Ilham Hussain

Ilham Hussain

$5/hr
ENGINEER
Reply rate:
-
Availability:
Hourly ($/hour)
Age:
28 years old
Location:
Hyderabad, Telangana, India
Experience:
1 year
ILHAM HUSSAIN Project Engineer (Fire Fighting) Telangana, Hyderabad, India Mobile: - | E-Mail:-| LinkedIn: linkedin.com/in/ilham-hussain-556a16172 | SkypeID: Ilham Hussain CAREER SUMMARY        An astute and accomplished Strategic Planner with 2 years of proven expertise in executing Fire Stop projects and a knack for adopting modern methodologies; complying with quality standards Adroit in executing numerous prestigious large-scale projects within tight deadlines and quality control Exposure in the management and organization of resources; planning and execution of all site activities, and; supervising and monitoring works Capable of expanding projects deftly in collaboration with clients, architects, consultants, and contractors Mechanical aptitude with the ability to interpret technical drawings, and experience of working in High Raised Buildings & Thermal power plant. Exceptional team player with excellent organizational and problem-solving skills, time management skill with ability to meet deadlines, and well conversant with the client requirements and technical know-how at work Possess good analytical, interpersonal, & communication skills, and a result-driven person with a “CAN DO” approach SKILLSET Computer Skills: Proficiency in Microsoft Office (Word, Excel, PowerPoint, and DOS), and HAP software for heat & cooling load calculation Behavioral Skills: Interpersonal and communication | Decision making | Leadership | Organizing | Time management | Problem-solving | Hardworking | Critical thinking | Analytical mindset | Willingness to learn | Adaptability & flexibility | Multi-tasking | Motivated and work-oriented | Team management WORK EXPERIENCE Organization: Interactive Data Systems Limited India Designation: Project Engineer (Fire Fighting) Duration: Jan 2019 to till date Key Deliverables:  Monitoring work progress on a daily basis and preparing the weekly, monthly program and report  Preparing BBU (Billing break-up) as per the drawings  Providing technical support to architects, engineers, and experts to strengthen the fire protection design  Proceeding as per the drawings in compliance with NFPA and NBC standards  Attending all internal/external meetings with client and consultant  Preparing and submitting the updated work program and cash flow curve that show actual progress and identifying areas of weakness and developing ways and methods of recovery, if any, and new critical activities PROJECTS HANDLED Project Name: Tuticorin (SEPC) Thermal Power Plant (Stage 4) 525MW Boiler, Madurai, India Role: Project Engineer Key Deliverables:  Erection testing and commissioning of fire fighting system with medium speed water spray system, high-speed water spray system, internal and external hydrant system, and foam system Organization: Comfort Line Systems Pvt. Ltd. India (HVAC Consultants and Project Management) Role: HVAC Site Engineer (Internship) Duration: Dec 2017 to Jun 2018 Key Deliverables:  Cooling load calculations by manual and latest HVAC software after survey using SMACNA and ASHRAE Standards  Calculating Blower CFM, air distribution duct design following SMACNA and DW144 Duct design codes, selection of diffusers, grilles G.I sheets, etc.  Verifying shop drawings according to tender drawings  Preparing and submitting material submittals for consultants/clients  Erection/installation of all types of equipment such as Chillers, Pumps, Air Handling Units, Packaged Ducting Units, Fan Coil Units, Hot Water Converters, Hot Water Coils, Bleed fans, Exhaust fans, of types of valves and inspecting the same for compliance with the requirements to be followed  Involved in the complete design work of ducting network with comprehensive standards and site supervision of duct fabrication and installation with complete knowledge of SMACNA standards with all accessories using via; Manual volume, Fire Damper, and Back Draft Dampers  Maintaining and recording site work progress report received from the Project Manager  Preparing test reports, and submitting Operation and Maintenance Manuals and building drawings and handing over projects  Preparing take-offs based on shop drawing and verifying with the bill of quantities for ordering material for execution & actual work execution  Designing chilled water pipe, preparing pipe route and their layout, etc. calculating pump head, and selecting CHW Pumps and valves M/s Klincindia Hitech city (140TR), Hyderabad, India Key Deliverables:  Involved in the complete design and selection of FCU and chillers  Preparing BOQ by referring consultants specifications and material take off’s M/s Surya Engineering Pvt. Ltd. (70.00 TR) Key Deliverables:  Designing & installation of complete duct & accessories including 3 nos. package units of 20 ton each; 2 split units with complete copper pipe connection, electrical termination, etc. capacity 5 ton each, and; 7 ceilings mounted exhaust fans Organization: Daikin Air Conditioning, Hyderabad, India Duration: Jun 2018 to Oct 2018 Role: HVAC Engineer Key Deliverables:  Assisting in preparing tender work program, cash flow, and manpower histogram  Reporting to the project manager on current work progress and contrasting the plan with actual progress and studying the impact of alternative approaches to work  Cooling load calculations using manual and latest HAP software after building survey using CARRIER and ASHRAE standards  Maintaining VRV systems  Preparing chilled water pipe schematic riser diagrams, fresh air, stair pressurization, kitchen making and extract air, etc.  Submitting technical material submissions, compliance statement, method statement and shop drawings for consultant approval and submitting samples for consultant approval  Performing other duties and responsibilities as may be assigned from time to time  Involved in duct static pressure calculations, and calculating number of G.I sheets required M/s Kotak Mahendra Bank (150.0 TR) Key Deliverables:  Designing & installing complete duct & its accessories including 2 nos. package units of 10 ton each; 6 split units with complete copper pipe connection, electrical termination, etc. capacity 5 ton each, and; 5 ceilings mounted exhaust fans Hotel Konarc Star (20.00 TR) Key Deliverables:  Designing & installing complete duct & its accessories including 7 split units with complete copper pipe connection, electrical termination, etc. capacity 2 ton each, and; 3 Window Units 2 ton each with installation and maintenance EDUCATION Qualification BE (Mechanical Engineering) Diploma (Mechanical Engineering) SSC 10th School/University/Board Osmania University State Board of Technical Education & Training Brilliant Grammar High School, Hyderabad Year- Percentage 75.8% 85.4% 8.0 GPA TRAINING Completed 3 months of training in the installation, design & maintenance of air conditioning and ventilation at Tecnolco Institute for HVAC, Hyderabad, India. Also did a project work of MEP design of G+6 Typical Floors Residential Building during HVAC designing training at Technolco, Hyderabad, India COURSE COMPLETED Diploma in AutoCAD from Skill Development Center, Hyderabad Industrial Training of 6 months from Police Transport Organization, Hyderabad PRESENTATIONS AND PUBLICATIONS Presented papers on a title called, Solar Pump with Solar Tracking Mechanism AWARDS AND RECOGNITIONS Received a certificate for attending the International Conference Technologies for Sustainable Ecosystem (TSE) in 2017 AREAS OF SPECIALIZATION Project Planning & Execution; Site Supervision; Administration; Cost Estimation; Team Facilitator, and; Cost Controller HOBBIES AND OTHER INTERESTS Interested in sports like cricket, football, and wrestling LANGUAGES KNOWN English, Hindi & Urdu LANGUAGE PROFICIENCY Scored an overall of 6.5 Bands in IELTS
Get your freelancer profile up and running. View the step by step guide to set up a freelancer profile so you can land your dream job.