Architectural Drawings-7
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE STATED.
2. ALL LEVELS ARE IN METERS AND REFERRED TO DUBAI
MUNICIPALITY DATUM (DMD).
3. THIS DRAWING MUST BE READ IN CONJUNCTION WITH
THE APPROVED MECHANICAL AND ELECTRICAL
DRAWINGS
ABBREVIATION :
J1
EL
-
FGL
-
ELEVATION
FINISHED GROUND LEVEL
SSL
-
STRUCTURAL SLAB LEVEL
TC
-
TOP COVER
TOP
-
TOP OF PARAPET
FRL
-
FINISHED ROOF LEVEL
I1
5580
TOP -
PARAPET WALL
FRL +20.45
ROOF BEAM
I1
EL-
W
1
D
2
LANDING
STEEL GUARD & HAND
RAIL WELDED TO UPSTAND
1200
SSL +17.80
FGL + 17.40
200
5580
1100
W
250
1
250mm THK. BLOCK WALL
1100
600
EL +15.864
DN
LANDING
PUMP STATION
0
20
EL -
SSL +13.392
D
J1
TENDER DOCUMENT
2
1100
SSL +12.00
2925
12
4
A
22-FEB-15
REV.
DATE
ISSUED FOR TENDER
WAM
DESCRIPTION
APPR'D
Client
13
07_003
Consultant
FLOOR PLAN
SCALE 1:40 @ A1
1:80 @ A3
SECTION
4
Project / Contract
SCALE 1:40 @ A1
07_003
JEBEL ALI HILLS
1:80 @ A3
ROADS & INFRASTRUCTURE
PACKAGE 5
Drawing Title
PROPOSED IRRIGATION AND
FIRE PUMP STATION
SECTION 4
User:
at :
on :
usi
ng
:
$ACCUSER$
$TI
M E$
$DATE$
$FI
LE$
CONTRACT No:
JOB No:
350655
DRAWN
DESIGNED
CHECKED
AH
MS
LB
WAM
DATE
ACTUAL SIZE
HORZ SCALE :
1:40
25-NOV-2014
Drawing No.
AR_IR_851_12_07_003
APPROVED
A1
Rev.
A