CONTACT-Nigeria|linkedin.com/in/nwosumarcelus-8a-
Tell: -,
-
PERSONAL INFO
Gender: Male
Marital Status: Married
Nationality: Nigerian
NIN:-
Race: Black African
Language: English, Igbo
Passport No: B-
OFFSHORE PAPPERS
OPITO BOSIET
OSP No: 199 659
NIMASA Medical
OGUK/OEUK Medicals
ISPS
STCW
SKILLS
Cable Lay
Rig Move
ROV Tracking
Dive Support
Geophysical Survey
Seismic Survey
Computer Proficiency
Problem Solving
Communication
Leadership Quality
Geotechnical Survey
Barge Positioning
Subsea Installation
Support/Positioning
SOFTWARE
EIVA Navipac 3.8 & 4.0
Hypack
Quinsy
Starfix NG
Autocad
Edgetech Discovery Software
(SSS & SBP))
Easytrac Alpha Applied
Acoustic Software
Easytrak Nexus Software
Starfish Scanline Software
Mesotech MS1000 Sector Scan
Software
Maglog
IXSEA GAPS USBL Software
Klein Sonar Pro 8.1, 11.1, 14.0
Software
Terminalx2 Software
Sonar UI
Echotrac Software
GS24 Geoswath Software
Sonardyne Scout Pro Software
Apos Hipap
NWOSU MARCELUS OSITA
With over 6 years of experience in the field of surveying, I am a dedicated Survey
Technician skilled in utilizing advanced geospatial technologies and methodologies to
deliver precise and efficient assessments. My expertise in topographic and boundary
surveying has led to an increase in project accuracy and reduction in project completion
time. I am eager to leverage my technical proficiency and innovative approach to
contribute to company reputation for excellence in engineering solutions.
EMPLOYMENT HISTORY
PISCES OFFSHORE LIMITED
Lagos, State, Nigeria
Survey Engineer
2018 – 2024
Executed high-precision hydrographic surveys, enhancing project accuracy and maintaining
superior data integrity for Offshore Limited.
Optimized subsea cable laid projects by leading a team, achieving an on-time delivery rate and
reducing operational costs
Leveraged AutoCAD to refine mapping processes, boosting design efficiency and streamlining
project workflows, resulting in a reduction in project delays.
Led a team of 10 in executing subsea cable lay projects, achieving an on-time delivery rate.
Optimized project workflows using .NET, reducing operational costs.
Managed rig move operations, ensuring safety and efficiency, resulting in zero incidents.
Facilitated geophysical surveys, enhancing data accuracy through advanced techniques.
PRINCELAND FURNITURE WORKSHOP
Enugu State, Nigeria
Carpenter
2015 – 2018
Designed and crafted over 150 custom furniture pieces annually, enhancing client satisfaction
through personalized design consultations and quality craftsmanship
Led a team in completing a major hotel interior decoration project, increasing Princeland’s
portfolio visibility and securing High-profile contracts
Streamlined the quotation preparation process, reducing turnaround time and improving client
engagement and conversion rates
NATIONAL YOUTH SERVICE CORP (NYSC)
Ondo State, Nigeria
Mathematics Teacher
2015 – 2016
Developed and implemented a comprehensive mathematics curriculum for exam students,
resulting in an increase in average test scores across the cohort
Initiated and led extra-moral classes, improving student engagement and contributing to a rise in
overall student performance in national exams.
Collaborated with the science department to enhance physics practical sessions, leading to
improvement in students’ practical assessment scores.
CELTEK BROADBAND LIMITED
Enugu State, Nigeria
Site Technician
2012 - 2015
Installed and optimized over 150 radio antennas, enhancing internet signal strength by 30% and
improving customer satisfaction scores.
Conducted routine maintenance on communication cables and routers, reducing downtime and
ensuring seamless connectivity for clients
Collaborated with cross-functional teams to implement new installation protocols, decreasing
setup time and increasing service efficiency
ORBITAL AND ORANGES NIG. LTD
Rivers State, Nigeria
SAFETY OFFICER (INTERNSHIP)
2011 - 2012
Developed and delivered safety induction training for employees, resulting in a reduction in
workplace incidents over six months.
Led monthly hazard hunts, identifying and mitigating potential risks, thereby enhancing
workplace safety and compliance with industry standards.
Facilitated interactive seminars and toolbox meetings, improving team awareness of jobrelated hazards and achieving increase in proactive hazard reporting.
