April 6, 2017
AQIUS CONSTRUCTION CORPORATION
TABUENA RESIDENCE, ANVAYA COVE
No. 6 A Alabama St.
Brgy. Kristong Hari, Quezon City
Attn: MR. KEN JAVIER
President
Thru: ENGR. DASH GUERRERO & ENGR. PAUL
Project Managers
Subject: Costings for the Additional Works Fabrication and Erection of Structural Steel Roof Framing of Tabuena Res. at The Cliffside, Anvaya Cove, Morong, Bataan
Gentlemen:
In compliance with your request, we are pleased to submit our costings for the additional works for the supply of materials, consumables, labor, tools and equipments, including technical supervision necessary for the fabrication and erection of structural steel roof framing of Tabuena Res. at the Cliffside, Anvaya Cove, Morong, Bataan, as per your instructions which is not in the original plans you have furnished to us, and will be considered as change orders.
A. Additional Rafter Bridging to OverhangP43, 200.00
On Top of Roof Beams
(Labor, Materials and Consumables)
B. Additional 16mm. Deform Bars ForP16, 000.00
Lintel Beam Hangers
(Labor and Consumables Only)
C. Additional Rafters Extension at FaçadeP39, 500.00
Considering CHB Wall Alignment
(Labor, Materials, and Consumables)
Total AmountP98, 700.00
(Ninety Eight Thousand Seven Hundred Pesos Only)
TERMS OF PAYMENT:
One hundred (100%) percent billing upon completion of the additional works.
DURATION: Simultaneous with the original contract schedule.
Page 1 of 2
_______________________________________________________________________________________________________
- Architectural & Miscellaneous Metal Works - Industrial, Commercial & Residential Building
- Structural Steel Works - Civil & Finishing Works
No. 3 Grace St. A-Prime Compound, Brgy. San Andres, Cainta, Rizal
Telephone No.:- /- * Cell No.:-/-
DESIGNER BUILDER FABRICATOR
OTHER TERMS AND CONDITIONS:
1. Offered price is E-VAT exclusive.
2. Scope of Works Includes:
a. Supply of consumables such as welding rod, oxygen and LPG gas, and others.
b. Supply of materials, labor, tools and equipment for the site fabrication and erection, full welding and application of primer paint.
c. Delivery of raw materials from supplier and Cainta Plant, to Bataan job site.
d. Technical Supervision.
3. NOT included are the following:
a. Preparation of fabrication and shop drawings.
b. Materials testing and NDT testing.
c. Water and electric power source at site.
d. Supply and application of non-shrink grout.
e. All civil, finishing, sanitary, plumbing, electrical and mechanical works.
f. Building and other government permits.
4. Any modification or additions not mentioned above and not in the furnished design plans and specifications, shall be considered change order, and will be billed accordingly.
Thank you very much for giving us the opportunity to quote on your requirements, and we look forward to your valued order soon.
Very truly yours,
R.D. ABABA METAL CRAFTNoted by:
ENGR. ZALDY J. LOVEREZROGELIO D. ABABA
Operations Manager General Manager
Conforme:
______________________
page 2 of 2
_______________________________________________________________________________________________________
- Architectural & Miscellaneous Metal Works - Industrial, Commercial & Residential Building
- Structural Steel Works - Civil & Finishing Works