Farhan Ahmed
Postal Address: Kashmir Town, Tehsil Dina, District Jhelum
Contact No.: -; -
Email:-
OBJECTIVE:
To contribute in the growth and vision of a dynamic corporation, while utilizing my potential for
achieving excellence and enhancing my technical and managerial skills.
Career Summary:
RAN Engineer with work experience of 8 years, ranges from subcontractor, vendor and operator.
Hands on experience on site solution designing, BOQ preparation, installation, commissioning
and project closures. Detail oriented technical knowledge resulted in track record of project
delivery within time and budgetary constraints.
Work Experience:
RAN Engineer
Organization: Huawei Technologies (Pvt.) Ltd.
Duration:
August 2018 – till now
Project worked on:
-
CMPAK/Ufone Project
Scope of Work Preparation
Sector Split 4T6S/4T4R/2T2R
Expansion from UL to GUL
RNC/BSC Upgrades
New Physical RO sites UL/GL
Integration (OMC) (CME/U2020)
Script preparation
Sector splitting
New physical RO sites
LTE/3G Rollout
Troubleshooting.
Project Coordination
Project based design solution verification and implementation
Project progress and documentation
Coordination with regional field managers for daily plan execution
Coordination with RF team for KPIs monitoring and benchmarking
Network Safety Management
Preparation of Request for Change (RFC) on Network
Coordination with Global Technical Assistant Center
Technical Review with local Technical Management Office (TMO)
RAN Assistant Design Engineer
-
Oman Ooredoo Swap
Design and Technology Configuration Synchronization
Equipment mapping as per Ooredoo approved configuration.
Technology involved are GSM/WCDMA/LTE-FDD/LTE-TDD/5G
Analyzing power requirements and availability
-
Zain KSA Ignite Project Phase-II
Design and Technology Configuration Synchronization
Equipment mapping as per Ignite Project approved configuration.
Technology involved are GSM/WCDMA/LTE-FDD/LTE-TDD/5G
Tower loading and civil structure compatibility
Project Engineer
Organization: CMPAK (Zong) Pvt. Ltd.
Duration:
November 2014 – 5-Sep-2017
Project worked on:
-
CMPAK Rollout Phase 6, 7 & 8
Indoor Building Solution of VIP sites
Coordination with authorities, design approval, team management,
Indoor equipment installation and final drive test approval.
Multi-vendor (HUAWEI & NOKIA) 2G Roll-Out sites implementation
Team management, equipment delivery to remote areas, coordination
with non-technical vendors for smooth execution of new deployments,
conduction of provisional acceptance test, generation of work orders,
Zong internal software expertise.
END-END media verification
MW Equipment mapping, media readiness for monthly targeted sites,
Media Route configuration on PTN and MW nodes, media
Troubleshooting, coordination with lease-media teams,
troubleshooting of media breakage issues.
Technical Site Survey Reports
Conduction of Technical Site Survey for new acquirable nominal, on
site troubleshooting and acceptance of newly built sites.
BSS Engineer
Organization: Huawei Technologies (Pvt.) Ltd.
Duration:
June 2014 - November 2014
Projects worked on:
-
4G-LTE Phase 1/2 – CMPAK
Nationwide inventory management of CMPAK group
Site wise delivery nodes creation and approvals
Coordination with Huawei warehouses for equipment dispatching
-
Wireless Optimization Project – CMPAK
BOQ preparation
Equipment mapping from site surveys
3G/4G Installation of (IBS) Indoor Building Solution and troubleshooting
BSS Engineer/Project Coordinator
Organization: Extreme Engineering Solution (Pvt.) Ltd.
Duration:
May 2012- January 2014
Projects worked on:
-
MOBILINK Swap Mega – HUAWEI
Coordinator for Mobilink Mega Swap North Region
Management of six field operation teams
Media readiness of cutover sites
Team lead of project surveys and documentation
-
CMPAK Rollout– HUAWEI
Coordinator for CMPAK Rollout installation in North Region
Installation of BTS3900, RTN 900 series TP4800 and Power Cube
Logistics management
Preliminary Acceptance Test visits of the sites with customer and
analysis of KPIs
-
CMPAK Expansion – HUAWEI:
Hard expansion of sites to avoid chocking in network
Coordination with RF team for benchmarking and KPIs monitoring
On site installation teams coordination
BSS & Transmission Engineer
Organization: Extreme Engineering Solution (Pvt.) Ltd.
Duration:
Jun 2011- May 2012
Projects worked on:
-
CMPAK Rollout – HUAWEI
Media clearance from BSC to End site
Installation Software Commissioning RTN 900 series, BTS 3900,
Execute the PAT of the network, Alarm patching & troubleshooting
-
HUAWEI ALU 200 SWAP CMPAK
Installation of BTS 3900, 3900A, RRUs, Power Solution FCB
Handling and Reporting of survey projects teams, Conduction PAT, Patching
and troubleshooting Alarms, RTN IF1B card swap in North region
Field Engineer
Organization:
TIER 4
Duration:
Jan 2011- May 2011
Projects worked on:
-
UFONE Microwave LOS Survey
(Survey Reporting)
CMPAK Microwave Links
(RTN 900 series, Microwave Cutover)
Academic Qualification:
BSc Electrical Engineering (Electronics) – PEC Registered
Institution:
Percentage:
Duration:
International Islamic University, Islamabad, Pakistan
71%
Sep 2006 – Aug 2010
FSc (Pre-Engineering) – H.S.S.C
Institution:
Institution:
Division:
Duration:
FG Intermediate College, Mangla Cantt, Pakistan
1st
June1 2004 – May 2006
Matriculation – S.S.C.
Institution:
Grade/Division:
Duration:
Quaid Model School
1st
June 2002 – May 2004
Technological Skills:
Programming Languages
C++, MATLAB 7.0. Assembly.
Technical Software
Web LCT (U2000), BTS Evolium, Protieus, Electronics Workbench.
Microsoft Office 97/2k/XP.
Certifications
HCIP (LTE)
3G Technology
Quality Assurance
Network Safety
(Huawei)
(Huawei)
(Huawei)
(Huawei
Personal Information:
Father’s Name:
Nationality:
Date of Birth:
N.I.C. #
Domicile:
PEC Reg #
Marital Status
References:
Will be furnished on demand
Tariq Mahmood Butt
Pakistani
31/03/-
Punjab
ELECTRO/13035
Married