EDUCATION
GODFREY OKOYE UNIVERSITY
Enugu State, Nigeria
Bachelor of Science in Physics
ECDL Module 1- Module 6 Certificates
Member of the Omnium Sanctorum Choir
Member Godfrey Okoye Cultural Group
2009 – 2013
SANCTA MARIA SECONDARY SCHOOL
Enugu State, Nigeria
West African Examination Counsel (WAEC)
2008 – 2008
SANCTA MARIA SECONDARY SCHOOL
Enugu State, Nigeria
National Examination Counsel (NECO)
2008 - 2008
BISHOP OKOYE PRIMARY SCHOOL
Enugu State, Nigeria
First Scholl Leaving Certificate
Member, Bishop Okoye Band Group
Member St. Theresa’s Catholic Parish Alter Boys’
1991 – 2001
TRAINING AND CERTIFICATIONS
OPITO Certified Basic Offshore Safety Induction and Emergency Training including
EBS ‘BOSIET’ (Tollman Nigeria)
Helicopter Underwater Escape Training (HUET) with EBS (Tollman Nigerial)
Sea Survival (Tollman Nigeria)
Fire Fighting and Self-Rescue (Tollman Nigeria)
First Aid and Hypothermia (Tollman Nigeria)
Compressed Air Emergency Breathing System (CA-EBS) Initial Deployment Course
(Tollman Nigeria)
EIVA-NAVIPAC, HYPACK – Marine Software Training (Pisces Offshore)
iHASCO (The Interactive Health & Safety Company) Manual Handling Training
(Pisces Offshore) iHASCO (The Interactive Health & Safety Company) Infection
Prevention and Control Training (Pisces Offshore)
iHASCO (The Interactive Health & Safety Company) Health and Safety Basics and
Essentials (Pisces Offshore)
iHASCO (The Interactive Health & Safety Company) General Workshop Safety
(Pisces Offshore) iHASCO (The Interactive Health & Safety Company) Drug and
Alcohol Awareness (Pisces Offshore) iHASCO (The Interactive Health & Safety
Company) Electrical Safety (Pisces Offshore)
iHASCO (The Interactive Health & Safety Company) Risk Assessment (Pisces
Offshore)
Health, Safety Environment (HSE) LEVEL 1, 2 & 3 Certificate. La PLage Meta
Verse (LPMV)
Project Management Professional Certificate La Plage Meta Verse (LPMV).
WORK EXPERIENCE
Vessel and
Date
Position
Location
Client
VESSEL: HD
CONTENDER
Freelance Survey
Engineer
Nigeria
HYDRO DIVE &
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED
February – March
2025
Scope Of Work
Surface and subsea positioning
operations for the Dive Support
Vessel HD Contender, supporting
the FORCADOS ACOE
decommissioning at the YOKRI
Field, offshore Warri, Nigeria.
This milestone marks a critical step
in advancing safe and efficient
offshore asset retirement in the
Niger Delta. Our team managed
complex subsea navigation under
challenging conditions, delivering:
Accurate vessel dynamic
positioning across all dive phases
Seamless integration diver
tracking systems
Zero safety incidents throughout
operations
Equipment and
Software Used
Hemisphere
VS1000,
Hemisphere V123,
RACOM Radio,
Applied
Acoustic Beacon,
UPS, Laptops and
Computers,
Printer, Extension
boxes, Power &
Data Cables,
Valeport Sound
Velocity Profiler
(SVP), Mesotech
Sector Scan,
MOXA and EIVA
Navipac software
was used.
The success of this operation not
only reinforces the reliability of our
positioning methodology but also
sets a benchmark for future
decommissioning campaigns in the
region.
VESSEL: HD
CONTENDER
NovemberDecember 2024
Freelance Survey
Engineer
Nigeria
HYDRO DIVE &
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED
Surface and subsea positioning of
the Dive Support Vessel HD
Contender for the FORCADOS
Single Buoy Mooring II floating
hose replacement at the YOKRI
Field in Warri. The vessel sailed to
Bonny for the BSBM 3 chain and
subsea host inspection at the Bonny
Field, offshore Nigeria.
This operation marks a critical
milestone in our offshore logistics
and underwater infrastructure
support. The team executed:
Precise positioning and mooring
at high-current zones
Safe replacement of aging
floating hose systems
Seamless transition to Bonny for
subsea chain and host inspection
These efforts not only enhance
operational uptime but also
mitigate environmental risk across
both fields.
CNav 3050,
Hemisphere
VS1000,
Hemisphere V123,
RACOM Radio,
Applied
Acoustic Beacon,
UPS, Laptops and
Computers,
Printer, Extension
boxes, Power &
Data Cables,
Valeport Sound
Velocity Profiler
(SVP), MOXA and
EIVA Navipac
software.
VESSEL:
VEGA JUNIZ
Freelance Survey
Engineer
Nigeria
April – June 2024
CHEVRON &
PRIME
SOURCE
LIMITED
(PSL)
The Chevron/PSL PANTHA
operation—covering the surface
positioning of the vessel VEGA
JINIZ and subsea positioning of
flexible pipe lay from the MALU 6
to MALU 9 platforms at the
MALU Field.
