BILL
-
Name of the Project : Proposed Construction Of Residential Roofing Shed.
Location
: Nellikatte, Karkala Taluk, Udupi District.
Owner
: Sri Ganesh Nayak. Nellikatte.
S.N
Description of Work
Quantity
Unit
Rate
Per
Amount
1
Earthwork excavation in ordinary
soil for foundation of walls, column
pits, trenches, leveling the ground
wherever necessary etc. complete.
70.00
Cft
8.00
Cft
560.00
2
Granite size stone masonry with
C.M 1:8, in Plinth at 9" height.
Courses, using bond stone at every
6'0" distance in each course;
curing etc, complete in foundation
& basement.
146.00
Cft
70.00
Cft
-
3
P/L Damp proof course with
cement concrete 1:2:4, average
5cm thick at plinth level using
20mm & down size granite metal,
including
mixing,
laying,
compacting, curing etc, complete.
60.00
Sft
30.00
Sft
1800.00
Cft
9.50
Cft
2000.00
403.00
Sft
60.00
Sft
-
35.00
Sft
190.00
Sft
6650.00
4
5
6
Filling in basement with the
excavated earth or the earth
carted from outside including
watering, consolidating, levelling
etc, complete.
6" thick Concrete Solid block
masonry with CM 1:4 Mix in
Utility outside walls .
i) Ground Floor
Fabricating, Supplying and Fixing
of Moulded FRP door in toilets
with all necessary fittings and
fixtures.
4000.00
7
Plastering with C.M. 1:4, 12mm
thick to the internal wall surfaces
including scaffolding, formwork,
finishing smooth using fine shell
lime slurry, curing etc, complete.
8
9
i) Ground Floor
Plastering with C.M 1:5, mix &
finishing with sponge to the
external wall surfaces.
i) Ground Floor
810.00
Sft
22.00
Sft
-
Sft
31.00
Sft
0.00
145.00
Sft
90.00
Sft
-
178.00
Sft
70.00
Sft
-
810.00
Sft
12.00
Sft
9720.00
Sft
11.00
Sft
0.00
Flooring with Vitrified tiles using
CM 1:3 & finishing the joints with
coloured joints.Note:Basic rate of
Tiles-Rs 75/Sft
i) Ground Floor
Providing & Laying of glazed tiles
in Toilets walls & Floor using CM
10 1:3 mix and finishing the joints
with coloured grouts. Note: Basic
rate of Tiles - Rs 40/Sft
i) Ground Floor
Providing
and
Applying
S.A
Emulsion distemper paint to
internal wall surface over coat of
11
cement primer, nessesary cleaning,
crack filling with putty etc
complete.
i) Ground Floor
External
wall
painting
with
12 ACE/Apex make exterior paint
over a coat of primer.
i) Ground Floor
Electrification & Plumbing works
13
approximate cost .
roofing
-
95.00
Grand Total Rs.
Rounded Off to Rs.
(Rupees One Lakh Forty Two Thousand Only)
-,037.00
142,000.00