Harrison Viloria

Harrison Viloria

$10/hr
Administrative Support, Project Management and Customer Service.
Reply rate:
-
Availability:
Hourly ($/hour)
Age:
39 years old
Location:
Barranquilla, Atlantico, Colombia
Experience:
16 years
HARRISON OMAR VILORIA ROJAS Civil Engineer 38 years old 01 December 1985 Barranquilla, Atlántico Colombia-C.C- - Male – Married www.linkedin.com/in/har rison-viloria/ 16 years total Professional skills Project Management, Civil Works Design SUMMARY OF HIS PROFESSIONAL CAREER CIVIL ENGINEER with 16 years of professional experience in the management, design and execution of engineering projects. With specific experience in construction projects and designs in the area of civil works, home building, infrastructure, energy in substations, photovoltaic parks and high voltage transmission lines. In the area of high voltage energy, I have experience in design and construction projects of civil works of electrical substations, solar parks and transmission lines, performing the functions of design engineer, functional specialist of civil works, project manager and coordinator of design and construction groups. With experience in the construction of housing projects, urban planning works, earthworks, aqueduct networks, sewerage, electricity, gas, concrete roads, construction with industrialized systems and traditional system, hospital and institutional infrastructure. In addition, I have experience in cost engineering, preparation, monitoring and control of budgets, work schedules and technical construction specifications. I have a postgraduate degree as a Specialist in construction management and control from the Universidad del Norte, with complementary studies in construction management (EAFIT University) and project management according to PMI methodologies (Uniasturias – European Postgraduate Institute) and a Master's degree in project management and administration from the University of Valencia – Spain. Civil Works Construction EDUCATION Areas of expertise Civil Works Design Construction Programming and Control Cost Engineering Electrical Substations Transmission Lines Photovoltaic Parks Energy Languages Spanish English Master's Degree in Project Management and Management. Universitat de València. 2018 Specialist in Construction Management and Control. Universidad del Norte 2014 Civil engineering. Universidad del Norte 2008 ADDITIONAL TRAINING Diploma in Project Management PMI Modality. University of Asturias – European Postgraduate Institute 2015 Diploma in Construction Project Management, ARGOS – EAFIT University. 2012 PROFESSIONAL AFFILIATIONS National Professional Council of Engineering 2010 Project Management Institute 2016 Atlantic Society of Engineers 2019 HARRISON OMAR VILORIA ROJAS Design Engineer, Energy WORK EXPERIENCE - GROUP COORDINATOR ISES SAS Apr2023 - Current Coordinator of the Civil Works Design group of the Energy area. - PROJECT COORDINATOR WSP INGENIERIA COLOMBIA SA Mar2022 - Apr2023 Coordinator of the Civil Works Design group of the Energy area. - PROJECT MANAGER AIRE-E SAS ESP Jan2021 - Mar2022 Review and follow-up of the execution of high-voltage electrical infrastructure designs. - AREA LEADER ISES SAS Oct2020 - Jan2021 Lead the Civil Works Design group in the Energy area. - HIGH VOLTAGE DEVELOPMENT ENGINEER ELECTRICARIBE S.A. ESP Mar2019 - Sep2020 Review and follow-up of the execution of high-voltage electrical infrastructure designs. - SENIOR PROFESSIONAL HIGH VOLTAGE OPERATING UNIT ENEL CODENSA S.A. ESP May2018 - Mar2019 Review and