ILHAM HUSSAIN
Project Engineer (Fire Fighting)
Telangana, Hyderabad, India
Mobile: - | E-Mail:-| LinkedIn: linkedin.com/in/ilham-hussain-556a16172 |
SkypeID: Ilham Hussain
CAREER SUMMARY
An astute and accomplished Strategic Planner with 2 years of proven expertise in executing Fire Stop projects
and a knack for adopting modern methodologies; complying with quality standards
Adroit in executing numerous prestigious large-scale projects within tight deadlines and quality control
Exposure in the management and organization of resources; planning and execution of all site activities, and;
supervising and monitoring works
Capable of expanding projects deftly in collaboration with clients, architects, consultants, and contractors
Mechanical aptitude with the ability to interpret technical drawings, and experience of working in High Raised
Buildings & Thermal power plant.
Exceptional team player with excellent organizational and problem-solving skills, time management skill with
ability to meet deadlines, and well conversant with the client requirements and technical know-how at work
Possess good analytical, interpersonal, & communication skills, and a result-driven person with a “CAN DO”
approach
SKILLSET
Computer Skills:
Proficiency in Microsoft Office (Word, Excel, PowerPoint, and DOS), and HAP software for heat & cooling load
calculation
Behavioral Skills:
Interpersonal and communication | Decision making | Leadership | Organizing | Time management | Problem-solving |
Hardworking | Critical thinking | Analytical mindset | Willingness to learn | Adaptability & flexibility | Multi-tasking |
Motivated and work-oriented | Team management
WORK EXPERIENCE
Organization: Interactive Data Systems Limited India
Designation: Project Engineer (Fire Fighting)
Duration: Jan 2019 to till date
Key Deliverables:
Monitoring work progress on a daily basis and preparing the weekly, monthly program and report
Preparing BBU (Billing break-up) as per the drawings
Providing technical support to architects, engineers, and experts to strengthen the fire protection design
Proceeding as per the drawings in compliance with NFPA and NBC standards
Attending all internal/external meetings with client and consultant
Preparing and submitting the updated work program and cash flow curve that show actual progress and
identifying areas of weakness and developing ways and methods of recovery, if any, and new critical activities
PROJECTS HANDLED
Project Name: Tuticorin (SEPC) Thermal Power Plant (Stage 4) 525MW Boiler, Madurai, India
Role: Project Engineer
Key Deliverables:
Erection testing and commissioning of fire fighting system with medium speed water spray system, high-speed
water spray system, internal and external hydrant system, and foam system
Organization: Comfort Line Systems Pvt. Ltd. India (HVAC Consultants and Project Management)
Role: HVAC Site Engineer (Internship)
Duration: Dec 2017 to Jun 2018
Key Deliverables:
Cooling load calculations by manual and latest HVAC software after survey using SMACNA and ASHRAE Standards
Calculating Blower CFM, air distribution duct design following SMACNA and DW144 Duct design codes, selection
of diffusers, grilles G.I sheets, etc.
Verifying shop drawings according to tender drawings
Preparing and submitting material submittals for consultants/clients
Erection/installation of all types of equipment such as Chillers, Pumps, Air Handling Units, Packaged Ducting
Units, Fan Coil Units, Hot Water Converters, Hot Water Coils, Bleed fans, Exhaust fans, of types of valves and
inspecting the same for compliance with the requirements to be followed
Involved in the complete design work of ducting network with comprehensive standards and site supervision of
duct fabrication and installation with complete knowledge of SMACNA standards with all accessories using via;
Manual volume, Fire Damper, and Back Draft Dampers
Maintaining and recording site work progress report received from the Project Manager
Preparing test reports, and submitting Operation and Maintenance Manuals and building drawings and handing
over projects
Preparing take-offs based on shop drawing and verifying with the bill of quantities for ordering material for
execution & actual work execution
Designing chilled water pipe, preparing pipe route and their layout, etc. calculating pump head, and selecting
CHW Pumps and valves
M/s Klincindia Hitech city (140TR), Hyderabad, India
Key Deliverables:
Involved in the complete design and selection of FCU and chillers
Preparing BOQ by referring consultants specifications and material take off’s
M/s Surya Engineering Pvt. Ltd. (70.00 TR)
Key Deliverables:
Designing & installation of complete duct & accessories including 3 nos. package units of 20 ton each; 2 split
units with complete copper pipe connection, electrical termination, etc. capacity 5 ton each, and; 7 ceilings
mounted exhaust fans
Organization: Daikin Air Conditioning, Hyderabad, India
Duration: Jun 2018 to Oct 2018
Role: HVAC Engineer
Key Deliverables:
Assisting in preparing tender work program, cash flow, and manpower histogram
Reporting to the project manager on current work progress and contrasting the plan with actual progress and
studying the impact of alternative approaches to work
Cooling load calculations using manual and latest HAP software after building survey using CARRIER and ASHRAE
standards
Maintaining VRV systems
Preparing chilled water pipe schematic riser diagrams, fresh air, stair pressurization, kitchen making and
extract air, etc.
Submitting technical material submissions, compliance statement, method statement and shop drawings for
consultant approval and submitting samples for consultant approval
Performing other duties and responsibilities as may be assigned from time to time
Involved in duct static pressure calculations, and calculating number of G.I sheets required
M/s Kotak Mahendra Bank (150.0 TR)
Key Deliverables:
Designing & installing complete duct & its accessories including 2 nos. package units of 10 ton each; 6 split
units with complete copper pipe connection, electrical termination, etc. capacity 5 ton each, and; 5 ceilings
mounted exhaust fans
Hotel Konarc Star (20.00 TR)
Key Deliverables:
Designing & installing complete duct & its accessories including 7 split units with complete copper pipe
connection, electrical termination, etc. capacity 2 ton each, and; 3 Window Units 2 ton each with installation
and maintenance
EDUCATION
Qualification
BE (Mechanical Engineering)
Diploma (Mechanical Engineering)
SSC 10th
School/University/Board
Osmania University
State Board of Technical Education & Training
Brilliant Grammar High School, Hyderabad
Year-
Percentage
75.8%
85.4%
8.0 GPA
TRAINING
Completed 3 months of training in the installation, design & maintenance of air conditioning and ventilation at
Tecnolco Institute for HVAC, Hyderabad, India. Also did a project work of MEP design of G+6 Typical Floors Residential
Building during HVAC designing training at Technolco, Hyderabad, India
COURSE COMPLETED
Diploma in AutoCAD from Skill Development Center, Hyderabad
Industrial Training of 6 months from Police Transport Organization, Hyderabad
PRESENTATIONS AND PUBLICATIONS
Presented papers on a title called, Solar Pump with Solar Tracking Mechanism
AWARDS AND RECOGNITIONS
Received a certificate for attending the International Conference Technologies for Sustainable Ecosystem (TSE) in 2017
AREAS OF SPECIALIZATION
Project Planning & Execution; Site Supervision; Administration; Cost Estimation; Team Facilitator, and; Cost Controller
HOBBIES AND OTHER INTERESTS
Interested in sports like cricket, football, and wrestling
LANGUAGES KNOWN
English, Hindi & Urdu
LANGUAGE PROFICIENCY
Scored an overall of 6.5 Bands in IELTS