Key Highlights:
Seamless integration of vesselbased positioning and subsea
tracking systems
Optimized lay path from MALU
6 to MALU 9 platform, reducing
tension and curvature risks
Zero safety incidents across the
full execution window
VESSEL: HD
CONTENDER
Online Surveyor
Nigeria
January – March
2024
HYDRO DIVE &
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED
Surface and subsea positioning of
the Dive Support Vessel, HD
Enterprise, for the Single Buoy
Mooring (SBM 3) floating hose
replacement—alongside a
comprehensive chain and subsea
host inspection—at Bonny Field.
This operation involved:
Dynamic vessel positioning
under varying sea states
Precision hose replacement and
chain evaluation
Detailed subsea host integrity
inspection
The project was executed safely
and on schedule, strengthening
critical infrastructure reliability in
the region. Our team’s
coordination with local marine
logistics and real-time subsea
telemetry ensured precision
throughout.
VESSEL:
LEADER Z
Survey Engineer
December 2023
Nigeria
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED AND
EXXONMOBIL
NIGERIA
Coordinated the mobilization of
equipment for both surface and
subsea positioning of the Support
Vessel, Leader Z, for the FPSO
Morem chain change-out at the
Bonga field, offshore Nigeria.
This milestone marks a critical step
in ensuring operational readiness
and safety for the subsea
intervention phase. Our team
coordinated complex logistics
under tight timelines, enabling:
Full subsea positioning system
integration
Dive support vessel readiness for
chain recovery operations
Compliance with local offshore
safety protocols
C Nav 5000, Satel
Radio, Mesotech
Sector Scan, Power
Extension Boxes,
Gyro Compass,
Laptops and
Computers, Power
&Data Cables,
MOXA, Video
Splitter, Simrad
Beacon,
Kongsberg USBL
and Eiva Navipac
Software was used.
CNav 3050,
Hemisphere
VS1000,
Hemisphere V123,
RACOM Radio,
Applied
Acoustic Beacon,
CNode
Transponder, UPS,
Laptops and
Computers,
Printer,
Extension boxes,
Power
& Data Cables,
MOXA and EIVA
Navipac software.
CNav 3050,
Hemisphere
VS1000,
Hemisphere V123,
RACOM Radio,
Applied Acoustic
Beacon, CNode
Transponder, UPS,
Laptops and
Computers,
Printer,
Extension boxes,
Power
& Data Cables,
MOXA and EIVA
navipac software.
VESSEL:
NORMAND
INSTALLER
Survey Engineer
Nigeria
December 2023
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED AND
EXXONMOBIL
NIGERIA
Coordinated the mobilization of
advanced surface and subsea
positioning equipment, ensuring
the successful deployment of the
Vessel, Normand Installer, for
FPSO Morem chain change-out
at Bonga field, Offshore Nigeria.
Optimized equipment setup
processes, reducing mobilization
time, which enhanced operational
efficiency and minimized
downtime during critical offshore
operations.
Collaborated with crossfunctional team in executing
precise survey operations,
achieving précised positioning,
which significantly improved the
safety and reliability of subsea
interventions.
VESSEL:
ADDA
SAVANNA
Survey Engineer
Nigeria
December 2023
VESSEL: HD
ENTERPRISE
September –
November 2023
Survey Engineer
Nigeria
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED AND
EXXONMOBIL
NIGERIA
HYDRO DIVE &
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED
Coordinated the mobilization of
advanced surface and subsea
positioning equipment for the
Vessel, Adda Savanna, ensuring
precise alignment for the FPSO
Morem Chain change-out at
Bonga Field, Offshore Nigeria.
Optimized equipment
deployment processes, reducing
mobilization time and enhancing
operational efficiency during
critical offshore projects.
Surface and subsea positioning of
the Dive Support Vessel, HD
Enterprise, for the installation of
the Forcados ACOE Temporary
Export System at the Forcados
Yokri Field, Offshore Nigeria.
This milestone was achieved under
challenging offshore conditions,
requiring precise coordination
between subsea operations and
surface navigation. Our team
ensured:
Accurate vessel positioning with
minimal deviation
Seamless integration with subsea
infrastructure
Timely execution aligned with
project timelines
CNav 3050,
Hemisphere
VS1000,
Hemisphere V123,
RACOM Radio,
Applied Acoustic
Beacon, CNode
Transponder, UPS,
Laptops and
Computers,
Printer,
Extension boxes,
Power
& Data Cables,
MOXA and Starfix
NG software.
CNav 3050,
Hemisphere
VS1000,
Hemisphere V123,
RACOM Radio,
Applied Acoustic
Beacon, CNode
Transponder, UPS,
Laptops and
Computers,
Printer,
Extension boxes,
Power
& Data Cables,
MOXA and EIVA
Navipac software.
