply and replace outside lighting pole fixture cover
EA
50
475.00
SR
23,750.00
Unit Rate
IV.3.1.8
Breakdown
Supply, install, and operate a globe with a normal lamp, 100 Watt
EA
25
175.00
SR
4,375.00
Unit Rate
ST
25
650.00
SR
16,250.00
Unit Rate
EA
15
275.00
SR
4,125.00
Unit Rate
EA
10
1,200.00
SR
12,000.00
Unit Rate
Long Description
Supply and install a complete set of apparent emergency LED lights, operational for six to seven hours after DC shutdown.
The emergency unit includes a nickel-cadmium battery, a battery charger, an electronic frequency transformer, a
transformation detector, a plug, and a switch to check the battery. The emergency light unit operates on 220 V/60 Hz,
2x20 Watt, normal start at current shutdown
Supply and install an emergency EXIT LED light unit (Green Color), operational for three hours after DC shutdown, to be
mounted on the ceiling or wall with a frame. The emergency EXIT unit includes a nickel-cadmium battery, a battery
charger, an electronic frequency transformer, a transformation detector, a plug, and a switch to check the battery. The
diffusing cover is transparent with an EXIT sign. The emergency EXIT light unit operates on 220 V/60 Hz, 1x8 Watt,
normal start at current shutdown
Supply and install a sodium projector, 250 Watt, for outside lighting, fixed to allow orientation to light the front of the
building. Includes all necessary components for installation, testing, and operation as per COMPANY Representative's
instructions
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
IV.3.1.9
Breakdown
IV.3.1.10
Breakdown
IV.3.1.11
Breakdown
IV.3.1.12
Breakdown
Supply and install LED light panel, 60 x 60 cm, white, operates on 220 V/60 Hz 70 Watt
EA
50
480.00
SR
24,000.00
Unit Rate
IV.3.1.13
Breakdown
Supply and install LED tube light with frame, operates on 220 V/60 Hz, 2x40 Watt, size 10 x 120 cm
EA
50
285.00
SR
14,250.00
Unit Rate
IV.3.1.14
Breakdown
Supply and install LED Floodlight, 250 Watt, white, for outdoor substation buildings
EA
50
985.00
SR
49,250.00
Unit Rate
IV.3.1.15
Breakdown
Supply and install LED spotlight, 400 Watt, white, for outdoor substation buildings
EA
50
985.00
SR
49,250.00
Unit Rate
IV.3.1.16
Breakdown
Supply and install LED spotlight, 400 Watt, white, ceiling-mounted for GIS room
EA
50
1,200.00
SR
60,000.00
Unit Rate
IV.3.1.17
Breakdown
Supply and install LED bulb light, 20 Watt, white for DC lighting system
EA
50
120.00
SR
6,000.00
Unit Rate
IV.3.1.18
Breakdown
Supply and install LED explosion-proof lighting fixture, operates on 220 V/60 Hz, 2x40 Watt, size 10 x 120 cm for the
battery room
EA
15
450.00
SR
6,750.00
Unit Rate
IV.3.1.19
Breakdown
Supply and install explosion-proof lighting/exit lighting (Green Color) fixtures in the battery room
EA
8
360.00
SR
2,880.00
Unit Rate
IV.3.1.20
Breakdown
Supply and install explosion-proof entrance/exit lighting fixtures in the battery room
EA
8
360.00
SR
2,880.00
Unit Rate
IV.3.1.21
Breakdown
Supply and install explosion-proof emergency lighting fixtures for the battery room
EA
8
360.00
SR
2,880.00
Unit Rate
IV.3.1.22
Breakdown
Supply and install explosion-proof DC lighting fixtures for the battery room
EA
8
360.00
SR
2,880.00
Unit Rate
IV.3.1.23
Breakdown
Provide and install temporary explosion-proof lighting fixtures at dip stations and manholes at different locations
D
1
850.00
SR
850.00
Unit Rate
IV.3.1.24
Breakdown
Supply and install lighting for steel monopoles as per SEC standard drawing
EA
25
1,200.00
SR
30,000.00
Unit Rate
Supply and install high bay LED light, pendent type, at the GIS buildings.
EA
15
850.00
SR
12,750.00
Unit Rate
EA
15
41.85
SR
627.75
Unit Rate
IV.3.1.25
IV.3.2
IV.3.2.1
Breakdown
Description
Breakdown
ELECTRICAL
WORKS
INSTALLATIONS WORKS as Per Item # 5.3.2 of Schedule "B"
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, single
switch, fixed 1.5 m above the tile floor level
BF-PA -78 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
IV.3.2.2
Breakdown
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, double
switch, fixed 1.5 m above the tile floor level
EA
15
83.70
SR
1,255.50
Unit Rate
IV.3.2.3
Breakdown
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, triple
switch, fixed 1.5 m above the tile floor level
EA
15
125.55
SR
1,883.25
Unit Rate
Breakdown
Supply and install a PHENOL compound switch for A/Cs and water heaters with a Bakelite cover, at least 30 Amp, with a
warning light, fixed 1.5 m above the tile floor level
EA
10
125.55
SR
1,255.50
Unit Rate
Breakdown
Supply and erect fixtures that work automatically with a photocell, including all accessories and providing a DC source to
power the photocell
EA
15
326.00
SR
4,890.00
Unit Rate
EA
15
185.00
SR
2,775.00
Unit Rate
EA
15
185.00
SR
2,775.00
Unit Rate
IV.3.2.4
IV.3.2.5
Supply and install a 220 V/13 Amp outlet, equipped with a switch, and a male plug, installed in the floor or wall at the
proper height from the tile level. Outlets for ventilating fans and emergency lights will be installed beside the unit
concerned
Supply and install a 220 V/13 Amp explosion-proof outlet, equipped with a switch, and a male plug, installed in the floor
or wall at the proper height from the tile level. Outlets for ventilating fans and emergency lights will be installed beside
the unit concerned
Supply and install a telephone outlet made of thick Bakelite or cast iron coated with non-glossy chrome, fixed on a proper
box at the height of common outlets
IV.3.2.6
Breakdown
IV.3.2.7
Breakdown
IV.3.2.8
Breakdown
EA
3
83.70
SR
251.10
Unit Rate
IV.3.2.9
Breakdown
Supply and install a LAN outlet made of thick Bakelite or cast iron coated with non-glossy chrome, fixed on a proper box at
the height of common outlets
EA
3
83.70
SR
251.10
Unit Rate
IV.3.2.10
Breakdown
Supply and install temporary power supply at dip stations and manholes at different locations
EA
3
4,850.00
SR
14,550.00
Unit Rate
IV.3.2.11
Breakdown
Supply, install, and operate an 50 liter electrical water heater that heats water pipes without a tank as per specifications
EA
4
4,850.00
SR
19,400.00
Unit Rate
IV.3.2.12
Breakdown
Supply, install, and operate an 100 liter electrical water heater that heats water pipes without a tank as per specifications
EA
4
6,580.00
SR
26,320.00
Unit Rate
IV.3.2.13
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x25+16 mm
M
130
185.00
SR
24,050.00
Unit Rate
IV.3.2.14
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x35+16 mm
M
130
225.00
SR
29,250.00
Unit Rate
IV.3.2.15
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x50+16 mm
M
130
245.00
SR
31,850.00
Unit Rate
IV.3.2.16
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x50+25 mm
M
130
255.00
SR
33,150.00
Unit Rate
IV.3.2.17
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x70+16 mm
M
130
287.00
SR
37,310.00
Unit Rate
IV.3.2.18
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x120+16 mm
M
130
305.00
SR
39,650.00
Unit Rate
IV.3.2.19
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x185+16 mm
M
130
335.00
SR
43,550.00
Unit Rate
IV.3.2.20
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x240+16 mm
M
130
385.00
SR
50,050.00
Unit Rate
IV.3.2.21
Breakdown
Supply and lay telephonic cable, 4x0.6 mm², insulated with PVC, to be installed in an adequate tray
M
50
65.00
SR
3,250.00
Unit Rate
IV.3.2.22
Breakdown
Supply and lay subsidiary LAN cable, insulated with PVC, to be installed in an adequate tray
M
50
65.00
SR
3,250.00
Unit Rate
IV.3.2.23
Breakdown
Install cable tray as per COMPANY standards and specifications
M2
80
125.00
SR
10,000.00
Unit Rate
IV.3.2.24
Breakdown
Install cable clamp as per COMPANY standards and specifications
EA
15
35.00
SR
525.00
Unit Rate
IV.3.2.25
Breakdown
Transfer cable drum from company warehouse to site as directed
TON
3
225.00
SR
675.00
Unit Rate
IV.3.2.26
Breakdown
Return existing/old cable system to company warehouse as directed
TON
5
225.00
SR
1,125.00
Unit Rate
IV.3.2.27
Breakdown
Supply and install an explosion-proof exhaust fan in the battery room
EA
5
1,250.00
SR
6,250.00
Unit Rate
Breakdown
Supply and install wall/ceiling mounted ventilating fans, 20x20 cm, and capacities, including the evacuation flexible duct,
exterior cover, and all accessories for operation
EA
7
850.00
SR
5,950.00
Unit Rate
IV.3.2.29
Breakdown
Supply and install wall/ceiling mounted ventilating fans, 30x30 cm, and capacities, including the evacuation flexible duct,
exterior cover, and all accessories for operation
EA
7
1,050.00
SR
7,350.00
Unit Rate
IV.3.2.30
Breakdown
Supply and install ventilating fans ceiling capacity not less than 388 CF/Min
EA
7
2,850.00
SR
19,950.00
Unit Rate
IV.3.2.28
BF-PA -79 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
IV.3.2.31
Breakdown
IV.3.2.32
Breakdown
IV.3.3
Description
Short Description
ELECTRICAL
WORKS
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
Supply and install ventilating fans ceiling capacity not less than 311 CF/Min
EA
7
2,650.00
SR
18,550.00
Unit Rate
Supply and install ventilating fans ceiling capacity not less than 205 CF/Min
EA
7
2,350.00
SR
16,450.00
Unit Rate
Conduct necessary inspections and tests for all ground systems in the substation according to COMPANY specifications and
standards and submit reports
EA
5
2,800.00
SR
14,000.00
Unit Rate
3
350.00
SR
1,050.00
Unit Rate
Long Description
GROUNDING SYSTEM WORKS as Per Item # 5.3.3 of Schedule "B"
IV.3.3.1
Breakdown
IV.3.3.2
Breakdown
Supply and Erect Earthing copper rod 1.5mx¾ Dia according to COMPANY specifications
EA
IV.3.3.3
Breakdown
Supply and Erect Earthing copper rod 3mx¾ Dia according to COMPANY specifications
EA
3
750.00
SR
2,250.00
Unit Rate
IV.3.3.4
Breakdown
Supply and install a copper ground mat or plate (1 m x 1 m x 3 mm) in normal soil, including excavation, filling with
ground conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.), backfilling, reinstatement, and connection to all
equipment as per the current Code of Practice of the COMPANY
EA
3
7,850.00
SR
23,550.00
Unit Rate
IV.3.3.5
Breakdown
Supply and install a copper ground mat or plate (1 m x 1 m x 3 mm) in rocky soil, including excavation, filling with ground
conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.), backfilling, reinstatement, and connection to all equipment
as per the current Code of Practice of the COMPANY
EA
3
7,850.00
SR
23,550.00
Unit Rate
IV.3.3.6
Breakdown
Provide materials and set ground conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.) for one grounding pit to
improve earth resistance when required
EA
3
4,850.00
SR
14,550.00
Unit Rate
IV.3.3.7
Breakdown
Supply and lay a copper braid stranded cable, size 70 sq. mm, including all necessary components for connecting and
fixing
M
25
180.00
SR
4,500.00
Unit Rate
IV.3.3.8
Breakdown
Supply and lay a copper braid stranded cable, size 120 sq. mm, including all necessary components for connecting and
fixing
M
25
280.00
SR
7,000.00
Unit Rate
Breakdown
Supply and lay a copper braid stranded cable, size 185 sq. mm, including all necessary components for connecting and
fixing
M
25
380.00
SR
9,500.00
Unit Rate
IV.3.3.10
Breakdown
Supply and lay a copper braid stranded cable, size 240 sq. mm, including all necessary components for connecting and
fixing
M
25
480.00
SR
12,000.00
Unit Rate
IV.3.3.11
Breakdown
Supply and lay a copper braid stranded cable, size 300 sq. mm, including all necessary components for connecting and
fixing
M
25
580.00
SR
14,500.00
Unit Rate
Breakdown
Supply and install an earthing bus bar, size 3.5 m x 25 mm x 5 mm, including all necessary components for fixing and
connecting
EA
3
1,380.00
SR
4,140.00
Unit Rate
IV.3.3.13
Breakdown
Supply and install an earthing bus bar, size 3.5 m x 40 mm x 5 mm, including all necessary components for fixing and
connecting
EA
3
1,880.00
SR
5,640.00
Unit Rate
IV.3.3.14
Breakdown
Supply and install an earthing bus bar, size 3.5 m x 50 mm x 5 mm, including all necessary components for fixing and
connecting
EA
3
2,280.00
SR
6,840.00
Unit Rate
IV.3.3.15
Breakdown
Install a grounding test pit, ensuring it meets all relevant specifications and standards. This includes excavation,
installation of the test pit, backfilling, and any necessary connections to the grounding system. The work should be carried
out as directed by the COMPANY REPRESENTATIVE and in accordance with the company's safety and quality requirements
EA
3
2,850.00
SR
8,550.00
Unit Rate
EA
20
78,800.00
SR
1,576,000.00
Unit Rate
EA
5
37,800.00
SR
189,000.00
Unit Rate
EA
5
42,800.00
SR
214,000.00
Unit Rate
IV.3.3.9
IV.3.3.12
IV.4
Description
SUPPORT FACILITY
IV.4.1
Description
SUPPORT FACILITY
IV.4.1.1
IV.4.2
SUPPLY AND ERECT PORTABLE CABINS as Per Item # 5.4.1 of Schedule "B"
deliver and erect a portable cabin with full water, power facilities, and furniture at Eastern Transmission Substation
locations. The portable cabin shall have dimensions of no less than 4x12 meters and be fully equipped with a toilet,
kitchen, power supply and MCB AC. Additionally, it shall include a water tank with a capacity of at least 3 cubic meters, to
be filled daily, and a temporary sewage pit with a volume of at least 3 cubic meters, to be discharged periodically as
needed
For the portable cabin base, stand legs with a 7mm plate shall be provided if the ground is solid. For unsuitable ground, a
40x40 cm concrete base shall be provided
Breakdown
Description
SUPPORT FACILITY as Per Item # 5.4 of Schedule "B"
SUPPORT FACILITY
TELECOM SHELTERS AND TOWERS WORKS as Per Item # 5.2.2 of Schedule "B"
IV.4.2.1
Breakdown
Supply and erection of a communication shelter with A/C at NG proposed locations for substations and transmission lines,
with dimensions (2.5x2.5 m). The shelter shall be equipped with two split air-conditioning units with a timer switch, cable
ladders, a power source, fire extinguishers, lights, power sockets, and the construction of a foundation for the
communication shelter, all as per COMPANY specifications
IV.4.2.2
Breakdown
Supply and erection of a communication shelter with A/C at NG proposed locations for substations and transmission lines,
with dimensions (3x3 m). The shelter shall be equipped with two split air-conditioning units with a timer switch, cable
ladders, a power source, fire extinguishers, lights, power sockets, and the construction of a foundation for the
communication shelter, all as per COMPANY specifications
BF-PA -80 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Line type
IV.4.2.3
Breakdown
Supply and install grounding on telecom towers and/or shelters
EA
8
850.00
SR
6,800.00
Unit Rate
IV.4.2.4
Breakdown
Supply and install cable trays between telecom towers and shelters
EA
10
3,780.00
SR
37,800.00
Unit Rate
IV.4.2.5
Breakdown
Remove old gravel, supply and fill new gravel for towers and shelters
M2
50
275.00
SR
13,750.00
Unit Rate
IV.4.2.6
Breakdown
Removal of loose/old paint from telecom towers and repainting according to COMPANY instructions and specifications
M2
5
650.00
SR
3,250.00
Unit Rate
IV.4.2.7
Breakdown
EA
8
3,780.00
SR
30,240.00
Unit Rate
IV.4.2.8
Breakdown
EA
5
4,200.00
SR
21,000.00
Unit Rate
IV.4.3
Description
Short Description
Long Description
Repair of the Telecom tower aviation lighting system
Supply and install an aviation lighting system on telecom towers
SUPPORT FACILITY
UOM
Quantity
Unit Price
Currency
Payment
Type
Item
Total
ADDITIONAL WORKS as Per Item # 5.4.3 of Schedule "B"
IV.4.3.1
Breakdown
Supply, install and removal guard posts at the site, including complete formwork (four posts), concreting, and beaming
EA
3
67,950.00
SR
203,850.00
Unit Rate
IV.4.3.2
Breakdown
Supply, install and removal an additional guard post
EA
3
15,000.00
SR
45,000.00
Unit Rate
IV.4.3.3
Breakdown
Supply required materials and paint guard posts
EA
3
8,500.00
SR
25,500.00
Unit Rate
IV.4.3.4
Breakdown
Prepare the site for the jointing of power cables by company technicians as directed, per joint bay
EA
3
3,870.00
SR
11,610.00
Unit Rate
IV.4.3.5
Breakdown
Supply and Install nameplates for the circuits as directed
EA
15
350.00
SR
5,250.00
Unit Rate
IV.4.3.6
Breakdown
