Curriculum Vitae
1.
Target position
Team Leader – Coordination
2.
Name
Angshuman HAZARIKA
3.
Date of Birth
25 September 1977
4.
Nationality
Indian
5.
Education
B. Sc. from Gauhati University (1998)
6.
Other Training / Courses
Diploma in Computer Applications from NIIT Education
(INDIA), GuwahatiCenter (1996)
Computer Hardware & Maintenance Course from Assam
Engineering Institute – Guwahati University (1999)
Inter-Organisational Training on ISO
Implementation&Management Representation (2007)
India
7.
Countries of Work Experience:
8.
Language Details
9.
Employment Record
1.
Language
English
Hindi
Assamese
Bengali
Employment Duration
From August 2016 till Date
Employer
Self
Employer’s Business
2.
Read
Good
Good
Avg
Avg
Write
Good
Good
Avg
Avg
Speak
Good
Good
Good
Good
Consultancy in Construction Projects for both Local and
National Based Establishments with cliental for MoH (EPIL for
BSF etc), POWERGRID, NTPC, NEEPCO, NHPC, REC, NPCC,
NBCC and All North Eastern State Power Departments for all
project verticals with common project components like
Survey, Detailed Field Report for Feasibility, Project
Execution, Mobilization, Project Execution Management
with Equipments & Menpower Management, Transport
Management, Completion Process like Handing Over
Documentation, Maintenance Period Managments etc for
o
Electrical Projects - Generation, Transmission, Distribution
o
Civil Projects - Townships, Hospitals, Administrative
Complexes, University Campuses, Plants of various
nature, Bridges including MS & Concrete
Establishment for self, Teak Wood Business of trading from
the state of Mizoram to various consumers across India per
requirement
Employment Duration
From January 2016 to July 2016
Employer
J A Brothers
Dhobinala, Dimapur, India
Employer’s Business
Government Suppliers & Contractor, Civil Works specially in the
area of North East India
Position Held
Project In-charge (Contractual Mode)
Reporting To
Proprietor (Mr Nirmal Jain, Dimapur) / Project Support @ HO
Page 1 of 10
3.
4.
5.
Reason for Leaving
Project Idling
Employment Duration
From September 2013 to till January 2015
Employer
Aravali Infrapower Ltd
Vikaspuri, New Delhi, India, http://aipl.in
Employer’s Business
Manufacturer of Tower Parts & Conductors, Transmission &
Distribution of Power, Solar Energy Projects, Hydro Power
Projects, Roads, Urban Infrastructure, Rail Infrastructure.
Position Held
Chief Manager – (Projects)
Reporting To
Director (Projects)
Reason for Leaving
Project Completion
Employment Duration
From Sep 2012 to May 2013
Employer
Cleanopolis Energy Systems (India) Pvt Ltd
Tezpur, Assam, India, http://cleanopolis.org
Employer’s Business
2.4 MW Bio-Methanation Plant, CDM Based
Power & Fertilizer Production Plant
Position Held
General Manager – Operation & Maintenance (Contractual
Mode)
Reporting To
CEO
Reason for Leaving
Project Idling
Employment Duration
From Oct 2010 to Mar 2012
Employer
A2Z Maintenance & Engineering Services Limited
Gurgaon, India,
http://a2zgroup.co.in & http://a2zepc.com
6.
Employer’s Business
EPC Company – part of A2Z Group, All kinds of turnkey
engineering projects in various parts throughout India
Position Held
Senior Manager – Coordination
Reporting To (Last)
General Manager (Transmission)
Reason for Leaving
My Son needed medical attention which I had to consider over
my job
Employment Duration
From Sep 2003 to Mar 2010
Employer
Power Network Engineers (P) Ltd
Guwahati, Assam, India
Employer’s Business
Electrical Contractors working for various Govt / Semi Govt /
Private Sectors working in different parts of North East India
Position Held
Management Representative & Chief Coordinator
& PA to MD (Regular)
Reporting to
Managing Director
Page 2 of 10
7.
Reason for leaving:
For a better Opportunity
Employment Duration
From Sep 1997 to Aug 2003
Employer
Skillage
Guwahati, Assam, India
Employer’s Business
Electrical Contractors working for various Govt / Semi Govt /
Private Sectors working in different parts of Assam, India
Position Held
Senior Supervisor / Assistant Manager (Regular)
Reporting To
Manager
Reason for Leaving
Project Completion and Better Opportunity
10. Experience Snapshot
A Seasoned Professional offering nearly 18 years of diverse &
rich experience, primarily in the areas of Construction Projects –
Electrical, (mostly in Distribution sector, Transmission sector now
in Civil Construction and also as Self Employed Entrepreneur.
