SCOPE OF WORKS POWER LINE UPGRADE
POWER DISTRIBUTION SYSTEM COSTING TEMPLATE
ESTIMATE OF SCOPE OF WORK FOR OVER-HEAD DISTRIBUTION SYSTEM UPGRADE
DESCRIPTION:
3 PHASE UPGRADE OF PRIMARY DISTRIBUTION SYSTEM TO SUPPLY 415 VOLTS TO 'CONFIDENTIAL CLIENT'
SITE AT LOCATION
PLANT POLE, INSTALL GUYS, TRANSFORMERS AND OTHER
RELATED HARDWARE ITEMS AT 'SITE LOCATION'.
WORK DESCRIPTION / ACTIVITIES
CONTRACTOR: TO BE SELECTED
PO #:
QTY
RATE
2,953.29
2,953.29
Digging Pole Hole for 35’ (10.5m) Pole, Rock/Limestone
3,029.89
3,029.89
Digging Pole Hole for 40’ (12m) Pole,Rock/Limestone
8,321.80
Digging Pole Hole for 45’ Pole, Compressor
9,561.21
Construct earth pit
Preparing foundation to stablilize steel Rail
DIGGING HOLES (GUYS)
PRICE EXTN.
QTY
DIGGING HOLES (POLES)
Digging Pole Hole for 30’ Pole, Rock/Limestone
8,321.80
0
0
2
$16,643.60
9,561.21
1
$9,561.21
24,500.00
3
$73,500.00
2,000.00
0
$0.00
0
0
Digging (1) Hole for D/Guy (Rock/Limestone) - Distribution
-
2,542.69
Digging (1) Hole for Class "B" O/H Steel Rail - Distribution
$0.00
$0.00
$0.00
-
2,231.75
Digging (1) Hole for D/Guy ( Compressor) - Distribution
-
8,132.67
Digging (1) Hole for Class "B" O/H Steel Rail (Compressor) - Distribution
SPOTTING (avg terrain distance 500') Distribution
-
6,808.74
2
0
15,000.00
0
$0.00
-
2,257.51
5100
5,100.00
0
1
$5,100.00
Erect Pri. & Sec. O/H Guy Steel Rail
RETIRING POLES
-
4,418.12
0
$0.00
Retire 30 - 35' Wood Pole
-
1,569.03
Retire 40' Wood Pole
-
2,868.75
-
5,673.95
0
0
0
-
2,523.77
0
-
1,329.97
-
3,795.50
1
0
$0.00
$16,265.34
$0.00
ERECTING POLES
Erect 30' - 35' Wood Pole
Erect 40' Wood Pole
Retire 10.5-12m Concrete Pole
$0.00
$0.00
$0.00
$0.00
STRAIGHTENING POLES & C/Arms
Straighten 30' - 35' Pole
$0.00
ERECTING GUYS (Distribution)
Erect Pri. & Sec. D/Guy
Erect Pri. & Sec. O/H Guy
$1,329.97
$0.00
RETIRING GUYS (Distribution)
Retire Pri. & Sec. D/Guy Less Anchor
-
353.30
Retire Primary & Sec. O/H Guy "B"
-
1,691.59
Retension Pri. & Sec. D/Guy "B"
-
430.84
Retension Pri. & Sec. O/H Guy "B" (Pole)
-
671.80
Tranfer Pri. & Sec. D/Guy "B"
-
470.56
Transfer Pri. & Sec. O/H Guy "B" (Pole)
-
671.80
Dress. 30'- 40' Pole with Top Brack. & Ins.
-
389.80
Dressing 30'-40' Pole with 8' C/Arm
-
507.63
Dressing 30'-40' Pole with Pin & Ins.
