Neil Bryan Medrano

Neil Bryan Medrano

$8/hr
Electrical Engineer
Reply rate:
-
Availability:
Full-time (40 hrs/wk)
Location:
Imus, Cavite, Philippines
Experience:
17 years
MEDRANO, NEIL BRYAN B. Registered Electrical Engineer (REE) Address: Covina Villas East Phase 3 Block 16 Lot 3 Buhay na Tubig Imus City, Cavite 4103 Cellphone #: -, - E-mail:-- CAREER OBJECTIVE To pursue a highly rewarding career, seeking for a job in a challenging and healthy environment where I can utilize my skills and knowledge for growth that will benefit the success of the company. PERSONAL INFORMATION Date of Birth: April 20, 1980 Age: 40 Civil Status: Married Nickname: Neil Religion: Roman Catholic Place of Birth: Malaybalay City Gender: Male Father: Melchor M. Medrano Mother: Ester B. Medrano Wife: Grace L. Medrano EDUCATIONAL ATTAINMENT Tertiary Education School: University of the Philippines Los Baños Laguna Degree: Bachelor of Science in Electrical Engineering Address: College, Los Baños, Laguna School Year:- Secondary Education School: Bukidnon State College Secondary School Laboratory Address: Fortich Street, Malaybalay City, Bukidnon School Year:- Elementary Education School: Bukidnon State College Elementary School Laboratory Address: Fortich Street, Malaybalay City, Bukidnon School Year:- WORK EXPERIENCES I. PPI PAZIFIK POWER INC. - #8 Lapu-Lapu St, Magallanes Village, Makati City 1232 - 4/F South Park Plaza, Santiago St. Paseo de Magallanes, Makati City Employment: September 16, 2004 up to March 23, 2015 (10 years and 5 months) A. Position: Substation Engineer -) Job Description:             Responsible for Programming, Testing and Commissioning of Differential Relays and Overcurrent Relays. Responsible for Programming and Commissioning of 3 Phase Meters. Responsible for checking and editing AutoCAD drawings for wiring diagrams for Control, Protection and Metering Panels. Responsible for the installation of 69 kV Primary Equipment (Current Transformer, Potential Transformer, Power Circuit Breaker, Lightning Arrester, Power Transformer) Responsible for the installation of 15 kV Secondary Equipment (Medium Voltage Switchgears) Responsible for the Panel Assembly of Control, Protection and Metering Panels. Responsible for Wiring, Testing and Commissioning of 69 kV Primary Equipment (Current Transformer, Potential Transformer, Power Circuit Breaker, Lightning Arrester, Power Transformer) and 15 kV Medium Voltage Switchgears. Final Inspection, Testing and Commissioning for 69kV/13.2 kV Substation. Installation, Testing and Commissioning of Meter Test Benches. Responsible for the Operation of Portable Working Standards, Calibration Portable Standard and 3 Phase Phantom Loads for Meter Testing. Furnishing of Purchase Requisition using EXACT Globe 2003 Application. Responsible for the Item Encoding of all items using Exact Globe 2003 Application. B. Position: Engineering Manager -) Job Description:      Supervision of Engineering Staffs for Substation Works: Design, Installation, Testing and Commissioning of 69/13.2 kV Substations. Scheduling of Engineering Staffs for Service and Maintenance Works for 69 kV/13.2 kV Substations. Supervision of Engineering Staffs for Assembly of Control, Protection and Metering Panels for Substations. Checking of Wiring and Schematic Diagrams for Control, Protection and Metering Panels for Substations. Supervision of Engineering Staffs for Programming, Testing and Commissioning of Differential Relays and Overcurrent Relays.     