Supply and install room identification signs
EA
15
175.00
SR
2,625.00
Unit Rate
IV.4.3.7
Breakdown
Supply and install signs for Electrical, Mechanical, Protective Equipment, Symbolic Safety Signs in the Control Room, Relay
Room, Communication Room, Battery Room, HVAC Room, Basement, and Switch Yard
EA
15
375.00
SR
5,625.00
Unit Rate
IV.4.3.8
Breakdown
Supply and install signboards on the Substation building
M2
40
850.00
SR
34,000.00
Unit Rate
IV.4.3.9
Breakdown
Supply and install trash bins (1. Combustibles (Red Color), 2. Salvage (Orange Color), 3. Plastic & Paper (Blue Color), and
4. Trash (Yellow Color)
EA
25
550.00
SR
13,750.00
Unit Rate
IV.4.3.10
Breakdown
Perform the required inspections of Water Pumps and Related Parts: controls and distribution panels to maintain them in
proper and good condition
EA
5
1,850.00
SR
9,250.00
Unit Rate
Breakdown
Perform the required inspections of Extract Ventilation and Exhaust Fans: for buildings, battery rooms, basements, etc. to
maintain them in proper and good condition
EA
5
1,850.00
SR
9,250.00
Unit Rate
IV.4.3.12
Breakdown
Perform the required inspections of Lights and Related Parts: including exit lights, emergency lights, building lights,
floodlights, security lights, and related controls and distribution panels for building facilities to maintain them in proper
and good condition
EA
5
850.00
SR
4,250.00
Unit Rate
IV.4.3.13
Breakdown
Perform the required inspections of Doors, Gates and Related Parts: for building facilities to maintain them in proper and
good condition
EA
5
1,350.00
SR
6,750.00
Unit Rate
Breakdown
Perform the required inspections of Toilets and Related Fittings and Consumables: for building facilities to maintain them
in proper and good condition
EA
5
1,350.00
SR
6,750.00
Unit Rate
IV.4.3.15
Breakdown
Perform the required inspections of Floors, Walls, and Slabs: for building facilities to maintain them in proper and good
condition
EA
5
1,350.00
SR
6,750.00
Unit Rate
IV.4.3.16
Breakdown
Perform the required inspections of Suspended/Dropped Ceilings: Including plywood/gypsum, aluminum boards for
building facilities to maintain them in proper and good condition
EA
5
1,350.00
SR
6,750.00
Unit Rate
IV.4.3.11
IV.4.3.14
IV.5
Description
MANPOWER
PROVIDE THE MANPOWER TO PERFORM ANY ADDITIONAL WORK NOT COVERED IN THE WORK UNIT RATES
WHEN REQUESTED BY THE COMPANY as Per Item # 5.4.3.10 of Schedule "B"
IV.5.1
Breakdown
Foreman or Technical Supervisor or Specialist
H
3
35.50
SR
106.50
Unit Rate
IV.5.2
Breakdown
Certified scaffolder foreman/supervisor
H
3
35.50
SR
106.50
Unit Rate
IV.5.3
Breakdown
Certified Scaffolder workers for erecting scaffolding systems
H
3
28.50
SR
85.50
Unit Rate
IV.5.4
Breakdown
Operator/Programmer
H
3
35.50
SR
106.50
Unit Rate
IV.5.5
Breakdown
Safety Officer
H
3
44.50
SR
133.50
Unit Rate
IV.5.6
Breakdown
Safety Engineer
H
3
52.50
SR
157.50
Unit Rate
BF-PA -81 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
IV.5.7
Breakdown
IV.5.8
Breakdown
Civil/Mechanical/Electrical Engineer
H
3
52.50
SR
157.50
Unit Rate
Surveyor/Mechanic/Electrician/Instrument/Senior A/C Technician
H
3
26.20
SR
78.60
Unit Rate
IV.5.9
Breakdown
Welder
H
3
26.20
SR
78.60
Unit Rate
IV.5.10
Breakdown
Plumber/Carpenter/Mason/Painter/Roofer
H
3
26.20
SR
78.60
Unit Rate
IV.5.11
Breakdown
Metal Fabricator/Metal Mechanic/Duct Fabricator
H
3
26.20
SR
78.60
Unit Rate
IV.5.12
Breakdown
Insulator/refractory worker
H
3
26.20
SR
78.60
Unit Rate
IV.5.13
Breakdown
Certified Lifting equipment driver
H
3
26.20
SR
78.60
Unit Rate
IV.5.14
Breakdown
Heavy Equipment Operator
H
3
26.20
SR
78.60
Unit Rate
IV.5.15
Breakdown
Heavy Truck Driver
H
3
26.20
SR
78.60
Unit Rate
Breakdown
Helper
H
4
16.50
SR
66.00
Unit Rate
IV.5.16
IV.6
Description
EQUIPMENT
Long Description
Unit Price
Currency
Payment
Type
UOM
Short Description
Total
PROVIDE THE Equipment TO PERFORM ANY ADDITIONAL WORK NOT COVERED IN THE WORK UNIT RATES
WHEN REQUESTED BY THE COMPANY as Per Item # 7 of Schedule "B"
IV.6.1
Breakdown
Dump Truck with 15 cubic meter capacity
H
4
175.00
SR
700.00
Unit Rate
IV.6.2
Breakdown
Portable Oil Tanker with 15 cubic meter capacity, with all associated hoses
H
4
165.00
SR
660.00
Unit Rate
IV.6.3
Breakdown
Portable Water Tanker with 15 cubic meter capacity, with all associated hoses
H
4
175.00
SR
700.00
Unit Rate
IV.6.4
Breakdown
Portable Oil Pumps not less than 1 HP, with all associated hoses
H
4
100.00
SR
400.00
Unit Rate
IV.6.5
Breakdown
Portable Water Pumps (1HP) with all associated hoses
H
4
120.00
SR
480.00
Unit Rate
IV.6.6
Breakdown
Portable Water Pumps (2HP) with all associated hoses
H
4
140.00
SR
560.00
Unit Rate
IV.6.7
Breakdown
Excavator including certified driver
H
4
225.00
SR
900.00
Unit Rate
IV.6.8
Breakdown
Backhoe including certified driver
H
4
225.00
SR
900.00
Unit Rate
IV.6.9
Breakdown
Pay loader Medium Size including certified driver
H
4
285.00
SR
1,140.00
Unit Rate
IV.6.10
Breakdown
Bobcat including certified driver
H
4
150.00
SR
600.00
Unit Rate
IV.6.11
Breakdown
Jack Hammer medium capacity including certified driver
H
4
175.00
SR
700.00
Unit Rate
IV.6.12
Breakdown
Bulldozer including certified driver
H
4
450.00
SR
1,800.00
Unit Rate
IV.6.13
Breakdown
Road Roller Medium Size
H
4
350.00
SR
1,400.00
Unit Rate
IV.6.14
Breakdown
Asphalt Cutter with 12" diameter blade
H
4
150.00
SR
600.00
Unit Rate
IV.6.15
Breakdown
Compactor Bottom Plate (18" x 18")
H
4
85.00
SR
340.00
Unit Rate
IV.6.16
Breakdown
Bucket Truck
H
4
350.00
SR
1,400.00
Unit Rate
IV.6.17
Breakdown
Crane, 10 Ton
H
4
350.00
SR
1,400.00
Unit Rate
IV.6.18
Breakdown
Crane, 15 Ton
H
4
375.00
SR
1,500.00
Unit Rate
IV.6.19
Breakdown
Crane, 20 Ton
H
4
450.00
SR
1,800.00
Unit Rate
BF-PA -82 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
IV.6.20
Breakdown
IV.6.21
Breakdown
Crane, 25 Ton
H
4
450.00
SR
1,800.00
Unit Rate
Forklift, 5 Ton
H
4
250.00
SR
1,000.00
Unit Rate
IV.6.22
Breakdown
Forklift, 10 Ton
H
4
350.00
SR
1,400.00
Unit Rate
IV.6.23
Breakdown
Heavy-duty industrial vacuum machine
H
4
350.00
SR
1,400.00
Unit Rate
IV.6.24
Breakdown
Air Compressor (0.63 Mpa)
H
4
175.00
SR
700.00
Unit Rate
IV.6.25
Breakdown
Mobile man lifter, portable type
H
4
175.00
SR
700.00
Unit Rate
Long Description
BF-PA -83 of 104
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
V
Description
AMD-N&H
V.1
Description
CIVIL WORKS
V.1.1
Description
CIVIL WORKS
Long Description
UOM
Quantity
M2
200
Breakdown
V.1.1.2
Breakdown
Preparation of topographical maps only as explained in item 5.1.1 in Schedule "B" for a pre-surveyed area,
excluding collection of site data with scales (1:50) or (1:20)
EA
V.1.1.3
Breakdown
Preparation of construction drawing of as built drawings for civil, electrical, mechanical works.
EA
CIVIL WORKS
Total
Payment
Type
SURVEYING as Per Item # 5.1.1 of Schedule "B"
V.1.1.1
Description
Currency
CIVIL WORKS as Per Item # 5.1 of Schedule "B"
Land surveying of area, the boundaries of which shall be specified by the Company. Includes site surveying, preparation
of detailed topographical maps, showing all existing structures, roads, electrical and communication networks, etc.,
with scales (1:250) or (1:100). The maps shall be submitted in hard and softcopies
V.1.2
Unit Price
Asset Maintenance Department-Nariyah & Hafar Al Batin (Nariyah, Khafji, Safaniyah, Qaryat Al-Ulya, Wadi AlMiyah, Tanajeeb, Hafar Al-Batin, Qaisumah and As-Suman)
23.50
SR
4,700.00
Unit Rate
15
1,850.00
SR
27,750.00
Unit Rate
15
1,850.00
SR
27,750.00
Unit Rate
EXCAVATION, BACKFILL AND COMPACTION SURVEYING as Per Item # 5.1.2 of Schedule "B"
V.1.2.1
Breakdown
Breaking and removal of asphalted top surface using adequate equipment and disposal to designated places
M3
250
128.25
SR
32,062.50
Unit Rate
V.1.2.2
Breakdown
Excavation in Rocky soil using all necessary equipment and dispose excavated material to dump areas
M3
250
90.25
SR
22,562.50
Unit Rate
V.1.2.3
Breakdown
Excavation in normal soil using all necessary equipment and dispose excavated material to dump areas
M3
200
72.00
SR
14,400.00
Unit Rate
V.1.2.4
Breakdown
Manual excavation using manual equipment in restricted area due to specialty of any areas specified by COMPANY
Engineers
M3
130
135.00
SR
17,550.00
Unit Rate
V.1.2.5
Breakdown
Shoring of trench wall(s) where necessary, using CONTRACTOR’s shoring gear. Work includes removal after job
completion. Rate per running meter of trenches shored up
M
130
150.00
SR
19,500.00
Unit Rate
V.1.2.6
Breakdown
Supply and backfill clean sand, general fill, select fill, source within 100 km from Work site
M3
100
55.00
SR
5,500.00
Unit Rate
V.1.2.7
Breakdown
Supply and backfill clean sand, general fill, select fill, source beyond 100 km from Work site
M3
100
V.1.2.8
Breakdown
Supply Backfilling material for sub-base course layer (under asphalt layer) as per COMPANY Specifications
M3
1,600
V.1.2.9
Breakdown
Supply Normal backfilling material as per COMPANY Specifications
M3
V.1.2.10
Breakdown
Supply and lay gravel, 10-15 cm thick layer, including leveling and compaction of selected area as per COMPANY
Standards
V.1.2.11
Breakdown
Supply and lay cable warning tapes and cement tiles 20x30cm dark red color
V.1.2.12
55.00
SR
5,500.00
Unit Rate
150.00
SR
240,000.00
Unit Rate
130
75.00
SR
9,750.00
Unit Rate
M3
130
75.00
SR
9,750.00
Unit Rate
M
200
25.00
SR
5,000.00
Unit Rate
Breakdown
Safety signs and equipment around excavation area (stand, warning tape, warning lights, caution warning plates, plastic
net orange color, cement blocks as required).
M
350
110.00
SR
38,500.00
Unit Rate
V.1.2.13
Breakdown
Supply and place sand as directed. When used to fill substation trenches this item includes skimming the surface with a
weak mix of sand and cement to a thickness of 5 cm. When this item is used in packing around 110 kV, 115 kV, 132 kV,
230 kV & 380 kV joints, the price includes placing the sand in bags and positioning them around the joint
M3
170
65.00
SR
11,050.00
Unit Rate
V.1.2.14
Breakdown
Perform soil investigation according to the company's approved specifications WI.GM- after any excavation
and backfilling
EA
15
1,650.00
SR
24,750.00
Unit Rate
V.1.2.15
Breakdown
Perform soil Conduct soil testing for compaction, bearing capacity, and soil resistivity
EA
15
1,650.00
SR
24,750.00
Unit Rate
V.1.2.16
Breakdown
Shallow Compaction: Using rollers, rammers, or vibratory plates to compact the soil at shallow depths
M3
15
65.00
SR
975.00
Unit Rate
V.1.2.17
Breakdown
Deep Compaction: Techniques like vibroflotation, dynamic compaction, and blasting compact soil at greater depths
M3
7
75.00
SR
525.00
Unit Rate
V.1.2.18
Breakdown
Permeation Grouting: Supply and injecting grout into the soil to fill voids and increase strength
M3
5
1,125.00
SR
5,625.00
Unit Rate
V.1.2.19
Breakdown
Compaction Grouting: Supply and injecting a stiff grout to displace and compact the surrounding soil
M3
3
740.00
SR
2,220.00
Unit Rate
V.1.2.20
Breakdown
Jet Grouting: Using high-pressure jets to mix grout with the soil, creating a solidified mass (including the injection
material)
M3
3
1,125.00
SR
3,375.00
Unit Rate
V.1.2.21
Breakdown
Chemical Stabilization: Supply and Adding lime, cement, or other chemicals to improve soil properties
M3
2
350.00
SR
700.00
Unit Rate
V.1.2.22
Breakdown
Mechanical Stabilization: Mixing soil with aggregates or geosynthetics to enhance strength and stability (including supply
of the aggregates)
M3
2
475.00
SR
950.00
Unit Rate
BF-PA -84 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
V.1.2.23
Breakdown
V.1.2.24
Breakdown
V.1.3
Description
CIVIL WORKS
Unit Price
Currency
Total
Payment
Type
Long Description
UOM
Quantity
Geosynthetics: Using geotextiles, geogrids, or geomembranes to reinforce and stabilize the soil (including supplying the
material)
M3
1
325.00
SR
325.00
Unit Rate
Soil Nailing: supply and Install steel bars (nails) into the soil to provide additional support and stability
M3
1
165.00
SR
165.00
Unit Rate
M2
1,600
70.00
SR
112,000.00
Unit Rate
Short Description
ASPHALTING SURVEYING as Per Item # 5.1.3 of Schedule "B"
V.1.3.1
Breakdown
Supply, deliver to site and lay tarmac, asphalt or other tar surface to a thickness of 10 cm including spray of liquid asphalt
(MC1) on final soil layer
V.1.3.2
Breakdown
Grind and remove top surface of asphalt to the required thickness using milling machine, Supply and deliver approved
asphalt to site and lay to restore the required level (Max 10 cm thick) using planner Asphalt Paper (Faraday)
M2
1,400
27.00
SR
37,800.00
Unit Rate
V.1.3.3
Breakdown
Supply and lay a layer of sub-base to a thickness not less than 20 cm composed from clean material, free from organic
material or clay and aspersion of water and compacting to reach required compaction, also supply, deliver to site and lay
asphalt areas at a thickness not less than 8 cm including preparation of surfaces to be cleaned from dust with air
compressor after removing all loose material from sub-base and spreading MC1 coat
M2
1,600
125.00
SR
200,000.00
Unit Rate
V.1.3.4
Breakdown
Road limit on both sides, left and right marking lanes with yellow color, shall be 15 cm and thickness not less than 0.3
mm
M
350
9.30
SR
3,255.00
Unit Rate
V.1.3.5
Breakdown
Paint road pavement (footpath) by black and yellow paint, 0.3 mm
M
350
V.1.3.6
Breakdown
Caution warning plate included plate pole shall be provided
EA
35
V.1.3.7
Breakdown
Road middle line white color 15 cm, 0.3 mm thickness
M
V.1.4
9.30
SR
3,255.00
Unit Rate
560.00
SR
19,600.00
Unit Rate
350
9.30
SR
3,255.00
Unit Rate
Description
CIVIL WORKS
SIDEWALKS SURVEYING as Per Item # 5.1.4 of Schedule "B"
V.1.4.1
Breakdown
Supply and Lay
Paving Only
Supply and lay paving tiles. All materials to be supplied by CONTRACTOR. Item includes bedding the tiles but not
construction foundation
M2
400
46.00
SR
18,400.00
Unit Rate
V.1.4.2
Breakdown
Walkways Works
Supply and erect curbstones 15x15x30cm with toggle joint 15cm (shape L) and backfilling with clean sand and immersion
with water, then lay lean concrete 10cm thick with reinforcement steel (4mm) and erect pathway tiles as per sample
approved by the Company Representative and making dilation joints and slope for drainage
M2
170
48.35
SR
8,219.50
Unit Rate
V.1.4.3
Breakdown
Curbstones
M
100
48.35
SR
4,835.00
Unit Rate
V.1.4.4
Breakdown
Reinstall existing Marbled tiles or special tiles work includes concrete base laying, jointing paving
M2
70
28.00
SR
1,960.00
Unit Rate
V.1.4.5
Breakdown
Reinstatement of Asphalted Sidewalk using Hot Asphalt includes base preparation according to site Conditions
M2
200
35.00
SR
7,000.00
Unit Rate
V.1.4.6
Breakdown
Reinstatement of plain concrete sidewalk according to site Conditions
M2
170
36.00
SR
6,120.00
Unit Rate
V.1.4.7
Breakdown
Reinstatement of reinforced concrete sidewalks according to site Conditions
M2
170
36.00
SR
6,120.00
Unit Rate
V.1.4.8
Breakdown
Reinstatement of graveled sidewalks according to site Conditions, thick 5-10cm
M2
1,000
28.00
SR
28,000.00
Unit Rate
V.1.4.9
Breakdown
Painting of curbstone around the sidewalk
M
350
16.00
SR
5,600.00
Unit Rate
V.1.4.10
Breakdown
Laying Cement tiles on sidewalks
M2
350
35.15
SR
12,302.50
Unit Rate
V.1.4.11
Breakdown
Supply and Construct reinforced concrete sidewalks with welded wire mesh
M2
350
42.00
SR
14,700.00
Unit Rate
V.1.5
V.1.5.1
Description
CIVIL WORKS
Description
CONSTRUCTION
CIVIL WORK
Supply and lay curbstones, Item includes all work needed to cut , fit and bed curbstone on an existing cement mortar
layer at a thickness of not less than 5cm
CONSTRUCTION CIVIL WORK SURVEYING as Per Item # 5.1.5 of Schedule "B"
FENCING as Per Item # 5.1.5.1 of Schedule "B"
V.1.5.1.1
Breakdown
Supply and installation of perimeter fence with concrete posts as per COMPANY Standards (70-TMSS-02 and TCS-M112.01)
M
250
1,015.00
SR
253,750.00
Unit Rate
V.1.5.1.2
Breakdown
Removal of existing fence and supply and erect of PVC coated mesh 4mm thick at a height of 2.45m with all accessories,
fixation and bottom flat bar to be fixed to the posts, including all necessary for erection as per COMPANY standards.
