My Resume
Personal Particulars
Full Name
: Mohd Jaafar Bin Mohd Hamdi
Correspondence Address
: No 40, Jalan TKI 4, Taman Krau Indah
28050 Temerloh,
Pahang Darul Makmur.
Contact No
:-– mobile
Hometown
: Kuantan, Pahang.
Citizenship
: Malaysian
Sex
: Male
Date of Birth
: 8 Feb 1985
NRIC No. (New)
:-
Race
: Malay
Religion
: Muslim
Marital Status
: Married
Health
: Excellent
Language Proficiency
Language : Spoken and Written
1. English
- Good
2. Bahasa Malaysia
- Good
1
Skill
Skill
1.Microsoft Office – Word/excel/project/outlook
2. Autocad/Solidwork/3D view
Education-
-UniKL – Institute Of Product Design & Manufacturing (IPROM)
Bachelor of Engineering Technology (Hons) in Tool & Die
GCPA 3.06
-
-UniKL – Malaysian Spanish Institute Diploma in Mould and
Manufacturing Technology
CGPA 3.20
-
-Sek.Men.Teknik (1) Kuantan Pahang
Form 4-5
Sijil Pelajaran Malaysia
-
-Sek.Men.Keb.Paya Besar Kuantan Pahang
Form 1-3
Penilaian Menengah Rendah
Professional Experience
Project Involved in:
2018
DURATION : July. 2018 – Nov. 2019
EMPLOYER : Dynaciate Engineering Sdn. Bhd.
POSITION : Project Coordinator cum Material Control
PROJECT : UnderGround Piping Installation for UERO 5 (DELIMA) Project At Malaysian
Refinery Company, Sungai Udang, Melaka (Under Hyundai Engineering &
Construction)
JOB SCOPE: 1) To coordinate work at site as well as arranging piping material from painting
shop to site.
2) To expedite & purchase material for wrapping for underground piping and
consumable for fabrication. (liaise with procurement dept)
3) To arrange equipment, tool and consumable from HQ to site.
4) To also coordinate with supervisor for material arrangement from laydown
to site.
2
Professional Experience
2018
DURATION : January. 2018 – Jun. 2018
EMPLOYER : Dynaciate Engineering Sdn. Bhd.
POSITION
: Project Coordinator
PROJECT
: Proces piping installation and Equipment installation for Verdepalm Project
(Under M+W Group)
JOB SCOPE : 1) To prepare & compile daily report upon submission to client.
2) To conduct daily toolbox meeting with workers for safety issue and work
coordination meeting.
3) To ensure & arrange piping materials from painting shop to site.
4)
To expedite & purchase material for painting as per spec for piping
material and consumable for fabrication.
2017
DURATION : August. 2017 – September. 2017
EMPLOYER : MZS Iman Supply & Services
POSITION : Project Engineer
PROJECT
: Flare Tip Replacement Project at PCPGD Turnaround 2017(Under Kingsar Sdn
Bhd.)
JOB SCOPE : 1) To prepare & compile Job Method Statement (JMS) upon submission to
client for review.
2) To prepare Job Pack for flare tip replacement and document compilation
for the final document.
DURATION : July. 2017 – August. 2017
EMPLOYER : MZS Iman Supply & Services
POSITION : Project Engineer
PROJECT
: Control Valve servicing project at BP Petronas Acetyl Sdn Bhd Turnaround
2017(Under Transwater API Sdn. Bhd.)
JOB SCOPE : 1) To plan & coordinate work activities throughout the project
2) To prepare & make arrangement of Tools, Equipment & Consumable for the
Project.
2) To conduct toolbox meeting with workers.
3) To ensure service and pre-testing control valve carried out meeting Client’s
3
requirement & acceptance.
Professional Experience
2017
DURATION : Jan. 2017 – Feb. 2017
EMPLOYER : MZS Iman Supply & Services
POSITION : Project Engineer
PROJECT
: External Painting main office building at Jabatan Perikanan Daerah Kuantan,
Padang Lalang, Kuantan, Pahang
JOB SCOPE : 1) To arrange tools, Equipment & consumable for the project
2) To ensure the quality of the painting work meeting Jabatan Perikanan
specification.