As Project Manager with JA Brothers, I had the proud privilege
of managing Civil Project that too for a client like EPIL along with
end client BSF / MHA. Working in a relatively tough terrain I feel
good that I am able to put another feather to my cap.
As associated with Aravali Infrapower Limited (AIPL) as Chief
Manager – Projects, handling all Transmission Line Projects of the
company, in terms of Project Operations and a prime linkage
between the site and Head office, being a strong middle
management gateway.
Functional Expertise in managing execution of projects, being a
part of Middle Management with key focus on bottom line
profitability by ensuring optimal utilization of resources with
planning.
This was achieved by proper vendor management, Cliental
liaison for follow-ups, timely supply of materials, synchronized
and planned execution of works, and Closure works with
Departments along with MIS data management in every stage
of the projects.
Well versed / experienced in Construction / Augmentation /
Renovation & Maintenance of Projects in terms of Planning,
Cost Data Analysis, Supply Vendor Management, Departmental
Liaison, Work Force Management – Subcontractor / Crew
Supervision, Reporting to Management in terms of cost
projections of Change Order Management, QA/QC
Management, maintaining Safety Norms, taking care of other
departments’ obligations in the part of employers.
ISO Implementation & Management Representation trained in
terms of Construction Projects.
Strong relationship management, communication skills with the
ability to network with Project Managers/ Consultants / Clients /
Sub-Contractors and the other utility agencies with
consummate ease.
An effective communicator with excellent relationship building
& interpersonal skills. Possesses a flexible & detail oriented
attitude & experience of developing service standards for
business excellence.
11. Key Skill Areas
Project Coordination
Project Execution
Plant Maintenance
Maintenance Operation
Page 3 of 10
Quality Implementation
Techno Commercial Operations
Liaising & Coordination
Customer Compliances
Customer Complaints
Resources Management
12. Detailed Tasks Assigned
Works Undertaken that best illustrates capability to handle the tasks assigned:
Name of assignment or project:
Construction of 10 nos Platoon Level and 3 Nos Company Level
Border Out Posts along IBB in the state of Mizoram Budget: INR
63.93 Crores revised value: 83.10 Crores
Year:
From January 2016 to July 2016
Location:
Project Site Demagiri (Tlabung), District Lunglei, Mizoram, India
Client:
Engineering Projects (India) Limited (EPIL)
Main Project features:
This Construction of 10 nos Platoon Level and 3 Nos Company
Level Border Out Posts along Indo Bangladesh Border (IBB) in the
state of Mizoram is a project under Ministry of Home Affairs
(MHA), MHA has taken up the Border Outpost construction
along with the Border Fence, and Border Road. India’s one of
the toughest terrains falls in the state of Mizoram, with very poor
road connectivity, and scanty communication facilities, the BSF
and companies like JA Brothers are seen apart from the local
people, while performing site works at Sites. Construction of BOP
involved Land Acquisition, Earth Work, Land Development,
Building Works, Drain, Road, Boundary Wall, Beautification,
Electrical Works, Sewerage, Plumbing etc.
Positions Held:
Project In-Charge
Activities performed:
Managing the Project Activities as per planning, coordinating
with client, involving HO, managing vendors and outside
agencies etc.
Procurement Management – Services & materials related Site,
Construction Materials procured, recorded, measured,
analysed, utilised at the site.
Inventory & Store Management – While storage is also an
important factor, to preserve the materials while the items being
in transit from source to the consumption site. Measurement of
the same is further an important factor which was taken care of
very strictly at Site.
Project Management & Implementation Supervision &
Monitoring – actual site workings managed, with MIS onto HO
Time Scheduling and Fund - flow Management at Site.
Contract Administration – Planned, Monitored and
implemented Contract related issues in terms of Project.
Managing all kinds of Cliental & Required Compliances. This
aspect required to be managed from grass root level data to
be collected as samples to be preserved under proper
supervision and documentation and then passed on to the
appropriate authorities for testing and necessary procedures.
Men Management – Co-workers, Staff and Workers with 1
Manager at Site, 3 Civil Engineers at Site, 6 Supervisors at Site, 19
Operators at Site, 8 Labor Teams at Site, and Randomly selected
Supply Vendors by company and petty vendors.
