ANGELO PAULO D. BALTAZAR
KSA Mobile Number: -
Email:-
JOB OBJECTIVE
To apply and enhance my knowledge in my chosen position, enabling me to make
a positive contribution to the organization.
EXPERIENCE SUMMARY
A result-driven and proactive Marine Operations Coordinator, Project Secretary,
Administrator, and Document Controller with 17 years of extensive experience in the
Oil and Gas industry in Saudi Arabia. Proven expertise in managing critical
correspondence, records, and documents, as well as proficiency in filing, scanning,
and archiving processes. Skilled in facilitating marine crew activities while ensuring
adherence to maritime regulations. Highly proficient in the Microsoft Office Suite,
database management, and SharePoint, with outstanding communication and
organizational skills. Dedicated to improving operational efficiency through keen
attention to detail and effective coordination.
EMPLOYMENT HISTORY
Subsea7 Saudi Arabia
Position: Marine Operations Coordinator
Projects: 28 Jackets in MRJN, SFNY & RBYN
11 Pipelines Replacement at Berri Field
Marjan Increment Package 2 (MIP-2)
Zuluf AH South & North WI Facilities
June 01, 2021 – April 15, 2025
Duties & Responsibilities:
➢
In charge of communication/coordination with the vessel owner/crewing team
for the preparation of marine crew CV packages.
➢
Responsible for reviewing and verifying marine crew certificates/documents
before submission to the Port Captain.
➢
Arranging & coordinating for mobilization/demobilization of marine personnel
in alignment with the vessel movement of the crew boat’s Port call schedule.
➢
Responsible for preparing and submitting of daily Vessels morning report
to Aramco.
Prepare and publish the vessel’s daily movement plan.
In charge of updating and issuing the vessel Timesheet tracker.
Check and verify the vessel's monthly timesheet.
Prepare & publish Vessel Tracker.
Check and verify the vessel's monthly meal timesheet.
➢
➢
➢
➢
➢
1|P age
➢
➢
➢
➢
➢
➢
➢
➢
➢
In charge of arranging/requesting vessel inward and outward clearance at
Rastanura.
Distribute the vessel plan & activities upon instruction from the Ops Manager.
In charge of arranging/requesting vessels ROB On Hire / Off Hire survey
through a third-party surveyor.
Responsible for preparing the vessel fuel & freshwater letter and requesting
the Pier berthing request as required.
Responsible for monitoring, tracking, and coordinating vessel certificates.
Responsible for updating and monitoring of vessel's quarterly inspection tracker.
Prepare and publish the vessel arrival and readiness tracker.
Blue Sticker, lifting / rigging renewal certificate/class inspection for Subsea 7
Asset arrangement
Responsible for requesting a towing approval certificate for the tug & cargo
barge.
Dynamic Industries Saudi Arabia Ltd. (DISA)
Position: Hook Up & Commissioning Administrator
Project: 5 Pipelines Replacement at Berri Field – Saudi Aramco Offshore Project Abu Ali
Island Jubail, Saudi Arabia
December 19, 2017 – May 31, 2021
Duties & Responsibilities:
➢
➢
➢
➢
➢
➢
➢
➢
Provides administrative support to the Onshore & Offshore Construction
Management Team (CMT) and SAPMT as required.
Maintains personnel names, accurate job titles, handling, coordinating Visa
validity and renewal in Master Crew Mobilization and Manpower Plan.
In charge of arranging/requesting remobilization and demobilization flight
tickets for offshore and onshore crew.
Initiate the Aramco ID new application and renewal for Offshore and Onshore
manpower personnel.
Initiate the Jubail Port Pass new application and renewal for Offshore and
Onshore manpower personnel.
Assists personnel in sending/acquiring news, scanned documents, and emails
Responsible for recording meeting minutes, if requested
Produces Daily Report, which involves:
o
o
➢
➢
➢
➢
➢
Gathering Daily Progress Reports from subcontractors.
Cumulative tracking of man-hours for all project personnel with help from
POB System
Assists in consolidating project progress reports.
Overall responsibility for the Timekeeping Plan
Responsible for Timekeeping, which involves:
o
o
Reviews timesheets, work charts, and timecards for completeness.
Accurate daily timekeeping in Excel format for all personnel and
subcontractors. Computes total time, posts time worked to the
master timesheet, and routes timesheet to the respective
departments.
o
Proper scanning, filing, and distribution of timesheets to management
and subcontractors
o
Liaisons with payroll in the event of incorrect pay to an employee
Coordination and help with logistics duties.
