Ditto Thiagarajan

Ditto Thiagarajan

$2.50/hr
Interaction with new peoples
Reply rate:
-
Availability:
Hourly ($/hour)
Age:
32 years old
Location:
Chennai, Tamil Nadu, India
Experience:
5 years
DITTO THIAGARAJAN Phone: (M) - Email:-/-2nd Floor, 24/2 1st Street, Thirunagar, Vadapalani, Chennai - 600 026 Seeking challenging assignments to leverage extensive expertise in the field of PROCESS ENGINEERING and deliver best-in-class results Result-oriented and skilled professional with 5.3 years of experience in Engineering Consultancy as a Process Engineer. Presently working with RSM Consultant engineers.       A technically adept professional with in-depth knowledge of Process Engineering Skilled at devising process improvements/controls to reduce wastages and enhance overall operational economy Adept at implementing quality control systems and procedures to minimize rejections and achieve highest quality standards Recognized as a hands-on, proactive professional who can rapidly identify problems, formulate tactical plans, initiate change and implement effective programs in challenging and diverse environments A proactive learner with a flair for adopting emerging trends & addressing industry requirements to achieve organizational objectives & quality norms An enterprising individual with proven ability to target and achieve break through goals COMPETENCY MATRIX WTP ETP FMEA Documentation Erection & Commissioning Report Preparation Procurement Plant Designing Equipment Sizing Technical Drawings Asset Hierarchy SUMMARY OF SKILLS          Generating ideas for eliminating recurrence of technical issues and return value stream to standard state Efficient worked in Different stages of projects like Costing, Sizing, Procurement and Execution. Leading and participating in continuous improvement activities Developing and maintaining standard operating procedures and processes of manufacturing Served as a resource for organization in the detailed design and optimization of new processes and technology initiatives Delivered process improvement results for top priority projects within the organization Extracted and analyzed operational information and performed statistical analysis to identify root causes Led data-supported process improvement identification, implementation and ongoing measurement Developed operational tools like indicators and dashboards to provide effective support in the improvement of continuous process CREDENTIALS B.Tech. (Mechancial Engineering) from Kalasalingam University in 2015 with 7.11 CGPA Technical Skills  AutoCAD    Creo Microsoft Office Smart Sheet WORK EXPERIENCE UNITFORCE TECHNOLOGIES,(Debuted into Larsen & Toubro Technology services) (Aug19 – April 20) Process Engineer Key Deliverables:  Done failure mode effective analysis for various equipment such pumps, compressor, Gas trains,etc.  Revision of WTP and ETP for further capacity improvement and assisting.  Preparation Bill of Materials for various plants.  Reviewed the piping and instrumentation diagram and Building equipment layouts.  Prepared the Asset register based on the Hierarchy concept.  Reviewed the Process data and Prepared the Asset management register.s  Maintained the Quality of Asset management based on the QC terms. RSM CONSULTANT ENGINEERS, Kodambakkam, Chennai Process Engineer (May’16 – Jan’19) (June 20- Till date) Key Deliverables:  Responsible for preparing process flow diagram, process instrumentation diagram, and simple equipment layout and data sheet.  Responsible for package of water treatment plant and handled in various stages such as designing, purchasing, detailing review, piping, erection and commissioning.  Involved in designing of effluent treatment plant and successfully commissioned.  Accountable for sizing and purchasing the Equipment such as Pumps, Air compressor, Tanks, Agitators, Hot Air generator, Pigment mill and cooling tower etc.  Prepared and floated tenders for equipment’s and communicated with vendors and details engineering consultants for receiving timely offers and solve vendor queries  Evaluated the offers and gave recommendation based on technical and commercial aspects.  Estimated the total power consumption of the overall plant and assigned the critical loads for running the plant in emergency.  Checked the piping layout and prepared the Isometric diagrams for piping  Followed up equipment fabrication status post ordering and created a detailed timeline for erection and commissioning of various equipment  Assisted in the erection and commissioning of various systems such as Rotary Kiln system, WESP system, drying system and fire hydrant system. Selected Highlights:  Successfully designed, erected and commissioned the FSH Dryer System  Successfully commissioned the Calciner.  Successfully commissioned water treatment plant.  Successfully commissioned Effluent treatment plant. RAVI ENGINEERS, Koviloor, Karaikudi Site Engineer (Apr’15 – May’16) Key Deliverables:  Read and interpreted blueprints, technical drawings, determine which equipment and tools will be required to complete the work  Prepared the Bill of quantity as per the blueprints and technical data  Prepared the work schedule and finished the work timely  Fabricated and assembled the piping products to ensure the products meet the required specifications     Supervised and assigned the task for workers Ensured the layouts, alignment, fits together fabricated parts of structural products in shop or field locations, according to blueprint and layout specifications Took necessary action to maintain the safety Prepared monthly techno commercial reports PROJECTS HANDLED Project#1: Client: Duration: Team size: Role: Responsibilities: Project#2: Client: Duration: Team size: Description: Role: Responsibilities: Project#3: Client: Duration: Team size: Description: Role: Responsibilities: Project#4: Client: Duration: Team size: Description: Role: Responsibilities: Formaldihyde and Pentaerethitol Asian Paints Ltd Oct’18 – Jan’19 4 Increasing the capacity of exiting Formaldehyde and sodium formate recovery Plant. Separate the penta from effluent and Sodium formate. Reviewing the exisiting technical documents, Create P&ID, PFD and Equipment layout for our process scheme, Sizing the agitator and pumps etc. 100TPD Tio2 Project Saraf Agencies Ltd Apr’17 – Dec’17 4 100 Tons per day Titamium Di-Oxide plant which placed in Odissa Completed review of basic engineering package for 100TPD Tio2 plant from china and updating wherever; coordinated and approval of basic detailed engineering drawings, Procurement of equipment from china and India. Reviewed technical documents such as GA drawings, Equipment layouts, Equipment drawings and other techical documents 50 TPD Tio2 Project Kilburn Chemicals Ltd May’16 – Oct’18 4 50 Tons per day Titanium Di-oxide plant which placed in Dahej SEZ, Gujarat. Prepared Basic Design engineering package for 50TPD Tio2 Plant, Identified specialized vendors for critical Equipment and assisted during procurement phase and assisting with commissioning of the plant. Equipment Sizing, Layout optimization Designing of WTP, Technical Drawing Review, BOQ preparation, P&ID PFD preparation, Assisting with erection and commissioning 100 TPD Titanium Slag Project Trimex Industries Ltd June 20 – Till date 4 100 Tons per day Slag plant which placed in Atchuthapuram, Vizag SEZ. Preparation of Detail Project cost , Basic enginering supply and Assisting in technical aspects, Procrement, Assing with installtion of various equipment and commissioning. Project cost estimation, Comparing of vendors during procurement, Layout review, Technical Drawing Review, BOQ preparation, P&ID PFD preparation, Assisting with erection and commissioning PERSONAL DETAILS Date of Birth: Languages Known: Location Preference: 08th July, 1993 English & Tamil Chennai / Bangalore
Get your freelancer profile up and running. View the step by step guide to set up a freelancer profile so you can land your dream job.