Supervision of Engineering Staffs for Wiring and Commissioning of High Voltage Power Circuit Breaker and Medium Voltage Switchgears. Supervision of Engineering Staffs for Programming and Commissioning of 3 Phase Meters. Supervision of Engineering Staffs for the Operation of Portable Working Standards, Calibration Portable Standard and 3 Phase Phantom Loads for Meter Testing C. Position: Automation Manager -) Job Description:     Supervision of Engineering Staffs for Automation/SCADA Works: Design, Testing and Commissioning of SCADA for Substations. Supervision of Engineering Staffs for Research and Development of SCADA software and different types of communications: Serial, GSM, GPRS, Ethernet, LAN, WAN, etc. Knowledgeable with different communication protocols for SCADA such as DNP 3.0, IEC61850, IEC 60870, MODBUS TCP, MODBUS RTU, SNMP, BACnet, DLMS, etc. Programming of Intelligent Electronic Devices (IEDs), Programmable Logic Controllers (PLCs) and Remote Terminal Units (RTUs) to be communicated with SCADA (Analog Inputs and Outputs, Digital Inputs and Outputs) via Ladder Logic Diagrams. II. BUSSBARR CORPORATION - Unit 201 Alabang Business Tower 1216 Acacia Avenue Madrigal Business Park, Alabang Muntinlupa City 1708 Employment: June 1, 2015 up to September 12, 2018 (3 years and 3 months) A. Position: Engineering Group Manager - Electrical & Automation (June 2015 up to December 2017) Job Description:      Supervision of Engineering Staffs for Electrical Engineering Design of Substations, Power Plants and Transmission Lines. The designs include High Voltage, Low Voltage for Control Rooms, Gensets, Protection and Metering Panels, Switchgears, ACU, etc. Supervision of Engineering Staffs for Electrical Engineering Design of Roof and Ground Mounted Solar Systems for Residential, Commercial and Industrial applications using Helioscope & PVSyst. Supervision of Engineering Staffs for Automation/SCADA Design of Substations and Power Plants. Final checking of all Electrical Engineering and SCADA design deliverables before sending to client for approval. See to it that all the designs should comply to all relevant standards such as Philippine Electric Code 2 (PEC 2) Part 1 & 2, NEC, IEC, ANSI, etc.     Coordination with all the suppliers and approval of supplier drawings to be used for the Detailed Engineering Design. Coordination with other disciplines (Architectural, Civil/Structural, Mechanical) and other departments of the company (Operations, Services, Sales, etc.) for the Detailed Engineering Design. Use of EasyPower and ETAP softwares for Load Flow and Protection Relay Coordination. Use of Synergee for Distribution Impact Study (DIS). B. Position: Tendering Group Manager (January 2018 up to September 2018) Job Description:         Preparation of all Tendering Documents for submission. Review of all Tendering Documents. Preparation of Tendering drawings such as Single Line Diagrams and Layouts for Tendering. Preparation of all Technical Data Sheets for submission. Preparation of Construction, Manpower and Equipment Schedules for submission. Preparation of the Bill of Materials (BOM) and prices for Tendering. Coordination with different suppliers for their equipment specifications and prices. Use of BluebeamRevu software for estimating and costing. III. AFRY (formerly POYRY ENERGY, INC.) - 8th Floor, Kings Court 1 Building 2129 Chino Roces Avenue, Makati City 1231 Employment: September 15, 2018 up to June 30, 2019 A. Position: Electrical Engineer (September 15, 2018 up to June 30, 2019) Job Description:      Prepare document/drawings e.g. Main Ground Grid Layout, Lightning Protection Plan/Section, Cables’ Sizing, Cable List, Street & Area Lighting, etc. Evaluate proposals submitted from vendors. Review document and drawings submitted from vendors. Coordinate with relevant parties for the works under my responsibility. Schedule preparing, monitoring and control the works under my responsibility. IV. SOLAR PHILIPPINES - 20th Floor, Philam Life Tower, Paseo de Roxas St. Makati City Employment: July 15, 2019 up to January 14, 2020 A. Position: Senior Electrical Engineer HV/MV (July 15, 2019 up to January 14, 2020) Job Description:       Prepare document/drawings e.g. Transmission Lines for 69 kV and 115 kV, 115 kV Cable Sealing End (CSE) for ACSR and XLPE Cables transition, XLPE Cables’ Sizing, MV cable route from Inverter Station to MVSG, etc. Evaluate proposals submitted from vendors. Review document and drawings submitted from vendors. Coordinate with relevant parties for the works under my responsibility. Schedule preparing, monitoring and control the works under my responsibility. Design of Roof and Ground Mounted Solar Systems for Residential, Commercial and Industrial applications using Helioscope & PVSyst. V. NEXEM (Online/Remote Work) - 2045 W Grand Ave Suite B #41236 Chicago, Illinois 60612 Employment: June 8, 2020 up to September 9, 2020 A. Position: Senior Electrical Engineer (June 8, 2020 up to September 9, 2020) Job Description:              Prepare documents/drawings for low voltage connection of Loads to Low Voltage System 240V/120 V 3 Phase 4 Wire Delta Connection (High Leg) Prepare documents/drawings for low voltage connection to 40 Footer Grow container (Load Calculations, Single Line Diagram, Grounding, Cable Sizing, Breaker Sizing, Disconnect Switch Sizing) Prepare documents/drawings for 240/480V Step Up Transformer (Load Calculations, Single Line Diagram, Grounding, Cable Sizing, Breaker Sizing, Disconnect Switch Sizing) Evaluate proposals submitted from vendors. Review document and drawings submitted from vendors. Coordinate with relevant parties for the works under my responsibility. Schedule preparing, monitoring and control the works under my responsibility. Remote Meetings with the team for coordination via Zoom & Slack. Project monitoring via Trello. Use of National Electrical Code (NEC) and Chicago Electrical Code for Electrical design. Familiar with the Raspberry Pi settings and configuration and wiring designs to remotely control and monitor the Electrical, Mechanical and Electronic Devices in the Grow Facility. Project designs done in Revit and AutoCAD as well as Google Docs, Google Sheets and Google Slides. Project designs monitoring in Autodesk 360. LIST OF COMPLETED PROJECTS I. PPI PAZIFIK POWER INC.  Peninsula Electric Cooperative (PENELCO) Bataan: Turnkey Project for SCADA/Automation of Balanga Substation  Peninsula Electric Cooperative (PENELCO) Bataan: Supply, Testing and Commissioning of 5/10 MVA 69 kV/13.2 kV Substations (Balanga, Abucay, Orani, Orion, Hermosa, Samal, Pilar, Alas-Asin)  Central Negros Electric Cooperative (CENECO) Bacolod: Turnkey Project of 30 MVA 69 kV/13.2 kV Gonzaga Substation  Iloilo Electric Cooperative 3 (ILECO3) Iloilo: Turnkey Project of 10 MVA 69 kV/13.2 kV Sara Substation  Iloilo Electric Cooperative 2 (ILECO2) Iloilo: Supply, Testing and Commissioning of 69 kV Equipments and Protection Relays Substations (Pototan, Passi, Janiuay, Calinog)  MITSUMI Cebu: Turnkey Project of 2 10 MVA 69 kV/13.2 kV Substation (Danao)  Negros Occidental Electric Cooperative (NOCECO) Kabankalan: Supply, Testing and Commissioning of 69 kV/13.2 kV Equipments and Protection Relays Substations (Kabankalan, Sipalay, Valladolid, San Enrique)  Manila Electric Company (MERALCO) Ortigas: Turnkey Projects for Test Benches, 10/20/40 Positions  Manila Electric Company (MERALCO) Ortigas: Supply and Commissioning of Medium Voltage Switchgears (FBGC & Binondo Substations)  Nueva Ecija Electric Cooperative 2 Area 1(NEECO 2 A1): Turnkey Project of 5/10 MVA 69kV/13.2kV Substations (Talavera, Mapangpang)  Nueva Ecija Electric Cooperative 2 Area 2 (NEECO 2 A2): Turnkey Project of 10 MVA 69kV/13.2kV Substation (Bongabon, Natividad and Penaranda)  Nueva Ecija Electric Cooperative 1 (NEECO1):Turnkey Project of 10/20 MVA 69 kV/13.2kV Substation (San Isidro and Sapang Jaen)  Ilocos Norte Electric Cooperative (INEC):Turnkey Project of 10 MVA 69kV/13.2kV Substation (Laoag) II. BUSSBARR CORPORATION           132 MWp Solar Power Plant in Cadiz, Negros Occidental 5 MW Diesel Power Plant in Olango Island, Cebu 11 MW Diesel Power Plant in Surigao del