Jason Arthur Cogill
50 Voortrekker Street
Merweville
Western Cape, South Africa
Contact number : 071 -
Profile and Background
Experience in project management in the construction industry. Over 19 years’ experience in the utilization of shotcrete and other materials. Sound knowledge of Health and Safety and operational and labour management in industry.
Skills
Industry
Safety file compilation
Risk assessments /Health and Safety procedures
Payment certificates
Estimating
Managing production
Quantity Surveying
Quality Control
Career experience
Employed by Guncrete from 2001 to 2017 , across various major projects, where outputs and responsibilities covered:
Quality Control
Safety management
Production management
Contracts management
Wages
Administration
Planning and Budgets
Project Management
Employed by Delmon Mining from 2017 to present, across various projects.
Projects in chronological order from most recent:
2020 Project Manager: Zimplats SMC – Zimbabwe
13000 ton silo repair using HSWR shotcrete
- Project Manager : Koeberg Nuclear Power station – concrete repairs
- Project Manager : Zimplats Ngezi Concentrator –Zimbabwe
15000 ton silo repair using HSWR + Carbon fibre installation
- Project Manager : Booysendal Platinum mine –Mpumalanga
Boxcut support work – Soil nailing and Shotcrete
Road cutting – Soil nailing and Shotcrete at height
2016 Project Manager : Sasol Ammonia Plant - Sasolburg (every 4 years)
Prillan Tower – construction of circular elevated work platform
Concrete repairs to inner walls and soffit
Sandblasting inner surface area
Epoxy coating to inner surface area
2015 Project Manager : Modderfontein Industrial – Johannesburg
Auger pile investigation holes
2015 Project Manager : R75 Uitenhage – Eastern Cape
Road cutting stabilization
Drilling and installation of drainage adits
2015 Project Manager : Harmony Gold Mine – Welkom
1 x ore silo - repair original concrete to inner walls
Install reinforced sacrificial high strength wear resistant lining
During 2014 I was appointed Operations Director and travelled between sites managing outputs mentioned above
2013 Site Manager : Bombela Gautrain Station – Sandton
Lateral support to basement – 7500m2
2013 Site Manager : Standard Bank Gabarone Botswana
Lateral support to basement -7500m2
2013 Site Manager : Samancor Alloys Plant – Meyerton
6 x Coal silo’s
Repair original concrete to inner walls
Installation of high strength wear resistant shotcrete lining to inner walls
2012 Site Manager : Khomanani Mine – Rustenburg
2 X ore silo’s
Install reinforced sacrificial high strength wear resistant lining
Repair original concrete to inner walls
2012 Site Manager : Sir Lowry’s Pass – Somerset West
Slope stabilization and pass rehabilitation
Installation of rock fall netting system including rock bolting- 8000m2
Installation of rock fall catch fence system – 240m
2012 Site Manager : Ammonia Plant – Sasolburg (every 4 years)
Prillan Tower – construction of circular elevated work platform
Concrete repairs to inner walls and soffit
Sandblasting inner surface area
Epoxy coating to inner surface area
2011 Site Manager : Standard Bank Rosebank
Lateral support to basement – 7500m2
2011 Site Manager : Witkransnek Pass – Eastern Cape
Mountain Pass rehabilitation
Installation of rock fall netting system 5000m2
Colour oxide shotcrete to road cuttings 1200m2
2011 Site Manager :Sasol Ethylene Plan – Sasolburg
Bund wall repairs with shotcrete
2011 Site Manager : Impala no 18 Shaft – Rustenburg
Fridge plant concrete repairs
Removal of all unsound concrete and replacement with shotcrete to original profile
2010 Site Manager : R36 Tzaneen
Installation of rock fall netting system to road cuttings including rock bolting 3500m2
2010 Site Manager : Samancor Alloys Plant – Meyerton
6 x Coal Silo’s
Repair original concrete to inner walls
Installation of high strength wear resistant shotcrete lining to inner walls
