Kingsley Ehizele Adogun

Kingsley Ehizele Adogun

Engineering and Project Management
Reply rate:
-
Availability:
Full-time (40 hrs/wk)
Location:
Birmingham, West Midlands, United Kingdom
Experience:
13 years
Kingsley Ehizele Adogun BEng (Hons) MIET MNSE MNIMechE Engineering/Project Lead 65, Frederick Road, Selly Oak, Birmingham, United Kingdom. B29 6NX -; -- Dedicated Engineering/Project Lead well-versed in the requirements and best practices of Engineering Design and Project Management for Petroleum and Aviation Depot Terminals. Talented project manager and complex problem-solver with a forward-thinking mentality. Safety-conscious and detail-oriented with over 10-year industry background. Well-versed in team leadership and task delegation to drive project progress and foster client satisfaction. Skilled at identifying or anticipating problems and providing solutions. Excels through mentoring, training and empowering team to excel in performance. Skills           Facilities Management Project Management Budgeting Scheduling Project Planning and Development Petroleum Terminal Construction Construction Management Technical Support Contractor/ Subcontractor Management Mechanical Engineering  Engineering Design  Design Direction  Bill of Material (BOM)  Metal Fabrication  Contract Management  Project Estimation and Bidding  Residential Construction  Project Leadership  Piping Diagram  Building, Demolition and Renovation  Tank Design & Construction  Procurement           Good Organizational AutoCAD Proficient Microsoft Excel Microsoft Office Suite Microsoft Project Estimating Commercial Bid Preparation Technical Bid Preparation Design/Drawing/Document Review FIDIC Contract (Yellow Book) Work History Aug. 2024 – To Date Engineering & Project Lead (Hybrid; Majorly Remote) Tezibon Engineering & Manufacturing Limited, Port Harcourt, Nigeria.     Liaise with the Managing Director to oversee all project activities/deliverables for the project ensuring prompt and accurate delivery. Responsible for interpretation of job specifications and establishment of project execution plan. Gives approval to the project quality assurance plan, its implementation, and subsequent revisions thereto. Approves Project HSES and Community Relations Plan and ensures its implementation.           Dec. 2023 – To Date Responsible for overall supervision and ensures the proper application of the project procedures. Responsible for achieving and sustaining the required quality level of all works as to continually meet the client’s needs. Review, directs, and monitors the activities of the project team. Makes project business decisions, manages the commercial, administration of the contract and, acquires and maintains the necessary resources for the project. Implements necessary controls, manages the reporting requirements of the contract. Monitors work progress and cost, and take suitable remedial action promptly to ensure timely completion of the project within budgeted costs. Ensures compliance with the requirements of the contract and regulations, codes and standards relating to the project, and shall resolve any conflict and all such resolutions maintained within the above requirements. Manages all project interfaces. Coordinates procurement in collaboration with the project manager and the procurement manager. Coordinates issue of final handover documentation and Close-out. Quality & Production Team Member Aisin Europe Manufacturing (UK) Ltd  Inspected finished component to identify defects in manufacture  Reported defects to the management as appropriate  Maintained high standards of quality control at all times  Completed all tasks within the required cycle time  Ensured that the Stop, Call and Wait procedure is followed when any machine breakdown or quality issue arises.  Ensured all operations/processes are carried out in accordance with company standards and procedures.  Sept 2023 – Dec. 2023 Reported incidents and hazardous situations to the management. Production Quality Assurance Operative Aisin Europe Manufacturing (UK) Ltd  Ensured components comply with customer specification – dimensionally and/or cosmetically.  Escalated non-conforming processes and products to management.  Ensured all operations/processes are carried out in accordance with company standards and procedures.  Authorised to stop production lines/zones if parts are found to be defective. Mar. 2023 – Sept. 2023 Quality Assurance Operative Minor Weir Willis Limited, Birmingham, UK  Identified and report issues affecting product configuration.  Inspected inbound delivery by confirming specifications; conducted visual and measurement tests; communicating required adjustments to QA supervisor.  Inspected finished products by confirming specifications; conducting visual and measurement tests before dispatch.  Documented inspection results by completing reports and logs; summarized re-work and waste; inputting data into quality database.  Maintained a safe and healthy work environment by following standards and procedures; complying with legal regulations.  Updated job knowledge by participating in educational opportunities; reading technical publications.  Accomplished quality and organization mission by completing related results as needed. Jul. 2017 – Feb. 2023 Head; Engineering Design /Project Manager TLD Global Services Limited, Lagos  Promptly delivered multi-billion dollar petroleum/aviation depot storage facilities’ construction projects within budget and to customers’ satisfactions.  