Sur 11 MW Diesel Power Plant in Koronadal, South Cotabato 60 MWp Solar Power Plant in Toledo, Cebu 20 MWp Solar Power Plant in Brgy. Bawing, General Santos City 5 MWp Diesel Power Plant in Mati, Davao Oriental Transformer & Medium Voltage Switchgears for Debre Birhan & Rorank Ethiopia 1 MW Damalerio Roof Mounted Solar Power Plant in General Santos City 1 MW Casadi Ground Mounted Solar Power Plant in Batangas III. AFRY (Formerly POYRY ENERGY, INC. )  North Negros Biopower 30 MW Biomass Power Plant in Manapla, Negros Occidental  South Negros Biopower 30 MW Biomass Power Plant in La Carlota, Negros Occidental IV. SOLAR PHILIPPINES  Calamba Tanauan 100 MW Solar Power Plant in Tanauan, Batangas  Naic Maragondon 100 MW Solar Power Plant in Maragondon, Cavite  Residential & Commercial Roof Mounted Solar Power Design & Installation V. NEXEM  Odell Grow Facility in Odell, Chicago, Illinois  40 Field Genetics Unit (FGU) Grow Facility. SKILLS & ABILITIES  Knowledgeable with Microsoft Office Softwares: Word, Excel, Powerpoint, Access.  Knowledgeable with Google Drive, Google Docs, Google Forms, Google Sheets & Google Slides.  Knowledgeable with Project Libre and MS Project for Gantt Charts/Schedule.  Knowledgable with Bluebeam Revu Software for Estimation.  Knowledgeable with AutoCAD & Draftsight for 2D drawings.  Knowledgeable with ETAP and EasyPower Softwares for Load Flow Studies & Protection Relay Coordination.  Knowledgeable with Helioscope & PVSYST Softwares for Solar Power Designs.  Knowledgeable with Dialux & Dialux EVO Software for Lighting Designs.  Knowledgeable with PLC & RTU Programming for SCADA & DCS.  Manual and Automatic Transmission Vehicle Driving.  Playing the Guitar. SEMINARS AND TRAININGS  General Electric (GE) DTP Transformer Protection, F650 Feeder/Bay Protection and UR Relays Platform Training Course Address: GE Consumer & Industrial Zamudio, Spain Date: September 26-29, 2005  Landis & Gyr ZMD &ZMG Meters, Communication Module, MAP 120 & MAP 110 Software Address: Landis+Gyr Pte Ltd No. 51 Changi Business Park Central 2 #09-14 The Signature, Singapore 486066 Date: July 10-14, 2006  Meter Test Equipment (MTE) Forum 2007 Address: Kota Kinabalu, Borneo/East Malaysia Date: April 15-18, 2007  Asian Energy Week 2007 Address: The Imperial Queen's Park Hotel199 Sukhumvit Soi 22, Bangkok ,Thailand Date: April 23-26, 2007  Training for Test Benches at Hong Kong Electric Address: Hong Kong Electric, Hong Kong Date: January 14-18, 2008  Copa-Data Zenon Energy Edition Software (SCADA) Training Address: COPA-DATA GmbH, Karolingerstrasse 7B, 5020 Salzburg, Austria Date: August 25-28, 2008& January 21-25, 2013  Horstmann Fault Indicators Training (Navigator with GSM) Address: Dipl.-Ing. H. Horstmann GmbH Humboldstrasse 2, D-42579 Heiligenhaus, Germany Date: September 1-3, 2009  Meter Test Equipment (MTE) Forum 2009, Power Transformer Online Monitoring System (Hydrocal Product Line) Address: EMH Energie-Messtechnik GmbH Vordem Hassel 2 D-21438, Brackel, Germany April 27-29, 2009  Novexia 24 and 36 kV Load Break Switches (LBS) Training Address: Novexia33 Avenue du General Leclerc –BP 323, Bagneres de Bigorre, France Date: May 4-5, 2009  Froschl ZFA-F Automatic Meter Reading (AMR) Software Training Address: ITF-EDV Froschl GmbH, Hauserbachstrasse 7-10, Walderbach, Germany Date: January 28 – February 1, 2013  Hirschmann Mission Critical Network Design Seminar Address: Sofitel Plaza Hanoi1 Thanh Nien Road, Ba Dinh District, Hanoi, Vietnam Date: August 28-30, 2013  Gear 1 Driving School Defensive Driving Seminar Address: 177B V. Agustin Bldg. Aguinaldo Highway Panapaan I Bacoor, Cavite Date: March 14, 2015 CHARACTER REFERENCES: Name: Richard A. Calixtro Contact Number:- Name: Anna Liza M. Pasco Contact Number:-
Get your freelancer profile up and running. View the step by step guide to set up a freelancer profile so you can land your dream job.