Benjamin Okpere, PMP
3734 Brampton Island Dr., Katy, Texas 77494
- ∙-
PROFESSIONAL SUMMARY
Certified Project Manager and Telecommunication Professional with over 14 years’ experience in turnkey telecoms infrastructure deployment projects; Planning, Design, Implementation, Controls, Integration, RF Optimization and Closing
Key Skills
Project Management/Quality Audit
Technical Installation, Writing
Commissioning/Integration
OSHA Regulation
MS Project, Primavera P6, AutoCAD
Database Administration (MySQL, Oracle)
Networking+ (TCP/IP)
Windows, UNIX,LAN/WAN, Linux
PROFESSIONAL DEVELOPMENT
Project Management Professional (PMP) Certification -)
Project Management Institute- Scheduling Professional ( PMI-SP)
Nokia- 4G LTE Multiradio-005-Airscale Certification
Ericsson – Telecom Installation Fundamentals Certification
Ericsson – CDMA (UMTS) LTE Commissioning Certification
Oracle Certified Associate-10g Administrator
OSHA 30 Hr Construction Safety & Health Certificate -)
Council for Regulation of Engineering in Nigeria (COREN) – Registered Engineer
PROFESSIONAL EXPERIENCE
Project Engineer- Operations 12/ 2018 – 03/2019
TELEWORLD SOLUTIONS, Chantilly VA (NB-IoT 5G Buildout DISH Wireless/ Ericsson Integration)
Carry out scheduled site commissioning and integration of the Narrow Band IoT for Dish Network
Create and update field MOP checklist document for smooth field implementation
Software package update Baseband Scripting and commissioning
Carry out Integration of the BB5216/ BB6630 using the RBS summary for remote access
Logging in to the EMCLI application interphase to run the NETCONF and MOSHELL files
Execute NETCONF protocol scripts, and MOSHELL scripts
Run/execute command line interface COLI for specific ERFCNs
Configure and set up the UE monitor uplink and downlink filter using the QCOM application
Carry out UE baud rate check and conduct the attach, ping, and detach test
Carry out attach, ping, detach test on channel frequency’s 11135, 13255, 13267
Data throughput testing for upload and download on all sectors for EARFCN, RSCP and SNR
UDP socket set up on the UE to test the UL throughput on all three frequencies
Set up SSH session to the iperf application server via DISH VPN
Data download throughput test using test scripts on DISH VPN for the EARFCNs
Integration log files and ACI acceptance report collation and submission
Responsible for training, and supporting team members for successful integration
DISH Wireless
Technical Service Operator III 10/ 2017 – 11/2018
SAC WIRELESS, Houston TX (Nokia Air scale Project/Verizon)
Planned and scheduled equipment deployment for installation and migration
Coordinated and provided support during maintenance window for successful migration
Managed projects resources and materials efficiently with respect to scope, time, cost & quality
Conducted Technical Site Survey (TSS) for Air scale planning and implementation
Carried out Equipment Installation according to Nokia /VZW MOP
Carried out pre-commissioning test and functional test of Nokia small cell radio
Carried out Low voltage power installation/connection and power up Air scale and SMM
Generated Site Commissioning File (SCF) from Nokia server prior to MW
Carried out on site Equipment commissioning /SW upgrade and Integration with RITC during MW
Conducted External Alarm Testing, troubleshooting and making the site alarm free
Conducted Call Testing/ E911 after Integration on all sectors and document result
Decommissioned ALU equipment (BBU/EAM) after successful migration
Prepared close out package on Nokia Newelo and updated site progress database
LTE Integration Engineer 08/2016 – 10/2017
SOFTWARE QUALITY LEADERS INC, Dallas TX (Ericsson/ATT)
Carried out equipment Installation, commissioning and integration on Ericsson equipment
Carried out Continuous Wave Measurement to calibrate propagation mode
Work ticket opening and closure via AT&T portal and NFSD for pre-work status /EIM
Worked with UTRAN support for current site commissioning software
Integrated and configured UMTS and LTE
Performed network migration from DUL-DUS- BB5216+ XMU career Add
Carried out NEA test for external alarm verification
Performed onsite troubleshooting on hardware or configuration issues on UMTS and LTE Nodes
On site alarm clearing and quality check punch list
Performed acceptance call test after site integration/ on air
Generated Close Out Package and post work report
Field Engineer 04/ 2015 – 05/2016
BURNETT, Houston TX (LA Market, Ericsson/ATT)
Equipment installations, commissioning and migration
Fiber running, cleaning and termination on BB5216
Tested and troubleshot backhaul and sectoral fiber cables for faults
Performed low voltage work, DC breaker connection, cable rack, stitching and trunking
Ensured all preventive, corrective and configuration job orders are duly implemented
