Sample of SOP Prepared for Data Centre Management
SoP No:
ICT-17-10-01
Title:
NUST Main Data Center (MDC) Administration and Management
1. DEFINITIONS
Abbreviation Definition
AC
Air Conditioner
CCTV
Close Circuit Television
CRAC
Computer Room Air Conditioning
DMZ
De-Militarized Zone
DVR
Digital Video Recorder
HEC
Higher Education Commission
ICT
Information and Communication Technologies
ISG
Internet Security Gateway
MDC
Main Data Centre
NOC
Network Operation Centre
SoP
Standard Operating Procedure
UPS
Un-interruptible Power Supply
WAPDA
Water and Power Distribution Authority
VPN
Virtual Private Network
2. PURPOSE
Purpose of this SoP is to define steps/ procedures for effective management of
MDC including routine and preventive maintenance of equipment installed, access
rights, safety and emergency procedures and installation of new equipment and
change management. As MDC is acting as hub for all ICT related services to NUST
Campus, hence, this SoP shall be enforced to ensure 24 x 7 operational capability of
Data Center.
3. SCOPE
Scope of SoP includes administration & management of
a. Equipment comprising MDC
b. Associated equipment installed outside MDC.
a. Equipment comprising MDC
(i) Raised Flooring
Bergvick ( 2ft x 2ft x 1.5ft)
(ii) Cooling System:
10 ton Stulz (Qty 2)
Page 1 of 9
(iii) Fire Detection & Suppression System
Fike
(iv) Un-interruptible Power Supply (UPS)
01 (80 kW APC Symmetra)
(v) CCTV with Digital Recording System
04 x Cameras + 1 DVR
(vi) Access Control System
Biometric Access Control
System
2. Associated equipment installed outside MDC.
(i) GenSet Cummins
200 KVA
(ii) GenSet Seimens
250 KVA
(iii) Automatic Transfer Switch (ATS)
01
(iv) Grounding Pits
04
(v) GenSets changeover Switch
01
4. DATA CENTER LAYOUT
The total covered area Design of MDC is 520 sqft. The total rack capacity is 12,
however, one extra rack is also installed in front row. Placement of racks is as
under:
Manual
Changeover
Switch
Genset-2
Page 2 of 9
3. OPERATIONS
MDC is operated through dual electric power source i.e. WAPDA and 2 x
GenSets. All three are combined on ATS installed outside MDC. In case of unavailability of main electric power from WAPDA, GenSet – 1 takes over in 30
seconds. In case GenSet – 1 malfunction, GenSet – 2 is initiated manually through
manual changeover switch by generator operator. During change over time, UPS
takes on the load of entire MDC less CRAC Units.
Power alarm system (comprising light and warning alarm) is installed in MDC
NOC, which is activated in case of un-availability of power from WAPDA and
Gensets. This is to alert personnel on duty to act in case of power is not restored
from Genset(s) and/or Main WAPDA.
Two x 10 tons of precision CRAC units are installed to maintain temperature
and humidity levels in the Data Centre. Both units run alternately on 12 hours
interval.
Fire/smoke detection and suppression system is installed to handle any
untoward situation in case fire breaks out in MDC. Following picture illustrates
location of fire/smoke detection sensors:
Page 3 of 9
First sensor sends a signal to alarm system if it senses any smoke/fire. As soon as
second sensor detects smoke/fire, second fire alarm will start to sound and with that
fire suppression system is activated to launch automatically in 15 secs, if no safety
action is taken. In case fire suppression system is not activated automatically, a
manual switch is available for activation/ de-activation of fire suppression system.
Following picture show location of fire suppression nozzles:
Video surveillance system compromising four cameras and IP based DVR is installed
to record non-stop video 24 x 7 for 21 days. Live video and recording can be watched
through remote access software over LAN and VPN.