H. No. 108,Ali Block,
New Garden Town,
Lahore
Phone--
Muhammad Aamer
Objective
I want to work from home as Administrative Assistant, Or Marketing
Executive.
Areas Of Interest
Although I am an Engineer, yet I grew up with Love for
English Writing. My special interest is Proofreading, Data
Entry in Excel Sheets, Writing Technical and non-technical
reports and Doing Office chores with complete grip on
language and vocabulary. Throughout my career, I was given
toughest tasks for completion and I did these with
challenging spirit.
Education
June1999–Sep.1999
Optima Engineering University
Web Development, HTML, VB Script, ASP and FrontPage.
Lahore
1997
TSE
America
Passed my TOEFL with 577/670 marks and scored 5.5/6 in Test Of
Written English.
1996
TSE
America
Passed my GMAT with a score of 550/800 with self study.
1988—1993
Engineering University
Lahore
Earned B.Sc. in Mechanical Engineering with 1st Division. Major subjects
were Thermodynamics, Heat Transfer, I.C. Engines, Hydraulics,
Machine Design, and Production Engineering etc.
1985—1987
Govt. College GRW.
Completed F.Sc. in Pre Engineering with 806/1100.
Computer Skills
Gujranwala.
Microsoft Word, Microsoft Excel, Article Writing, Search Engine
Optimization, Adobe Photoshop, Fireworks, Dreamweaver,
Microsoft FrontPage
Experience
2015 till date
BBR Power And Light Germany
Lahore, Pakistan
Manager Sales
Selling Used and New Diesel, Gas and HFO Engines
Communication with the Prospects.
 Arranging the sale meetings and finalizing the deals.
 Loading the Gensetsm Installation and Commissioning of the
Gensets.
2005 to 2013
Sarfraz Yaqub Textiles Ltd
Multan Road.
Plant Manager
Complete Erection of 03 Gensets Waukesha GLD 24 under my
supervision with Electrical and Civil works.
Commissioning of the Gensets
 Operation of 03 JenBacher Gas Engines and 03 Waukesha Engines
with a Stand By CAT 3512.
 Managed maintenance and other related Auxiliaries problems also.
2004-5
Adil and Ittehad Textiles Ltd
FSD Road, SKP.
Plant Incharge
Complete Erection with civil and electrical works of 02 Gen Sets CAT
3516B and 03 Waukesha Enginators under my supervision.
Commissioning of all the Gensets.
Operation of two Mitsubishi Diesel Generators SEG1400 and CAT G3516B Genset-, 2001–.2004
Bhanero Energy Ltd.
FSD Road, SKP
Shift Engineer.
Participated in the erection and commissioning of 03 Gensets, Stork
Wartsila Diesel Generator sets, 2.99 MW each and their auxiliaries.
 Duties were to supervise a team of five people for operation of
Power House.
The personnel were between Electrical and Mechanical departments.
The Power Station had a set of three 2.99 MW Stork Wartsila and
one 5.5 MW VAASA Wartsila Diesel Generators. Total capacity 14.5
MW of makes Stork and VAASA Wartsila with a set of other
auxiliaries.
The duties included operation and troubleshooting of the following
1. Centrifugal Pumps.
2. Reciprocating Pumps.
3. Gear Pumps
4. L.O. & H.F.O. Centrifuges.
5. Waste Heat Recovery Boilers. 6.
Water Treatment Plant.
7. Plate and Tube Type Heat Exchangers.
1996—1996
Maple Leaf Electric
Sikander Abad
Shift Engineer
Performed duties for the erection and commissioning of three
Niigata Diesel Generators with their Waste Heat Recovery Boilers.
 Duties were to supervise a team of six people for operation of Power
House.
The personnel were between Electrical and Mechanical departments.
The Power Station had a set of three 6.0 MW Niigata Diesel
Generators and a set of other auxiliaries.
1994 –1995
Hayat Textiles Ltd.
Lahore
Mechanical Cum Boiler Engineer.
Supervised a team of five people operating a boiler and two persons
maintaining the textile machinery.
 Operation and maintenance of Boiler with auxiliaries and
maintenance of Knitting textile machinery.