Promptly delivered Engineering design projects (Conceptual, FEED and DED) and managed procurement/construction of depot constructions with high quality of service delivery; while striving for best in class products and business practices to deliver to the customer’s expectations, managing teams and projects across the business. These projects are basically for Petroleum and Aviation depots and cover the following areas: Process, Tanks, Equipment and Piping design with associated Civil designs; other facilities/utilities civil/structural designs, Electrical/Instrumentation design; and project management.       Formulated and facilitated the implementation of strategies and plans focused on managing the company’s facilities in my unit and project sites. Prepared technical and contractual documents for issue to Client and analyzed returned tenders. Put in place an operating process for safe selection of external contractors thereby ensuring that all external contracts are regularly reviewed to ensure best value. Worked with marketing unit on product development, market opportunities and trends. Coordinated projects’ value engineering and financial control of contracts during construction stage. Developed planning and prioritize processes to ensure that multi-disciplinary resource is well aligned to maximize delivery of projects. MAIN DUTIES • Worked with other engineering teams to ensure good communication of work load requirements and consistent approaches to policies and methodologies. • Prepared engineering calculation packages for the storage tanks and hydraulics calculations for the Piping networks for the Petroleum Depot facilities. • Reviewed engineering designs (drawings, Bill of materials, specifications, etc.) for existing and new petroleum depot facility. That is both brownfield and greenfield projects. • Managed and provided timely updates to engineering schedule, and engineering updates to the project and engineering management team. • Strong in AutoCAD to create models and drawing. • Generated Bill of material on Microsoft Office Tools. • Prepared Engineering Change Notices, part reports, and engineering specifications, check layouts and ensures conformance to all policies and procedures related to engineering functions. • Provided design solutions to correct non-conformances while taking into account safety, quality, schedule, and cost. • Assisted engineering manager with any requested technical and engineering related tasks. • Prepared Technical and Commercial Tenders. • Assisted engineering manager with preparation of prequalification questionnaire for projects used in assessing contractors. April 2016 – Jun. 2017 Head; Engineering Design TLD Global Services Limited, Lagos  Checked design compliance with product specifications and standards requirements.  Managed construction administration and value engineering processes.        Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts and coordinate delivery timelines. Generated system concepts to satisfy product requirements. Communicated project requirements and areas for improvement in design review meetings. Interfaced with development engineers and suppliers to resolve quality issues. Evaluated final product's overall performance, reliability and safety. Reviewed technical drawings developed by CAD technicians and drafters. Altered and modified designs to meet requirements and eliminate malfunctions. Oct. 2012 – March 2016 Mechanical Engineer Oct. 2011 – Oct. 2012 Mechanical Engineer Trainee GOWASK Engineering Limited, Lagos.  Applied mechanical problem solving skills to develop creative solutions for quality products.  Created models, assemblies and drawings using AutoCAD and other engineering software application.  Examined existing documents and blueprints to best update and maintain project records.  Liaised with stakeholders to define and document design requirements.  Addressed design challenges and evaluated alternative design models to meet project requirements.  Created CAD models and drawings for Petroleum Terminal designs.  Checked design compliance with product specifications and standards requirements.  Drafted assemblies, models and other technical drawings. GOWASK Engineering Limited; (A Subsidiary of TLD Global Services Limited Lagos.  Organized data archive of engineering specifications, drawings and specifications and maintained traceability of documents by proper filing and indexing.  Developed technical skills through training and shadowing experienced professionals.  Documented survey information and organized data for review by senior engineers.  Performed calculations according to standard procedures. Education Dec. 2003 – Dec. 2008 B. Eng. Mechanical Engineering Sept. 1997 – Jun. 2000 NECO SSCE University of Benin; Benin City Henson Demonstration Secondary School; Benin City Languages English Language Affiliations          The Institution of Engineering and Technology (IET); UK | 2023 PRINCE2 Foundation Project Management; AXELOS Global Best Practice; UK | 2019 PRINCE2 Practitioner Project Management; AXELOS Global Best Practice; UK | 2019 The Council for the Regulation of Engineering in Nigeria (COREN) | 2019 PRINCE2 Project Management Proficiency; AXELOS Global Best Practice; UK. | 2018 Oil and Gas Piping Engineering; NSE/ASPOG Lagos | 2018 Oil and Gas Facility Management; NSE/ASPOG Lagos | 2018 The Nigerian Institution of Mechanical Engineers (NIMechE) | 2018 The Nigerian Society of Engineers (NSE) | 2018
Get your freelancer profile up and running. View the step by step guide to set up a freelancer profile so you can land your dream job.