M
250
245.00
SR
61,250.00
Unit Rate
V.1.5.1.3
Breakdown
Supply and erection of one set of precast boundary walls consisting of two column grad beams and one wall panel having
dimension (3x3 MT as per SEC. Standard TA-800144, TA-800012 and AT-800013
M
350
1,350.00
SR
472,500.00
Unit Rate
BF-PA -85 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
V.1.5.1.4
Breakdown
V.1.5.1.5
Breakdown
Supply and Install of decorative steel fence on top of boundary as per Sec-Standard TA-800112
M
170
235.00
SR
39,950.00
Unit Rate
Supply and install perimeter fence with concrete posts as per SEC standard at dip station and around tower OHL different
locations
M
50
1,015.00
SR
50,750.00
Unit Rate
V.1.5.1.6
Breakdown
Supply and install personnel fence gate- mm Wide
EA
50
1,870.00
SR
93,500.00
Unit Rate
V.1.5.1.7
Breakdown
Supply and installation door for fence above as per COMPANY Standards.
EA
7
4,500.00
SR
31,500.00
Unit Rate
V.1.5.1.8
Breakdown
Supply and install metal barriers to raise the Substation boundary in areas facing equipment that poses a danger
M
70
235.00
SR
16,450.00
Unit Rate
V.1.5.1.9
Breakdown
Removal of existing barbed wire and erection of 3 barbed wires and flat bar in between 2 posts to fix these wires.
M
250
35.00
SR
8,750.00
Unit Rate
V.1.5.1.10
Breakdown
Additional cost to be added to item (V.1.5.1.9) when supplying and erection of spiral barbed wire instead of the 3 barbed
wires.
M
130
155.00
SR
20,150.00
Unit Rate
V.1.5.1.11
Breakdown
Removal of existing barbed wire and erection of spiral barbed wires and flat bar in between 2 posts to fix these wires
M
130
185.00
SR
24,050.00
Unit Rate
EA
20
4,478.10
SR
89,562.00
Unit Rate
33,000.00
SR
231,000.00
Unit Rate
V.1.5.2
Description
CONSTRUCTION
CIVIL WORK
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
DOOR AND WINDOW WORKS as Per Item # 5.1.5.2 of Schedule "B"
V.1.5.2.1
Breakdown
Supply and erection of steel door with all required accessories including frames, anchors, hinges, dust proof strips, the
thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant paint at least
0.5mm thick with primer and final paint as per COMPANY specifications, with inside size of 100 x 220cm
V.1.5.2.2
Breakdown
Supply and erection of steel sliding door size 400 x 500cm with all required accessories including frames, anchors, wheels
& sliding channels, dust proof strips, the thickness of the metal sheets is 2mm, filled-in with insulation, fire rated with a
coat of fire-resistant paint at least 0.5mm thick with primer and final paint as per company specifications. COMPANY
representative may request a single door 100 x 220cm in one of the leaves if needed
EA
7
V.1.5.2.3
Breakdown
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant
paint at least 0.5mm thick with primer and final paint as per company specifications, with inside size of 200 x 220 cm.
EA
20
7,260.00
SR
145,200.00
Unit Rate
V.1.5.2.4
Breakdown
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire-resistant
paint at least 0.5mm thick with primer and final paint as per company specifications, with inside size of 400 x 300 cm.
EA
10
19,800.00
SR
198,000.00
Unit Rate
V.1.5.2.5
Breakdown
EA
7
34,650.00
SR
242,550.00
Unit Rate
V.1.5.2.6
Breakdown
EA
10
4,700.00
SR
47,000.00
Unit Rate
V.1.5.2.7
Breakdown
EA
10
4,700.00
SR
47,000.00
Unit Rate
EA
10
9,588.00
SR
95,880.00
Unit Rate
EA
10
7,150.00
SR
71,500.00
Unit Rate
EA
10
2,750.00
SR
27,500.00
Unit Rate
Supply and erection of double leaf steel door with all required accessories including frames, anchors, hinges, dust proof
strips, fire rated with a coat of fire-resistant paint at least 0.5mm thick with primer and final paint as per company
specifications, with inside size of 500 x 420 cm.
Supply and erection of single steel door with all required accessories including frames, anchors, hinges, dust proof strips,
the thickness of the metal sheets is 2mm, filled in between with insulation, fire rated with a coat of fire resistant paint at
least 0.5mm thick with primer and final paint as per company specifications, with inside size of 100 x 220cm (emergency
door), equipped with anti-panic arm to open and the arm closer
Supply and installation of a metal door of 100 × 220cm with all accessories including Framing, fixtures, Hinges, Handles,
locks and arm-closer and dust proof strips, type steel artwork and painted with furnace electrostatic powder, form and
color to be determined by the company Representative and provide number (3) Keys “Master Key”
Supply and installation of a metal double leaf door of 200 × 220cm (100×220cm each leaf) with all accessories including
Framing, fixtures, Hinges, Handles, locks and arm-closer and dust proof strips, type steel artwork and painted with
furnace electrostatic powder, form and color to be determined by the company Representative and provide number (3)
Keys “Master Key”
Supply and install aluminum doors with all the accessories including Framings, fixtures, Hinges, arm closer, handles, locks
and dust proof strips, the thickness of the fiber sheet must be 3mm filled in between with insulation materials and the
size 100×220cm, catalogs must be presented for approval of the door and choose the color. Note that COMPANY
Representative may request to leave a ventilation gap at the bottom of the door of approximate size 15 × 40cm segments
with filter and rips for ventilation
Supply and install wooden doors size 100×220cm with all accessories including Framings, fixtures, Hinges, Handles, locks,
arm closer, and in this regard the CONTRACTOR must provide samples for the initial choice of colors from all variety of
colors and finishes available in the factory to decide the finishing of doors and frames, these samples must come in the
form of angled section of about 15cm2 at the same thickness and material of the WORK in its final form
V.1.5.2.8
Breakdown
V.1.5.2.9
Breakdown
V.1.5.2.10
Breakdown
V.1.5.2.11
Breakdown
Supply and erection of a roll-up door with all required accessories including frames, anchors, hinges, fire rated with a coat
of fire-resistant paint with a three-hour fire rating, with size of 500 x 600 cm
EA
7
79,500.00
SR
556,500.00
Unit Rate
Breakdown
Supply and installation of bird screen doors with all accessories including the bird screen mesh 3mm thick and size
100×200cm with the appropriate metal supports and Framings, fixtures, Hinges, Handles, locks in accordance with the
COMPANY Specifications
EA
7
3,190.00
SR
22,330.00
Unit Rate
V.1.5.2.12
BF-PA -86 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Quantity
Breakdown
EA
7
1,478.00
SR
10,346.00
Unit Rate
Breakdown
Supply and installation of aluminum, section with thickness not less than 3 mm to be fixed in the openings adequately by
sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any leak of dust
and water, and double glass isolated (6/8/6 ) mm to be well fixed and surrounded by rubber entirely continuous from both
sides, and all the accessories such as handles and wheels must be of high quality, and the color of glass as determined by
the Company Representative with the installation of a sliding wire mesh, the size 120x100cm, and a sample of these
windows must be provided for approval. Also supply and erect external metal grids to protect the windows with squared
bars 1.5 cm # 15 x 15 cm, to be painted with primer coat and final coat same as paint specifications of the outer walls.
EA
7
3,696.00
SR
25,872.00
Unit Rate
V.1.5.2.15
Breakdown
Supply and installation of aluminum window, section with thickness not less than 3 mm to be fixed in the openings
adequately by sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any
leak of dust and water, and double glass isolated (6/8/6 ) mm to be well fixed and surrounded by rubber entirely
continuous from both sides, and all the accessories such as handles and wheels must be of high quality, and the color of
glass as determined by the Company Representative with the installation of a sliding wire mesh, the size 60x80cm twist
type and a single glass reinforced with wire mesh for toilets, and a sample of these windows must be provided for
approval. Also supply and erect external metal grids to protect the windows with squared bars 1.5 cm # 15 x 15 cm, to be
painted with primer coat and final coat same as paint specifications of the outer walls.
EA
7
1,478.00
SR
10,346.00
Unit Rate
V.1.5.2.16
Breakdown
Supply and install substation drive gate 6-meters width as per company standard drawing SA-036272
EA
7
29,700.00
SR
207,900.00
Unit Rate
V.1.5.2.17
Breakdown
Supply and install personnel gate for substation 1-meter-wide as per company Sec-Standard SA-036272
EA
7
7,700.00
SR
53,900.00
Unit Rate
V.1.5.2.18
Breakdown
Supply and install gates at dip stations at different locations Sec-Standard
EA
3
18,350.00
SR
55,050.00
Unit Rate
V.1.5.2.19
Breakdown
Supply and install gates of fence with concrete posts as per SEC standard at dip station and OHTL tower at different
locations
EA
7
18,350.00
SR
128,450.00
Unit Rate
V.1.5.2.20
Breakdown
Supply and install steel handrails (2-inch G.I. pipe) for stairways as per NFPA101 requirements, painted canary yellow
M
70
145.00
SR
10,150.00
Unit Rate
V.1.5.2.21
Breakdown
Supply and install exit safety devices for all exterior doors as per SEC standard TES-P-119.19
EA
7
1,080.00
SR
7,560.00
Unit Rate
V.1.5.2.22
Breakdown
Supply and install canopy above door and windows frame
EA
7
985.00
SR
6,895.00
Unit Rate
Supply and install clear anodized aluminum window curtains
M2
170
135.00
SR
22,950.00
Unit Rate
V.1.5.2.14
V.1.5.2.23
V.1.5.3
Short Description
Breakdown
Description
CONSTRUCTION
CIVIL WORK
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Supply and installation of aluminum window, section with thickness not less than 3mm to be fixed in the openings
adequately by sealing the entire area around the aluminum with approved sealant from inside and outside to prevent any
leak of dust and water, and double glass isolated (6/8/6)mm to be well fixed and surrounded by rubber entirely
continuous from both sides, and all the accessories such as handles and wheels must be of high quality, and the color of
glass as determined by the Company Representative with the installation of a sliding wire mesh, the size 60x80cm twist
type and a single glass reinforced with wire mesh for toilets, and a sample of these windows must be provided for
approval. Also supply and erect external metal grids to protect the windows with squared bars 1.5 cm # 15 x 15cm, to be
painted with primer coat and final coat same as paint specifications of the outer walls
V.1.5.2.13
Line type
Building Works as Per Item # 5.1.5.3 of Schedule "B"
V.1.5.3.1
Breakdown
Concrete block wall thickness 20 cm
M2
70
163.63
SR
11,454.10
Unit Rate
V.1.5.3.2
Breakdown
Concrete block wall thickness 15 cm
M2
70
126.23
SR
8,836.10
Unit Rate
V.1.5.3.3
Breakdown
Concrete block wall thickness 10 cm
M2
70
93.50
SR
6,545.00
Unit Rate
V.1.5.3.4
Breakdown
Sand lime block wall thickness 20 cm
M2
35
171.81
SR
6,013.35
Unit Rate
V.1.5.3.5
Breakdown
Sand lime block wall thickness 15 cm
M2
35
132.54
SR
4,638.90
Unit Rate
V.1.5.3.6
Breakdown
Construction of decorative block wall (rock type) 20cm thick.
M2
35
98.18
SR
3,436.30
Unit Rate
V.1.5.3.7
Breakdown
Work of the repair of walls
M2
170
V.1.5.3.8
Breakdown
Construct a substation security guard house as per company construction standard drawings TA 800039, TA 800040, TA
800041, and TA 800042
EA
V.1.5.3.9
Breakdown
Supply and install Substation signboard on the Substation Building as per Sec-Standard TC-800003
EA
V.1.5.3.10
Breakdown
Supply and install Substation signboard on the Gate House as per Sec-Standard TA-800111
EA
BF-PA -87 of 104
143.00
SR
24,310.00
Unit Rate
2
146,680.00
SR
293,360.00
Unit Rate
7
3,850.00
SR
26,950.00
Unit Rate
7
3,850.00
SR
26,950.00
Unit Rate
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
V.1.5.4
Line type
Short Description
Description
CONSTRUCTION
CIVIL WORK
Long Description
Total
Payment
Type
SR
101,500.00
Unit Rate
1,450.00
SR
174,000.00
Unit Rate
UOM
Quantity
Unit Price
M3
70
1,450.00
Currency
Concrete Works as Per Item # 5.1.5.4 of Schedule "B"
V.1.5.4.1
Breakdown
Supply and deliver to site and lay concrete for slabs with a mix of 1:2:4, the cement must not be less than 350kg/m3,
item includes covering the background lean concrete or backfilling with polyethylene sheet 200 micron thick and
reinforcement steel mesh #15x15cm 8mm dia., to be doubled (two layers) on at least 1m from the grade beam
centerlines.
V.1.5.4.2
Breakdown
Supply and deliver to site and lay concrete including reinforcement steelwork for foundations, grade beams, beams and
columns, with a mix of 1:2:4, the cement must not be less than 350kg/m3 and the reinforcement steel not less than 100
kg, unless specifically indicated in drawings or directed by the Company Representative. It is required to paint the
underground portion of the reinforced concrete with an approved waterproofing material to prevent corrosion. The
contactor must use a vibrator (50mm dia. And speed 3000tr/Min) sufficiently during concreting as directed.