follow-up of the execution of high-voltage electrical infrastructure designs. Page 2 of 10 HARRISON OMAR VILORIA ROJAS Design Engineer, Energy - CIVIL ENGINEER ISES SAS Jan2018 - Apr2018 Prepare the designs of civil works for the projects executed in the company. - DESIGN ENGINEER WSP COLOMBIA SAS May2014 - Nov2017 Prepare the designs of civil works for the projects executed in the company. - CONSTRUCTION MANAGER AB INTEGRAL WORKS MANAGEMENT Feb2014 - May2014 Coordinate the technical, economic and administrative management of the company's execution projects. - CONSTRUCTION MANAGER ECO SA Mar2013 - Oct2013 Coordinate the technical, economic and administrative management of the company's execution projects. - CONSTRUCTION RESIDENT MARVAL SA May2008 - Mar2013 Technical, economic and administrative management of the company's execution projects. Page 3 of 10 HARRISON OMAR VILORIA ROJAS Design Engineer, Energy PROFESSIONAL EXPERIENCE Energy Substations and High Voltage Lines — SDL Panceguita 34 5 13 8 kV 10 MVA expansion. Bolívar. Colombia (2023). AFINIA S.A. E.S.P. ISES S.A.S. — SDL San Pelayo Expansion 34.5/13.8kV 15MVA. Córdoba. Colombia (2023). AFINIA S.A. E.S.P. ISES S.A.S. — Replacement TR Guaranda 34.5/13.8 kV at 15MVA. Sucre. Colombia (2023). AFINIA S.A. E.S.P. ISES S.A.S. — Baranoa I Solar Park (19.9MW). Baranoa. Colombia (2023). POWER CHINA. ISES S.A.S. — SDL Los Córdobas 6.5MVA expansion. Córdoba. Colombia (2023). AFINIA S.A. E.S.P. ISES S.A.S. — SDL Maracayo 34.5/13.8 kV expansion to 5 MVA. Córdoba. Colombia (2023). AFINIA S.A. E.S.P. ISES S.A.S. — SDL Astrea 34.5-13.8kV expansion to 10MVA. Cease. Colombia (2023). AFINIA S.A. E.S.P. ISES S.A.S. — Fifth TR SE Nueva Cospique 110/13.8kV 30MV. Bolívar. Colombia (2023). AFINIA S.A. E.S.P. ISES S.A.S. — Second TR ZAMBRANO-kV 48MVA. Bolívar. Colombia (2023). AFINIA S.A. E.S.P. ISES S.A.S. — Second TR Nueva Montería 110/34.5/13.8 50MVA. Córdoba. Colombia (2023). AFINIA S.A. E.S.P. ISES S.AS. — New Guatapuri 110kV substation. Cease. Colombia (2023). AFINIA S.A. E.S.P. ISES S.A.S. — PERENCO Connection to the Electrical Hub SE Caño Gandul / SE Sardines 115 kV. Casanare. Colombia (2023). WSP INGENIERIA COLOMBIA S.A. — Basic Engineering Sahagún 500 kV Solar Park Step-Up Substation. Sahagún. Colombia (2023). WSP INGENIERIA COLOMBIA S.A. — Basic Engineering Chinú Solar Park 500 kV Step-Up Substation. Chinú. Colombia (2023). WSP INGENIERIA COLOMBIA S.A. — Basic Engineering Valledupar Substation and 220/33 kV Step-Up Substation. Valledupar. Colombia (2023). WSP INGENIERIA COLOMBIA S.A. — Basic Engineering Transmission Line 220kv Cáclic – Jaén Norte, Derivation Of Lines In 60kV And Associated Substations. Jaen. Peru (2022). WSP INGENIERIA COLOMBIA S.A. — Proposal Engineering CLECO Construction of a New 138 kV Ring Perkins/ Elizabeth 138 kV Substations. Louisiana. USA (2022). WSP INGENIERIA COLOMBIA S.A. — Proposal Engineering CAISO - TransmissionPlan (Plan) 500/230kV HVDC substations. California. USA (2022). WSP INGENIERIA COLOMBIA S.A. — Basic Engineering Atlantic Substation 500 kV EGP. Sabanalarga. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S — Atlantic substation 500 kV. Sabanalarga. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S Page 4 of 10 HARRISON OMAR VILORIA ROJAS Design Engineer, Energy — New Puerto Viejo 34.5/13.2 kV Substation. Ambalema. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S — Second Transformer 34.5/13.2 KV Tuluni Substation. Chaparral. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S — Expansion and connection of Ortigal – Tunal 34.5/13.2 kV. Candlemas. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S — Expansion of the second Ortigal 34.5/13.2 kV SE transformer. Ortigal. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S. — New Bahia 34.5/13.2 kV Substation. Buenaventura. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S. — Second Natagaima Substation Transformer 34.5/13.8 kV. Natagaima. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S — Tabor 115/34.5kV – 25MVA Substation Expansion. Buenaventura. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S — Expansion of Manzanillo Substation 110/13.8 kV – 7.5/10 MVA. Cartagena. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S — New El Carreto 34.5 kV Substation. Tubará. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S — Expansion of the Pailón 115/34.5 kV Substation. Buenaventura. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S — New El Salto 34.5 kV Substation. Sling. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S — New Istanbul 115/34.5/13.2 kV Substation. Palmira. Colombia (2022). WSP INGENIERIA COLOMBIA S.A.S. — Union Substation Reconfiguration 110/34.5/13.8 kV – 50 MVA. Barrranquilla, Colombia (2021). AIR-E S.A.S. E.S.P. — Second power transformer 34.5/13.8 kV – 12.5 MVA Plato Substation. Plato, Colombia (2021). AIR-E S.A.S. E.S.P. — Replacement of 34.5/13.8 kV – 8 MVA power transformer Pivijay Substation. Pivijay, Colombia (2021). AIR-E S.A.S. E.S.P. — Second power transformer 34.5/13.8 kV – 12.5 MVA Zawady Substation. Río Frío, Colombia (2021). AIR-E S.A.S. E.S.P. — Second power transformer 34.5/13.8 kV – 13.3 MVA Fonseca Substation. Fonseca, Colombia (2021). AIR-E S.A.S. E.S.P. — Second power transformer 34.5/13.8 kV – 12.5 MVA Bonda Substation. Bonda, Colombia (2021). AIR-E S.A.S. E.S.P. — Second power transformer 110/13.8 kv – 50 MVA Ciénaga Substation. Ciénaga, Colombia (2021). AIR-E S.A.S. E.S.P. — Caracolí Substation 110/13.8 kV - 30 MVA – SDL. Malambo, Colombia (2021). AIR-E S.A.S. E.S.P. — North Substation 110/13.8 kV - 30 MVA – SDL. Puerto Colombia, Colombia (2021). AIR-E S.A.S. E.S.P. — Second 34.5/13.8 kV – 3 MVA power transformer Río Viejo Substation. Río Viejo, Colombia (2020). ELECTRICARIBE S.A. E.S.P. — Second power transformer 34.5/13.8 kv – 6.5 MVA María la Baja Substation. María la Baja, Colombia (2020). ELECTRICARIBE S.A. E.S.P. Page 5 of 10 HARRISON OMAR VILORIA ROJAS Design Engineer, Energy — Standardization of Veinte de Julio 110/13.8 kV Substation. Barranquilla, Colombia (2020). ELECTRICARIBE S.A. E.S.P. — La Loma Substation – SDL 110/34.5/13.8 kV – 50/30/20 MVA. La Loma, Colombia (2019). ELECTRICARIBE S.A. E.S.P. — Expansion of the transformation of La Jagua Substation 110/34.5/13.8 kV –30 MVA. La Jagua, Colombia (2019). ELECTRICARIBE S.A. E.S.P. — Transformation Expansion of San Jacinto Substation 66/34.5/13.8 kv 8 MVA. San Jacinto, Colombia (2019). ELECTRICARIBE S.A. E.S.P. — Manzanillo Substation – SDL 110(66)/13.8 kV – 30 MVA. Cartagena, Colombia (2019). ELECTRICARIBE S.A. E.S.P. — Transformer Installation PAT SE BAYUNCA - EGAL BAYUNCA connection 1 34.5 KV. Bayunca, Colombia (2019). ELECTRICARIBE S.A. E.S.P. — Construction of New Compartir 115 kV Substation and associated 115 kV lines. Soacha, Colombia (2019). ENEL CODENSA S.A. — Assembly of the new 11.4 kV cell train Bolivia Substation. Bogotá, Colombia (2019). ENEL CODENSA S.A. — Expansion of the Sauces Substation 115 kV – 34.5 kV. Fusagasugá, Colombia (2019). ENEL CODENSA S.A. — New Cabrera 34.5 kV-13.2 kV