Fleet Management – The Complete Site Works depended on
the backbone of a Fleet of 21 Tippers, other related required
Page 4 of 10
vehicle, like Jeeps, Pickups, JCB, Excavators, trucks which need
to ply from store and sources of materials to work site for its
construction. This along with a sincere team of operators which
handled this important aspect, had been well taken care of, in
focus and tune with output result as desired by Client and our
HO. This whole tune-up required to be performed across 160 kMs
daily which was possible to ply only once to and fro in a day.
Name of assignment or project:
Construction of 2.4 MW Bio Methanation Plant at Borpakhiajhar,
Dipota, Sonitpur, Assam, IndiaBudget: INR 28.0 Crores
Year:
From Sep 2012and due completion
Location:
Tezpur, Assam
Client:
Cleanopolis Energy Systems (India) Pvt Ltd
Main Project features:
A 2.4 MW Bio-Methanation Plant was started from scratch like
Land Procurement to Construction, involving Coordination with
Consultants both Electrical & Civil. This Project shall Generate 2.4
MW Electricity along with 100 MT per Day of Bio Fertiliser with
Clean Development Mechanism (CDM). Further, it involves socio
economic activities involving raw material suppliers based on
the principles thru pay, align & barter systems. It also involves
Heat Recovery options, for Cold Storage.
Positions Held:
General Manager – Operation & Maintenance
Activities performed:
Team Lead and overall In-charge for the entire execution of the
project which included:
Procurement Management – men & materials for complete
project was handled by the undersigned.
Project Management in initial construction was carried out by
the undersigned & Implementation Supervision was due as
project was due functional.
Time Scheduling and Cashflow management was taken care of
for the initial project kick off stages.
Contract Administration was taken care of for initial project
construction phases.
Managing all kinds of Governmental Compliances
Men Management – Staff and Workers with 2 Managers, 5
Assistant Managers, 10 Supervisors, 30 Operators, 3-5 nos
Concreting team, 8 different Contractors, 9 Nos Supply Vendors
Name of assignment or project:
A Research Study on Financial Inclusion Related Issues of
Rickshaw Pullers in India, 2012
Year:
From Jan 2012 Sep 2012
Location:
North East India
Client:
United Nations through US Infratech Private Limited, New Delhi
Main Project features:
United Nations Development Program – UNDP had
commissioned the captioned study to M/s Centre for Rural
Development.
Study the socio-economic status of urban rickshaw pullers, their
accessibility to available financial products and services
covering recommendations on improving their livelihoods, and
identified options to improve financial market for the rickshaw
transport sector in India
Positions Held:
Coordinator
Page 5 of 10
Activities performed:
The undersigned was assisting & coordinating the managing of
complete study including the field work, analysis.
Name of assignment or project:
Baseline study under North Eastern Region Community Resource
Mobilization Project for Upland Areas, India-
Year:
From Mar 2011 Sep 2012
Location:
North East India
Client:
United Nations through US Infratech Private Limited, New Delhi
Main Project features:
Baseline study under North Eastern Region Community Resource
Mobilization Project for Upland Areas, India- (Project
Economist/Institutional Expert, Project Coordinator)—The North
Eastern Region Community Resource Management Project
(NERCORMP) was an International Fund for Agricultural
Development (IFAD) funded project designed to improve the
livelihood of vulnerable groups in a sustainable manner through
improved, environmentally beneficial management of their
resource base.
Positions Held:
Coordinator
Activities performed:
The undersigned was hired on Contractual mode to assess
infrastructure gaps and identify potential intervention areas for
NERCORMP by conducting focus group discussions, and
baseline and socio-economic surveys across six of NERCORMP’s
project districts. He assisted & coordinated the data collection,
compilation and analysis to produce a final report subsequently.