CNav 3050,
Hemisphere
VS1000,
Hemisphere V123,
RACOM Radio,
Applied Acoustic
Beacon, Solar
Panels, CNode
Transponder, UPS,
Laptops and
Computers,
Printer,
Extension boxes,
Power
& Data Cables,
MOXA and EIVA
Navipac software.
VESSEL: HD
ENTERPRISE
June-August
2023
VESSEL: HD
ENTERPRISE
Survey Engineer
Survey Engineer
Nigeria
Nigeria
February-May
2023
HYDRO DIVE &
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED
HYDRO DIVE &
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED
Directed precise surface and
subsea positioning for Dive
Support Vessel HD Enterprise,
ensuring successful installation
of Forcados Alternative Crude
Oil Export System (ACEO) with
zero incidents.
Optimized survey operations at
Forcados Yokri Field, enhancing
positioning accuracy through
advanced geospatial techniques.
Collaborated with crossfunctional teams to streamline
installation processes, reducing
project completion time and
saving operational costs.
CNav 3050,
Hemisphere
VS1000,
Hemisphere V123,
RACOM Radio,
Applied Acoustic
Beacon, Solar
Panels, CNode
Transponder, UPS,
Laptops and
Computers, Printer,
Extension boxes,
Power
Directed surface and subsea
positioning for Dive Support
Vessel HD Enterprise, ensuring
precise installation of Forcados
ACOE Temporary Export
System, enhancing operational
efficiency
CNav 3050,
Hemisphere
VS1000,
Hemisphere V123,
RACOM Radio,
Applied Acoustic
Beacon, Solar
Panels, CNode
Transponder, UPS,
Laptops and
Computers,
Printer,
Extension boxes,
Power
& Data Cables,
MOXA and EIVA
Navipac software.
Optimized positioning accuracy
at Forcados Yokri Field,
Offshore Nigeria, reducing
installation time and minimizing
potential environmental impact
Cooprerated with crossfunctional teams to implement
advanced surveying techniques,
resulting in increase in project
delivery speed and accuracy
SURVEY BOAT
January 2023
Survey Engineer
Nigeria
OIL SERV &
NNPC
Geophysical survey along the River
Niger corridor at Lokoja, Kogi
State, Nigeria—essential
milestones in mapping the pipeline
track for the AKK Pipe Lay
Project.
Spanning several kilometers of
complex riverine terrain, this
survey required advanced
subsurface imaging and real-time
data acquisition to ensure precision
alignment with environmental and
engineering benchmarks. Our team
deployed resistivity and seismic
profiling techniques to delineate
subsurface conditions, enabling
optimal route planning and risk
mitigation.
Key Outcomes:
Accurate mapping of the
proposed pipeline track along the
River Niger
Identification of geotechnical
risk zones and sedimentary
anomalies
& Data Cables,
MOXA and EIVA
Navipac software.
Sound Velocity
Profiler, EdgeTech
Side Scan Sonar,
Sub-Bottom
Profiler, Single
Beam Echo Track,
Magnetometer,
Hemisphere V123,
C- Nav
3050 DGPS,
Laptops and
Computers, UPS,
Hypack Software
VESSEL: GO
SUPPORTER
Survey Engineer
Nigeria
December 2022
VESSEL: HD
ENTERPRISE
November 2022
Survey Party
Chief
Nigeria
PISCES
OFFSHORE
LIMITED / LES
ENERGY
SERVICE
LIMITED /
MOBILE
PRODUCING
NIGERIA
LIMITED (MPN).
HYDRO DIVE &
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED
Directed deep-water subsea
operations using ROV tracking,
achieving accurate data and
reducing operational downtime.
Optimized marine intervention
processes, leading to an increase
in efficiency and ensuring
compliance with MIL 198
standards
Collaborated with crossfunctional teams to implement
advanced ROV support systems,
enhancing project delivery
timelines
I led the successful Surface and
Subsea positioning operations of
the Dive Support Vessel HD
Enterprise during the installation of
the Forcados FSBM 2 Sub-Sea
host at the Forcados Yokri Field,
Warri Offshore, Nigeria.
This achievement not only
reinforces our operational
capabilities but also demonstrates
our commitment to excellence in
offshore execution.
EIVA-Navipac,
HiPAP USBL,
Applied Acoustics
Positioning
Beacons,
Telemetry systemRipex 2 radio
modem, BricsCAD
software,
Hemisphere
GNSS receivers
(VS 1000),
C-Nav DGPS
receivers,
Teledyne TSS
Meridian Surveyor
Gyrocompass,
Mesotech MS
1000, Valeport
Midas SVX2,
Tarsus DGPS
receiver, Leica
Total Station.
Executed precise surface and
subsea positioning for Dive
Support Vessel HD Enterprise,
ensuring successful installation
of subsea host at Forcados Yokri
Field, Offshore Nigeria,
achieving 100% alignment with
project specifications.