3) To supervise & ensure the painting work activities at the main office
building comply with Jabatan Perikanan Safety Rules & Regulation.
2016
DURATION : Nov. 2016 – Dis. 2016
EMPLOYER : MZS Iman Supply & Services
POSITION : Project Engineer
PROJECT
: Painting Work for the whole Jabatan Perikanan Jetty Area.
JOB SCOPE : 1) To arrange tools, Equipment & consumable for the project
2) To ensure the quality of panting work meeting Jabatan Perikanan
specification.
4) To supervise and ensure painting activity at the Jetty comply with Jabatan
Perikanan safety rules & regulation as well as maintaining the house
keeping.
4
Professional Experience
DURATION : Jun. 2016 – July. 2016
EMPLOYER : MZS Iman Supply & Services
POSITION : Project Engineer cum Workleader
PROJECT : Air Craft Warning Light Replacement Project at CCR Tower , Petronas
Penapisan Terengganu
(Under Hadid Engineering (M) Sdn. Bhd.)
JOB SCOPE : 1) To arrange, plan & coordinate daily work activities.
2) To ensure Sufficient Tools, Equipment & consumables available throughout
the project duration
3) To always ensure compliance to Petronas Safety Rules & Regulation while
working.
2016
DURATION : Feb. 2016 – Apr. 2016
EMPLOYER : MZS Iman Supply & Services
POSITION : Project Engineer Cum Work Leader
PROJECT : Control Valve servicing Project at Petronas Chemical MTBE/PDH Sdn. Bhd
Turnaround 2016, Gebeng (Under Kingsar Sdn. Bhd.)
JOB SCOPE : 1) To plan & coordinate daily work activities throughout the duration .
(including Work Permit PTW issuance)
2) To ensure sufficient Tools, Equipment & consumable available for the
project
3) To supervise logistic activity from MTBE/PDH site to service workshop.
4) To produce daily progress report, Service report and Close out report for
the project.
5
Professional Experience
2015
DURATION : July. 2015 – Aug. 2015
EMPLOYER : MZS Iman Supply & Services
POSITION : Project Engineer
PROJECT
: Sliding Hood replacement project at Lab Petronas penapisan Terengganu
(Under Ecoswift Sdn. Bhd.)
JOB SCOPE : 1) To plan & coordinate daily work activities throughout the duration .
( including Work Permit PTW issuance)
2) To ensure sufficient Tools, Equipment & consumable available for the
Project
3) To produce daily progress report, Service report and Close out report for
the project.
DURATION : Jun. 2015 – July. 2015
EMPLOYER : MZS Iman Supply & Services
POSITION : Project Engineer
PROJECT
: Spring Support Replacement Project at Export Teminal Petronas Gas Berhad ,
Tanjung Sulong Kemaman (Under Kingsar Sdn. Bhd.)
JOB SCOPE : 1) To plan & coordinate daily work activities throughout the duration .
( including Work Permit PTW issuance)
2) To ensure sufficient Tools, Equipment & consumable available for the
Project
4) To supervise & monitor on dismantling of existing spring support upon
installing the new spring support.
4) To produce daily progress report, Service report and Close out report for
the project.
6
Professional Experience
2014
DURATION : Sept. 2014 – Feb. 2015
EMPLOYER : Dynaciate Engineering Sdn. Bhd.
POSITION : Material Controller
PROJECT
: MG-1 project (Plant Expansion) at Kaneka (M) Sdn. Bhd. (Under Sumitomo
Chemical Engineering (M) Sdn. Bhd.)
JOB SCOPE : 1) To arrange tools, Equipment & consumable for the project
2) Arrange the Logistic for Pipe Spool from HQ to site.
3) Purchase the pipe and fitting as per BOM from Iso drawing.
DURATION : Nov. 2013 – Sept. 2014
EMPLOYER : Dynaciate Engineering Sdn. Bhd.
POSITION : Material Controller
PROJECT
: Strawberry 5 project (Plant Expansion) at Emery Oleochemical (Under
Desmet Balestra (M) Sdn. Bhd.)