M3
120
V.1.5.4.3
Breakdown
Supply and deliver to site 50 kg of cement additional to normal concrete mix design of 1:2:4
EA
70
43.30
SR
3,031.00
Unit Rate
V.1.5.4.4
Breakdown
Supply and deliver to site and lay lean concrete without reinforcement steel with a mix of 200kg/m3. The underground
portion must be painted with an approved waterproofing material to prevent water infiltration into the reinforced concrete
as directed by the Company Representative. Concrete strength should be 2500 Psi
M3
50
209.00
SR
10,450.00
Unit Rate
V.1.5.4.5
Breakdown
M3
15
315.00
SR
4,725.00
Unit Rate
V.1.5.4.6
Breakdown
M3
35
360.00
SR
12,600.00
Unit Rate
V.1.5.4.7
Breakdown
Cover the cable trenches with tight covers to avoid infiltration of water and oil. The covers should be in the form of steel
frames (frame with steel angles 5x5 cm and closing the frame from the bottom with a 2 mm thick steel plate) to be
poured with lightweight foam concrete (450 kg/m³) reinforced with #15x15 cm steel mesh, 4 mm diameter at least. The
joints between the covers (8 mm) will be filled with polyurethane sealant
M2
50
153.00
SR
7,650.00
Unit Rate
V.1.5.4.8
Breakdown
Repair and replace damaged or weak cable trench covers according to the COMPANY Specifications
M2
35
145.00
SR
5,075.00
Unit Rate
V.1.5.4.9
Breakdown
Supply and erect covers for cable trenches according to the COMPANY Specifications
M2
35
181.25
SR
6,343.75
Unit Rate
M2
100
182.00
SR
18,200.00
Unit Rate
M2
50
182.00
SR
9,100.00
Unit Rate
V.1.5.5
Description
V.1.5.5.1
Breakdown
V.1.5.5.2
Breakdown
V.1.5.5.3
Breakdown
Supply and erect on site pre-cast reinforced concrete pits according to the company specifications. Item include
installation and supply cover for pit and also excavation and restoration of site to original
Raise the level of the cable trench side walls by at least 10 cm. This item includes supplying and delivering to the site
concrete with a mix of 1:2:4, including reinforcement steel, which must be fixed after drilling the top of trench walls with
epoxy grout (glue). Also, fix a steel angle 5x5 cm on the internal edge of trench walls
CONSTRUCTION
CIVIL WORK
Flooring Works and finishing as Per Item # 5.1.5.5 of Schedule "B"
Supply and lay ceramic tiles with a minimum thickness of 4 mm for walls and 9.5 mm for floors, including all necessary
materials for execution and the skirting at the foot of the wall, implemented as per technical standards. A sample of these
tiles should be provided for approval by the COMPANY Representative before implementation
Supply and lay Acid-resistant ceramic tiles with a minimum thickness of 4 mm for walls and 9.5 mm for floors at the
battery room, including all necessary materials for execution and the skirting at the foot of the wall, implemented as per
technical standards. A sample of these tiles should be provided for approval by the COMPANY Representative before
implementation
Supply and lay tiles, including spreading clean sand under the tiles at the required thickness for final finishing with an
average slope of 5 to 8 cm. Fix the tiles with cement mortar and sand, with a mix of 300 kg of cement per cubic meter of
sand at a thickness of not less than 3 cm, and joint with white cement
M2
100
182.00
SR
18,200.00
Unit Rate
M2
100
182.00
SR
18,200.00
Unit Rate
M2
80
240.00
SR
19,200.00
Unit Rate
Supply, install and replace damaged baseboards, 100 mm thick, matching the existing ones over telecommunication cable
trenches
Supply and lay un-scratchable granite tiles, dimensions 30x60 cm and 2 cm thick, for floors and walls. Fix with white
cement, wire mesh, and mortar for wall fixing. The granite must be sorted before fixing, and non-assorted samples should
be rejected
Supply and lay granite tiles for steps, 3 cm thick, with two rubber strips for each step, implemented as per company
specifications
M2
80
95.00
SR
7,600.00
Unit Rate
M2
100
235.00
SR
23,500.00
Unit Rate
M2
70
185.00
SR
12,950.00
Unit Rate
Supply and lay epoxy flooring resistant to scratches and chemical wear, with a thickness of 1000 microns and 300 microns
M2
170
175.00
SR
29,750.00
Unit Rate
M2
130
215.00
SR
27,950.00
Unit Rate
M2
70
245.00
SR
17,150.00
Unit Rate
V.1.5.5.4
Breakdown
Supply and fix rubber tiles, size 30x30 cm, with glue after cleaning the existing surface with a brush, implemented as per
technical standards. A sample of these tiles must be provided for approval by the COMPANY Representative before
implementation
V.1.5.5.5
Breakdown
Supply, install and replace damaged raised floor tiles, matching the existing ones in the Control Room, Optical Fiber
Room, AC/DC Room, and PLC Room (without jack)
V.1.5.5.6
Breakdown
V.1.5.5.7
Breakdown
V.1.5.5.8
Breakdown
V.1.5.5.9
Breakdown
V.1.5.5.10
Breakdown
V.1.5.5.11
Breakdown
Plaster with epoxy screed mortar, which must have low susceptibility to expansion and good compressive strength. An
epoxy primer coat may be required for bonding with existing concrete. The surface must be completely leveled to the final
required level, with a thickness varying from 10 to 15 mm
Build Substation steps, including materials and labor according to company specifications. This includes plastering the
steps, compacting the soil, reinforcement steel, paint, and all materials provided at a height of 15 cm
BF-PA -88 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
V.1.5.5.12
Breakdown
V.1.5.5.13
Breakdown
V.1.5.5.14
Breakdown
V.1.5.5.15
Breakdown
V.1.5.5.16
V.1.5.5.17
V.1.5.5.18
Breakdown
Breakdown
Breakdown
V.1.5.6
V.1.5.6.1
Description
Short Description
CONSTRUCTION
CIVIL WORK
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
M2
70
235.00
SR
16,450.00
Unit Rate
Supply and erect ceiling tiles, including metal frames, steel supports, and all necessary accessories. A sample of the tiles
must be submitted for approval by the COMPANY Representative
Supply and erect stainless-steel slides, including steel supports and all necessary accessories. A sample of the slides must
be submitted for approval by the COMPANY Representative
Supply and erect a surrounding crown on the top part of buildings with brick tiles (GUERMID), including supplying and
erecting a steel structure to support the bricks (1.5x1.5 m) and fixing the bricks as per usual technical standards. Also,
erect the false ceiling for this crown with all supports and frames and all necessary works
M2
70
185.00
SR
12,950.00
Unit Rate
M2
35
175.00
SR
6,125.00
Unit Rate
M
35
215.00
SR
7,525.00
Unit Rate
Supply and install vinyl tiles with skirting in offices and corridors
Apply epoxy on the manhole's ground at various locations
Supply and apply an epoxy coating system for the S/S floor building, stone grey color RAL7030
M2
M2
M2
50
35
70
-
SR
SR
SR
5,600.00
3,430.00
6,860.00
Unit Rate
Unit Rate
Unit Rate
5,750.00
SR
40,250.00
Unit Rate
Long Description
Supply and fix natural rock aspects. This item includes providing tools, labor, equipment, and materials to fix vertical rock
tiles with thickness not exceeding 75 mm, including the inside of the tiles and oblique planes. Fixtures must be adjustable
in three directions for proper fixing. Lay marble tiles at the bottom of the aspects at a height of 60 cm, implemented as
per the specifications for fixing marble tiles. It is preferable to finish the faces of the marble tiles with a light gloss or
almost faded finish, as the marble tiles may lose glossiness under weather conditions
Plumbing and Sanitary Works as Per Item # 5.1.5.6 of Schedule "B"
Breakdown
Supply and erect a kitchen washing basin with all accessories, including alimentation, sewage, and mixers
EA
7
V.1.5.6.2
Breakdown
Supply and erect a WC oriental chair (Saudi ceramic or similar), including all installation and necessary components for
operation
EA
15
3,322.00
SR
49,830.00
Unit Rate
V.1.5.6.3
Breakdown
Supply and erect a WC Frank chair (“American type one piece” or similar), including all installation and necessary
components for operation
EA
10
3,618.00
SR
36,180.00
Unit Rate
V.1.5.6.4
Breakdown
Supply and erect lavatories made from artificial marble, Corian material, or similar, in one piece, as per the color and form
approved by the COMPANY Representative. The lavatories shall be solid surface type and un-scratchable, including all
accessories, mirrors, etc
EA
10
5,875.00
SR
58,750.00
Unit Rate
V.1.5.6.5
Breakdown
Supply and replace water closets, including all accessories, in the toilet
EA
10
4,572.00
SR
45,720.00
Unit Rate
V.1.5.6.6
Breakdown
Supply and construct a septic tank as per SEC construction standard drawing TA-800134
EA
7
17,860.00
SR
125,020.00
Unit Rate
V.1.5.6.7
Breakdown
Supply and construct a disposal system and seepage as per SEC Standard TA-800135
EA
7
9,500.00
SR
66,500.00
Unit Rate
V.1.5.6.8
Breakdown
Supply and construct a sanitary sewer manhole as per SEC Standard TA-800137
EA
10
9,500.00
SR
95,000.00
Unit Rate
V.1.5.6.9
Breakdown
Supply and install a sewer manhole cover as per SEC Standard TA-800138
EA
10
1,350.00
SR
13,500.00
Unit Rate
V.1.5.6.10
Breakdown
Supply and install acid-resistant floor drains in the battery room
M
70
245.00
SR
17,150.00
Unit Rate
V.1.5.6.11
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 1500 liters
EA
3
2,030.00
SR
6,090.00
Unit Rate
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 2000 liters
EA
3
2,755.00
SR
8,265.00
Unit Rate
V.1.5.6.13
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 3000 liters
EA
3
5,075.00
SR
15,225.00
Unit Rate
V.1.5.6.14
Breakdown
Supply and install a fiber glass water tank with all required materials, such as glue and solvent, for the substation toilet,
with a capacity ranging from 4000 liters
EA
3
5,130.00
SR
15,390.00
Unit Rate
V.1.5.6.15
Breakdown
Supply and install a flush tank for the WC oriental chair, with all required materials, such as glue and solvent
EA
10
750.00
SR
7,500.00
Unit Rate
V.1.5.6.16
Breakdown
Supply and install a flush tank for the WC Frank chair, with all required materials, such as glue and solvent
EA
7
750.00
SR
5,250.00
Unit Rate
V.1.5.6.17
Breakdown
Supply and install a washing basin mixer, including all installation and necessary materials
EA
7
695.00
SR
4,865.00
Unit Rate
Supply and install a shower mixer, including all installation and necessary materials
EA
7
840.00
SR
5,880.00
Unit Rate
M2
700
165.00
SR
115,500.00
Unit Rate
V.1.5.6.12
V.1.5.6.18
Breakdown
V.1.6
Description
V.1.6.1
Description
V.1.6.1.1
Breakdown
CIVIL WORKS
MAINTENANCE
CIVIL WORK
MAINTENANCE CIVIL WORK SURVEYING as Per Item # 5.1.6 of Schedule "B"
Waterproofing of Substation Roof and Treatment of Water Leakage as Per Item # 5.1.6.1 of Schedule "B"
Removal of old waterproofing and cleaning of the roof from all detachable parts, the gar coating and material that may
compose a weak separating layer, also removal of the concrete layer if it is loose or totally fissured, without damaging
parapets or evacuation downspouts. WORK includes removal of debris to approved dumping area as directed by COMPANY
REPRESENTATIVE
BF-PA -89 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
V.1.6.1.2
Breakdown
Repair of deep cracks by opening them in “V” shape to be sealed with chemical crack filler, and the hair cracks with epoxy
putty, also sandpapering the repaired area and cleaning dust, as directed by COMPANY REPRESENTATIVE
M2
200
185.00
SR
37,000.00
Unit Rate
V.1.6.1.3
Breakdown
Concrete the roof at a minimum thickness of 5cm (at least 5cm on top of highest corrugation in case of steel roof),
reinforced with steel mesh # 15x15, dia. 6mm
M2
350
185.00
SR
64,750.00
Unit Rate
V.1.6.1.4
Breakdown
Supply workshops insulator aqueous and thermal system urinary (polyurethane) foam thickness and average 4cm and the
intensity of 40-45 kg/m3 directly above the face of the bishop concrete or top slalom surfaces metal or insulation layer old
reformed, with the WORK and vertical height of 20cm on all Aldoara vertical surrounding bishop. Maintain proper slopes
during the application of waterproofing material towards the drain
M2
250
195.00
SR
48,750.00
Unit Rate
V.1.6.1.5
Breakdown
supply and paint with 3 layers of paint, Acrylic Foam Type Shield thickness of each layer after drought 300 microns with
the WORK of arming the network for paint textured fiber weight of 160 g/m2 to strengthen the Paint
M2
170
44.00
SR
7,480.00
Unit Rate
V.1.6.1.6
Breakdown
Supply and install Thermoplastic Single Ply Roofing Membrane, 1.5 mm thick, 1500 WMR UV PVC waterproofing
membrane, including wall corners
M2
170
115.00
SR
19,550.00
Unit Rate
V.1.6.1.7
Breakdown
Supply and install 40 x 40 cm cement tiles
M2
170
82.00
SR
13,940.00
Unit Rate
V.1.6.1.8
Breakdown
Supply and install 60 x 60 cm cement tiles
M2
170
195.00
SR
33,150.00
Unit Rate
V.1.6.1.9
Breakdown
Supply and Install 50 mm thick thermal insulation
M2
350
145.00
SR
50,750.00
Unit Rate
V.1.6.1.10
Breakdown
Carry out waterproofing paint (acrylic) on sloping deck sheeted roof using fiber mesh to reinforce the overlapping of steel
corrugated sheets and polyurethane sealant on fixing screws, implementation conform to the COMPANY specifications and
the technical procedure indicated in material catalogs
M2
350
165.00
SR
57,750.00
Unit Rate
V.1.6.1.11
Breakdown
Prevent leakage of water from the passing through external cable openings as per Item 5.1.6.1.8. of Schedule B
M2
170
145.00
SR
24,650.00
Unit Rate
V.1.6.1.12
Breakdown
Prevent leakage of water from dilation joints or cracks of the basement or cable trenches as per Item 5.1.6.1.9. of
Schedule B
M2
350
145.00
SR
50,750.00
Unit Rate
V.1.6.1.13
Breakdown
Opening dilation joints every 5m in all directions 1.5cm thick & 2.0 cm depth to fill with polyurethane sealant
M
250
65.00
SR
16,250.00
Unit Rate
V.1.6.1.14
Breakdown
Supply and install Aluminum sheet Gutter to drain the water
M
100
75.00
SR
7,500.00
Unit Rate
V.1.6.1.15
Breakdown
Supply and install Roof Drain 100 mm schedule 80
M
100
167.00
SR
16,700.00
Unit Rate
V.1.6.1.16
Breakdown
Supply and install roof Dom and concrete splash down
M3
35
185.00
SR
6,475.00
Unit Rate
V.1.6.1.17
Breakdown
Supply and install new flushing on roof parapet. With sealant
M
100
85.00
SR
8,500.00
Unit Rate
V.1.6.1.18
Breakdown
Supply and install water ingress insulation at basement as per Sec-Standard
M2
70
185.00
SR
12,950.00
Unit Rate
Supply and install Insu-wrap PVC waterproofing membrane (2000 Flee Back-UV) ultra violet membrane
M2
100
185.00
SR
18,500.00
Unit Rate
L
1,600
45.00
SR
72,000.00
Unit Rate
V.1.6.1.19
V.1.6.2
Breakdown
Description
MAINTENANCE
CIVIL WORK
Long Description
Breakdown
Supply and refill the joints with flexible and waterproof materials such as polyurethane, or flexible epoxy compounds
V.1.6.2.2
Breakdown
Supply and install metal or rubber covers to protect the joints from future damage
V.1.6.2.3
Breakdown
Supply and replace the filler board for construction expansion joints as needed
V.1.6.2.4
Breakdown
V.1.6.3
V.1.6.3.1
Description
Breakdown
Currency
Total
Repair expansion joints in concrete structures as Per Item # 5.1.6.2 of Schedule "B"
V.1.6.2.1
Supply and install protective covers over the expansion joints
MAINTENANCE
CIVIL WORK
Unit Price
Payment
Type
UOM
Short Description
M
350
35.00
SR
12,250.00
Unit Rate
M2
350
75.00
SR
26,250.00
Unit Rate
M
350
75.00
SR
26,250.00
Unit Rate
M2
350
65.00
SR
22,750.00
Unit Rate
Painting Works as Per Item # 5.1.6.3 of Schedule "B"
Removal of loose old paint using all the means used in this regard and without damaging the integrity of equipment and
devices inside and outside the substation as instructed by the company representative, and repairing the deep cracks by
opening them in "V" shape to be filled with crack filler and tiny cracks by filling with Epoxy putty, And ends of this
preparatory WORK by sanding walls or floors and cleaning from dust so that it will not be allowed any scratches or
unleveled surface or for any defects that could be observed, and these WORKs should be approved by COMPANY
REPRESENTATIVE before starting the paint, and CONTRACTOR has to follow up 5-Star Safety & Health Management
System Specification of Color Coding for Plant, Pipelines, floor and walls Epoxy Paint applications as per Safety Manual
titled "1.10 Color Coding Plant and Pipelines”
BF-PA -90 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
V.1.6.3.2
Breakdown
Quantity
Removal white aunt and fill back all damage area
M2
100
35.00
SR
3,500.00
Unit Rate
Breakdown
Painting for First Aid/Emergency Equipment/Medical Supplies/Oxygen Station etc. Stacking and Storage, Stairs, Doors,
and Reflector stickers at basement
V.1.6.3.3
M2
170
44.00
SR
7,480.00
Unit Rate
V.1.6.3.4
Breakdown
Wall paint with a primer coat and a final coat, with the color to be determined by the Company Representative. The paint
must be resistant to carbon, moisture, weather factors, chemicals, acids, and oils, and must be cleanable and expandable,
with a solid content proportion of not less than 70%. The type of paint should be Acrylic Aliphatic Polyurethane Paint
M2
700
35.00
SR
24,500.00
Unit Rate
V.1.6.3.5
Breakdown
V.1.6.3.6
Breakdown
Long Description
Coating of insulators and fire protection coating for cables, with the color to be determined by the Company Standards.