Substation. Cabrera, Colombia (2019). ENEL CODENSA S.A. — Expansion of capacity Chía 115 kV Substation. Chía, Colombia (2018). ENEL CODENSA S.A. — Expansion of the Mosquera 115 kV substation. Mosquera, Colombia (2018). ENEL CODENSA S.A. — New 34.5 kV-13.2 kV module La Esperanza Substation. La Mesa, Colombia (2018). ENEL CODENSA S.A. — Assembly of a new 11.4 kV cell train at the San Mateo Substation. Soacha, Colombia (2018). ENEL CODENSA S.A. — Remodeling of Charquito Substation 34.5 kV – 11.4 kV. Soacha, Colombia (2018). ENEL CODENSA S.A. — Normalization and replacement of cells San Carlos Substation. Bogotá, Colombia (2018). ENEL CODENSA S.A. — Civil and electromechanical designs for the standardization of the Puerto Libertador 34.5/13.8 kV Substation, Puerto Libertador (Córdoba), Colombia (2018). ELECTRICARIBE S.A. INGENIERÍA Y SOLUCIONES ESPECIALIZADA ISES S.A.S. — Civil and electromechanical designs IAR project El Bosque Substation, Cartagena, Colombia (2018). ELECTRICARIBE S.A. INGENIERÍA Y SOLUCIONES ESPECIALIZADA ISES S.A.S. — Civil and electromechanical designs IAR project Manzanares Substation, Santa Marta, Colombia (2018). ELECTRICARIBE S.A. INGENIERÍA Y SOLUCIONES ESPECIALIZADA ISES S.A.S. — Detailed design of substation, medium voltage lines, line bays associated with the San marcos – La Cumbre – Lobo Guerrero 34.5 kv ring located in the department of Valle del Cauca. Expansion of the Lobo Guerreo 34.5 kV – 13.2 kV substation, Colombia (2018). EPSA S.A. INGENIERÍA Y SOLUCIONES ESPECIALIZADA ISES S.A.S. Page 6 of 10 HARRISON OMAR VILORIA ROJAS Design Engineer, Energy — Detailed design of substation, medium voltage lines, line bays associated with the San marcos – La Cumbre – Lobo Guerrero 34.5 kv ring located in the department of Valle del Cauca. New La Cumbre 34.5 kV – 13.2 kV Substation, Colombia (2018). EPSA S.A. INGENIERÍA Y SOLUCIONES ESPECIALIZADA ISES S.A.S. — Detailed design of substation, medium voltage lines, line bays associated with the San marcos – La Cumbre – Lobo Guerrero 34.5 kv ring located in the department of Valle del Cauca. 34.5 kV Guabinas – La Cumbre line, Colombia (2018). EPSA S.A. INGENIERÍA Y SOLUCIONES ESPECIALIZADA ISES S.A.S. — Detailed design of substation, medium voltage lines, line bays associated with the San marcos – La Cumbre – Lobo Guerrero 34.5 kv ring located in the department of Valle del Cauca. 34.5 kV San Marcos – La Cumbre line, Colombia (2018). EPSA S.A. INGENIERÍA Y SOLUCIONES ESPECIALIZADA ISES S.A.S. — Design of Lines and Substations for the SDL Level 4 Expansion Plan (115 kV). Ladera 115 kV substation. Cali, Colombia (2018). EMCALI E.I.C.E E.S.P. INGENIERÍA Y SOLUCIONES ESPECIALIZADA ISES S.A.S. — Supervision of the process whose purpose is: design, supply, construction, assembly, testing and commissioning under the EPC "Engineering, Procurement & Construction" modality of electrical substations. Electrificadora de Santander ESSA S.A. E.S.P, Bucaramanga, Colombia (2017): Interventoría Diseños. Auditing of STR Santander Designs (10 Substations). Electrificadora de Santander ESSA S.A. WSP COLOMBIA S.A.S. — Pre-engineering and environmental pre-feasibility for the structuring of the call UPME 06-2017 Collector Substation I 500kV and associated transmission lines. Albania, Colombia (2017): Alupar Colombia S A S. WSP COLOMBIA S.A.S. — Feasibility studies and detailed design for the development of a photovoltaic park for electricity generation. Amazona Solar Park, Cali, Colombia (2016). Engineering Projects PROING S.A. WSP COLOMBIA S.A.S. — Civil