BILL NO.1: SUB-CONTRACT PRELIMINARIES
ITEM DESCRIPTION
QTY UNIT
1
Samples and materials generally clause - The Sub- contractor shall, when
required, provide for approval at no extra cost, samples of all materials
to be incorporated in the works. Such samples, when approved, shall be
retained by the Engineer and shall form the standard for all such
materials incorporated.
2
Bills of quantities clause - All the Quantities are based on the Contract
Drawings and are provisional and they shall not be held to gauge or to
limit the amount or description of the work to be executed by the Subcontractor but the value thereof shall be deducted from the Sub-contract
Sum and the value of the work ordered by the Engineer and executed
there under shall be measured and valued by the Engineer in accordance
with the contract. All work liable to adjustment under this Sub-contract
shall be left uncovered for a reasonable time to allow measurements
needed for such adjustment to be taken by the Quantity Surveyor or
Engineer. Immediately the work is ready for measuring the Subcontractor shall give notice to the Quantity Surveyor or Engineer to
carry out measurements before covering up. If the Sub-contractor shall
make default in these respects he shall, if the Architect so directs, uncover
the work to enable the necessary measurements to be taken and
3
4
5
6
1
Item
1
Item
Setting to work and regulating system clause- No testing or
commissioning shall be undertaken except in the presence of and to the
satisfaction of the Engineer unless otherwise stated by him (Subcontractor’s own preliminary and proving tests excepted). It will be
deemed that the Sub-contractor has included in the Sub-contract Sum for
the costs of all fuel, power, water and the like, for testing and
commissioning as required.
1
Item
Identification of plant components clause - Sub-contractor shall supply
and fix identification labels to all plant, starters, switches and items of
control equipment etc with white traffolyte or equal labels engraved in
red lettering denoting its name, function and section controlled.
1
Item
Working drawings clause - Sub-contractor shall prepare such Working
Drawings as may be necessary. The Working Drawings shall be complete
in such detail not only that the Sub-contract Works can be executed on
site but also that the Engineer can approve the Sub-contractor’s
proposals, detailed designs and intentions in the execution of the Subcontract Works.
1
Item
Records Drawings (As Installed) and instructions clause - Record
Drawings, will be subject to the approval of the Engineer, include
approved Working Drawings adjusted as necessary and certified by the
Sub-contractor as a correct record of the installation of the Sub-contract
Works.
1
Item
Sub Total carried to next page
6
RATE
SHS.
AMOUNT
SHS.
ITEM DESCRIPTION
QTY UNIT
RATE
AMOUNT
SHS.
SHS.
Sub-Total B/F from Previous Page
7
8
9
10
11
Maintenance Manual clause - Upon Practical Completion of the Subcontract Works, the Sub- contractor shall furnish the Engineer four copies
of a Maintenance Manual relating to the installation forming part of all
of the Sub- contract Works.
1
Item
Hand over clause - The Sub-contract Works shall be considered complete
and the Maintenance and Defects Liability Period shall commence only
when the Sub-contract Works and supporting services have been tested,
commissioned and operated to the satisfaction of the Engineer and
officially approved and accepted by the Employer, provided always that
the handing over of the Sub- contract Works shall be coincident with the
handing over of the Main Contract Works.
1
Item
Testing and inspection - manufactured plant clause - The Engineer
reserves the right to inspect and test or witness of all manufactured plant
equipment and materials. The right of the Engineer relating to the
inspection, examination and testing of plant during manufacture. Subcontractor shall give two weeks’ notice to the Engineer of his intention
to carry out any inspection or tests and the Engineer or his
representative shall be entitled to witness such tests and inspections
1
Item
Initial Maintenance Clause - The sub-contractor shall make routine
maintenance once a month during the liability for the Defects Period
and shall carry out all necessary adjustments and repairs, cleaning and
oiling of moving parts. A monthly report of the inspection and any
works done upon the installation shall be supplied to the Engineer. Shall
allow in the sub-contract Sum of the initial maintenance, inspection and
break-down service
1
Item
Supervision by Project Electrical Engineer - The sub-contractor shall in his
tender allow for the provision of management meetings and site
inspections, as instructed by the Engineer, and also profit and attendance
on these funds. The funds shall be expended according to Project
Manager’s instructions to the contractor.