The coating must be resistant to fire and heat, moisture, weather factors, chemicals, and acids
Sand blasting of steel doors as needed, followed by painting with a primer coat and a final coat of polyurethane paint with
a solid content ratio of not less than 70%
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
M
350
85.00
SR
29,750.00
Unit Rate
M2
800
35.00
SR
28,000.00
Unit Rate
Breakdown
Epoxy paint work for the flooring includes:
1. Repair of cracks of concrete floors by opening the deep cracks in the form of "V" and filling with chemical filler (CRACK
FILLER) and the hair cracks by filling with Epoxy putty.
2. Epoxy floor paint (solid content 100%) 200 microns thickness, the WORK carried on two layers at a thickness of not
less than 0.1mm each layer. And the execution in accordance with the method indicated in the catalogues, any change of
color will not be allowed, and the CONTRACTOR must respect the thickness and method of implementation instructed by
the company representative.
M2
1,000
135.00
SR
135,000.00
Unit Rate
V.1.6.3.8
Breakdown
Self-leveling painting work for flooring including:
1. Completely clean the concrete slab of any residue of glue and detachable parts, and then Repair of cracks of concrete
floors by opening the deep cracks in the form of "V" and filling with chemical filler (CRACK FILLER) and the hair cracks by
filling with Epoxy putty.
2. Apply a self-leveling paint (SELF LEVELING FLOOR PAINT) 4mm thick, including the primer coat in accordance with the
specifications of the company and method of execution indicated in the catalogues
M2
1,000
95.00
SR
95,000.00
Unit Rate
V.1.6.3.9
Breakdown
Apply self-leveling paint in accordance with the specifications of the item above but at a thickness of 3 mm
M2
170
85.00
SR
14,450.00
Unit Rate
V.1.6.3.10
Breakdown
Apply self-leveling paint in accordance with the specifications of the item above but at a thickness of 2 mm
M2
170
65.00
SR
11,050.00
Unit Rate
V.1.6.3.11
Breakdown
Apply white & Black PU on exposed steel structure foundation
M2
70
18.00
SR
1,260.00
Unit Rate
V.1.6.3.12
Breakdown
Apply cementitious cutting material at oil catch basin interior wall face
M2
350
75.00
SR
26,250.00
Unit Rate
Breakdown
Epoxy coating system for floors in substation, epoxy coating color –stone grey–ral-7030 for GIS Room, Control Room,
switchgear Room, workshop, and relay rooms.
Work required as follows:
1. 1mm epoxy past for repairing cracks and floor levelling.
2. Master Top 1200 Resin: Primer
3. Master top 1230 -2-4mm self levelling epoxy coating
M2
1,000
115.00
SR
115,000.00
Unit Rate
V.1.6.3.7
V.1.6.3.13
V.1.6.4
Description
MAINTENANCE
CIVIL WORK
Repair Works as Per Item # 5.1.6.4 of Schedule "B"
V.1.6.4.1
Breakdown
Break of foundation layer & cable trench
M3
350
365.00
SR
127,750.00
Unit Rate
V.1.6.4.2
Breakdown
Repair of minor crack in wall and plaster defects
M2
500
145.00
SR
72,500.00
Unit Rate
V.1.6.4.3
Breakdown
Repair of major wall crack in wall and plaster defects
M2
500
265.00
SR
132,500.00
Unit Rate
V.1.6.4.4
Breakdown
Seal rodent and reptile entry holes to substations.
EA
80
85.00
SR
6,800.00
Unit Rate
V.1.6.4.5
Breakdown
Reconstruct collapsed/sagged floor
M2
500
145.00
SR
72,500.00
Unit Rate
V.1.6.4.6
Breakdown
Repair of crack due to corrosion of reinforcement
M2
130
265.00
SR
34,450.00
Unit Rate
V.1.6.4.7
Breakdown
Coring in R.C.C / block walls
EA
20
120.00
SR
2,400.00
Unit Rate
V.1.6.4.8
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 4" in thick wall
EA
15
120.00
SR
1,800.00
Unit Rate
V.1.6.4.9
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 8" in thick wall
EA
15
160.00
SR
2,400.00
Unit Rate
V.1.6.4.10
Breakdown
Drilling hole on manhole/handhold wall, Reinforced concrete 12" in thick wall
EA
15
180.00
SR
2,700.00
Unit Rate
BF-PA -91 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
V.1.6.4.11
Breakdown
V.1.6.4.12
Breakdown
Install duct plug on empty duct in manhole/ hand hole
EA
25
55.00
SR
1,375.00
Unit Rate
Civil work repair of the opening of manhole/ handhole cover
EA
25
850.00
SR
21,250.00
Unit Rate
Breakdown
Exposing Buried Manhole to clear out and exposed buried manhole. The excavated excess soil shall be scraped and
leveled to the existing ground.
V.1.6.4.13
EA
35
1,350.00
SR
47,250.00
Unit Rate
V.1.6.4.14
Breakdown
Replacement of damaged manhole/handhole cover or frame
EA
15
1,350.00
SR
20,250.00
Unit Rate
V.1.6.4.15
Breakdown
Raising of Manhole & Hand Hole Roof Slab: Raise the roof slab with cover and frame 50 mm from the asphalt yard level to
prevent water infiltration
EA
7
3,650.00
SR
25,550.00
Unit Rate
V.1.6.4.16
Breakdown
Supply& install protective barrier (cement Blocks), as per COMPANY Standards
EA
7
1,350.00
SR
9,450.00
Unit Rate
V.1.6.4.17
Breakdown
Relocation only, protective barrier (cement Blocks), same site.
EA
7
650.00
SR
4,550.00
Unit Rate
V.1.6.4.18
Breakdown
Supply and install concrete splash block size (1.00 x 0.20 M).
EA
25
245.00
SR
6,125.00
Unit Rate
V.1.6.4.19
Breakdown
Supply and Install Eyewash with Shower at battery room.
EA
25
3,250.00
SR
81,250.00
Unit Rate
V.1.6.4.20
Breakdown
Supply and install first aid kit at control room.
EA
35
485.00
SR
16,975.00
Unit Rate
V.1.6.4.21
Breakdown
Supply and install cabinet stand galvanized steel with roller (500 mm x 1400 mm at battery room).
EA
35
1,850.00
SR
64,750.00
Unit Rate
V.1.6.4.22
Breakdown
Supply and Install Link Box Manhole Heavy Duty Covers: At different locations
EA
7
650.00
SR
4,550.00
Unit Rate
Supply and Repair Link Box Manhole Concrete: At different locations
EA
7
1,650.00
SR
11,550.00
Unit Rate
V.1.6.4.23
V.1.6.5
Breakdown
Description
MAINTENANCE
CIVIL WORK
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Short Description
REPAIR OF DOORS as Per Item # 5.1.6.5 of Schedule "B"
V.1.6.5.1
Breakdown
Repair of Any Defects or Damages to Substation and Dip Stations Doors: Includes skew leaves doors, hard closing doors,
repair of hinges, increasing their number, changing them in case of spoilage, dismantling door leaves, balancing door
leaves, re-erecting instantly, and any necessary materials for the repair, including welding works and assembling
EA
40
1,650.00
SR
66,000.00
Unit Rate
V.1.6.5.2
Breakdown
Repair and Re-fixing Latches or Any Type of Substation and Dip Stations Door Lock Systems: Includes welding works,
dismantling and re-erecting doors, changing latches and locks to ensure proper operation
EA
70
1,250.00
SR
87,500.00
Unit Rate
V.1.6.5.3
Breakdown
Repair and re-fix latches or any type of door lock systems for the internal doors in the substations. This includes
dismantling and re-erecting doors, changing latches, locks, and hinges to ensure proper operation
EA
70
1,250.00
SR
87,500.00
Unit Rate
V.1.6.5.4
Breakdown
Repair of Locks, Door Handle, and Arm-Closer of Substation and Dip Stations Doors: Includes replacing them in case of
spoilage as per COMPANY specifications, ensuring their operation in good condition, and necessary greasing of hinges and
locks
EA
70
1,250.00
SR
87,500.00
Unit Rate
V.1.6.5.5
Breakdown
Repair or Change Door Lock Cylinders: As per COMPANY standard
EA
80
650.00
SR
52,000.00
Unit Rate
V.1.6.5.6
Breakdown
Supply and Erect Dustproof Weather Straps for Substation External Doors: As per COMPANY specifications, including
removing worn-out existing straps
EA
50
650.00
SR
32,500.00
Unit Rate
Breakdown
Supply and Erect Anti-Panic Arm for Emergency Doors: Includes all necessary for erection as per technical code of practice
and corresponding modifications to door frames
EA
50
850.00
SR
42,500.00
Unit Rate
V.1.6.5.8
Breakdown
Supply and Apply Steel Sheet (2 mm): Includes welding work for any small part of the door damaged by corrosion and
repainting the part with the same door color
EA
50
650.00
SR
32,500.00
Unit Rate
V.1.6.5.9
Breakdown
Maintenance and Cleaning of the Roller of Shutter Rolling Doors: Includes greasing and repair of its electrical motor (for
electrical doors) and/or truss (for manual doors) gears to ensure proper operation
EA
7
3,500.00
SR
24,500.00
Unit Rate
Breakdown
Supply, Erect, and Replace Dustproof Weather Straps for Shutter Rolling Doors: Same specifications and size as initially
erected straps
EA
7
1,250.00
SR
8,750.00
Unit Rate
V.1.6.5.11
Breakdown
Supply, Erect, and Replace Worn-Out Steel Slides of Shutter Rolling Doors: Same specifications and size as existing slides,
including all necessary for dismantling damaged slides and erecting new ones
EA
35
3,500.00
SR
122,500.00
Unit Rate
V.1.6.5.12
Breakdown
Replacement of All Damaged Door Rubber: Around the door itself or around the door frame and door strap, especially
important for halls protected by firefighting systems
EA
50
1,350.00
SR
67,500.00
Unit Rate
V.1.6.5.13
Breakdown
Supply and Install Door Threshold: Outdoor/indoor type to prevent water and dust infiltration
EA
15
850.00
SR
12,750.00
Unit Rate
V.1.6.5.14
Breakdown
Supply and Install Heavy Duty Door Closer
EA
35
1,350.00
SR
47,250.00
Unit Rate
V.1.6.5.7
V.1.6.5.10
BF-PA -92 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
V.1.6.5.15
V.1.7
Line type
Short Description
Breakdown
Description
Long Description
Supply and install glass for the internal doors in the substations (6 mm thickness)
CIVIL WORKS
Total
Payment
Type
SR
127,500.00
Unit Rate
180.00
SR
30,600.00
Unit Rate
UOM
Quantity
Unit Price
M2
170
750.00
M
170
Currency
CIVIL WORK DEMOLITION AND REMOVAL SURVEYING as Per Item # 5.1.7 of Schedule "B"
V.1.7.1
Breakdown
Removal of fence including gate and all fittings.
V.1.7.2
Breakdown
Removal of concrete block walls and its structure.
M2
400
155.00
SR
62,000.00
Unit Rate
V.1.7.3
Breakdown
Removal and Disposal of Concrete Structure/Debris/Surplus Materials: Includes breaking and clearing
M3
100
150.00
SR
15,000.00
Unit Rate
M
350
3,730.00
SR
1,305,500.00
Unit Rate
Around Substations/dip stations yard Boundary and Access Roads
M3
3,200
44.00
SR
140,800.00
Unit Rate
Around Substation/dip stations yard Equipment using brooms and Bobcats or suitable loader
M3
3,200
44.00
SR
140,800.00
Unit Rate
Under or beneath disconnect platforms without damaging or loosening the ground cables or connections by using brooms
only
M3
350
65.00
SR
22,750.00
Unit Rate
Around Substations/dip stations yard Boundary and Access Roads
M3
3,200
44.00
SR
140,800.00
Unit Rate
Around Substation/dip stations yard Equipment using brooms and Bobcats or suitable loader
M3
3,200
44.00
SR
140,800.00
Unit Rate
Under or beneath disconnect platforms without damaging or loosening the ground cables or connections by using brooms
only
Removal of Accumulated Sand Inside and Outside the Surface of Manhole/Hand Hole or Its Cover: Excess soil shall be
removed and leveled to the existing ground
M3
350
65.00
SR
22,750.00
Unit Rate
M3
350
65.00
SR
22,750.00
Unit Rate
M2
100
15.00
SR
1,500.00
Unit Rate
M2
100
22.35
SR
2,235.00
Unit Rate
M3
350
92.00
SR
32,200.00
Unit Rate
M3
700
105.00
SR
73,500.00
Unit Rate
M2
170
115.00
SR
19,550.00
Unit Rate
V.1.8
V.1.8.1
V.1.8.1.1
V.1.8.2
Description
CIVIL WORKS
Description
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
Breakdown
Description
V.1.8.2.1
Breakdown
V.1.8.2.2
Breakdown
V.1.8.2.3
Breakdown
V.1.8.2.4
Breakdown
V.1.8.2.5
Breakdown
V.1.8.2.6
Breakdown
V.1.8.2.7
Breakdown
V.1.8.3
Description
V.1.8.3.1
Breakdown
V.1.8.3.2
Breakdown
V.1.8.4
V.1.8.4.1
V.1.8.5
V.1.8.5.1
V.1.8.6
V.1.8.6.1
Description
Breakdown
Description
Breakdown
Description
Breakdown
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
By Sweeping /
Pushing
By Sweeping /
Pushing
By Sweeping /
Pushing
By Loading /
Unloading
By Loading /
Unloading
By Loading /
Unloading
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
MAINTAIN THE SUBSTATIONS ACCESS ROADS AND SAND REMOVAL SURVEYING as Per Item # 5.1.8 of
Schedule "B"
SUBSTATIONS/NG FACILITIES ACCESS ROADS as Per Item # 5.1.8.1 of Schedule "B"
Design, supply and construction of 8m width service road with suitable structures which is essentially to fulfill the
requirements of service roads such as, site preparation, soil test, site survey, culverts, retaining walls, back walls, road
drain, hump, crash barriers, pavements, asphalting, curb stones, traffic signs, road marking, street lightings etc., as per
COMPANY Standards
SAND/WASTE REMOVAL as Per Item # 5.1.8.2 of Schedule "B"
SAND STABILIZATION as Per Item # 5.1.8.3 of Schedule "B"
Supply, deliver and spreading crude oil to stabilize sand at the designated locations Around Substations/dip stations yard
Boundary and Access Roads
Supply, Deliver and Spreading diluted acrylic co-polymer (e.g. Soil Cement or equivalent) to stabilize sand at the
designated locations Around Substations/dip stations yard Boundary and Access Roads
SAND BACKFILLING as Per Item # 5.1.8.4 of Schedule "B"
Supply, deliver and backfilling sand areas at designated locations Around Substations/dip stations yard Boundary and
Access Roads
SUPPLY, SPREADING AND COMPACTION OF MARL as Per Item # 5.1.8.5 of Schedule "B"
Supply, deliver, spreading and compacting marl at designated locations Around Substations/dip stations yard Boundary
and Access Roads
SUB-GRADING AND LEVELING as Per Item # 5.1.8.6 of Schedule "B"
Sub-grading preparation prior to placing marl Around Substations/dip stations yard Boundary and Access Roads
BF-PA -93 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
V.1.8.7
Line type
Short Description
Description
MAINTAIN THE
SUBSTATIONS
ACCESS ROADS
AND SAND
REMOVAL
V.1.8.7.1
Breakdown
V.1.8.7.2
Breakdown
V.2
Description
V.2.1
Description
MECHANICAL
WORKS
MECHANICAL
WORKS
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
Take Samples to test quality of marl and take three (3) samples after compaction is completed to test quality and
strength of compaction
EA
7
350.00
SR
2,450.00
Unit Rate
Take an additional marl compaction sample
EA
2
350.00
SR
700.00
Unit Rate
Long Description
MARL QUALITY AND COMPACTION TESTS as Per Item # 5.1.8.7 of Schedule "B"
MECHANICAL WORKS as Per Item # 5.2 of Schedule "B"
DEWATERING as Per Item # 5.2.1 of Schedule "B"
V.2.1.1
Breakdown
Direct pumping to approve location by municipality
M3
350
10.55
SR
3,692.50
Unit Rate
V.2.1.2
Breakdown
Pump and transport using tankers
EA
170
190.00
SR
32,300.00
Unit Rate
Breakdown
Remove water from the substation rooms using specialized electrical equipment that complies with company safety
regulations
M3
130
15.75
SR
2,047.50
Unit Rate
V.2.1.4
Breakdown
Remove water from on/under the cables, trenches, manholes, handholes, conduits, link box manholes, and dip station at
various locations
EA
7
450.00
SR
3,150.00
Unit Rate
V.2.1.5
Breakdown
Clean the power transformer oil retention pit using special materials designed to contain and absorb spilled oils, in
accordance with the company's specifications
EA
35
285.00
SR
9,975.00
Unit Rate
V.2.1.6
Breakdown
Remove and clean oil from trenches, manholes, conduits, tunnels, and dip station at various locations
M3
70
185.00
SR