Ensure safe transfer of project files from project locations at all times.
Asia Structural Developer Corporation
Position: Document Controller
Manggahan, General Trias, 4107 Cavite, Philippines
2|P age
June 22, 2016 - November 16, 2017
Duties & Responsibilities:
➢
➢
➢
➢
➢
➢
Maintains and manages all important documents, including electronic data and
documents for a particular project and assures that they are easily accessible
and stored.
Coordinate all activities related to the Document Control procedure, including
technical documents, drawings, and commercial correspondence.
Scans and verifies documents before they are released and ensures that such
documents are registered and electronically stored.
Collaborates with the different departments within the Division on all related
activities and verifies that documents are kept in the right location and are
readily accessible to all internal departments, ensuring all departments of the
Division are following the same procedures.
Input document data into the standard registers and to ensure that all
documents, data and records are properly maintained, controlled and filed so
that they will be easily traceable/ retrievable.
Always maintain the documents and drawings in the Document Control office
under safe custody without any damage or deterioration.
Arabian Consulting Engineering Centre (ACEC)
Position: Document Controller
Bugshan Centre, Prince Sultan Street Al-Mutlaq District Area
Al-Khobar 31952, Saudi Arabia
July 14, 2008 – July 30, 2015
Resource Sciences Arabia Limited (RSAL) – currently AECOM
Position: Project Support Specialist
Petroleum Center, Al-Mutlaq District Area
Al-Khobar 31952, Saudi Arabia
July 14, 2007 – July 13, 2008
Assigned Projects:
Al-Khafji Joint Operations (KJO) Aramco Gulf Operation Co. - Oil and Gas
Contracts Department- Contracts Administration Division (CAD)
Position: Division Secretary cum Document Controller
June 01, 2014 – July 31, 2015
Duties & Responsibilities:
➢
➢
➢
➢
➢
➢
Responsible in handling the flows of Communications letters (In &
Out) in Contracts Administration Division, ensure that all In & Out
letters from other Departments and Contractors are properly log and
track in Correspondences Log file.
Able to set up an efficient and effective filling system for easy access
by Division team.
Process Contracts, Prior Approval, SO’s and Engineering Work Order of
Contractor’s.
Maintain systematic tracking list of Contract, from Routing to
Proponent
Department,
Executive
Department
up
to
Contractor’s
signing.
Ensures proper document classification, sorting, filing and proper
archiving.
Responsible in preparing Contracts Administration Division’s Weekly
3|P age
➢
➢
➢
➢
➢
Highlights.
Prepare new binders for newly signed contracts, scanning, distribution
to Proponent Department and uploading to Contract Administration
folder in the Intranet.
Ensuring all document are up to date as possible within electronic
filing systems.
Maintain registers of all receipts and issues or submissions of
documents and correspondence.
Assist the Contracts Administration Division group as required.
Assist in invoice processing and forwarding to Finance & Accounting
Department.
Al-Khafji Joint Operations (KJO) Aramco Gulf Operation Co. - Oil and Gas
Power Plant As-Built Project
Engineering Support Department- Technical Support Division
Position: Document Controller
September 1, 2013 – March 21, 2014
Duties & Responsibilities:
➢
➢
➢
➢
➢
➢
➢
➢
➢
➢
➢
➢
Assigned as a Document Controller, reporting directly to the Project
Manager.
Responsible in maintaining up to date documents pertaining to the
project
i.e.,
drawings,
data sheets,
correspondences,
and
other
sensitive documents.
Responsible in typing various correspondences, minutes of meeting.
Attend and write down the minutes of Weekly Progress Coordination
meeting.
Maintain
engineering
documentation
library
by
properly
updating
document when received.
Maintain document receipt by appropriate logs.
Process EWO of GES Contractor.
Process Prior Approval of GES Contractor.
Process Temporary ID Gate Passes for the Contractors.
Process Temporary Vehicle Pass for the Contractors.
Process material Gate Passes for the Contractors.
Process Helicopter and Boat Access for the Contractors.
Al-Khafji Joint Operations (KJO) Aramco Gulf Operation Co. - Oil and Gas
Engineering Support Department-Facilities Planning Division
Position: Division Secretary cum Document Controller
March 16, 2013 – August 31, 2013
Duties & Responsibilities:
➢
➢
➢
➢
➢
➢
➢
➢
Remind All FPD Engineers to update their Weekly Highlights every end of the
week and consolidate their update.