Optimized positioning accuracy
through advanced geospatial
techniques, reducing installation
time and enhancing operational
efficiency for Offshore Limited.
Collaborated with crossfunctional teams to implement
innovative surveying
technologies, resulting in
increase in data acquisition speed
and improved decision-making
processes.
CNav 3050,
Hemisphere
VS1000,
Hemisphere V123,
RACOM Radio,
Applied Acoustic
Beacon, Solar
Panels, CNode
Transponder, UPS,
Laptops and
Computers,
Printer,
Extension boxes,
Power
&
Data Cables,
MOXA and EIVA
navipac software
This complex operation involved
precise coordination, technical
oversight, and real-time decisionmaking under challenging offshore
conditions. Our team ensured:
Accurate subsea positioning for
host installation
Seamless vessel maneuvering
and dive support
Timely execution aligned with
project milestones
VESSEL: HD
ENTERPRISE
SeptemberOctober 2022
Survey Engineer
Nigeria
HYDRO DIVE &
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED
C-Nav DGPS
3050, Hemisphere
VS1000 Dgps,
TSS Meridian
Gyrocompass,
Hipap Usbl, Cnode
Beacons, Sound
Velocity Profiler
(Valeport) and
EIVA Navipac
software.
VESSEL:
PRINCE
JAMESON 1
Survey Engineer
Nigeria
June-August 2022
VESSEL: HD
ENTERPRISE
April - June 2022
Nigeria
Survey Engineer
AWARITSE
NIGERIA
LIMITED/TILON
E SUBSEA
LIMITED/
MOBILE
PRODUCING
NIGERIA
UNLIMITED
(MPN).
HYDRO DIVE &
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED
The subsea survey for Field
Maintenance, along with Diver and
ROV tracking/support, was
successfully completed.
The survey delivered valuable
insights and real-time positioning
data essential for ongoing
maintenance planning. Our team
ensured full alignment with
operational safety standards, and
the integration of ROV tracking
significantly enhanced visibility
during subsea activities. Key
highlights include:
Accurate mapping of critical
subsea infrastructure
Real-time tracking of diver
movement and ROV deployment
No incidents or downtime
reported during operations
Surface and Subsea positioning of
the Dive Support Vessel, HD
Enterprise, for the SBM2 Changeout operation at the Forcados
Yokri Field, Offshore Nigeria
The operation supported critical
infrastructure upgrades and was
executed with full compliance to
safety and environmental
standards.
Key Highlights:
Accurate vessel positioning in
challenging offshore conditions
Timely support for SBM2
disconnection
Zero incident report throughout
the operation.
VESSEL: HD
CONTENDER
February 2022
Survey Engineer
Nigeria
HYDRO DIVE &
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED
Conducted the mobilization/rigup for surface and subsea
positioning of a Dive support
vessel, HD Contender, enhancing
dive support operations through
precise execution and planning
Optimized deployment strategies
for HD Contender, resulting in
reduction in setup time and
increasing operational efficiency
Our team implemented advanced
positioning systems, improving
accuracy and reducing project
delays
C-NAV DGPS
3050, TSS
Meridian
Gyrocompass,
Hipap USBL,
sonardyne
Beacons, Applied
Acoustic beacons,
Valeport Sound
Velocity Profiler
(SVP), Blueview
Sonar, Valeport
current meter
CNav 3050,
Hemisphere
VS1000,
Hemisphere V123,
RACOM Radio,
Applied Acoustic
Beacon, Solar
Panels, CNode
Transponder, UPS,
Laptops and
Computers,
Printer,
Extension boxes,
Power
&
Data Cables,
MOXA and
EIVA navipac
software
CNav 3050,
CNode
Transponder, UPS,
Laptops and
Computers,
Printer,
Extension boxes,
Power
&
Data Cables,
MOXA and
EIVA navipac
software
VESSELS:
JASCON 65 &
JASCON 90
November 2021
Survey Engineer
Nigeria
Following the successful
WAV/MOBIL
deployment at Bonny River
PRODUCTION
Terminal, the surface positioning
AND
for the SPM Storage system.
DEVELOPMENT
COMPANY
This milestone marks a critical step
in our ongoing offshore readiness
LIMITED
and demonstrates the team’s
NIGERIA.
precision in executing complex
marine positioning under
challenging tidal conditions. The
operation was conducted with full
compliance to HSE standards and
within projected timelines.
