Khadar Shaik

Khadar Shaik

$45/hr
Electrical Engineer
Reply rate:
-
Availability:
Hourly ($/hour)
Age:
47 years old
Location:
Abbotsford, BC, Canada
Experience:
20 years
KHADAR ALI SHAIK P. Eng., SC, A- FSR Class-A Unrestricted Electrical Engineer Mobile:- Email:- PROFESSIONAL PROFILE Electrical Engineer • Professional Electrical Engineer registered with APEGBC, APEGA and NAPEG possessing 20+ years of handson experience in Power Systems, Control Systems, design, technical documentation, testing and commissioning. • Designing Power Systems, transformers, power distribution panels, high voltage and low voltage substations and power generation units. • Field Safety Representative A-FSR Class-A Unrestricted registered with Technical Safety BC. • Experienced in Industrial, commercial and residential power upgrade projects, Power Distribution, project management, control systems and Instrumentation. • Excellent managerial and leadership skills. Supervised multi-disciplinary team on multimillion-dollar projects. • Well acquainted with Canadian Electrical Codes and standards and National Master Specifications. • Seeking to leverage experience and expertise in a professional assignment. Career Highlights • Water treatment and Wastewater treatment Modular building power system design, building electrical permits, CSA A277 Certification, Installation, testing and Commissioning. TELUS, Shaw and Freedom mobile telecommunication tower and building power upgrade, design, load calculations, shop drawings and as-built drawings review, Schedules, IFR and IFC Drawings review. • • Nuclear plant Technical change control, equipment maintenance, project estimation, project coordination, nuclear waste management, technical scope of work review, product technical details verification and approval. • Site C Dam Electrical Power Systems Design and Construction Coordination: High Voltage Substation and High Voltage Power system design, Protection and Control, scope of work preparation and implementation. Engineering change control and management. Designing Primary power on site, Power distribution, electrical permits and utility authority approvals. • Electrical Systems condition assessment: Electrical systems inspection and assessment, preparing maintenance instructions and maintenance. • Project Engineer for the Public works and Government services Canada (PWGSC) submarine hanger power upgrade project, Victoria shipyard electrical systems design, port power upgrade design. • LNG Canada water treatment plant electrical power distribution design and installation. • Power System Analysis, Short Circuit Analysis, Arc Flash Analysis and Protective Device Coordination studies using the ETAP 14.1 software. Electrical control systems design using EPLAN software. Control network design components design VFD Drives, MSP, Contactors, PLC, Instrumentation, Digital and Analog inputs, Flow, temperature and level sensors and transmitters. • • Maintained 138KV high voltage Substation, transmission and distribution system for a chemical plant of 300 ton/day capacity. • Supervised 15-member multi discipline team to complete substation, switchgear and low voltage power distribution panel testing, installation and commissioning project. Supervised young engineers, technologists and technicians. • Coordinating with clients, consultants, contractors and internal departments during different phases of Project-Initiating, execution and completion. Completed projects within budget and on time. • Provided technical guidelines to the team in design and maintenance of electrical and mechanical systems, HVAC, Boiler and pumps. Excellent in project cost estimation, Quotations, RFQ, preparing Scope and specification documents, conceptual and detailed design drawings, project substantial completion walk through and change orders. • • Played a leadership role in safe and reliable operation of low voltage Substation, Switch-gear and Panel boards, Automation, Instrumentation and Control (I & C) systems, PLC Programming. As a member of preventive maintenance team at a chemical plant, I have played a key role in developing and maintaining the plant as zero breakdown units in the year-. • • As a maintenance team leader, maintained electrical utility system effectively for Defense Base. (The Air Handling units and Chiller plant maintenance for tunnel cooling system). Career Summary • BI Pure Water Canada Inc., Surrey, BC Canada Senior Electrical Engineer_ (January 2019 to Present) Key Responsibilities: ● ● ● ● ● ● • Potable Water and Waste Water treatment plant Power and Control systems design and Installation. Electrical Permits, CSA A277 