Name of assignment or project:
P236-TW01 400 kV Transmission Line Berhampore Bheramara
Project Budget: INR 45.7 Crores (Initial Value)
Year:
From Aug 2011 till Mar 2012
Location:
Berhampore, Murshidabad, West Bengal, India
Client:
Power Grid Corporation of India Limited
Main Project features:
Supply, Erection, Testing & Commissioning of a 98 Km EHV Line of
400 kV from a switching station near Berhampore to Bheramara
(Indian part - Bangladesh Border), further this will export power
to BANGLADESH from India
Positions Held:
Senior Manager – Coordination
Activities performed:
In-charge for complete project coordination of the project
which included:
Name of assignment or project:
Site and Head / Regional office Coordination
Coordinate, Monitor & Manage Commercial Processes
with Client (POWERGRID)
Assisted Project Head in Project Management at Site in
various upcoming, ongoing, unsolved issues -● Right of
Way (ROW) Railways Telecom Survey Issues
Works Planning Execution involved - Subcontractor /
Team workings Planning / Supervision
Logistic Management
Material, Stores
Indo Bangladesh Border Flood Lighting Project Budgets: INR
28.5 Crores
Page 6 of 10
Year:
From Oct 2010 to Jul 2011
Location:
Sabroom, South Tripura, India
Client:
National Projects Construction Company (NPCC), a Govt of
India enterprise for Border Security Force (BSF)
Main Project features:
Indo Bangladesh Border Flood Lighting, over the International
Border, fenced with Barbed wire involved construction of DG
Control Room, DG Sheds, Laying of Cables in Cable Trenches of
from sizes 25 Sq mm to 185 Sq mm, 220 Sq mm over a stretch of
60 running Kms, Erection of Lighting poles with Fixtures, Control
Gear, Installing DG Sets of 100 kVA, cables jointing
Positions Held:
Senior Manager – Coordination
Activities performed:
Team Lead for execution of the project at Site Level with extremely
Rough Terrain, In-spite of Seasonal & Local Disturbances to timely
completion with 2 Managers and 20 Junior Engineers, Store Keeper,
10 Office Staff, with 4 Sub-Contractors with 200+ team strength
workers in extreme interiors in the border areas.
Coordinate with Site and Head office specially balanced
coordination with NPCC and BSF
Solve Day to Day affairs of Site and HO
Facilitate the Purchase Process like Approvals, Inspection
byClient, for Material Dispatches with Logistics
Management,
Coordinate with Client (NPCC) for Execution related
issues like Inspection of Supply Items etc.
Facilitate Local and Remote Resource Management
Monitor Profit per works and Reporting
HRM Issues Managed per site.
Project Implementation Planning
Coordinated with Client for Implementation of the
project with all other aspects of Project Management.
Name of assignment or project:
Rajiv Gandhi Gramin Vidytikaran Yojna (RGGVY) Works
including BPL Connection (Erection) Budget: INR 1.2 Crores
(Iinitial Value)
Year:
From April 2010 to Sept 2010
Location:
Champai District, Mizoram, India
Client:
Power & Electricity Department, Mizoram, India
Main Project features:
RGGVY Project Involved Laying New 11 KV Lines of 60 kMS, LT
Lines of 150 Kms, Installation of Distribution Transformers from 16
kVA to 63 KVA, Installing and Commissioning of BPL Connection
to Villagers per list of P&E Department at Village House Hold
Level
Positions Held:
General Manager – Projects (worked on Contractual mode with
Tesla Energy Systems (P) Ltd, Guwahati, India)
Activities performed:
Team Lead for planning & execution of the project at Site Level
with Most Rough Terrain, In-spite of Seasonal & Local Disturbances
to timely completion with 4 Managers and 15 Junior Engineers,
Store Keeper, 20 Office Staff, with 10 Sub Contractors with 400+
team strength workers in extreme hilly areas in the state of Mizoram.
Mobilized manpower, Gangs at Site
Initiated & executed planned Progress in record 2 months
time in spite of rain and extremely remote and toughest
Page 7 of 10
terrain in the state of MIZORAM
Managed HR Processes & Issues
Planned Project Implementation
Coordinated with Client (Power & Electricity deptt.,
Mizoram)
Implemented the project with all other aspects of project
management.
Name of assignment or project:
Accelerated Power Development & Reforms Program (APDRP)
Phase – I Budget: 24 Crores
Year:
From Sep 2004 to Jun 2007
Location:
Bongaigaon Electrical Circle, Rangiya Electrical Circle, Tezpur
Electrical, under Assam State Electricity Board (ASEB)
Client:
Assam State Electricity Board & Areva T&D Ltd, Noida, UP, India
Main Project features:
Supply, Erection, Testing & Commissioning including R&M of 33
Nos of mostly 1.5 MVA 33/11 kV Substation, 2400 Nos 16 to 750
KVA Distribution Substation, 60 Kms of 33 kV Line, 150 kMS of 11
kV Line, 1200 kMs of LT Lines in various remote locations of 3
Electrical mentioned Circles. Sites included weather-damaged
interstates and state highways throughout the Assam
Positions Held:
Chief Coordinator
Activities performed:
Performed in the last role as Chief Coordinator to perform
complete project management and liaison between AREVA &
ASEB, including monitoring and guiding teams for timely
completion of scheduled work
Project Planning & Implementation per Management
Represented the Management in terms of ISO training and
Implementation in the Organization
Served as a PA to MD in Company’s affairs, business
development and other PR related affairs
Solve Day to Day affairs of Site and HO in tune with Client
Facilitate the Purchase Process like Approvals, Inspection by
Client, for Material Dispatches with Logistics Management,
Coordinate with Client for Execution related issues like
Inspection of Supply Items etc.