Hemisphere
VS1000,
Hemisphere
VS330, CNav
3050, Gyro
Compass Racom
Radio, UPS,
MOXA,
Laptop and
Coputers, Printer,
Power extension
boxes, and EIVA
navipac
Key Highlights:
Accurate mooring point
calibration for SPM Storage
Real-time surface positioning
using GNSS-integrated systems
Zero incident report throughout
the operation window
VESSEL: HD
ENTERPRISE
November 2021
SURVEY BOAT
July 2021
Survey Engineer
Survey Engineer
Nigeria
Nigeria
HYDRO DIVE &
SHELL
PRODUCTION
AND
DEVELOPMENT
LIMITED
. ORETOL
Mobilization/rig-up of surface
and subsea positioning systems
for the Dive Support Vessel HD
Enterprise, enhancing operational
efficiency
Implemented innovative survey
techniques that improved data
accuracy, supporting critical
offshore construction projects
Conducted comprehensive
geophysical and pre-dredge
surveys, resulting in an increase
in project efficiency and reducing
operational costs
Collaborated with crossfunctional team to implement
advanced survey technologies,
enhancing data accuracy and
improving client satisfaction
scores
Optimized survey processes
through innovative
methodologies, decreasing
survey completion time and
expanding project capacity
Kongsberg CNode,
Racom Radio,
HemispherVS100,
EIVA navipac
software,
Hemisphere 103,
CNAV 3050, Gyro
Compass, Valeport
Sound Velocity
Profiler, MOXA,
Printer, Laptops,
Power Extension
boxes, Total
Station, Sector
Scan, VGA
Splitters, KVM
Extender, Network
Switch and WSM
Sonardyne
Beacons
ECHOTRAC
Single Beam
Echosounder, SubBottom
Profiler, HYPACK
software
VESSEL:
JASCON 10
Survey Engineer
Nigeria
May 2021
MOBIL
PRODUCTION
AND
DEVELOPMENT
COMPANY
LIMITED
NIGERIA.
Coordinated the mobilization and
deployment of surface and
subsea positioning systems for
the SPM/Pipeline Reinstallation
Bonga Oil Production field,
ensuring optimal adherence to
project timelines and safety
standards
Optimized survey operations by
implementing advanced
positioning techniques, reducing
installation time and saving
project costs
Worked with a cross-functional
team in the successful execution
of complex subsea surveys,
achieving accuracy in data
collection and analysis
VESSEL: HD
ENTERPRISE
Survey Engineer
Nigeria
APRIL – MAY
2021
HYDRODIVE,
PEACE
SERVICE
LIMITED AND
CHEVRON
NIGERIA
LIMITED.
Directed the installation of
spools, risers, and mattresses at
Meren WP, M102 Platform,
enhancing structural integrity and
operational efficiency
Optimized installation processes,
reducing project completion time
and cutting costs through
strategic resource allocation
Worked with a functional team,
successfully coordinating
complex offshore installation
tasks with zero safety incidents
February 2021
Survey Engineer
Nigeria
SHELL
PRODUCTION
AND
DEVELOPMENT
COMPANY.
Coordinated mobilization and
surface positioning for SEWOP
moves, ensuring full compliance
with safety and regulatory
standards, resulting in zero
incidents
Optimized navigation and
positioning systems, improving
efficiency by and reducing
operational downtime
Collaborated with a crossfunctional team to successfully
execute complex offshore survey
operations, achieving project
milestones ahead of schedule
USBL system,
MOXA, Printer,
UPS, Power
Extension Boxes,
Laptops and
Computers,
APPLIED
ACOUSTIC
Transponders,
Sonardyne
Transponders,
Sound Velocity
Profiler, Mesotech
Scanner and EIVA
Navipac Software
C-NAV DGPS
3050, VS1000
dgps, TSS
Meridian
Gyrocompass,
Kongsberg
Hipap USBL, Cnode / Applied
Acoustic /
Sonardyne
beacons, Sound
Velocity Profiler
(SVP) and EIVA
Navipac Software
UPS, MOXA,
Power
Extension boxes,
C- Nav
3050, EIVA
navipac software,
VGA Splitters and
Printer
VESSEL:
SURVEY BOAT
Survey Engineer
Nigeria
January 2021
SHELL
PRODUCTION
AND
DEVELOPMENT
COMPANY.
Orchestrated the mobilization for
the Afremo Geophysical Survey,
ensuring on-time deployment of
equipment and personnel,
contributing to an increase in
operational efficiency
Working with a functional team
in executing a complex
geophysical survey, achieving a
quality data and enhancing
project deliverables
Implemented innovative
surveying techniques that
reduced data collection
timeoptimizing resource
allocation and project timelines
VESSEL:
December 2020
Survey Engineer
Nigeria
NPDC OKPOHO
Successful mobilization for
Subsea intervention ROV
tracking and dive support on the
OKONO 8’’ pipeline, ensuring
operational readiness and
adherence to safety protocols
Coordinated a cross-functional
team to execute complex
underwater surveys, reducing
project downtime and enhancing
data accuracy
Multi Beam
Echosounder,
Computers,
MOXA,
Hemisphere
VS1000, Total
Station, UPS,
Laptops,
Magnetometer,
EdgeTech
Side Scan, SubBottom Profiler
and Hypack
Software
HIPAP system,
Kongsberg Cnode,
Applied
Acoustic
transponders,
MOXA,
Printer, UPS,
Power Extension
Boxes, Laptops
and Computers,
hypack software
Implemented innovative tracking
solutions that improved ROV
navigation efficiency, resulting in
increase in survey coverage area
VESSEL: MV
CALAFACE
December 2020
Survey Engineer
Nigeria
RMC
Mobilization for Buoy Positioning
aboard the MV CALAFACE, under
the RMC scope of work. The
operation was executed as planned,
with all systems integrated and
deployed on schedule.