and electromechanical designs of Incienso 230/69/13.8 kV – 2 x 150 MVA substation, Guatemala City, Guatemala (2016). Central American Electric Transmission Company TRELEC S.A. WSP COLOMBIA S.A.S. — Project STR03-2015: Engineering design of civil and electromechanical works for EPSA's new Montería 110 kV substation, Montería, Colombia (2016). Empresa de Energía del Pacifico EPSA S.A. WSP COLOMBIA S.A.S. — Project STR01-2015 Civil and electromechanical design of the extensions of the Cuestecita 220 kV, Riohacha 110 kV and Maicao 110 kV substations. EPSA's EP-CO-, Riohacha, Colombia (2016). Empresa de Energía del Pacifico EPSA S.A. WSP COLOMBIA S.A.S. — Design for the installation of a new 220/110 kV transformer of 100 MVA in the Valledupar substation owned by TRANSELCA S.A. E.S.P. EP-CO- of EPSA., Valledupar, Colombia (2016). Empresa de Energía del Pacifico EPSA S.A. WSP COLOMBIA S.A.S. — Conceptual, basic, detailed engineering and complementary studies of electrical substations and transmission and distribution lines in the area of influence of the ESSA E.S.P. Isla VI 115/34.5 kV Substation; 20/25 MVA. Electrificadora de Santander ESSA S.A. E.S.P. Puerto Wilches, Colombia (2015). Electrificadora de Santander ESSA S.A. WSP COLOMBIA S.A.S. — Conceptual, basic, detailed engineering and complementary studies of electrical substations and transmission and distribution lines in the area of influence of the Page 7 of 10 HARRISON OMAR VILORIA ROJAS Design Engineer, Energy ESSA E.S.P. Condor Substation 115/34.5 kV; 40/50 MVA. Electrificadora de Santander ESSA S.A. Yondó, Colombia (2015). Electrificadora de Santander ESSA S.A. WSP COLOMBIA S.A.S. — Conceptual, basic, detailed engineering and complementary studies of electrical substations and transmission and distribution lines in the area of influence of ESSA E.S.P. Puerto Wilches substation expansion 115 KV – 15/20 MV. Electrificadora de Santander ESSA S.A. Puerto Wilches, Colombia (2015). Electrificadora de Santander ESSA S.A. WSP COLOMBIA S.A.S. — Carry out basic and/or conceptual and/or detailed engineering and/or complementary studies of electrical substations and transmission and distribution lines, in ESSA's area of influence. CT-SESTEAIG027413-R1. WSP COLOMBIA SAS. Bucaramanga, Colombia (2015). Electrificadora de Santander ESSA S.A. WSP COLOMBIA S.A.S. — Consultancy for the execution of conceptual, basic and detailed engineering, as well as complementary studies for electrical substations and transmission/distribution lines. Expansion and remodeling of the Tibú substation 115/34.5/13.8 kV - 55/70 MVA. Centrales Eléctricas del Norte de Santander CENS S.A. E.S.P. Tibú, Colombia (2015). Centrales Eléctricas del Norte de Santander S.A. WSP COLOMBIA S.A.S. — Consultancy for the execution of conceptual, basic and detailed engineering, as well as complementary studies for electrical substations and transmission/distribution lines. New Socuavó 115/34.5 kV-30/40 MVA Substation. Centrales Eléctricas del Norte de Santander CENS S.A. E.S.P. WSP COLOMBIA SAS. Tibú, Colombia (2015). Centrales Eléctricas del Norte de Santander S.A. WSP COLOMBIA S.A.S. — Civil and electromechanical designs of the Incienso and Guatemala Sur substations No- of TRELEC. Guatemala City, Guatemala (2016). Central American Electric Transmission Company TRELEC S.A. WSP COLOMBIA S.A.S. — Design and Audit Services of High Voltage Development Works CONT-CA108-09 of ELECTRICARIBE S.A E.S.P. Barranquilla, Colombia -). ELECTRICARIBE S.A. WSP COLOMBIA S.A.S. — Se Montería 220 kv expansion, stage 