Certification and Approvals from Local inspectors. IFR and IFC Drawings, Load calculations, Distribution Panel Schedules and As-Built drawings. Engineering change management. Power distribution, Generation and electrical load calculations. Power systems design, lighting, grounding and Project Management. Marshall Engineering, Abbotsford, BC Canada Technical Change Analyst_ (July 2018 to January 2019) Key Responsibilities: ● ● ● • Technical change documentation and Control. Engineering Change management. Drawings documentation and release to the client shop floor. Canadian Nuclear Laboratories, CNL White Shell Laboratories AECL, Pinawa MB Canada Electrical Engineer _ (March 2018 to July 2018) Key Responsibilities: ● ● ● ● ● ● Electrical systems design, installation and commissioning. Technical change control, statement of work and engineering change. Project coordination, supporting change management, technical reviews and approvals. Project schedule and coordination. Product verification, review and approval. Team meetings, mentoring and project management. • Peace River Hydro Partners, BC Hydro Site C Dam, Fort Saint John, BC Canada Electrical Engineer _ M & E Design Coordinator (October 2016 to Sept 2017) Key Responsibilities: ● ● ● ● ● ● ● ● ● ● • Power systems and electrical distribution system design. Project Coordination for the Site C Dam construction across Peace River. 25KV Construction Power design, installation, testing and commissioning. Technical statement of work, tender documents and product technical details review and approval. Single line drawings and panel schedules. Coordinating with clients and contractors. Power System Analysis, Short Circuit Analysis, Arc Flash Analysis and Protective Device Coordination studies. Drainage tunnel ventilation and construction coordination. Shop drawing review and approval. Design Coordination for the Diversion and Drainage tunnels, till conveyors, Hydraulic Gates, electromechanical equipment for Dam Construction, RCC Conveyor, Fish way, GSS Conveyor, Buildings, lighting, grounding and generators. AES Engineering, Vancouver, BC Canada Intermediate Electrical Engineer (July 2016 to October 2016) Key Responsibilities: ● ● ● ● ● ● ● ● • Design and project management for the Esquimalt graving dock South and West Jetty renovation, Port Dry dock power distribution and ship maintenance kiosk power, SCADA and communication. Shipyard North substation power upgrade and switchgear replacement. Cable sizing and Voltage drop calculations. Single line drawings and panel schedules. Coordinating with clients and contractors. Buildings electrical systems design. Project progress reviews, coordination meetings and project change orders and site instructions. Power System Analysis, Short Circuit Analysis, Arc Flash Analysis and Protective Device Coordination studies. Shop drawing review and approval. Williams Engineering Canada, Abbotsford, BC Canada Electrical Engineer (Feb 2016 to June 2016) Key Responsibilities: ● ● ● ● ● • Electrical equipment condition assessment, maintenance and feasibility studies using the 4tell, I-plan software. Coordinating with BC Hydro for power upgrade. Coordinating with clients and contractors. Shop drawing review and approval. Electrical equipment condition assessment using the I-plan software, analysis, preparing QA sheets and report. Stantec Consulting Ltd. Victoria BC Canada Electrical Design Engineer (March 2014 to September 2015) Key Responsibilities: ● ● Electrical systems design and Power distribution for Public Works and Government Services Canada buildings. Project management for the PWGSC submarine hanger power upgrade. Preparing the Project estimation, reviewing the electrical equipment quotations. Coordinating with BC Hydro for utility power distribution and approvals. Conducted site inspections, witnessed Generator, Control Panel and Transformers tests. Coordinating with Architects, mechanical, civil and instrumentation departments for various projects. Designed University of Victoria Civil Labs and spray booth electrical control panels. Project progress review for the Shaw Cables Hub room power Systems upgrade project. Experienced in Conceptual Design-Feasibility study, Detailed Design and Construction Administration. Preparing the capital spending requests based on the condition of the equipment. ● ● ● ● ● ● ● ● • BC Hydro, John Hart Generating Station, Campbell River, BC Canada Engineer 1 (June to Dec 2013) Key ● ● ● ● • Responsibilities: Preparing preventive maintenance instructions for Hydro Electric Generator Auxiliary equipment. Preparing maintenance instructions for the Generator