Several Freelance projects completed
Alfaisal University- Collage of Engineering. ARE355, Quantity Surveying
Mid Term 02. July 14. 2020. Weight 15%
Specific Course Outcomes
Students who successfully complete this course should be able to:
CLO.1. Be able to Recognize the responsibility of an Architectural
engineer in terms of building cost, life-cycle cost, and construction
estimating
CLO.2. Be able to Describe the appropriate application and
performance of construction materials, products and components,
including their economic and environmental impact and reuse.
CLO.3. Be able to Prepare economic analysis and cost estimates
related to design, construction, and maintenance of systems in buildings
taking into account realistic economic constrains.
CLO.4. Be able to Evaluate the available advanced technological
solutions and factors that affect the cost of a building based upon
economic, performance and sustainability criteria.
CLO.5. Be able to Use common construction rates, including the
constituents of material, labour, plant and profit with the accurate
application of rules of measurement to complex structures.
CLO.6. Be able to Operate with different proprietary computer
Architectural that enables to measure different items of buildings
according to the Standard Method of Measurement of Building Work.
CLO.7. Be able to Prepare precise specifications and bill of quantities
for a proposed building design.
Mapped
Program
SOs
SO1
Questions
SO1
Q1-2
SO2
Q2
Q1-2
SO7
SO4
S06
PSYCHOMOTOR
Q1-2
Please answer the following questions on the attached pages provided.
Q-1.0 Your project is to analyze the new staff building construction project
comprising Architectural, and structural detailed construction design
drawings and to quantify the requested line items for the divisions stated Use
the proper Bill of Quantity format, (BoQ), project name, division and page
number. (Wt 15.0).
Your answers should show the take-off Process and how the quantities or
items are calculated. The use of color is also recommended.
Question
From these Construction drawings please study and provide the BoQ take off items for the following
Divisions:
Div (10) : Four line items.
Div (11) : Four line items. 2 for Kit and Two for Laundry
Div (12) : Four line items.
Mid Term 02 July 14, 2020. ARE 355- Dr. I. Al Saudi
Weight 3pts
for each Div.
Page 2
Alfaisal University- Collage of Engineering. ARE355, Quantity Surveying
Mid Term 02. July 14. 2020. Weight 15%
Refer to the water services drawings and provide the following take offs:
Div (22) : Three line items for COLD water network (2 toilet and 1Washing)
Three line items for HOT water network. (2 toilet and 1Washing)
Weight 12
pts.
Three line items for DRAINAGE water network. (1 toilet, 1 Washing, 1 Roof)
Main sewer line is 1.0 M below ground slab.
Div (23): Three line items
Note: The 5 washing machines which require both Cold and Hot lines are occupying
a 5.0 M wall length.
Toilet accessories for the toilets and bathrooms:
Chrome, Tower rail 400mm long.
Chrome, Paper holder.
Chrome, Hook.
Chrome, Towel Ring 300mmDia.
Glass Shelf 150x300mm
Spray hose.
Waste basket
Mirror 900mmx900mm
Equipment for Food and Beverages are shown on the drawings:
Drawings Attached
PH and HVAC
Assume, the following info on (floor plan and Roof Plan):
1- Main water supply from roof tank is 2.0 M away from the roof Elect. Water
Heater.
2- Main Cold water and Hot water Lines on the Roof run down on the roof
between Grid Lines 11 and 12 and then continue horizontally along Grid Line
(C). Both lines feed below (vertically) in the column on Grid (C8) to feed Toilet
G04 and G05. Also, while on the roof the main lines continue on the roof to
feed below (vertically) the laundry room on Column Grids (E4).
Mid Term 02 July 14, 2020. ARE 355- Dr. I. Al Saudi
Page 3
Alfaisal University- Collage of Engineering. ARE355, Quantity Surveying
Mid Term 02. July 14. 2020. Weight 15%
3- Roof drain water discharges on the façade wall 300mm from the ground.
4- G04 Toilet. The shower is 1.0M wide and the sink is 800mm from the side
wall, WC is 1400mm from the side wall.
NOTE
BoQ pages for the relevant divisions. Only use the applicable items.
Good Luck\\\
Mid Term 02 July 14, 2020. ARE 355- Dr. I. Al Saudi
Page 4