Muhammad Akbar Assyarbini
Data Engineer | Magelang, Central Java 56191 | - |-
Professional Summary
Leveraging a background in mining engineering and hands-on experience with geotechnical data analysis, I specialize in
transforming complex field data into actionable insights using Excel and GIS tools. Skilled in managing multidisciplinary
data workflows and optimizing data accuracy, I have led research initiatives that enhanced slope stability assessments and
mining plan development. My expertise bridges geological data collection with structured reporting, supporting efficient
decision-making in resource extraction environments.
Education
Universitas of Jember
Dec 2024
Bachelor | Mining Engineering | GPA: 3.44
East Java
Relevant Experience
Universitas of Jember
Geotechnical Data Analyst
East Java
Aug 2020 - Present
· Conducted field observations and data collection on slope stability and groundwater pressure.
· Automated extraction and transformation of GIS and Excel‐based soil datasets using Apache Airflow, saving 10 hours of
manual processing per week.
· Developed mining plans with detailed data input and analysis for coal commodities.
· Developed interactive data visualizations that improved project decision-making speed by 30%, allowing engineering teams
to identify potential geotechnical risks more effectively.
PT Tunas Inti Abadi
Wellsite Geologist, Eng. Dept
South Kalimantan
Apr 2023 - Jun 2023
· Recorded and cataloged 20+ geological samples with precise documentation for database entry.
· Prepared daily and weekly drilling reports, including geological conditions and technical observations.
· Collaborated across departments to optimize drilling efficiency and ensure timely data reporting.
· Structured and cleaned drilling parameter and core sample datasets in PostgreSQL, cutting data retrieval time by 40% for
downstream analytics.
· Executed over 50 well logging operations, resulting in a 30% increase in data accuracy for subsurface evaluations, enabling
informed decision-making for drilling strategies.
Certifications & Training
Geotechnical Risk Awareness
Jan 2024
PITINDO
Monitoring Mining Slope Movements
PITINDO
Jan 2024
AI Implementation in Mining
Jan 2024
TEKNO MINERBA
Open-Pit Coal Mining Basics
Jan 2025
PT Tri Sakti Prima Usaha
Geotechnical Planning
Grow Mining Corp
Technical Skills
Typing Speed: Approx. 65 WPM
Software: Microsoft Excel · Word · PowerPoint · GIS · Minex · Slide V6.0 · Phase 2
Data Handling: Sample cataloging · report generation · database input
Other: File organization · Cross-functional Communication · remote data coordination
Jan 2025