1
Item
12
Profit and Attendance for the above item
13
Any other preliminaries
%
TOTAL C/F TO MAIN SUMMARY PAGE
7
60,000.00
60,000.00
PROPOSED REFURBISHMENT OF NSSF BUILDING BLOCK A' 15TH AND 20TH FLOORS
BILL NO. 2: ELECTRICAL INSTALLATION WORKS
SCHEDULE 1: CAS OFFICE, WAITING AREA AND RECEPTION ON 15TH FLOOR ELECTRICAL INSTALLATION WORKS
ITEM
1.01
QTY UNIT
DESCRIPTION
Supply, Install, Test and commission the following:
LIGHTING POINTS
Lighting point wired in 3x1.5mm2 SC/PVC insulated copper cables drawn
in 20mm diameter HG PVC conduits concealed inside the ceiling complete
with all necessary accessories excluding switches
i) One way Switching
ii) Two way switching
46
12
No.
No.
2
4
1
No.
No.
No.
a) 2000 lumens, 28W 165mm Recessed downlight as Philips CoreLine Slim
Downlight or equal and approved equivalent. (Type DL1)
12
No.
b) 2000 lumens, 28W 165mm Recessed downlight as Philips CoreLine Slim
Downlight or equal and approved equivalent with 3 hour emergecency
kit. (Type DL1)
5
No.
c) 1200mm, 18W 2300Lumens, Single LED bare batten luminaire as
Philips,Thorn or equal and approved equivalent.
3
No.
d) 500 Lumens, 6W 60mm Recessed downlight as Philips Clear Accent or
equal and approved equivalent (Type DL2)
48
No.
e) Supply and install complete Neon LED Rope light 15w per meter 3000k
30
Lm.
5
No.
5
No
2
No.
1.02 10A moulded ivory switch plates as Crabtree or approved equivalent as
follows:
i) One gang one way switch
ii) One gang Two way Switch
iii) Two gang One way Switch
LIGHTING FITTINGS
1.03 Light fittings complete with all accessories and lamps as follows:-
SOCKET OUTLETS
Socket outlet point comprising wiring in 3 x 2.5mm2 SC/PVC insulated
1.04
copper cables in concealed in trunking/in conduit.
1.05
13A switched twin socket outlet mounted on trunking as Crabtree or
approved equivalent
TV POINT
TV outlet point wired in 75 Ohms Screened Coaxial TV cables drawn in
1.06 concealed 20mm diameter HG/PVC conduits and linked to the outside
through the roof space (to the amplifier) via telephone draw in boxes.
Sub total carried to next page
8
RATE
SHS.
AMOUNT
SHS.
ITEM
QTY UNIT
DESCRIPTION
Sub total carried from previous page
CONSUMER UNIT/DISTRIBUTION BOARD
6 Ways SPN , flush mounted Consumer Unit complete with 100A integral
1.07 SPN isolator as SCHNEIDER or approved equivalent complete with all
accessories but excluding MCBs.
1
No.
4
2
No.
No.
1
No.
1
No.
1
No.
1
No.
1.13
Air Conditioning Unit power point comprising wiring in 3 x 4mm2
SC/PVC insulated copper cables drawn in trunking/32mmØ concealed HG
PVC conduits(Approx 20M)
2
No.
1.14
20A SPN Isolator switch for item above as Crabtree or approved
equivalent
2
No.
1
No
1
No
10
LM
1.08 Miniature Circuit Breakers to fit into the above consumer unit as follows:
i) 32A SP
ii) Blank Plates
HAND DRYER
Power point wired in 3 x 4mm² SC/PVC insulated copper cables drawn in
1.09 concealed 25mm diameter HG/PVC conduits and including all the other
accessories. (Approx 30M)
1.10
1.11
1.12
20A polished brass finish switched DP switch with neon light
INSTANT SHOWER
Supply and install Instant Shower circuits wired using 3 x 4mm2 SC/PVC
insulated copper cables drawn in 25 mm diameter PVC heavy gauge
conduits but excluding the 20 Amps DP switch.