2 — Capacitive compensation 110 kv Monteria Substation — Se El Carmen capacitive compensation 66kv - 15mva — Relocation and expansion Se Cospique 110/66/13.8kv — Transformation expansion Sabanagrande Substation 34.5/13.8 kv – 14 mva — Maicao 110/34.5/13.8 kv substation expansion — Barranco De Loba Substation 34.5/13.8 kv, 5 mva — IAR Projects 2014 — IAR Projects 2015 — Expansion of Toluviejo Substation Awaralá 110kv output. Page 8 of 10 HARRISON OMAR VILORIA ROJAS Design Engineer, Energy Buildings Design — Consulting service for the preparation of schematic engineering designs and cost estimation for the Banyan Tree Angsana Hotel and Resort project. Grupo Argos S.A. Santa Marta, Colombia (2016). Grupo Argos S.A. WSP COLOMBIA S.A.S. — Consultancy for the preparation of engineering designs for the Ziruma Pedestrian Path project. Design of a pedestrian bridge between the 2+240 and 2+300 abscissae. Design of a pedestrian bridge between the abscissas 1+060 and 1+120. by LATITUDE STUDIOS S.A:S. Santa Marta, Colombia (2016). Grupo Argos S.A. LATITUDE STUDIOS S.A:S. WSP COLOMBIA S.A.S. Buildings Construction — Remodelling of the Emergency Service Hospital of Polonuevo -Atlántico. Governorate of the Atlantic. Polonuevo, Colombia (2014). AB INTEGRAL MANAGEMENT OF WORKS. — Expansion of the general consultation and dentistry area of the Santo Tomas – Atlántico hospital. Governorate of the Atlantic. Santo Tomas, Colombia (2014). AB INTEGRAL MANAGEMENT OF WORKS. AB INTEGRAL MANAGEMENT OF WORKS. — Expansion of the emergency area of the Campo de la Cruz – Atlántico hospital. Governorate of the Atlantic. Campo de la Cruz, Colombia (2014). AB INTEGRAL MANAGEMENT OF WORKS. — Construction of the new "Universal Laundry" headquarters, Barranquilla – Atlántico. Barranquilla, Colombia (2014). AB INTEGRAL MANAGEMENT OF WORKS. — Construction of the VIP priority interest housing project. Royal Citadel of the Caribbean. 720 apartments, 18 Towers. "One Hundred Thousand Free Homes" Program Malambo – Atlántico. Ministry of Housing. Malambo, Colombia (2013). ECO S.A. — Construction of the "Reserva de los Almendros" project, 808 homes. Soledad – Atlántico. Sodedad, Colombia (2011). Marval S.A. — Preparation of the direct cost budget and work programming of the "Torres de San José" project. Barranquilla, Colombia (2010). Marval S.A. — Preparation of the budget of direct costs and programming of the work of the "Palmeras del Parque" project. Barranquilla, Colombia (2010). Marval S.A. — Preparation of the direct cost budget of the "Toledo" project. Barranquilla, Colombia (2010). Marval S.A. — Preparation of the direct cost budget and work programming of the "Los Almendros Reserve" project. Barranquilla, Colombia (2010). Marval S.A. — Construction of the "Castellana Real Stage 1" Project. 44 homes, Barranquilla – Atlántico. Barranquilla, Colombia (2009). Marval S.A. — Construction of the "Santillana" Project. 2 Towers 20 floors, 144 apartments. Barranquilla – Atlántico. Barranquilla, Colombia (2008). Marval S.A. Page 9 of 10 HARRISON OMAR VILORIA ROJAS Design Engineer, Energy AWARDS Exxon Mobile Scholarship Recipient/Fund 2003 Exxon Mobile Fund Scholarships Universidad del Norte PUBLICATIONS AND PRESENTATIONS Publications — Viloria, Harrison. "Determination of the modulus of elasticity of different types of concrete" Bachelor's Thesis in Civil Engineering, January 2008, pp. Page 10 of 10
Get your freelancer profile up and running. View the step by step guide to set up a freelancer profile so you can land your dream job.