-
463.56
0
0
$0.00
$0.00
RETENSIONING GUYS (Distribution)
0
0
$0.00
$0.00
TRANSFERING GUYS (Distribution)
0
0
$0.00
$0.00
DRESSING POLES (Distribution)
0
2
3
$0.00
$1,015.26
$1,390.68
Dress. 30-40'Pole with D/E Polymer
-
548.48
Dress. 30-40' Pole with Stand-Off Bracket
-
359.73
Dress. 30-40' Pole with (2 Set 3) D-Iron
-
897.24
Dress. 30-40' Pole with D/O Switch Bracket
-
359.73
Ret. Pole Top Brackets on 30-40'Pole
-
257.60
Ret. 8' C/Arm on 30-40' Pole
-
332.49
Ret. Ins. Pin & Ins. on 30-40' Pole
-
250.79
Ret. 10" Disc Ins. on 30-40' Pole
-
332.49
Ret. D-Irons on 30-40' Pole
-
250.79
#2 - #2/0 2 Wire/Span
-
1,961.34
#2 - #2/0 3 Wire/Span
-
#4 - #3/0 1 Wire/Span
#4 - #3/0 2 Wire/Span
9
0
3
3
$4,936.32
$0.00
$2,691.72
$1,079.19
RETIRING C/ARMS & INSULATORS
0
0
3
0
0
$752.37
2,737.98
2
$5,475.96
-
733.83
-
978.19
2
0
#4 - #3/0 1 Wire/Span
-
379.78
#4 - #3/0 3 Wire/Span
-
1,134.79
#4 - #2 1 Wire/Pole
-
368.43
#2/0 - #3/0 3 Wire/Pole
-
1,113.61
#6 - #2 / Joint
-
379.78
Making Jumper/Bonding
-
254.19
Disconnecting Jumpers
-
254.19
9
6
0
-
551.51
0
$0.00
#2 - #2/0 1 Wire Primary
-
508.39
#2 - #2/0 3 Wires Secondary
-
961.55
0
1
$961.55
5kVA - 25 KVA Transformer
-
2,899.01
50 kVA Transformer
-
5,241.22
100kVA - 167 KVA Transformer
RETIRING SINGLE PHASE TRANSFORMER
-
7,032.68
5kVA - 25 KVA Transformer
-
1,842.90
50 kVA Transformer
-
3,349.90
100kVA - 167 KVA Transformer
TRANSFERRING SINGLE PHASE TRANSFORMER
-
4,396.18
5kVA - 25 KVA Transformer
-
1,842.90
50 kVA Transformer
-
3,349.90
$0.00
100kVA - 167 KVA Transformer
INSTALLING PROTECTIVE EQUIPMENT - Distribution
-
4,396.18
$0.00
Grounding Connections (to include bonding all metal part and install lugs)
-
1,244.49
High Voltage Fuse Cutouts (All Voltages)
-
755.01
$0.00
$0.00
$0.00
$0.00
STRINGING & TENSIONING OF CONDUCTORS
$0.00
RETIRING OF CONDUCTORS
$1,467.66
$0.00
RETENSIONING OF CONDUCTORS
0
0
$0.00
$0.00
TRANSFER & RETENSION OF CONDUCTOR (Distribution)
0
0
$0.00
$0.00
AMPACTING OF JOINTS (Distribution)
$3,418.02
$1,525.14
$0.00
TRANSFER OF SERVICES (Distribution)
#4 - #3/0 3 Wires
WORKING ON DEADEND (Distribution)
$0.00
ERECTING SINGLE PHASE TRANSFORMER
3
0
$8,697.03
$0.00
$0.00
3
0
$5,528.70
$0.00
$0.00
0
$0.00
5000
2
3
0
-
567.40
0
$0.00
-
1,525.16
0
$0.00
BUSHING - LUMP
$2,488.98
$2,265.03
$0.00
RETIRING PROTECTIVE EQUIPMENT
High Voltage Fuse Cutouts (All Voltages)
INSTALL HPS & MV FIXTURES (Include Wiring &Bracket)
100 / 150 Lamps
TRANSFER OF HPS & MV FIXTURES (Wiring & Bracket Not Included)
100 / 150 Lamps
-
1,271.72
0
TOTAL 1 (LABOUR)
$0.00
$166,093.73
DISCOUNT 10%
$16,609.37
NEW LABOUR COST
$149,484.36
TRANSPORTATION
BUCKET TRUCK - minimum 38' Reach and Material Handling Capacity 385kg-
10,623.57
2
-
8,024.78
35.19
35.19
6
280
-
4,978.91
-
31.87
-
12,021.45
-
104.91
FLAT RATE / DAY
$21,247.14
LINE TRUCK - 5 tonne and over
FLAT RATE / DAY
RATE / MILE
$48,148.68
$9,853.20
PICK-UPS & SMALL VEHICLE
FLAT RATE / DAY
RATE / MILE
6
280
$29,873.46
$8,923.60
BULK HAULAGE
(3000 - 9000)kg - FLAT RATE/DAY
RATE / MILE
TOTAL 2 (TRANSPORTATION)
GRAND TOTAL
N.B - Mileage apply only when operating
outside 10 miles radius of Collection Point
This serves to confirm that I have examined the uTILITY Pole Line Services Rates
set out on pages _ to _ of this document and the terms governing Pole line
Services, and agree to execute at the said rates, which shall remain fixed and final.
Name: ___________________________ Company/Business: ___________________
Signature: _________________________ Position: ___________________________
Date: _____________________________ Witness: ___________________________
This serves to confirm that I have examined the JPS Pole Line Services Rates
set out on pages 1 to 12 of this document and the terms governing Pole line services
and do not agree to execute at the said rates, which shall remain fixed and final.
Name: ___________________________ Company/Business: ___________________
Signature: _________________________ Position: ___________________________
Date: _____________________________ Witness: ____________________________
4
140
$48,085.80
$14,687.40
$180,819.28
$346,913.01