20A polished brass finish switched DP switch with neon light
AIR CONDITIONING AND OTHER POWER POINTS
1.15
1.16
1.17
EXTRACT FAN POINT
Power point wired in 3 x 2.5mm² SC/PVC insulated copper cables drawn
in concealed 25mm diameter HG/PVC conduits and including all the
other accessories. (EXTRACT FAN)
20A polished brass finish switched DP switch with neon light
SUB-MAINS CABLES
3 x 6mm² SC/PVC insulated copper cables strapped on a cable tray/ inside
an electrical duct/clipped direct.
TOTAL C/F TO 15TH FLOOR COLLECTION PAGE
9
RATE
SHS.
AMOUNT
SHS.
PROPOSED REFURBISHMENT OF NSSF BUILDING BLOCK A' 15TH AND 20TH FLOORS
SCHEDULE 2: CAS OFFICE, WAITING AREA AND RECEPTION 15TH FLOOR EASTERN WING B STRUCTURED
CABLING INSTALLATION WORKS
BILL NO 3: STRUCTURED CABLING INSTALLATION WORKS CAS OFFICE, WAITING AREA AND RECEPTION 15TH
FLOOR EASTERN WING B
ITEM
DESCRIPTION
QTY
UNIT
11
No.
Supply, Install, Test and commission the following:
HORIZONTAL CABLING
A
RJ45 cat 6A UTP (Dual) Data and voice outlets complete with
faceplates and labelling system as Siemons or its equal and approved
equivalent
B
3m RJ45- RJ45 Cat 6A UTP factory terminated patch cord as Siemons
for use at workstation areas
11
No.
C
1m, RJ45- RJ45 cat 6A UTP factory terminated patch cord as Siemons
to be used in cabinet.
11
No.
D
Cat 6A UTP 4-pair screened cable as Siemons pulled between cabinet
and work stations.
550
Lm.
2
No.
E
ACTIVE COMPONENTS
Wireless Access point , versatile, high-performance wireless solution
that supports t 802.11ac Wave 2 wireless connectivity, as Cisco WAP
200 Wireless Access Point or approved equivalent
TOTAL C/F TO 15TH FLOOR COLLECTION PAGE
10
RATE
SHS.
AMOUNT
SHS.
PROPOSED REFURBISHMENT OF NSSF BUILDING BLOCK A' 15TH AND 20TH FLOORS
BILL NO. 4: 15TH FLOOR ELECTRICAL INSTALLATION WORKS
SCHEDULE 3: HUMAN RESOURCE DEPARTMENT, 15TH FLOOR WESTERN WING B ELECTRICAL INSTALLATION
WORKS
ITEM
DESCRIPTION
QTY UNIT
RATE
AMOUNT
SHS.
SHS.
Supply, Install, Test and commission the following:
LIGHTING POINTS
2.01 Lighting point wired in 3 x 1.5mm2 SC/PVC insulated copper cables
drawn in 20mm diameter HG PVC conduits concealed inside the ceiling
complete with all necessary accessories excluding switches
i) One way Switching
15
No.
ii) Two way switching
12
No.
2.02 10A moulded ivory switch plates as Crabtree or approved equivalent as
follows:
i) One gang one way Architrave switch
iii) One gang Two way Switch
6
8
No.
No.
a) 600mm by 600mm, 4300lumens, 35W recessed LED Panel luminaire
designed for use in lay-in ceiling grids as Philips CoreLine Panel or equal
and aprroved equivalent
21
No.
b) 600mm by 600mm, 4300lumens, 35W recessed LED Panel luminaire
designed for use in lay-in ceiling grids as Philips CoreLine Panel or equal
and aprroved equivalent with 2 hour emergency kit
3
No.
c) 1200mm, 18W 2300Lumens, Single LED bare batten luminaire as
Philips,Thorn or equal and approved equivalent.
3
No.
d)Self-contained single sided EXIT sign with 8W LED lamp for nonmaintained emergency lighting for 3 hour duration as Thorn EF X3 or
approved equivalent.
2
No.
24
No.
24
No
1
1
1
No.
No
No.