This milestone marks a critical
foundation for the next phase of the
project. The team demonstrated
strong coordination throughout
mobilization, ensuring:
Accurate buoy calibration and
placement readiness
Seamless integration with vessel
systems
Full compliance with safety and
environmental protocols
MOXA, Printer,
UPS, Power
Extension Boxes,
Laptops and
Computers
Sonardyne
Transponders &
Sensor hub, Power
extension
boxes, Gyro
Copass and EIVA
navipac software
VESSEL:
MAERSK
MAKER
Survey Engineer
Nigeria
RAYTHEON
ENERGY
LIMITED AND
CHEVRON
NIGERIA
LMITED.
Survey Engineer
Nigeria
BOAZ
INTEGRATED
ENERGY AND
ATLAS
PETROLUM
LIMITED
OCTOBER 2020
VESSEL:
WHISKY STAR
7
Sept 2020
Seabed debris survey at Ejuelebe
Platform A, located in the Escravos
region of Nigeria.
The scope of work was executed
with precision and within the
expected timeframe. Key highlights
include:
Full coverage of the designated
survey grid using high-resolution
sonar
Identification and safe clearance
of non-conforming seabed items
Data validation and submission
ahead of schedule
C-NAV DGPS
3050
and
5000, VS1000 gps,
Meridian
Gyrocompass,
Kongsberg
Hipap LBL, Cnode
Transponders,
ADL and
Racom radio
modem and EIVA
Navipac software
Executed precise jackup
positioning for the Ejuelebe
platform in Nigeria's Ecravos
region, ensuring alignment
within 0.5 meters of target
coordinates, enhancing
operational efficiency.
C-nav Dgps 3050,
Veripos Gps, TSS
Meridian
Gyrocompass and
EIVA Navipac
software
Optimized survey processes by
integrating advanced GPS
technology, reducing setup time
and improving data accuracy.
Collaborated with crossfunctional teams to troubleshoot
and resolve positioning
discrepancies, minimizing
downtime and maintaining
project timelines.
VESSEL: SEA
PREVAILER
JULY 2020
Survey Engineer
Nigeria
BOAZ
INTEGRATED
ENERGY AND
ATLAS
PETROLUM
LIMITED
Mobilization for positioning
support related to subsea facility
maintenance at the Erha and USAN
(MOBIL) Fields, covering both
Lagos and Port Harcourt.
This achievement marks a critical
step in ensuring readiness for
offshore maintenance operations.
The scope covered:
Deployment of specialized
subsea positioning assets
Coordination across Lagos and
Port Harcourt logistics hubs
Compliance with field-specific
safety and technical protocols
The operational efficiency and
safety-first approach demonstrated
by our crew set a strong foundation
for the next phase..
C-NAV DGPS
3050,
TSS Meridian
Gyrocompass,
Kongsberg
Mesotech Sector
Scan and EIVA
Navipac Software
VESSEL:
JASCON 2
Survey Engineer
Nigeria
February – March
2020
WEST AFRICA
VENTURE/
AFRICA
DIVING
SERVICE /
ADDAX
PETROLEUM
DEVELOPMENT
NIGERIA
LIMITED.
Pipe-lay from ADN-A to ADN-B
platform, along with dive support
operations off the coast of Nigeria
for Addax.
Our team delivered under
challenging offshore conditions,
maintaining full compliance with
HSE protocols and timeline
expectations. Key highlights
include:
Seamless pipe-lay alignment
between ADN-A and ADN-B
Zero incidents during dive
operations
Operational readiness confirmed
for Addax’s next phase
C-NAV DGPS
3050, TSS
Meridian
Gyrocompass.
Kongsberg
Mesotech Sector
Scan, Ruskin CTD,
MT9 Beacon,
IXSEA GAPS
USBL and EIVA
Navipac Software
This milestone not only reinforces
our technical capability but also
strengthens our delivery record in
West Africa’s offshore sector.
VESSEL:
JASCON 65
Survey Engineer
Nigeria
WEST AFRICA
VENTURE/
AFRICA
DIVING
SERVICE /
ADDAX
PETROLEUM
DEVELOPMENT
NIGERIA
LIMITED.
VESSEL:
TRIDENT 8
RIG
Survey Engineer
Nigeria
SHIELF
DRILLING
NIGERIA AND
AMNI
PRODUCTION
COMPANY.
