Farooq Khan

Farooq Khan

$4/hr
I can take off Materials Quantity and cost of Civil structures work
Reply rate:
-
Availability:
Part-time (20 hrs/wk)
Age:
36 years old
Location:
Islamabad, Islamabad, Pakistan
Experience:
10 years
FAROOQ KHAN (Site Engineer&AQS) Address: House#167 Street#3 Ittefaq Town Kirpa Road Islamabad. Cell: -;- E-mail-- Personal Information Father’s Name Date of Birth Nationality Marital status Zareen Gul- Pakistani Married Educational Qualifications 1) Bachelor of Science In Engineering Technology (Honrs) -) Sarhad University of Science and Information Technology Peshawar. (CGPA=3.09) 2) Diploma in Associate Engineering (Civil-): Swedish Institute of Technology wah Cantt.( Marks Obtained=83%) 3) FSc Pre Engineering -): Indus Group of Colleges wah Cantt.(Marks Obtained=63%) 4) Matric (Science-): Govt.Boys Higher Secondary School Hassan Abdal. (Marks Obtained=73%) Computer Skills Design / Drafting: MS Office: Driving ● ● ● AUTOCAD WORD, EXCEL, POWER POINT,Software Installation. LTV Car, Jeep, (Auto& Manual Both) Areas of Interest ● ● ● ● Road and Bridges Construction High rise Building Construction, Estimating and Costing of Road Structures and Building. Housing Society Development and Infrastructure work. Professional experience (09 Years) 01) Feb 2021 to Uptill Now Employer Frontier Works Organization (FWO 759 CTE ). Position Site Engineer Client CDA/NAPHDA. Project 1. Development Of Low Cost Housing Farash Town Islamabad. 2. Construction Of Dadocha Dam Rawat. Employer Position Client Employer Position Client Project Employer Position Client Project Employer Position Client Project 02) October 2019 to January 2021 Zeedem Construction Co.Pvt. (Syed Ahmed Ali Shah&Co.) Site Engineer&Quantity Surveyor. Multi Gardens (MCHSP) Islamabad&Faisal Hills. 03) September 2018 to September 2019 ATA Enterprises Site Engineer Pak Army (45 Engineer Division.) 1.Construction Of Road for TDP From Samma to Doggar(23 Km). (Sectiom-1 Kurram Agency FATA) 2.Asphalt work of Parachinnar Bypass Road(11 km). 3.Asphalt Work of Road From Doggar to Koat Mehran 04) October 2016 to August 2018 TopCity-1 Site Engineer TopCity-1 Construction &Development of TopCity-1 05) May 2016 to Sep 2016 Zaib Afridi Construction Company Site Engineer & Quantity Surveyor FATA Development Authority. 1-strengthening & improvement of road from dwatoi to sandana (length 20 km & 4 x bridges), khyber agency, fata. 2-construction of new road from sandana to kk top (15 km). 3-construction of new hydropower plant in painda chena for pak army 27 bergade’s base camp. Employer Position Client Project 06) August 2015 to May 2016 Ms Shah and Co. Sub Engineer AWC Wah Cantt. 1.Construction of 5 Storey Commercial Plaza Hassan Abdal. 2.Extension of 3 Storey Civil Engineering Directorate Building at AWC (Air Weapons Complex) Mohra Choak Wah Cantt. 07) January 2013 to August 2015 Employer Frontier Works Organization (FWO 121 QC Bn Engr). Position Site Engineer Client Fata Secretariat. Project 1. Construction and Improvement of Peshawar Torkham Road N-5 Multicell Box Culvert Rigid Pavement and Bridge Constrcution. 2.Construction Of KKF Chek Post, Building , Weight Station and Construction of Building of School In Landikotal Cantt. Employer Position Client Project ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● 08) July 2012 to December 2012 Bolan City Housing Society Site Supervisor/Sub Engineer Bolan City Development of Bolan City(Building Works). Responsibilities: To control and monitor project total expenditure including verifying and checking of invoice and claims from main contractor, vendors and subcontractor to ensure that all project expenditures are properly recorded. Supervision of structural and architectural works at site. Layout of building and road’s structures. Inspection of raft foundation reinforcement, form work and concreting. Perform project cost related reporting to the team and management’s review on a monthly basis to ensure that expenditure are kept within the project budget. Preparation/checking of BOQ. Measurement of works in accordance with the various standard methods of measurements related to the quantity surveying. Preparing various Quantity surveying documents including estimates from sketch drawing, Bill of Quantities for all disciplines and Estimates.. Review/Verify measurements and take off quantities from drawing, site, and schedule. Vetting of Shop Drawing and Bar Bending Schedule in coordination with designer before the implementation of work. Working for Weekly and monthly presentation/progress report and presenting it to Client. Co-ordinate with all disciplines to perform tasks. Implemented road and infrastructure work for sewage, drainage pipes, manholes, telecommunication, water, irrigation, street lighting, and traffic signage. Arrange the soil testing experts and coordination with client and designer about foundation and other works as per site. Inspection of different works at site according to given section given by designer. Coordinate and work with Project Management Team to resolve project issues to ensure the Delivery/ Completion of the Project Work. Prepare the Required Material Demand for the Procurement department as per schedule to avoid any delay in the time frame to project activity. Plaster, paint and other finishes item performed at site. Prepare bill of quantities according to work done at site. Maintain the record of material arrived, consumed and store at si te. Reference will be furnished on demands..
Get your freelancer profile up and running. View the step by step guide to set up a freelancer profile so you can land your dream job.