LIGHTING FITTINGS
2.03 Light fittings complete with all accessories and lamps as follows:-
SOCKET OUTLETS
2
Socket outlet point comprising wiring in 3 x 2.5mm SC/PVC insulated
copper cables in concealed in trunking/in conduit.
2.05 13A switched twin socket outlet mounted on trunking as Crabtree or
approved equivalent
2.04
CONSUMER UNIT/DISTRIBUTION BOARD
2.06 Carefully add the following Miniature Circuit Breakers to the existing 12way Consumer Unit:
i) 20A SP
ii) 32A SP
iii) Blanking Plates
Sub total carried to next page
11
ITEM
DESCRIPTION
QTY UNIT
Sub total carried from previous page
TV POINT
2.07 TV outlet point wired in 75 Ohms Screened Coaxial TV cables drawn in
concealed 20mm diameter HG/PVC conduits and linked to the outside
through the roof space (to the amplifier) via telephone draw in boxes.
1
No.
2.08 Supply and install Instant Shower circuits wired using 3 x 4mm2 SC/PVC
insulated copper cables drawn in 25 mm diameter PVC heavy gauge
conduits but excluding the 20 Amps DP switch.
1
No.
2.09 20A polished brass finish switched DP switch with neon light
1
No.
1
No.
1
No.
INSTANT SHOWER
HAND DRYER
Power point wired in 3 x 4mm² SC/PVC insulated copper cables drawn in
2.10 concealed 25mm diameter HG/PVC conduits and including all the other
accessories. (Approx 30M)
2.11
20A polished brass finish switched DP switch with neon light
TOTAL C/F TO 15TH FLOOR COLLECTION PAGE
12
RATE
SHS.
AMOUNT
SHS.
PROPOSED REFURBISHMENT OF NSSF BUILDING BLOCK A' 15TH AND 20TH FLOORS
SCHEDULE 4: HUMAN RESOURCE DEPARTMENT 15TH FLOOR WESTERN WING B STRUCTURED CABLING
INSTALLATION WORKS
BILL NO. 5: STRUCTURED CABLING INSTALLATION WORKS HUMAN RESOURCE DEPARTMENT 15TH FLOOR
WESTERN WING B
ITEM
DESCRIPTION
QTY UNIT
RATE
AMOUNT
SHS.
SHS.
Supply, Install, Test and commission the following:
A
HORIZONTAL CABLING
RJ45 cat 6A UTP (Dual) Data and voice outlets complete with
faceplates and labelling system as Siemons or its equal and approved
equivalent
17
No.
3m RJ45- RJ45 Cat 6A UTP factory terminated patch cord as Siemons
for use at workstation areas
17
No.
C
1m, RJ45- RJ45 cat 6A UTP factory terminated patch cord as Siemons
to be used in cabinet.
17
No.
D
Cat 6A UTP 4-pair screened cable as Siemons pulled between cabinet
and work stations.
850
Lm.
2
No.
B
E
ACTIVE COMPONENTS
Wireless Access point , versatile, high-performance wireless solution that
supports t 802.11ac Wave 2 wireless connectivity, as Cisco WAP 200
Wireless Access Point or approved equivalent
TOTAL C/F TO 15TH FLOOR COLLECTION PAGE
13
PROPOSED REFURBISHMENT OF NSSF BUILDING BLOCK A' 15TH AND 20TH FLOORS
SCHEDULE 5: 15TH FLOOR IP PABX (TELEPHONY) WORKS FOR OFFICES IDENTIFIED FOR REFURBISHMENT
BILL NO 6: IP PABX (TELEPHONY) WORKS FOR 15TH OFFICES TO BE REFURBISHED
ITEM
DESCRIPTION
QTY UNIT
RATE
SHS.
Sub total carried from previous page
IP TELEPHONE INSTRUMENTS
Supply, Install, test and Commission the following:
A
IP Telephone instruments as Unify OpenScape Desk Phone CP200 or
equal and approved equivalent with all necessary licences
TOTAL C/F TO 15TH FLOOR COLLECTION PAGE
14
5
No.
AMOUNT
SHS.