December 2019
Geophysical pre-lay survey
conducted between platforms
AND-A and AND-B at the
Addax site in Nigeria.
Our team focused on seabed
characterization and route
assessment to support pipeline
installation. We completed
acquisition across the designated
corridor, capturing highresolution bathymetry, subbottom profiles, and
magnetometer data.
C-NAV DGPS
3050,
Hemisphere V330
DGPS,
Edgetech 3100
SBP, singlebeam
echosounder
(echotrac),
magnetometer
G882, Klein 3000
Side Scan
Sonar, C-max side
Scan Sonar, TSS
Meridian
Gyrocompass,
Valeport SVP, T20 and R2sonic
multibeam
Rig-move and demobilization
operations at Okoro field.
C-NAV DGPS
3050, TSS
Meridian
Gyrocompass,
Kongsberg Sector
Scan Sonar.and
EIVA navipac
software
The scope of work covered:
Safe rig-move execution from the
Okoro platform to the designated
laydown area
Full demobilization of associated
marine spread and support assets
Final site clearance in accordance
with field protocols and HSE
standards
All activities were completed on
schedule and within operational
parameters. No incidents were
recorded during the move, and all
equipment has been accounted for
and signed off by the offshore
supervisor.
VESSEL:
SURVEY BOAT
Survey Engineer
Nigeria
OSHE REWO
GREMOORE
LIMITED
AND MOBILE
PRODUCING
NIGERIA
UNLIMITED
(MPN).
Geophysical and ROV survey
conducted at Asasa Field—
specifically at Asasa VA and VB
within the Asabo region
Our team completed the initial
survey tasks, including seabed
mapping and sub-bottom
profiling, with ROV support for
both visual inspection and data
acquisition.
C-NAV DGPS
3050,
Veripos DGPS,
Edgetech 3100
SBP, singlebeam
echosounder,
magnetometer
G882, Klein 3000
Side Scan Sonar,
Edgetech
4200 side Scan
Sonar, TSS
Meridian
Gyrocompass,
Kongsberg Sector
Scan Sonar, ROV
(Seaeye), Valeport
SVP, T-20
multibeam,
Sonardyne ranger
USBL, ROV and
(Hypack, EIVA
Navipac)
Software’s
Survey Engineer
Nigeria
CHEVRON
NIGERIA
LMITED
Chevron's FSO Escravos,
specifically regarding the LPG
Escravos FSO Mooring and Turret
Monitoring.
Our team conducted a
comprehensive assessment focused
on real-time mooring load
behaviour, turret alignment, and
structural fatigue indicators. Key
outcomes included:
C-NAV DGPS
3050,
Meridian
Gyrocompass,
ADL radio modem
and EIVA Navipac
Software
NOVEMBER
2019
VESSEL: L P G
Escravos FSO
AUGUST 2019
Enhanced sensor calibration
protocols for dynamic mooring
tension
Predictive maintenance triggers
based on turret bearing data
Risk mitigation
recommendations aligned with
Chevron’s offshore safety
framework
VESSEL:
TRIGENT 8
RIG
JULY 2019
Survey Engineer
Nigeria
SHIELF
DRILLING
NIGERIA AND
AMNI
PRODUCTION
COMPANY
Rig move and final positioning at
Okoro Field.
The operation involved:
Coordinating rig relocation
logistics across shallow water
zones
Executing precision positioning
using dynamic reference points
Ensuring optimal alignment for
immediate drilling readiness
All tasks were completed safely,
within schedule, and in full
compliance with site-specific
protocols.
C-NAV DGPS
3050,
Meridian
Gyrocompass,
Kongsberg Sector
Scan Sonar,
Kongsberg
MS1000 and EIVA
Navipac Software
Detailed salary breakdown on following
page SALARY DETAILS
Package Details
Monthly Basic Salary
Company Car (Make/Value/Year) OR Car Allowance
Petrol / Maintenance/Variables
Medical Aid (Medical Scheme /Company & Plan) (Main Member +
Adult
Dependent/s +
Children)
Earnings / Company
Contributions
R
R
R
R
Pension Fund/Provident/RA
Group Life/Disability/Funeral
Cell Phone / Connectivity (Personal/business/capped/uncap
ped) (Company Cell Phone or Allowance)
R
R
R
Laptop/ADSL/3G
R
Commission Monthly/Quarterly/Yearly Average
commission paid out
R
Overtime / Standby Allowance (Monthly Average)
R
13th Cheque or Bonus
R
Obligation to current employer:
(Study Loan/ Bursary Obligations/ Loans/ Maternity Benefits/ Training/
Retention Bonus/other)
R
Housing/Housing Allowance
R
Other Allowances
(Preferential Rates/Parking/Annual Subscription/Membership
Fees/Lunch/Home Office/Subsistence Allowances/Other)
R
Shares / Share Options
R