Provided technical support to troubleshoot system remotely for effective job completion
Produced and provided project closeout photos and documentation
Project Manager 01/ 2013 – 03/ 2015
MYD TELECOMS LIMITED, (Sub-contractor and crew management)
Leading telecom support and managed Service Company, privately owned with diverse portfolio
Planned, scheduled and controlled deployment of 348km Galaxy Backbone fiber optic project under National Information Computer Technology Internet Backbone (NICTIB) project using Primavera P6
Created and developed baseline project schedules in implementation of turnkey construction of 44 MTN Base transceiver stations (BTS) with input from multiple work groups and client
Managed sub-contractors on project on Installation and Commissioning of Ceragon Radio Links
Created schedule and controlled implementation of CCTV installation, Access Control, and Fire Alarm System
Performed site rerouting of sites, Optimization with microwaves and SDH equipment for MTN
Provided field support for connecting, disconnecting, upgrading, downgrading, and relocating HW components
Maintained project schedules, provided progress updates and performed project closeout
Implementation Engineer/ Manager 06/ 2008 –01/ 2013
GLOBACOM LIMITED, Lagos, Nigeria (Alcatel, Huawei, ZTE, Ceragon equipment)
Nigerian privately owned multinational telecommunications carrier headquartered in Lagos, 4,000+ staffs
Oversaw successful roll-out programs (turn-key) for company from preliminary network design (PND), city survey, site acquisition and documentation, line of site (LOS), technical site survey (TSS), final site survey report (FSSR), site build/ Civil works, equipment deployment/installations, commissioning and integration
Managed projects efficiently, balanced enhanced constrains of scope, time, cost, quality, risk
Initiated 300+ sites by conducting viability analysis of potential site coverage for network capacity growth
Planned networks, completed RF design, created & implemented new sites for coverage expansion
Commissioned and integrated 100+ 2G/3G sites by monitoring and controlling site built processes including civil/tower foundation work, electro-mechanical works, RF, BSS/TX, BTS/MW link installation implementation
Closed 200+ sites by conducting site acceptance with approved changes, signed final acceptance certificate
Implemented planned work order for integration/commissioning of GSM900 & 1800MHz on Alcatel & Huawei telecommunication systems from BTS to BSC, Optimized 2G/3G networks
Laid/installed fiber optics and cross-connection for transmission of data, & voice services on 3G and routing of Huawei RNC (Radio Network Controller) supervision to OMC (Operations and Maintenance Centre)
Implemented/Commissioned 3G voice and data services using Huawei NodeB equipment on Globacom network
Project Engineer 01/ 2006 –05/ 2008
SERVETEK ENGINEERING LTD, Lagos, Nigeria (ZAIN, MTN, ETISALAT)
Nigerian company with 400+ strong business and services spanning construction, engineering, telecommunications, and investment
Conducted site search with approved coordinates, site acquisition and proper documentation
Conducted technical site survey (TSS) for new sites to generate site specific requirement and working drawings prior to start up meeting (SUM)
Carried out soil test using deep cone penetrometer test for foundation specification and design
Constructed different types of foundations ( Pile, Raft, Pad and column) for tower, reinforced concrete retaining wall, equipment slabs with appropriate concrete strength
Determined strength and adequacy of concrete and foundations using cube crushing test and NDT
Grounding system installation on site and testing using the earth meter tester
Supervised tower rigging and carried out tower certification (torque test ) and acceptance
Prepared As-Built drawing for all sites as part of project closing documentation
Wireless Field Engineer 12/ 2004 –01/ 2006
LIKUSASA NIG LIMITED, Lagos, Nigeria (ECONET, MTN)
Nigerian company with comprehensive range of services and products in the telecommunications, infrastructure, and energy sectors, Headquarter in South Africa.
Installed sectorial antenna 900MHZ and 1800MHZ antennas, RBS 2202,2206
Rectifier installation and termination (24V and -48V) Emerson, Delta, Grintek
Completed antenna dish alignment and fine tuning for accurate receive level
Completed AC/DC, alarms and signal wiring for equipment shelter
Installed ALU 9100 BTS and radio transmission equipment, ALU microwave radios and ALU ADM
Installed power cables for ALU BTS and transmission equipment
Carried out E1/T1 termination to DDF rack
Carried out VSWR test on the feeder cables
EDUCATION
Bachelor of Science (BS), Civil Engineering
University of Lagos, Lagos Nigeria