ITEM
15TH FLOOR ELECTRICAL INSTALLATIONS, STRUCTURED CABLING AND IP PABX
(TELEPHONY) WORKS COLLECTION PAGE
DESCRIPTION
AMOUNT
1
SCHEDULE 1: CAS OFFICE, WAITING AREA AND RECEPTION ON 15TH FLOOR
ELECTRICAL INSTALLATION WORKS
2
SCHEDULE 2: CAS OFFICE, WAITING AREA AND RECEPTION 15TH FLOOR EASTERN
WING B STRUCTURED CABLING INSTALLATION WORKS
3
SCHEDULE 3: HUMAN RESOURCE DEPARTMENT, 15TH FLOOR WESTERN WING B
ELECTRICAL INSTALLATION WORKS
4
SCHEDULE 4: HUMAN RESOURCE DEPARTMENT 15TH FLOOR WESTERN WING B
STRUCTURED CABLING INSTALLATION WORKS
5
SCHEDULE 5: 15TH FLOOR IP PABX (TELEPHONY) WORKS FOR OFFICES IDENTIFIED
FOR REFURBISHMENT
GRAND TOTAL C/F TO SUMMARY PAGE
15
PROPOSED REFURBISHMENT OF NSSF BUILDING BLOCK A' 15TH AND 20TH FLOORS
BILL NO. 7: ELECTRICAL INSTALLATION WORKS
SCHEDULE 6: FINANCE OFFICER'S OFFICE AND 2 OTHER OFFICE SPACES 20TH FLOOR EASTERN WING C
ELECTRICAL INSTALLATION WORKS
ITEM
DESCRIPTION
QTY UNIT
Supply, Install, Test and commission the following:
LIGHTING POINTS
3.01 Lighting point wired in 3 x 1.5mm2 SC/PVC insulated copper cables drawn
in 20mm diameter HG PVC conduits concealed inside the ceiling
complete with all necessary accessories excluding switches
i) One way Switching
ii) Two way switching
3
1
No.
No.
3.02 10A moulded ivory switch plates as Crabtree or approved equivalent as
follows:
i) One gang one way Architrave switch
iii) One gang Two way Switch
3
2
No.
No.
4
No.
10
No.
30
M
a)Powder coated twin punched outlet plate for fixing twin socket outlets
10
No
b)Ditto but for data/telephone outlets
10
No
c)Carry out bonding throughout the entire length of the above trunking
and connect to earthing
1
Item
LIGHTING FITTINGS
3.03 Light fittings complete with all accessories and lamps as follows:a) 600mm by 600mm, 4300lumens, 35W recessed LED Panel luminaire
designed for use in lay-in ceiling grids as Philips CoreLine Panel or equal
and aprroved equivalent
DATA
3.04 Data appoximately 20m for each point from the communication room
done in 25mmsq. Size conduits concealed inside ceiling
TRUNKING
i) 150x50mm two compartment powder coated steel trunking
manufactured in 14 swg galvanized mild steel sheet and finished in cream
3.05 powder coating to details shown complete with covers, bends and all
fixing accessories. The trunking to be angular section. Allow for colour
change to Architect’s detail.
SOCKET OUTLETS
2
3.06
Socket outlet point comprising wiring in 3 x 2.5mm SC/PVC insulated
copper cables in concealed in trunking/in conduit.
10
No.
3.07
13A switched twin socket outlet mounted on trunking as Crabtree or
approved equivalent
10
No
TOTAL C/F TO 20TH FLOOR COLLECTION PAGE
16
RATE
SHS.
AMOUNT
SHS.
PROPOSED REFURBISHMENT OF NSSF BUILDING BLOCK A' 15TH AND 20TH FLOORS
SCHEDULE 7: FINANCE OFFICER'S OFFICE AND 2 OTHER OFFICE SPACES 20TH FLOOR EASTERN WING C WING
B STRUCTURED CABLING INSTALLATION WORKS
BILL NO. 8: STRUCTURED CABLING INSTALLATION WORKS
ITEM
DESCRIPTION
QTY UNIT
Supply, Install, Test and commission the following:
B
HORIZONTAL CABLING
RJ45 cat 6A UTP (Dual) Data and voice outlets complete with
faceplates and labelling system as Siemons or its equal and approved
equivalent
10
No.