12,950.00
Unit Rate
V.2.1.3
V.2.2
Description
MECHANICAL
WORKS
PIPE WORKS as Per Item # 5.2.2 of Schedule "B"
V.2.2.1
Breakdown
Supply, install and lay PVC conduit, 100-150 MM I.D., excavation not included
M
350
49.50
SR
17,325.00
Unit Rate
V.2.2.2
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (0.5" - 1.0")
M
7
45.50
SR
318.50
Unit Rate
V.2.2.3
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (1.5" - 2.0")
M
7
63.00
SR
441.00
Unit Rate
V.2.2.4
Breakdown
Supply, install, and lay Steel pipes, including delivery to the site of steel pipes size (3.0")
M
7
91.00
SR
637.00
Unit Rate
V.2.2.5
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (0.5" - 1.0")
M
250
30.80
SR
7,700.00
Unit Rate
V.2.2.6
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (1.5" - 3.0")
M
200
49.00
SR
9,800.00
Unit Rate
V.2.2.7
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for cold water size (4" - 6")
M
70
69.30
SR
4,851.00
Unit Rate
V.2.2.8
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (0.5" - 1.0")
M
250
30.80
SR
7,700.00
Unit Rate
V.2.2.9
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (1.5" - 3.0")
M
100
49.00
SR
4,900.00
Unit Rate
V.2.2.10
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for hot water size (4" - 6")
M
130
69.30
SR
9,009.00
Unit Rate
V.2.2.11
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for sewage water size (4")
M
170
77.00
SR
13,090.00
Unit Rate
V.2.2.12
Breakdown
Supply, install, and lay plastic pipes, including delivery to the site of PVC pipes for sewage water size (6")
M
250
105.00
SR
26,250.00
Unit Rate
V.2.2.13
Breakdown
Lay PVC Conduit only
M
130
135.00
SR
17,550.00
Unit Rate
V.2.2.14
Breakdown
Lay Steel pipes only
M
7
185.00
SR
1,295.00
Unit Rate
Lay Plastic pipes only
M
70
125.00
SR
8,750.00
Unit Rate
EA
5
3,500.00
SR
17,500.00
Unit Rate
V.2.2.15
V.2.3
V.2.3.1
Breakdown
Description
Breakdown
MECHANICAL
WORKS
REPAIR OF WATER PUMPS as Per Item # 5.2.3 of Schedule "B"
Maintenance of electrical water pumps and replacement of faulty spare parts and damaged electrical wiring to ensure they
operate in good condition
BF-PA -94 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Quantity
Unit Price
Currency
Total
Payment
Type
Long Description
UOM
Maintenance of electrical oil pumps and replacement of faulty spare parts and damaged electrical wiring to ensure they
operate in good condition
EA
5
3,500.00
SR
17,500.00
Unit Rate
15
4,500.00
SR
67,500.00
Unit Rate
15
4,500.00
SR
67,500.00
Unit Rate
V.2.3.2
Breakdown
V.2.3.3
Breakdown
Supply and install Water transfer pump -Set-WTP 01 Motor Class F Insulation and 1 ph. x 230 volts, 60 Hz, 3450 RPM
EA
V.2.3.4
Breakdown
Supply and install Water transfer pump -Set-WTP 01 Motor Class F Insulation and 1 ph. x 230 volts, 60 Hz, 3450 RPM
EA
V.2.3.5
Breakdown
Supply and install Water Booster pump set-WBP 01 (3 ph. x 380 volts, 60 Hz, 3450 RPM)
EA
7
7,500.00
SR
52,500.00
Unit Rate
V.2.3.6
Breakdown
Supply and install Basement sump pump SP-01 01 (Submersible motor IP 68, Class F rating 1.10 kw (1.5 HP), 1 PH x22
volts,60 Hz, and 3450 RPM
EA
15
4,800.00
SR
72,000.00
Unit Rate
V.2.3.7
Breakdown
Supply and installation of Transfer sump pit pump TPP-01 (TEFC Motor IP 54, Class F rating 4.00 kw (5.50 HP),1 ph. x 230
Volts, 60 Hz and 1750 RPM
EA
15
15,000.00
SR
225,000.00
Unit Rate
V.2.3.8
Breakdown
Supply and install Booster pump for domestic water one (1) Horsepower with pressurized tank
EA
7
4,800.00
SR
33,600.00
Unit Rate
Breakdown
Supply and install transformer pit pump having the following mechanical and electrical data:
1. Mechanical Data: Discharge Rate shall be 4 L/s (63.41gpm), 1750 rpm TEFC Enclosure
2. Electrical Data: 220volts/1-phase /60Hz, manually operated with auto stop
EA
15
4,800.00
SR
72,000.00
Unit Rate
M2
400
357.75
SR
143,100.00
Unit Rate
351.13
SR
140,450.00
Unit Rate
V.2.3.9
V.2.4
Description
MECHANICAL
WORKS
METALLIC WORKS as Per Item # 5.2.4 of Schedule "B"
V.2.4.1
Breakdown
Supply and erect 0.7 mm thick corrugated steel sheets (sandwich panel with 50 mm polystyrene foam), including all fixing
and erecting accessories, ridges, overlaps, and gutters. This also includes bottom-side insulation with a 2 cm thick rock
wool layer, compliant with U.S. standard ASTM C 168-80, covered on both sides with aluminum foil, and installation of
lightweight metal mesh to secure and protect the insulation
V.2.4.2
Breakdown
Supply and erect double corrugated sheets for the surrounding wall between the block wall and the ceiling (external and
internal sheets), with rock wool insulation and tubes in between. This includes all fixings, assembly, and the top and
bottom “U” channels. Alternatively, ready-made sandwich corrugated sheet panels may be used. Transparent corrugated
sheets should be erected between every two columns to increase natural illumination, with no insulation required behind
the transparent sheets
M2
400
V.2.4.3
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 200 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
1,358.30
SR
20,374.50
Unit Rate
V.2.4.4
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 250 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
1,697.88
SR
25,468.13
Unit Rate
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 300 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
2,037.45
SR
30,561.75
Unit Rate
V.2.4.6
Breakdown
Supply and install 6-meter-long "I" or "H" steel beams 350 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
2,378.50
SR
35,677.50
Unit Rate
V.2.4.7
Breakdown
Supply and install 6-meter-long “U” steel beams 100 x 50 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
893.00
SR
13,395.00
Unit Rate
Breakdown
Supply and install 6-meter-long “U” steel beams 200 x 100 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
1,358.30
SR
20,374.50
Unit Rate
V.2.4.9
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 100 x 50 x 5 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
628.50
SR
9,427.50
Unit Rate
V.2.4.10
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 80 x 40 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
513.00
SR
7,695.00
Unit Rate
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 50 x 50 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
377.18
SR
5,657.70
Unit Rate
V.2.4.12
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 20 x 40 x 3 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
227.00
SR
3,405.00
Unit Rate
V.2.4.13
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 100 x 100 x 5 mm cross-section, including painting, welding,
and all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
1,257.00
SR
18,855.00
Unit Rate
Breakdown
Supply and install 6-meter-long “☐” “Square” steel tubes 80 x 80 x 5 mm cross-section, including painting, welding, and
all necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
1,026.00
SR
15,390.00
Unit Rate
V.2.4.15
Breakdown
Supply and install 6-meter-long "L" shape steel angles 100 x 100 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
1,131.92
SR
16,978.75
Unit Rate
V.2.4.16
Breakdown
Supply and install 6-meter-long "L" shape steel angles 50 x 50 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
565.96
SR
8,489.38
Unit Rate
V.2.4.17
Breakdown
Supply and install 6-meter-long "L" shape steel angles 40 x 40 mm cross-section, including painting, welding, and all
necessary work and parts for fixing and erection, according to COMPANY specifications
EA
15
485.00
SR
7,275.00
Unit Rate
V.2.4.18
Breakdown
Supply and install 6-meter-long flat bars 60 mm width and 6 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
15
452.77
SR
6,791.50
Unit Rate
V.2.4.5
V.2.4.8
V.2.4.11
V.2.4.14
BF-PA -95 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
UOM
Quantity
Unit Price
Currency
Total
Payment
Type
V.2.4.19
Breakdown
Supply and install 6-meter-long flat bars 40 mm width and 4 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
15
420.00
SR
6,300.00
Unit Rate
V.2.4.20
Breakdown
Supply and install 6-meter-long flat bars 30 mm width and 3 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
15
387.00
SR
5,805.00
Unit Rate
Breakdown
Supply and install 6-meter-long flat bars 20 mm width and 2 mm thickness, including painting, welding, and all necessary
work and parts for fixing and erection, according to COMPANY specifications
EA
15
290.25
SR
4,353.75
Unit Rate
V.2.4.22
Breakdown
Supply and install 6-meter-long flat sheet 20 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
15
11,515.00
SR
172,725.00
Unit Rate
V.2.4.23
Breakdown
Supply and install 6-meter-long flat sheet 14 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
15
8,025.25
SR
120,378.75
Unit Rate
Breakdown
Supply and install 6-meter-long flat sheet 10 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
15
5,757.50
SR
86,362.50
Unit Rate
V.2.4.25
Breakdown
Supply and install 6-meter-long flat sheet 6 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
15
3,554.38
SR
53,315.63
Unit Rate
V.2.4.26
Breakdown
Supply and install 6-meter-long flat sheet 3 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
15
1,777.19
SR
26,657.81
Unit Rate
V.2.4.27
Breakdown
Supply and install 6-meter-long flat sheet 2 mm thickness, including painting, welding, and all necessary work and parts
for fixing and erection, according to COMPANY specifications
EA
15
1,480.99
SR
22,214.84
Unit Rate
V.2.4.28
Breakdown
Supply, install and replace 10 mm thick checkered plates inside the substation. This includes supplying the checkered
plates, cutting to size, fabricating and fitting lifting handles, welding frames and supports, painting, and removing and
returning unwanted old plates to the store, as per COMPANY Standards
M2
100
519.95
SR
51,995.00
Unit Rate
V.2.4.29
Breakdown
Supply and install permanent steel access ladders (Emergency) fixed to the walls with safety cages, as per company
standard TA-800049, for accessing the roof. The design should conform to the standards followed in the transmission
substations
M
50
395.00
SR
19,750.00
Unit Rate
V.2.4.30
Breakdown
Supply and install steel channel supports for checkered plates or equipment in a substation room
M
35
185.00
SR
6,475.00
Unit Rate
V.2.4.31
Breakdown
Remove the existing chain link fencing, including the frame, and return it to the company scrub store. Supply and erect
expanded meshes at least 3 mm thick with proper steel supports and frame as required, and paint according to galvanized
paint specifications
M2
250
185.00
SR
46,250.00
Unit Rate
V.2.4.32
Breakdown
Supply and install steel grating for the transformer oil catch basin
M2
35
285.00
SR
9,975.00
Unit Rate
V.2.4.33
Breakdown
Supply and install hot-dip steel bridge over power cables in the cable room or Substation Basement
M2
35
135.00
SR
4,725.00
Unit Rate
V.2.4.34
Breakdown
Supply and install hot-dip galvanized steel Unistrut supports routing outgoing feeders
M2
35
135.00
SR
4,725.00
Unit Rate
V.2.4.35
Breakdown
Supply and install anchor bolts for fixing equipment structures, type-3, as per SEC Standard
EA
15
45.00
SR
675.00
Unit Rate
V.2.4.36
Breakdown
Supply, install and repair ladders at manholes different locations
M
15
235.00
SR
3,525.00
Unit Rate
V.2.4.37
Breakdown
Repair the existing car parking shed to adjust the top cloth and align with required welding and grinding
M2
50
185.00
SR
9,250.00
Unit Rate
Breakdown
Supply and install bollard post barriers with chains, including steel poles with concrete foundation, excavation, backfilling,
grounding, and re-asphalting as per NG standards. The poles and chains should maintain a 1.5 to 2 meters distance and
include yellow and black painting
EA
15
1,250.00
SR
18,750.00
Unit Rate
Supply and install air holes for ventilation fans, with fans installed at manholes in various locations
EA
15
1,650.00
SR
24,750.00
Unit Rate
V.2.4.21
V.2.4.24
V.2.4.38
V.2.4.39
V.2.5
Breakdown
Description
MECHANICAL
WORKS
AIR CONDITIONING WORK as Per Item # 5.2.5 of Schedule "B"
V.2.5.1
Breakdown
Supply and install new window air-conditioning units (12,000 BTU/1.5 HP/1 Ton) capacity
EA
3
1,650.00
SR
4,950.00
Unit Rate
V.2.5.2
Breakdown
Supply and install new window air-conditioning units (18,000 BTU/2.0 HP/1.5 Ton) capacity
EA
3
1,900.00
SR
5,700.00
Unit Rate
V.2.5.3
Breakdown
Supply and install new window air-conditioning units (24,000 BTU/2.5 HP/2 Ton) capacity
EA
3
2,200.00
SR
6,600.00
Unit Rate
V.2.5.4
Breakdown
Supply and install new split-type air-conditioning units (12,000 BTU/1.5 HP/1 Ton) capacity
EA
3
2,300.00
SR
6,900.00
Unit Rate
V.2.5.5
Breakdown
Supply and install new split-type air-conditioning units (18,000 BTU/2.0 HP/1.5 Ton) capacity
EA
7
2,800.00
SR
19,600.00
Unit Rate
V.2.5.6
Breakdown
Supply and install new split-type air-conditioning units (24,000 BTU/2.5 HP/2 Ton) capacity
EA
7
2,900.00
SR
20,300.00
Unit Rate
BF-PA -96 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
V.2.5.7
Breakdown
V.2.5.8
Breakdown
Supply and install new split-type air-conditioning units (30,000 BTU/3 HP/2.5 Ton) capacity
EA
7
3,400.00
SR
23,800.00
Unit Rate
Supply and install new split-type air-conditioning units (36,000 BTU/3.5 HP/3 Ton) capacity
EA
5
4,000.00
SR
20,000.00
Unit Rate
V.2.5.9
Breakdown
Manufacturing supply and erect metal ducts for air conditioned, ducts shall be made of galvanized metal sheets (density
24Kg/sq. m) according to SMACANA & ASHRAE specifications, ducts will be externally insulated with fiberglass, wrapped
with aluminum foil, and then covered with galvanized metal sheets of the same specifications, and fitted with means for
suspension, fixations and air outlets
M
70
467.00
SR
32,690.00
Unit Rate
V.2.5.10
Breakdown
Dismantle the louvered steel sunshade transformer roofs. This item includes all necessary measures to carry out the job
without harming or damaging any components of the roof
M2
100
235.00
SR
23,500.00
Unit Rate
V.2.5.11
Breakdown
Re-erect the dismantled louvered steel sunshade transformer roofs. This item includes all necessary measures for
reinstatement
M2
100
235.00
SR
23,500.00
Unit Rate
V.2.5.12
Breakdown
Replace defective duct dampers and damper motors according to COMPANY standards
EA
35
875.00
SR
30,625.00
Unit Rate
V.2.5.13
Breakdown
Repair duct mechanical protection (cladding) according to SMACNA specifications
EA
35
475.00
SR
16,625.00
Unit Rate
Repair duct access door
EA
35
576.00
SR
20,160.00
Unit Rate
V.2.5.14
V.2.6
Breakdown
Description
MECHANICAL
WORKS
Long Description
Unit Price
Currency
Payment
Type
UOM
Short Description
Total
SCAFFOLDING as Per Item # 5.2.6 of Schedule "B"
Breakdown
Supply, Erection & Dismantling of Fixed Type Scaffolding with sufficient working Platforms for inside/outside any facilities
of the Sub-station building or equipment.
M3
350
105.00
SR
36,750.00
Unit Rate
V.2.6.2
Breakdown
Supply, Erection & Dismantling of Mobile Type Scaffolding with sufficient working Platforms for inside/outside any facilities
of the Sub-station building or equipment.
