BOT T OM OF ROOF
T OP OF BEAM
0.30
0.90
T OP OF ROOF
2 N D
LANDING
3.5mm thk. FICEM board ceiling
w/ metal framing spaced @
0.40m
CEILING LINE
3.00
3.5mm thk. FICEM board ceiling
w/ metal framing spaced @
0.40m
FINISH FLOOR LINE
S E C T I O N
scale
N G L
0.15
C R O S S
F F L
2.60
-
-
3.5mm thk. FICEM board
ceiling w/ metal framing
spaced @ 0.40m
2.80
2.60
CEILING LINE
3.5mm thk.
FICEM Board
ceiling w/ metal
framing spaced
@ 0.40m
1:100
0.30
3.5mm thk. FICEM board ceiling
w/ metal framing spaced @
0.40m
T OP OF BEAM
0.90
T OP OF ROOF
BOT T OM OF ROOF
-
1
2
3
4
5
9
6
CEILING LINE
2 N D
LANDING
8
2.80
2.60
2.80
CONCRETE GUTTER
(SEE DETAIL)
F F L
14
REFLECTED CEILING PLAN
13
12
4
CEILING LINE
scale
5
9
8
7
6
1:50
3.00
10
2.60
3.00
3.50
11
7
3
2
1
FINISH FLOOR LINE
0.15
N G L
LONGITUDINAL SECTION
scale
1:100
IMPORTANT
CERTIFIED BY:
PREPARED BY THE OFFICE OF:
ARCHITECT / CIVIL ENGINEER
LOCATION:
PRC NO.:
PTR NO.:
VALIDITY:
DATE:
TIN NO.:
PLACE:
ALL DESIGNS, SPECIFICATIONS AND
COPIES THEREOF, PREPARED AND
FURNISHED BY THE ARCHITECT IN
CONNEC TI ON WI TH THI S PROJECT, ARE
INSTRUMENTS OF PROFESSIONAL
SERVICE. A S INSTRUMENTS OF
P ROFES SIONAL SERVICE , T HE Y ARE THE
P R OP ER T Y O F TH E AR CH I TE CT
WH ETHER TH E WORK F OR WHI CH THEY
ARE MADE MAY BE EX ECUTED O R NOT,
AND ARE NOT TO BE REPRODUCED
OR USED ON OTHER WORK EXCEPT
B Y W RITTE N AG RE EMEN T W ITH
T H E
A R C H I T E C T .
PROJECT TITLE:
TWO (2) STOREY THREE (3) BEDROOM
RESIDENTIAL HOUSE
LOCATION:
LOT 7, BLOCK3 , BRGY. TABUNAN,
BAGO CITY, NEG. OCC.
OWNER:
RONALD G. STIESS & LORES MAE B. STIESS
REVISIONS:
SHEET CONTENTS:
AS SHOWN
SHEET NO.:
A
4