Structural Drawing-16
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS
ARE IN METERS UNLESS OTHERWISE SPECIFIED.
2. THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL
JOINT SEALANT
OTHER DRAWINGS
WALL THICKNESS
12.5 (TYP.)
3. HOSES AT THE CONSTRUCTION JOINTS HAVE TO BE
INJECTED BEFORE RELEASING THE DEWATERING
20
REINJECTABLE HOSE SYSTEM(TYP)
PVC EXTERNAL &
SYSTEM,HOSES SHOULD ALSO BE TESTED BEFORE
INTERNAL WATERSTOP
FLOOR THI
CKNESS
AND AFTER POURING CONCRETE TO AVOID BLOCKAGE.
4. RETARDERS SHOULD BE USED AT THE CONSTRUCTION
JOINTS CONCRETE SURFACE WITH REASONABLE POT
LIFE SUBJECTED TO THE ENGINEER'S APPROVAL AND
75
SHOULD BE WASHED IN THE SPECIFIED TIME.
240 MIN.
20
Y
PARAPET WALL
WATERPROOFING
240 M I
N.
MEMBRANE
75mm THK.
BLINDING CONCRETE
50 mm THK SAND/
CEMENT SCREED
400
100
TYPICAL CONSTRUCTION JOINT
PVC EXTERNAL AND
7
IN BASE SLAB
INTERNAL WATERSTOP
NTS
X
200
X
125
150
125
Y
PLAN
TYPICAL CONSTRUCTION
JOINT IN WALL
8
NTS
3Y 10
300
TENDER DOCUMENT
400
125
150
200
125
100
270x250 GRATING
2Y 10
A
ISSUED FOR TENDER
DATE
WAM
DESCRIPTION
APPR'D
Client
300
200
100
300
22-FEB-15
REV.
3Y 10
250
250
Consultant
Project / Contract
JEBEL ALI HILLS
ROADS & INFRASTRUCTURE
3Y 10
PACKAGE 5
3Y 10
3Y 10
2Y 10
SECTION X-X
SECTION Y-Y
Drawing Title
PROPOSED IRRIGATION AND FIRE
PUMP STATION-SCUPPER DRAIN
AND CONSTRUCTION JOINT DETAILS
CONTRACT No:
SCUPPER REINFORCEMENT DETAILS
User:
at :
on :
usi
ng
:
$ACCUSER$
$TI
M E$
$DATE$
$FI
LE$
NTS
DRAWN
ALI
HORZ SCALE :
JOB No:
350655
DESIGNED
CHECKED
MS
LB
WAM
DATE
ACTUAL SIZE
NTS
25-NOV-2014
Drawing No.
ST_IR_851_12_10_016
APPROVED
A1
Rev.
A