M3
200
105.00
SR
21,000.00
Unit Rate
V.2.6.3
Breakdown
Supply, mobilize and demobilize pipe with 1 m length
EA
3
6.50
SR
19.50
Unit Rate
V.2.6.4
Breakdown
Supply, mobilize and demobilize pipe with 2 m length
EA
3
8.50
SR
25.50
Unit Rate
V.2.6.5
Breakdown
Supply, mobilize and demobilize pipe with 3 m length
EA
3
11.50
SR
34.50
Unit Rate
V.2.6.6
Breakdown
Supply, mobilize and demobilize pipe with 4 m length
EA
3
13.50
SR
40.50
Unit Rate
V.2.6.7
Breakdown
Supply, mobilize and demobilize pipe with 6 m length
EA
3
15.50
SR
46.50
Unit Rate
V.2.6.8
Breakdown
Supply, mobilize and demobilize Wooden Plank with 2 m length
EA
2
6.50
SR
13.00
Unit Rate
V.2.6.9
Breakdown
Supply, mobilize and demobilize Wooden Plank with 3 m length
EA
2
8.50
SR
17.00
Unit Rate
V.2.6.10
Breakdown
Supply, mobilize and demobilize Wooden Plank with 4 m length
EA
2
11.50
SR
23.00
Unit Rate
V.2.6.11
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 3 m length
EA
3
13.50
SR
40.50
Unit Rate
V.2.6.12
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 4 m length
EA
3
15.50
SR
46.50
Unit Rate
V.2.6.13
Breakdown
Supply, mobilize and demobilize Fiber Glass Ladder with 6 m length
EA
3
350.00
SR
1,050.00
Unit Rate
V.2.6.14
Breakdown
Supply, mobilize and demobilize Base Plate
EA
3
6.50
SR
19.50
Unit Rate
V.2.6.15
Breakdown
Supply, mobilize and demobilize Adjustable Base Plate
EA
3
6.50
SR
19.50
Unit Rate
V.2.6.16
Breakdown
Supply, mobilize and demobilize Double Coupler
EA
7
8.50
SR
59.50
Unit Rate
V.2.6.17
Breakdown
Supply, mobilize and demobilize Universal Coupler
EA
7
8.50
SR
59.50
Unit Rate
V.2.6.18
Breakdown
Supply, mobilize and demobilize Putlog Coupler
EA
7
8.50
SR
59.50
Unit Rate
V.2.6.19
Breakdown
Supply, mobilize and demobilize Swivel Coupler
EA
7
8.50
SR
59.50
Unit Rate
V.2.6.20
Breakdown
Supply, mobilize and demobilize End to End Coupler
EA
7
8.50
SR
59.50
Unit Rate
V.2.6.1
BF-PA -97 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
V.2.6.21
Breakdown
V.2.6.22
Breakdown
Supply, mobilize and demobilize C- Clamp
EA
5
8.50
SR
42.50
Unit Rate
Supply, mobilize and demobilize Beam Clamp
EA
5
8.50
SR
42.50
Unit Rate
V.2.6.23
Breakdown
Supply, mobilize and demobilize Reveal Pin
EA
7
8.50
SR
59.50
Unit Rate
V.2.6.24
Breakdown
Supply, mobilize and demobilize Chain blocks
EA
3
450.00
SR
1,350.00
Unit Rate
V.2.6.25
Breakdown
Supply, mobilize and demobilize Metal/fabric Slings, hooks
EA
7
250.00
SR
1,750.00
Unit Rate
V.2.6.26
Breakdown
Supply, mobilize and demobilize approved Electrical cables extensions
EA
3
280.00
SR
840.00
Unit Rate
V.2.6.27
Breakdown
Supply, mobilize and demobilize Lighting
EA
2
320.00
SR
640.00
Unit Rate
V.2.6.28
Breakdown
Supply, mobilize and demobilize medium dumping container
EA
2
350.00
SR
700.00
Unit Rate
V.2.6.29
Breakdown
Supply, mobilize and demobilize large dumping container
EA
2
520.00
SR
1,040.00
Unit Rate
V.2.6.30
Breakdown
Provide load test certificates
EA
7
1,500.00
SR
10,500.00
Unit Rate
V.2.6.31
Breakdown
Provide inspection certificates
EA
7
1,500.00
SR
10,500.00
Unit Rate
M2
50
860.00
SR
43,000.00
Unit Rate
EA
7
385.00
SR
2,695.00
Unit Rate
M2
80
786.00
SR
62,880.00
Unit Rate
M2
80
860.00
SR
68,800.00
Unit Rate
EA
70
185.00
SR
12,950.00
Unit Rate
EA
70
185.00
SR
12,950.00
Unit Rate
EA
70
135.00
SR
9,450.00
Unit Rate
V.2.7
Description
V.2.7.1
Breakdown
V.2.7.2
Breakdown
V.2.7.3
Breakdown
V.2.7.4
Breakdown
V.3
Description
V.3.1
Description
MECHANICAL
WORKS
Long Description
Currency
Total
FIRE ZONING as Per Item # 5.2.7 of Schedule "B"
Closing the space between bus-ducts and the wall opening with COMPANY-approved fire-resistant material (sandwich
type) to prevent fire from spreading through the opening (complying with COMPANY-approved fire zoning procedures).
The gap closure should be designed to be easily removable and re-fixable for bus duct maintenance
ELECTRICAL
WORKS
ELECTRICAL
WORKS
Unit Price
Payment
Type
UOM
Short Description
Sealing the cable openings from both sides (or one side in case of a panel on top) with COMPANY-approved fire-resistant
sealant (3cm thick and 3cm deep). The remaining gap on the face shall be filled with HPM mortar (3cm deep) or any
equivalent approved material, and the gap between the two faces of the opening shall be filled with rock wool insulation
(minimum density 120kg/m³, melting point 1000°C)
Coating the cables in the substation basement with COMPANY-approved fire-resistant paint at a minimum thickness of
1.5mm (2kg/m²) as instructed by COMPANY representative. Bunched control cables must be painted with COMPANYapproved fire-resistant paint at a minimum thickness of 1.5mm (2kg/m²)
Sealing the power cable tunnels: one side of the tunnel must be sealed in a “sandwich” type sealing with two Fire Stop
Mortar layers (generally reinforced) of at least 5cm thick, intercalated with rock wool (5cm thick). PVC pipes must be
provided around the passing cables to maintain a gap of at least 3cm, to be removed after mortar setting. These gaps
must be sealed from both sides with COMPANY-approved fire-resistant sealant (3cm thick and 3cm deep), and the gap
between the two faces of the opening shall be filled with rock wool insulation (minimum density 120kg/m³, melting point
1000°C)
ELECTRICAL WORKS as Per Item # 5.3 of Schedule "B"
LIGHTING SYSTEM WORK as Per Item # 5.3.1 of Schedule "B"
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V” and crisscross
aluminum slide diffuser, to be installed in the false ceiling, different size (60 x 120), rapid start type
V.3.1.1
Breakdown
V.3.1.2
Breakdown
V.3.1.3
Breakdown
V.3.1.4
Breakdown
Supply and install a fluorescent lamp, 2x40 Watt, with a prismatic cover, rapid start type
EA
15
67.50
SR
1,012.50
Unit Rate
V.3.1.5
Breakdown
Supply and install a halogen spotlight, 250 Watt
EA
20
1,500.00
SR
30,000.00
Unit Rate
V.3.1.6
Breakdown
Repair, clean, and supply sodium lamp, 250/400-Watt flood light bulbs
EA
15
1,500.00
SR
22,500.00
Unit Rate
V.3.1.7
Breakdown
Supply and replace outside lighting pole fixture cover
EA
70
475.00
SR
33,250.00
Unit Rate
V.3.1.8
Breakdown
Supply, install, and operate a globe with a normal lamp, 100 Watt
EA
35
175.00
SR
6,125.00
Unit Rate
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V” and crisscross
aluminum slide diffuser, to be installed in the false ceiling, different size (60 x 60 cm), rapid start type
Supply and install a fluorescent lamp, 4x40 Watt, with an aluminum reflector in the shape of a “V”, to be installed in the
false ceiling, size 60 x 120 cm, rapid start type. The light diffuser must be impervious and have a protection factor of at
least IP40
BF-PA -98 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
Supply and install a complete set of apparent emergency LED lights, operational for six to seven hours after DC shutdown.
The emergency unit includes a nickel-cadmium battery, a battery charger, an electronic frequency transformer, a
transformation detector, a plug, and a switch to check the battery. The emergency light unit operates on 220 V/60 Hz,
2x20 Watt, normal start at current shutdown
Unit Price
Currency
Total
Payment
Type
UOM
Quantity
ST
35
650.00
SR
22,750.00
Unit Rate
EA
20
275.00
SR
5,500.00
Unit Rate
EA
15
1,200.00
SR
18,000.00
Unit Rate
V.3.1.9
Breakdown
V.3.1.10
Breakdown
V.3.1.11
Breakdown
V.3.1.12
Breakdown
Supply and install LED light panel, 60 x 60 cm, white, operates on 220 V/60 Hz 70 Watt
EA
70
480.00
SR
33,600.00
Unit Rate
V.3.1.13
Breakdown
Supply and install LED tube light with frame, operates on 220 V/60 Hz, 2x40 Watt, size 10 x 120 cm
EA
70
285.00
SR
19,950.00
Unit Rate
V.3.1.14
Breakdown
Supply and install LED Floodlight, 250 Watt, white, for outdoor substation buildings
EA
70
985.00
SR
68,950.00
Unit Rate
V.3.1.15
Breakdown
Supply and install LED spotlight, 400 Watt, white, for outdoor substation buildings
EA
70
985.00
SR
68,950.00
Unit Rate
V.3.1.16
Breakdown
Supply and install LED spotlight, 400 Watt, white, ceiling-mounted for GIS room
EA
70
1,200.00
SR
84,000.00
Unit Rate
V.3.1.17
Breakdown
Supply and install LED bulb light, 20 Watt, white for DC lighting system
EA
70
120.00
SR
8,400.00
Unit Rate
V.3.1.18
Breakdown
Supply and install LED explosion-proof lighting fixture, operates on 220 V/60 Hz, 2x40 Watt, size 10 x 120 cm for the
battery room
EA
15
450.00
SR
6,750.00
Unit Rate
V.3.1.19
Breakdown
Supply and install explosion-proof lighting/exit lighting (Green Color) fixtures in the battery room
EA
10
360.00
SR
3,600.00
Unit Rate
V.3.1.20
Breakdown
Supply and install explosion-proof entrance/exit lighting fixtures in the battery room
EA
10
360.00
SR
3,600.00
Unit Rate
V.3.1.21
Breakdown
Supply and install explosion-proof emergency lighting fixtures for the battery room
EA
10
360.00
SR
3,600.00
Unit Rate
V.3.1.22
Breakdown
Supply and install explosion-proof DC lighting fixtures for the battery room
EA
10
360.00
SR
3,600.00
Unit Rate
V.3.1.23
Breakdown
Provide and install temporary explosion-proof lighting fixtures at dip stations and manholes at different locations
D
2
850.00
SR
1,700.00
Unit Rate
V.3.1.24
Breakdown
Supply and install lighting for steel monopoles as per SEC standard drawing
EA
35
1,200.00
SR
42,000.00
Unit Rate
V.3.1.25
Breakdown
Supply and install high bay LED light, pendent type, at the GIS buildings.
EA
15
850.00
SR
12,750.00
Unit Rate
V.3.2
Description
Supply and install an emergency EXIT LED light unit (Green Color), operational for three hours after DC shutdown, to be
mounted on the ceiling or wall with a frame. The emergency EXIT unit includes a nickel-cadmium battery, a battery
charger, an electronic frequency transformer, a transformation detector, a plug, and a switch to check the battery. The
diffusing cover is transparent with an EXIT sign. The emergency EXIT light unit operates on 220 V/60 Hz, 1x8 Watt,
normal start at current shutdown
Supply and install a sodium projector, 250 Watt, for outside lighting, fixed to allow orientation to light the front of the
building. Includes all necessary components for installation, testing, and operation as per COMPANY Representative's
instructions
ELECTRICAL
WORKS
INSTALLATIONS WORKS as Per Item # 5.3.2 of Schedule "B"
V.3.2.1
Breakdown
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, single
switch, fixed 1.5 m above the tile floor level
EA
20
41.85
SR
837.00
Unit Rate
V.3.2.2
Breakdown
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, double
switch, fixed 1.5 m above the tile floor level
EA
20
83.70
SR
1,674.00
Unit Rate
Breakdown
Supply and install a PHENOL compound light switch with a Bakelite cover, at least 20 Amp, installed in the wall, triple
switch, fixed 1.5 m above the tile floor level
EA
20
125.55
SR
2,511.00
Unit Rate
V.3.2.4
Breakdown
Supply and install a PHENOL compound switch for A/Cs and water heaters with a Bakelite cover, at least 30 Amp, with a
warning light, fixed 1.5 m above the tile floor level
EA
15
125.55
SR
1,883.25
Unit Rate
V.3.2.5
Breakdown
Supply and erect fixtures that work automatically with a photocell, including all accessories and providing a DC source to
power the photocell
EA
20
326.00
SR
6,520.00
Unit Rate
V.3.2.6
Breakdown
Supply and install a 220 V/13 Amp outlet, equipped with a switch, and a male plug, installed in the floor or wall at the
proper height from the tile level. Outlets for ventilating fans and emergency lights will be installed beside the unit
concerned
EA
15
185.00
SR
2,775.00
Unit Rate
V.3.2.7
Breakdown
Supply and install a 220 V/13 Amp explosion-proof outlet, equipped with a switch, and a male plug, installed in the floor
or wall at the proper height from the tile level. Outlets for ventilating fans and emergency lights will be installed beside
the unit concerned
EA
15
185.00
SR
2,775.00
Unit Rate
V.3.2.8
Breakdown
Supply and install a telephone outlet made of thick Bakelite or cast iron coated with non-glossy chrome, fixed on a proper
box at the height of common outlets
EA
3
83.70
SR
251.10
Unit Rate
V.3.2.3
BF-PA -99 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Quantity
EA
3
83.70
SR
251.10
Unit Rate
3
4,850.00
SR
14,550.00
Unit Rate
5
4,850.00
SR
24,250.00
Unit Rate
Long Description
Unit Price
Currency
Total
Payment
Type
UOM
Supply and install a LAN outlet made of thick Bakelite or cast iron coated with non-glossy chrome, fixed on a proper box at
the height of common outlets
V.3.2.9
Breakdown
V.3.2.10
Breakdown
Supply and install temporary power supply at dip stations and manholes at different locations
EA
V.3.2.11
Breakdown
Supply, install, and operate an 50 liter electrical water heater that heats water pipes without a tank as per specifications
EA
V.3.2.12
Breakdown
Supply, install, and operate an 100 liter electrical water heater that heats water pipes without a tank as per specifications
EA
5
6,580.00
SR
32,900.00
Unit Rate
V.3.2.13
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x25+16 mm
M
170
185.00
SR
31,450.00
Unit Rate
V.3.2.14
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x35+16 mm
M
170
225.00
SR
38,250.00
Unit Rate
V.3.2.15
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x50+16 mm
M
170
245.00
SR
41,650.00
Unit Rate
V.3.2.16
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x50+25 mm
M
170
255.00
SR
43,350.00
Unit Rate
V.3.2.17
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x70+16 mm
M
170
287.00
SR
48,790.00
Unit Rate
V.3.2.18
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x120+16 mm
M
170
305.00
SR
51,850.00
Unit Rate
V.3.2.19
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x185+16 mm
M
170
335.00
SR
56,950.00
Unit Rate
V.3.2.20
Breakdown
Supply and lay thermoplastic non-reinforced cables for electrical works inside the building, size 3x240+16 mm
M
170
385.00
SR
65,450.00
Unit Rate
V.3.2.21
Breakdown
Supply and lay telephonic cable, 4x0.6 mm², insulated with PVC, to be installed in an adequate tray
M
70
65.00
SR
4,550.00
Unit Rate
V.3.2.22
Breakdown
Supply and lay subsidiary LAN cable, insulated with PVC, to be installed in an adequate tray
M
70
65.00
SR
4,550.00
Unit Rate
V.3.2.23
Breakdown
Install cable tray as per COMPANY standards and specifications
M2
100
125.00
SR
12,500.00
Unit Rate
V.3.2.24
Breakdown
Install cable clamp as per COMPANY standards and specifications
EA
15
35.00
SR
525.00
Unit Rate
V.3.2.25
Breakdown
Transfer cable drum from company warehouse to site as directed
TON
3
225.00
SR
675.00
Unit Rate
V.3.2.26
Breakdown
Return existing/old cable system to company warehouse as directed
TON
7
225.00
SR
1,575.00
Unit Rate
V.3.2.27
Breakdown
Supply and install an explosion-proof exhaust fan in the battery room
EA
7
1,250.00
SR
8,750.00
Unit Rate