Facilitate Local and Remote Resource Management
Monitor Profit per works and Reporting
HRM Issues Managed per site.
Coordinated with Client for Implementation of the project
with all other aspects of Project Management.
Name of assignment or project:
Erection Testing & Commissioning of 220 / 132 kV Byrnihat
Substation Budget: 12 Crores
Year:
From Mar 2006 to Jan2009
Location:
9th Mile, Byrnihat, Meghalaya, India
Client:
POWERGRID / GET Power (P) Ltd, Chennai, India
Main Project features:
220 / 132 kV Byrnihat Substation of POWERGRID
Page 8 of 10
Positions Held:
Chief Coordinator
Activities performed:
Coordinated and monitored the complete project works which
included:
Name of assignment or project:
Bay Extension and Tower Erection works of 132 kV Diphu
Substation, Diphu, Assam Budget: 0.10 Crores
Year:
From Mar 2007 to Dec 2008
Location:
Diphu, Assam, India
Client:
ASEB / Shyama Power Ltd, Gurgaon, India
Main Project features:
Under the R&M Deposit works of ASEB, 132 kV Diphu Substation
at Diphu, this is mainly towards supporting the APDRP Ph-2 works
in and around Diphu in terms of Power Improvement in the
region.
Positions Held:
Chief Coordinator
Activities performed:
Coordinated and monitored the complete project works which
included:
Complete Project Management right from Final Stages of
Land Acquisition, Site - Land Development, Civil & Electrical
Installations Monitoring, Vendor Management, Procurement
& Logistics, Including Insurance and related issues.
Complete Project Management starting from, Site - Land
Development, Civil & Electrical Installations Monitoring,
Supply Chain Management, Including Insurance and
related issues and liaison with client and information to
respective MeSEB (Mother Client)
Name of assignment or project:
ASEB’s 33/11 kV S/s, 33 & 11 kV Line Projects Budget: INR 0.10 Cr
Year:
Feb 1998 to Aug 2003
Location:
Various Parts of Lower Assam including hills and Bhutan Border till
Arunachal Pradesh
Client:
ASEB
Main Project features:
Various kind of Earth Work, under 66 kV Electrical Installations,
Civil Works
Positions Held:
Senior Supervisor / Assistant Manager
Activities performed:
Coordinated and monitored the complete project works which
included:
Land Development Activities, Civil & Electrical Installations
Monitoring, Supply Chain Management, PR in local and
remote locations and liaison with client and information to
respective ASEB personnel.
Additional Information / Reference can be
considered:
Utpal Deka
Director
Amal Paul
US Infratech Private Limited
3019, Sec-A, Pocket-B&C
Vasantkunj, New Delhi - 110070, INDIA
Cell No: -, --Power Grid Corporation of India Ltd
Page 9 of 10
Chief Manager
(posted at Berhampore in the year 2012)
Power Grid Corporation of India Ltd
Berhampore Construction Office
Berhampore Construction Office
Berhampore, West Bengal, India
Cell No: --,-
Total Experience
21+ Years
Expected CTC
As per Standard Practices Consideration
Current Location
Nagaland/Manipur/Mizoram/Guwahati (Assam)
Preferred Location
Any
Notice Period
None conflicts with your current engagement
Current Company
Self Employed
Passport No.
H-
Driving License Details
AS-
Skype ID
angshu36
Clarification:
I, Angshuman Hazarika, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes
myself, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to
my disqualification or dismissal, if engaged.
Angshuman HAZARIKA
Date: August 07, 2020
Hno5, Ashoka Road (Bye Lane), Opp Elora Path, Ajanta Path Main Lane, Hatigaon, Kamrup, Assam, India, Guwahati 781038
- (preferred) & - -