2010 Site Manager : Verlatenkloof Pass – Fraserburg Northern Cape
Mountain Pass rehabilitation
8000m2 of reinforced shotcrete
Drilling and installation of drainage adits and rock bolts
1500m2 of rock fall netting
2009 Site Manager : Everest South Platinum Mine – Mpumalanga
Underground support work
6000m2 of shotcrete to soffit and side walls
2009 Site Manager : Dwarsrivier Chrome Mine – Steelpoort
Explosive magazines – protective shotcrete lining to outer walls 8000m2
2008 Site Manager : Harmony Gold Mine – Welkom
3 x Ore Silo’s
Repair original concrete to inner walls
Installation of high strength wear resistant shotcrete lining to inner walls
2008 Site Manager : Everest South Platinum Mine – Mpumalanga
Boxcut support work
Installation of rock bolts to high walls
Shotcrete to highwalls – 7000m2
2008 Site Manager : Sasol Ammonia Plant – Sasolburg (every 4 years)
Prillan Tower – construction of circular elevated work platform
Concrete repairs to inner walls and soffit
Sandblasting inner surface area
Epoxy coating to inner surface area
2007 Site Manager : Ford Factory – Pretoria
Furnace repair involving a refractory shotcrete lining to furnace inner surface area
2007 Site Manager : Huis River Pass – Calitzdorp Western Cape
Mountain Pass rehabilitation
High pressure grouting to rock bolts
Installation of rock fall netting 15000m2 to road cuttings
2006 Site Manager : Target Mine – Welkom
Ore Silo repair
Repair original concrete to inner walls
Install reinforced sacrificial high strength wear resistant lining
2006 Site Manager : Teekloof Pass - Northern Cape
Mountain Pass rehabilitation
13000m2 of shotcrete to road cuttings
1200 drainage adits to road cuttings
Rock bolting and installation of rock fall netting to road cuttings
2006 Site Manager : Olifantshoek Pass – Eastern Cape
Mountain Pass rehabilitation
Rock bolting to road cuttings
Installation of rock fall netting to road cuttings
Oxide coloured shotcrete to road cuttings
2005 Site Manager : Sasol Caustic Evaporation Plant – Sasolburg
Repairs and sacrificial linings to dams using shotcrete
2005 Site Manager : Two Rivers Platinum Mine – Steelpoort
Boxcut support work
6000m2 of meshing and lacing
Resin bolts and shotcrete to high walls
2005 Kroondal Platinum Mine – Rustenburg
Boxcut support work
8000m2 of meshing and lacing
Resin bolts and shotcrete to high walls
2004 Site Manager : Silvermine Bridge – Fish Hoek
Concrete repairs and installation of cathodic protection system
2004 Site Manager : Sasol Ammonia Plant – Sasolburg(every 4 years)
Prillan Tower – construction of circular elevated work platform
Concrete repairs to inner walls and soffit
Sandblasting inner surface area
Epoxy coating to inner surface area
2004 Site Manager : Thabazimbi Game Lodge
Repairs to dam wall using shotcrete
2004 Site Manager : Venetia Diamond Mine – Musina
Boxcut support work
Resin bolts, meshing and lacing to high walls
2003 Site Manager : Middelburg Colliery
High strength wear resistant lining to silo inner walls
2003 Site Manager : Johannesburg Scuba Diving School
Cave diving pool construction using shotcrete
2003 Site Manager : Sasol Chlorine Plant – Sasolburg
Bund wall concrete repairs
Demolish and reconstruct pillars and beams with shotcrete
2002 Site Manager : Vaal Dam Yacht Club
Construction of manmade island and causeway – 3000m2 reinforced shotcrete
2002 Site Manager : Newtown Science Building – Johannesburg
Lateral support to basement
2000m2 reinforced shotcrete wall
1800m2 reinforced shotcrete between piles
2001 Site Manager : Union Section Platinum Mine – Rustenburg
Boxcut support work
7000m2 reinforced shotcrete to high walls
Certification
NOSA Samtrac – Cum Laude
IRCA Construction management
Other Personal Information
ID Number-
Valid Passport
Driver’s License Code : EB
References
David Bray - Director : Guncrete Geotechnical
-
Nate Arendse – Safety manager : Koeberg Nuclear Power station
+27 79 -