V.3.2.28
Breakdown
Supply and install wall/ceiling mounted ventilating fans, 20x20 cm, and capacities, including the evacuation flexible duct,
exterior cover, and all accessories for operation
EA
8
850.00
SR
6,800.00
Unit Rate
V.3.2.29
Breakdown
Supply and install wall/ceiling mounted ventilating fans, 30x30 cm, and capacities, including the evacuation flexible duct,
exterior cover, and all accessories for operation
EA
8
1,050.00
SR
8,400.00
Unit Rate
V.3.2.30
Breakdown
Supply and install ventilating fans ceiling capacity not less than 388 CF/Min
EA
8
2,850.00
SR
22,800.00
Unit Rate
V.3.2.31
Breakdown
Supply and install ventilating fans ceiling capacity not less than 311 CF/Min
EA
8
2,650.00
SR
21,200.00
Unit Rate
V.3.2.32
Breakdown
Supply and install ventilating fans ceiling capacity not less than 205 CF/Min
EA
8
2,350.00
SR
18,800.00
Unit Rate
V.3.3
Description
ELECTRICAL
WORKS
GROUNDING SYSTEM WORKS as Per Item # 5.3.3 of Schedule "B"
V.3.3.1
Breakdown
Conduct necessary inspections and tests for all ground systems in the substation according to COMPANY specifications and
standards and submit reports
EA
7
2,800.00
SR
19,600.00
Unit Rate
V.3.3.2
Breakdown
Supply and Erect Earthing copper rod 1.5mx¾ Dia according to COMPANY specifications
EA
3
350.00
SR
1,050.00
Unit Rate
V.3.3.3
Breakdown
Supply and Erect Earthing copper rod 3mx¾ Dia according to COMPANY specifications
EA
3
750.00
SR
2,250.00
Unit Rate
Breakdown
Supply and install a copper ground mat or plate (1 m x 1 m x 3 mm) in normal soil, including excavation, filling with
ground conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.), backfilling, reinstatement, and connection to all
equipment as per the current Code of Practice of the COMPANY
EA
3
7,850.00
SR
23,550.00
Unit Rate
V.3.3.4
BF-PA -100 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Quantity
V.3.3.5
Breakdown
Supply and install a copper ground mat or plate (1 m x 1 m x 3 mm) in rocky soil, including excavation, filling with ground
conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.), backfilling, reinstatement, and connection to all equipment
as per the current Code of Practice of the COMPANY
EA
3
7,850.00
SR
23,550.00
Unit Rate
V.3.3.6
Breakdown
Provide materials and set ground conditioning agents (Charcoal, Maronite, Bentonite, Salt, etc.) for one grounding pit to
improve earth resistance when required
EA
3
4,850.00
SR
14,550.00
Unit Rate
Breakdown
Supply and lay a copper braid stranded cable, size 70 sq. mm, including all necessary components for connecting and
fixing
M
35
180.00
SR
6,300.00
Unit Rate
V.3.3.8
Breakdown
Supply and lay a copper braid stranded cable, size 120 sq. mm, including all necessary components for connecting and
fixing
M
35
280.00
SR
9,800.00
Unit Rate
V.3.3.9
Breakdown
Supply and lay a copper braid stranded cable, size 185 sq. mm, including all necessary components for connecting and
fixing
M
35
380.00
SR
13,300.00
Unit Rate
Breakdown
Supply and lay a copper braid stranded cable, size 240 sq. mm, including all necessary components for connecting and
fixing
M
35
480.00
SR
16,800.00
Unit Rate
V.3.3.11
Breakdown
Supply and lay a copper braid stranded cable, size 300 sq. mm, including all necessary components for connecting and
fixing
M
35
580.00
SR
20,300.00
Unit Rate
V.3.3.12
Breakdown
Supply and install an earthing bus bar, size 3.5 m x 25 mm x 5 mm, including all necessary components for fixing and
connecting
EA
3
1,380.00
SR
4,140.00
Unit Rate
Breakdown
Supply and install an earthing bus bar, size 3.5 m x 40 mm x 5 mm, including all necessary components for fixing and
connecting
EA
3
1,880.00
SR
5,640.00
Unit Rate
V.3.3.14
Breakdown
Supply and install an earthing bus bar, size 3.5 m x 50 mm x 5 mm, including all necessary components for fixing and
connecting
EA
3
2,280.00
SR
6,840.00
Unit Rate
V.3.3.15
Breakdown
Install a grounding test pit, ensuring it meets all relevant specifications and standards. This includes excavation,
installation of the test pit, backfilling, and any necessary connections to the grounding system. The work should be carried
out as directed by the COMPANY REPRESENTATIVE and in accordance with the company's safety and quality requirements
EA
3
2,850.00
SR
8,550.00
Unit Rate
EA
20
78,800.00
SR
1,576,000.00
Unit Rate
EA
7
37,800.00
SR
264,600.00
Unit Rate
42,800.00
SR
299,600.00
Unit Rate
V.3.3.7
V.3.3.10
V.3.3.13
V.4
Description
SUPPORT FACILITY
V.4.1
Description
SUPPORT FACILITY
V.4.1.1
V.4.2
SUPPORT FACILITY
Currency
Total
SUPPORT FACILITY as Per Item # 5.4 of Schedule "B"
SUPPLY AND ERECT PORTABLE CABINS as Per Item # 5.4.1 of Schedule "B"
deliver and erect a portable cabin with full water, power facilities, and furniture at Eastern Transmission Substation
locations. The portable cabin shall have dimensions of no less than 4x12 meters and be fully equipped with a toilet,
kitchen, power supply and MCB AC. Additionally, it shall include a water tank with a capacity of at least 3 cubic meters, to
be filled daily, and a temporary sewage pit with a volume of at least 3 cubic meters, to be discharged periodically as
needed
For the portable cabin base, stand legs with a 7mm plate shall be provided if the ground is solid. For unsuitable ground, a
40x40 cm concrete base shall be provided
Breakdown
Description
Long Description
Unit Price
Payment
Type
UOM
Short Description
TELECOM SHELTERS AND TOWERS WORKS as Per Item # 5.2.2 of Schedule "B"
V.4.2.1
Breakdown
Supply and erection of a communication shelter with A/C at NG proposed locations for substations and transmission lines,
with dimensions (2.5x2.5 m). The shelter shall be equipped with two split air-conditioning units with a timer switch, cable
ladders, a power source, fire extinguishers, lights, power sockets, and the construction of a foundation for the
communication shelter, all as per COMPANY specifications
V.4.2.2
Breakdown
Supply and erection of a communication shelter with A/C at NG proposed locations for substations and transmission lines,
with dimensions (3x3 m). The shelter shall be equipped with two split air-conditioning units with a timer switch, cable
ladders, a power source, fire extinguishers, lights, power sockets, and the construction of a foundation for the
communication shelter, all as per COMPANY specifications
EA
7
V.4.2.3
Breakdown
Supply and install grounding on telecom towers and/or shelters
EA
10
850.00
SR
8,500.00
Unit Rate
V.4.2.4
Breakdown
Supply and install cable trays between telecom towers and shelters
EA
15
3,780.00
SR
56,700.00
Unit Rate
V.4.2.5
Breakdown
Remove old gravel, supply and fill new gravel for towers and shelters
M2
70
275.00
SR
19,250.00
Unit Rate
V.4.2.6
Breakdown
Removal of loose/old paint from telecom towers and repainting according to COMPANY instructions and specifications
M2
7
650.00
SR
4,550.00
Unit Rate
V.4.2.7
Breakdown
EA
10
3,780.00
SR
37,800.00
Unit Rate
EA
7
4,200.00
SR
29,400.00
Unit Rate
V.4.2.8
V.4.3
Repair of the Telecom tower aviation lighting system
Breakdown
Description
Supply and install an aviation lighting system on telecom towers
SUPPORT FACILITY
ADDITIONAL WORKS as Per Item # 5.4.3 of Schedule "B"
BF-PA -101 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Total
Payment
Type
SR
203,850.00
Unit Rate
SR
45,000.00
Unit Rate
8,500.00
SR
25,500.00
Unit Rate
3,870.00
SR
11,610.00
Unit Rate
350.00
SR
5,250.00
Unit Rate
15
175.00
SR
2,625.00
Unit Rate
EA
15
375.00
SR
5,625.00
Unit Rate
Supply and install signboards on the Substation building
M2
50
850.00
SR
42,500.00
Unit Rate
Breakdown
Supply and install trash bins (1. Combustibles (Red Color), 2. Salvage (Orange Color), 3. Plastic & Paper (Blue Color), and
4. Trash (Yellow Color)
EA
35
550.00
SR
19,250.00
Unit Rate
V.4.3.10
Breakdown
Perform the required inspections of Water Pumps and Related Parts: controls and distribution panels to maintain them in
proper and good condition
EA
7
1,850.00
SR
12,950.00
Unit Rate
V.4.3.11
Breakdown
Perform the required inspections of Extract Ventilation and Exhaust Fans: for buildings, battery rooms, basements, etc. to
maintain them in proper and good condition
EA
7
1,850.00
SR
12,950.00
Unit Rate
V.4.3.12
Breakdown
Perform the required inspections of Lights and Related Parts: including exit lights, emergency lights, building lights,
floodlights, security lights, and related controls and distribution panels for building facilities to maintain them in proper
and good condition
EA
7
850.00
SR
5,950.00
Unit Rate
V.4.3.13
Breakdown
Perform the required inspections of Doors, Gates and Related Parts: for building facilities to maintain them in proper and
good condition
EA
7
1,350.00
SR
9,450.00
Unit Rate
V.4.3.14
Breakdown
Perform the required inspections of Toilets and Related Fittings and Consumables: for building facilities to maintain them
in proper and good condition
EA
7
1,350.00
SR
9,450.00
Unit Rate
V.4.3.15
Breakdown
Perform the required inspections of Floors, Walls, and Slabs: for building facilities to maintain them in proper and good
condition
EA
7
1,350.00
SR
9,450.00
Unit Rate
Breakdown
Perform the required inspections of Suspended/Dropped Ceilings: Including plywood/gypsum, aluminum boards for
building facilities to maintain them in proper and good condition
EA
7
1,350.00
SR
9,450.00
Unit Rate
Item
Line type
Long Description
UOM
Quantity
V.4.3.1
Breakdown
V.4.3.2
Breakdown
Supply, install and removal guard posts at the site, including complete formwork (four posts), concreting, and beaming
EA
3
67,950.00
Supply, install and removal an additional guard post
EA
3
15,000.00
V.4.3.3
Breakdown
Supply required materials and paint guard posts
EA
3
V.4.3.4
Breakdown
Prepare the site for the jointing of power cables by company technicians as directed, per joint bay
EA
3
V.4.3.5
Breakdown
Supply and Install nameplates for the circuits as directed
EA
15
V.4.3.6
Breakdown
Supply and install room identification signs
EA
V.4.3.7
Breakdown
Supply and install signs for Electrical, Mechanical, Protective Equipment, Symbolic Safety Signs in the Control Room, Relay
Room, Communication Room, Battery Room, HVAC Room, Basement, and Switch Yard
V.4.3.8
Breakdown
V.4.3.9
V.4.3.16
V.5
Description
Short Description
MANPOWER
Unit Price
Currency
PROVIDE THE MANPOWER TO PERFORM ANY ADDITIONAL WORK NOT COVERED IN THE WORK UNIT RATES
WHEN REQUESTED BY THE COMPANY as Per Item # 5.4.3.10 of Schedule "B"
V.5.1
Breakdown
Foreman or Technical Supervisor or Specialist
H
3
35.50
SR
106.50
Unit Rate
V.5.2
Breakdown
Certified scaffolder foreman/supervisor
H
3
35.50
SR
106.50
Unit Rate
V.5.3
Breakdown
Certified Scaffolder workers for erecting scaffolding systems
H
3
28.50
SR
85.50
Unit Rate
V.5.4
Breakdown
Operator/Programmer
H
3
35.50
SR
106.50
Unit Rate
V.5.5
Breakdown
Safety Officer
H
3
44.50
SR
133.50
Unit Rate
V.5.6
Breakdown
Safety Engineer
H
3
52.50
SR
157.50
Unit Rate
V.5.7
Breakdown
Civil/Mechanical/Electrical Engineer
H
3
52.50
SR
157.50
Unit Rate
V.5.8
Breakdown
Surveyor/Mechanic/Electrician/Instrument/Senior A/C Technician
H
3
26.20
SR
78.60
Unit Rate
V.5.9
Breakdown
Welder
H
3
26.20
SR
78.60
Unit Rate
V.5.10
Breakdown
Plumber/Carpenter/Mason/Painter/Roofer
H
3
26.20
SR
78.60
Unit Rate
V.5.11
Breakdown
Metal Fabricator/Metal Mechanic/Duct Fabricator
H
3
26.20
SR
78.60
Unit Rate
V.5.12
Breakdown
Insulator/refractory worker
H
3
26.20
SR
78.60
Unit Rate
BF-PA -102 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
V.5.13
Breakdown
V.5.14
Breakdown
V.5.15
V.5.16
V.6
Quantity
Certified Lifting equipment driver
H
3
26.20
SR
78.60
Unit Rate
Heavy Equipment Operator
H
3
26.20
SR
78.60
Unit Rate
Breakdown
Heavy Truck Driver
H
3
26.20
SR
78.60
Unit Rate
Breakdown
Helper
H
5
16.50
SR
82.50
Unit Rate
Description
EQUIPMENT
Long Description
Unit Price
Currency
Payment
Type
UOM
Short Description
Total
PROVIDE THE Equipment TO PERFORM ANY ADDITIONAL WORK NOT COVERED IN THE WORK UNIT RATES
WHEN REQUESTED BY THE COMPANY as Per Item # 7 of Schedule "B"
V.6.1
Breakdown
Dump Truck with 15 cubic meter capacity
H
5
175.00
SR
875.00
Unit Rate
V.6.2
Breakdown
Portable Oil Tanker with 15 cubic meter capacity, with all associated hoses
H
5
165.00
SR
825.00
Unit Rate
V.6.3
Breakdown
Portable Water Tanker with 15 cubic meter capacity, with all associated hoses
H
5
175.00
SR
875.00
Unit Rate
V.6.4
Breakdown
Portable Oil Pumps not less than 1 HP, with all associated hoses
H
5
100.00
SR
500.00
Unit Rate
V.6.5
Breakdown
Portable Water Pumps (1HP) with all associated hoses
H
5
120.00
SR
600.00
Unit Rate
V.6.6
Breakdown
Portable Water Pumps (2HP) with all associated hoses
H
5
140.00
SR
700.00
Unit Rate
V.6.7
Breakdown
Excavator including certified driver
H
5
225.00
SR
1,125.00
Unit Rate
V.6.8
Breakdown
Backhoe including certified driver
H
5
225.00
SR
1,125.00
Unit Rate
V.6.9
Breakdown
Pay loader Medium Size including certified driver
H
5
285.00
SR
1,425.00
Unit Rate
V.6.10
Breakdown
Bobcat including certified driver
H
5
150.00
SR
750.00
Unit Rate
V.6.11
Breakdown
Jack Hammer medium capacity including certified driver
H
5
175.00
SR
875.00
Unit Rate
V.6.12
Breakdown
Bulldozer including certified driver
H
5
450.00
SR
2,250.00
Unit Rate
V.6.13
Breakdown
Road Roller Medium Size
H
5
350.00
SR
1,750.00
Unit Rate
V.6.14
Breakdown
Asphalt Cutter with 12" diameter blade
H
5
150.00
SR
750.00
Unit Rate
V.6.15
Breakdown
Compactor Bottom Plate (18" x 18")
H
5
85.00
SR
425.00
Unit Rate
V.6.16
Breakdown
Bucket Truck
H
5
350.00
SR
1,750.00
Unit Rate
V.6.17
Breakdown
Crane, 10 Ton
H
5
350.00
SR
1,750.00
Unit Rate
V.6.18
Breakdown
Crane, 15 Ton
H
5
375.00
SR
1,875.00
Unit Rate
V.6.19
Breakdown
Crane, 20 Ton
H
5
450.00
SR
2,250.00
Unit Rate
V.6.20
Breakdown
Crane, 25 Ton
H
5
450.00
SR
2,250.00
Unit Rate
V.6.21
Breakdown
Forklift, 5 Ton
H
5
250.00
SR
1,250.00
Unit Rate
V.6.22
Breakdown
Forklift, 10 Ton
H
5
350.00
SR
1,750.00
Unit Rate
V.6.23
Breakdown
Heavy-duty industrial vacuum machine
H
5
350.00
SR
1,750.00
Unit Rate
V.6.24
Breakdown
Air Compressor (0.63 Mpa)
H
5
175.00
SR
875.00
Unit Rate
V.6.25
Breakdown
Mobile man lifter, portable type
H
5
175.00
SR
875.00
Unit Rate
BF-PA -103 of 104
______________________________Name in Print and Signature of Bidder
)خارج ر
Classified as Confidential External by SEC - (الشكة السعودية للكهرباء مصنف مقيد
ي
RFX NO-
BID FORM
PRICING ATTACHMENT
Item
Line type
Short Description
Long Description
UOM
Quantity
Unit Price
TOTAL BID PRICE FOR SIX YEARS PERIOD (ITEMS I + II + III + IV + V)
Currency
SR
Total
109,501,718.25
Payment
Type
Unit Rate
End of Pricing Attachment
BF-PA -104 of 104
______________________________Name in Print and Signature of Bidder