Remind All FPD Engineers to update their Monthly Highlights 4days before the
submission to Manager for review and approval.
Record All Incoming Communication came from other department addressed to
FPD.
Draft a letter (as per the ICE instruction) as response in any communication
between FPD in inter-office, IK or OOK communication.
Record All Outgoing correspondence as response in any communication
between FPD inter-office, IK or OOK communication.
Process EWO/SO of BES and GES Contractor under FPD
Process Prior of Approval of BES/ GES Contractors under FPD
Send all SO/EWO (Original) to Contracts Department &file all copies of SO/
EWO/PAF
4|P age
➢
➢
➢
➢
➢
➢
➢
Transmit Documents/Packages came from BES/GES contractor and send it to
concern department.
Received Document/Packages from the contractor and send to the FPD incharge.
Process Temporary ID Gate Passes for the Contractors.
Process Temporary Vehicle Pass for the Contractors.
Process material Gate Passes for FPD Engineers & Contractors.
Process Helicopter and Boat Access for FPD Engineers & contractors.
Process Business Trip Expedite for approval and follow-up.
Upgrade Control Systems – Abqaiq Plants – (SAUDI ARAMCO Project)
Project Proposal to Detail Design Engineering
Position: Secretary cum Document Controller
February 2011 – January 2013
Upgrade Process Automation System at Juay’mah Gas Plant (SAUDI
ARAMCO Project)
Position: Secretary cum Document Controller
November 2009 – December 2010
Duties & Responsibilities:
➢
➢
➢
➢
➢
➢
➢
Coordinate for the project meeting.
Arrange the minutes of meeting.
Maintaining & managing the office Records & Documents.
Writing letters & reports
Logging & distributing all incoming & outgoing documents, transmittals, &
drawings.
Establish & maintain a filling system for the documents, transmittals, &
drawings.
Handling the E-mail & phone call for the supervisors.
Natural Gas Distribution System (Oil & Gas Company)
Dammam Industrial City (DIC2)
Position: Document Controller
July 2008 – October 2009 (Working Visa Sponsorship transferred to Arabian
Consulting Engineering Center – ACEC)
Duties & Responsibilities:
➢
➢
➢
Received and record project documents/ drawings and distribute to the
discipline engineers concerned.
Responsible in typing various correspondences, project reports, minutes of
meeting, data sheets, and other documents within the department.
Assist in monitoring the accuracy and availability of all project files. Responsible
in transmitting and controlling drawings/documents to Contractors.
Responsible in maintaining systematic filing of all incoming and outgoing
documents for future reference.
Natural Gas Distribution System (Oil & Gas Company)
Dammam Industrial City (DIC2)
Position: Document Controller
July 2007 – July 2008 (Working Visa Sponsorship under RSAL (currently AECOM)
Duties & Responsibilities:
5|P age
➢
➢
➢
Received and record project documents/ drawings and distribute to the
discipline engineers concerned.
Responsible in typing various correspondences, project reports, minutes of
meeting, data sheets, and other documents within the department.
Assist in monitoring the accuracy and availability of all project files. Responsible
in transmitting and controlling drawings/documents to Contractors.
Responsible in maintaining systematic filing of all incoming and outgoing
documents for future reference.
STRENGTHS AND ATTITUDE
➢
➢
➢
➢
➢
➢
➢
Completed 39 units in master’s in management
Able to learn and apply quickly and effectively
Knowledgeable in basic computer operations and internet applications
Able to plot and print Auto-CAD drawings.
Excellent typing skill
Responsible, with sense of discipline and hardworking
Sports minded person
SKILL
Driving light vehicle (has a valid Philippine & Saudi Driver’s License)
INTEREST
Playing, Coaching and Training Basketball (former Collegiate Basketball Varsity
Player)
TRAINING & CERTIFICATES
➢
➢
➢
Sea Survival (SMTC Global) - Including Travel Safely by Boat, Basket transfer
& Swing Rope
First Aid and CPR (Bayan Training Institute)
Basic Fire Fighting (Bayan Training Institute)
EDUCATIONAL BACKGROUND:
College:
Lyceum of the Philippines University
Bachelor of Science in Business Administration
(Major in Data Management)
Year Graduated: 1997 – 2001
Masteral Course:
Trinity University of Asia
(formerly Trinity College of Quezon City)
Master’s in Management (Undergraduate)
Completed 39 units: 2002 – 2005
6|P age
7|P age