Governor, Pumps, Compressors and Motors. Creating work orders. Preparing the maintenance instructions for Power systems and Grounding. National Gas and Industrialization Company, Riyadh, Saudi Arabia Senior Electrical Engineer (Dec 2008 to May 2013) Key Responsibilities: ● ● ● ● ● ● ● ● ● ● ● ● • Power and control systems design, upgrade, testing and commissioning. Providing the Engineering and production departments with engineering support. Monitoring daily key operating and maintenance parameters for 7 gas plants in Saudi Arabia. Verification of electrical codes and standards. Class, Division and Group verification for explosion proof areas. Ingress Protection Classification, National Fire Protection and Self Ignition Temperature Classification. Substation, switchgear and power distribution systems design, installation, testing and commissioning. Troubleshooting plant operational problems. Preparing the project budget, capital spending requests, scheduling and monitoring the project work. Developing Preventive Maintenance techniques for smooth operation of gas plants. Conducting meetings for Engineers and Technicians to explain the targets and maintenance procedures according to the schedule. Managed 15-member team. Maintained and Installed the MCC control panels, transformers, uninterrupted power supply system, generator and auto transfer switch, lighting and grounding system. Maintained control system, relay and instrumentation panels for the liquefied petroleum gas process. Maintenance of security system CCTV, Fire Alarm and Sound systems. Ministry of Defense and Aviation, Riyadh, Saudi Arabia Electrical Engineer (Oct 2006 to Nov 2008) Key Responsibilities: ● ● ● ● ● ● ● ● Power systems design, power distribution, electrical load calculations and commissioning. Monitoring daily key operating and maintenance parameters of 3MW Power Generation Plant. Troubleshooting plant operational problems. Developing Preventive Maintenance techniques for smooth operation of Defense base. Conducting meetings for Engineers and Technicians to explain the targets and maintenance procedures according to the schedule. Reviewing the operation of regulatory and advanced control systems. Conducting firefighting and fire rescue demonstrations Power generation planning as a member of Power generation planning team. ● • Maintenance of Security system CCTV, Fire Alarm and Sound systems. Pepsi India Electrical Engineer (Feb 2005 to Aug 2005) Key Responsibilities: ● Generation of 3MW Power for beverage plant process, operation and maintenance of plant. ● Electrical Systems design, power distribution and project coordination. ● Management of machine control center control panel maintenance ● Management of plant utility system maintenance. • Andhra Sugars, Chemical, Gas and Fertilizer Company, Kovvur, India Electrical Engineer (May 2001 to Feb 2005) Key ● ● ● ● ● ● ● ● Responsibilities: High and low voltage substation design, power distribution and testing. Maintaining High, Medium and Low Voltage Substations. Designing, Erection and Commissioning of 132/33KV substation of 24MW Power Plant. Troubleshooting of low voltage Induction Motors and over hauling works. Machine control center Panels Preventive maintenance. Cable Laying and Termination. Planning and conducting preventive maintenance works. Electrical installations for sulfuric acid plant erection work Professional Affiliations • Professional Engineer(P.Eng)registered with EGBC(BC),NAPEG (NWT and Nunavut) and APEGA(Alberta). • Electrical Field Safety Representative FSR Class-A Unrestricted certified from Technical Safety BC. • Security Systems Consultant registered with Security Systems Authority, Industry Licensing Authority, Canada. Education • Bachelor of Engineering in Electrical Engineering, Madurai Kamaraj University India, 1996 - 2000 • PG Diploma in Industrial Engineering, Andhra Productive Council India, 2004 Attended/Conducted Trainings • CSA Codes and Standards Course, Camosun College Victoria BC 2015 • Project Based Language Training (PBLT) Construction and Engineering, Camosun College Victoria BC 2016 • Canadian English Language level 9, Intercultural Association, Victoria, BC 2015 Computer Skills Microsoft Office E-Plan software for Power and Control Systems Design. Building electrical systems assessment 4 tell _I-plan software. AGI32-Lighting Level Calculation. Short Circuit Analysis, Arc Flash Analysis and Protective Devices Coordination Studies using ETAP14.1. • AUTOCAD Electrical. • • • • • Mobile:-, Email:-
Get your freelancer profile up and running. View the step by step guide to set up a freelancer profile so you can land your dream job.