JOB SCOPE : 1) To arrange tools, Equipment & consumable for the project
2) Arrange the Logistic for Pipe Spool from HQ to site.
3) Purchase the pipe and fitting as per BOM from Iso drawing.
2013
DURATION : July. 2013 – Nov. 2013
EMPLOYER : Dynaciate Engineering Sdn. Bhd.
POSITION
: Project Engineer
PROJECT
: MP-2 Project (Plant Expansion) at Poly Plastic (M) Sdn. Bhd. (Under
Mitsubishi Kakoki Kaisha Ltd)
JOB SCOPE : 1) To arrange tools, Equipment & consumable for the project
2) Arrange the Logistic for Pipe Spool from HQ to site.
3) Supervise the Piping installation activity and hydrotest activity.
4) line walk with client for final reinstatement activity after hydrotest as per
test package
7
Professional Experience
2013
DURATION : Jun. 2012 – Jun. 2013
EMPLOYER : Dynaciate Engineering Sdn. Bhd.
POSITION : Project Coordinator
PROJECT
: Flare Gas Recovery Unit(FGRU) Project at Petronas Gas Berhad, Paka (Under
Synerlitz(M) Sdn. Bhd.)
JOB SCOPE : 1)To compile daily report and submit to client.
2) To conduct daily toolbox meeting with workers on safety issue and
Work coordination meeting.
3) To arrange piping material from painting shop to site.
2012
DURATION : March. 2012 – May.2012
EMPLOYER : Dynaciate Engineering Sdn. Bhd.
POSITION : Project Engineer
PROJECT
: MP-1 Project, Under Kaneka Engineering (M) Sdn. Bhd.
JOB SCOPE : 1)To arrange tools, Equipment & consumable for the project
2) Arrange the Logistic for Pipe Spool from HQ to site.
3) Supervise the Piping installation activity and hydrotest activity.
4) Line walk with client for final reinstatement activity after hydrotest as
per test package
5) Compile final document
8
Professional Experience
2011
DURATION : Nov. 2011 – Dis.2011
EMPLOYER : Nuriman Ent.
POSITION
: Project Engineer
PROJECT
: Roof Repair at Main Entrance at Shell Depot Tanjung gelang, Perlabuhan
Kuantan.
JOB SCOPE : 1) To arrange tools, Equipment & consumable for the project
2) Supervise the removal the old roof and reinstall the new roof .
3) Compile the report for final document
2011
DURATION : Apr. 2011 – May.2011
EMPLOYER : Nuriman Ent.
POSITION : Project Engineer
PROJECT : Roof Repair at Main Office Building at Shell Depot Tanjung gelang, Perlabuhan
Kuantan.
JOB SCOPE : 1) To arrange tools, Equipment & consumable for the project
2) Supervise the removal the old roof, change of the wood and reinstall
the new roof .
3) Compile the report for final document
DURATION : Jan. 2011 - Feb. 2011
EMPLOYER : Oris Engineering Sdn. Bhd.
POSITION : Project Engineer
PROJECT
: Electronic safety board installation Project at Flexsys (M) Sdn. Bhd. Gebeng
JOB SCOPE : 1) To compile the workers document for safety induction.
2) To arrange tools, Equipment & consumable for the project
3) Apply PTW for the work activities
4) Supervise the civil work and the installation work
5) Compile the report for final document
9
Professional Experience
2010
DURATION : Jan. 2010 - Dis. 2010
EMPLOYER : Oris Engineering Sdn. Bhd.
POSITION : Piping Engineer
PROJECT
: Loading Arm Replacemant Project at Export Terminal Petronas Gas Berhad
Tanjung Sulong ,Kemaman. (Under Kopetro Berhad)
JOB SCOPE : 1) To compile the workers document for safety induction.
2) To arrange tools, Equipment & consumable for the project
3) Apply PTW for the work activities (hot work, cable laying, critical lifting)
4) Supervise the fabrication work, dis-assemble old loading arm and
new loading arm replacement
5) Compile the report for final document