3m RJ45- RJ45 Cat 6A UTP factory terminated patch cord as Siemons
for use at workstation areas
10
No.
D
1m, RJ45- RJ45 cat 6A UTP factory terminated patch cord as Siemons
to be used in cabinet.
10
No.
E
Cat 6A UTP 4-pair screened cable as Siemons pulled between cabinet
and work stations.
500
Lm.
C
TOTAL C/F TO 20TH FLOOR COLLECTION PAGE
17
RATE
SHS.
AMOUNT
SHS.
PROPOSED REFURBISHMENT OF NSSF BUILDING BLOCK A' 15TH AND 20TH FLOORS
BILL NO. 9: ELECTRICAL INSTALLATION WORKS
SCHEDULE 8: FORMER CFO's OFFICE AND RECEPTION ON 20TH FLOOR ELECTRICAL INSTALLATION WORKS
ITEM
DESCRIPTION
QTY UNIT
Supply, Install, Test and commission the following:
LIGHTING POINTS
4.01 Lighting point wired in 3 x 1.5mm2 SC/PVC insulated copper cables
drawn in 20mm diameter HG PVC conduits concealed inside the ceiling
complete with all necessary accessories excluding switches
i) One way Switching
ii) Two way switching
4
4
No.
No.
4.02 10A moulded ivory switch plates as Crabtree or approved equivalent as
follows:
i) One gang one way Architrave switch
iii) One gang Two way Switch
1
2
No.
No.
a) 600mm by 600mm, 4300lumens, 35W recessed LED Panel luminaire
designed for use in lay-in ceiling grids as Philips CoreLine Panel or equal
and aprroved equivalent
8
No.
DATA
Data appoximately 20m for each point from the communication room
4.04
done in 25mmsq. Size conduits concealed inside ceiling
14
No.
30
M
a)Powder coated twin punched outlet plate for fixing twin socket outlets
14
No
b)Ditto but for data/telephone outlets
14
No
c)Carry out bonding throughout the entire length of the above trunking
and connect to earthing
1
Item
14
No.
14
No
LIGHTING FITTINGS
4.03 Light fittings complete with all accessories and lamps as follows:-
TRUNKING
4.05 i) 150x50mm two compartment powder coated steel trunking
manufactured in 14 swg galvanized mild steel sheet and finished in cream
powder coating to details shown complete with covers, bends and all
fixing accessories. The trunking to be angular section. Allow for colour
change to Architect’s detail.
SOCKET OUTLETS
Socket outlet point comprising wiring in 3 x 2.5mm2 SC/PVC insulated
copper cables in concealed in trunking/in conduit.
13A switched twin socket outlet mounted on trunking as Crabtree or
4.07
approved equivalent
4.06
TOTAL C/F TO 20TH FLOOR COLLECTION PAGE
18
RATE
SHS.
AMOUNT
SHS.
PROPOSED REFURBISHMENT OF NSSF BUILDING BLOCK A' 15TH AND 20TH FLOORS
SCHEDULE 9: CFO's OFFICE AND RECEPTION 20TH FLOOR EASTERN WING A STRUCTURED CABLING
INSTALLATION WORKS
BILL NO 10: STRUCTURED CABLING INSTALLATION WORKS
ITEM
DESCRIPTION
QTY UNIT
Supply, Install, Test and commission the following:
B
HORIZONTAL CABLING
RJ45 cat 6A UTP (Dual) Data and voice outlets complete with
faceplates and labelling system as Siemons or its equal and approved
equivalent
11
No.
C
3m RJ45- RJ45 Cat 6A UTP factory terminated patch cord as Siemons
for use at workstation areas
11
No.
D
1m, RJ45- RJ45 cat 6A UTP factory terminated patch cord as Siemons
to be used in cabinet.
11
No.
E
Cat 6A UTP 4-pair screened cable as Siemons pulled between cabinet
and work stations.
550
Lm.
TOTAL C/F TO 20TH FLOOR COLLECTION PAGE
19
RATE
SHS.
AMOUNT
SHS.
PROPOSED REFURBISHMENT OF NSSF BUILDING BLOCK A' 15TH AND 20TH FLOOR OFFICES
SCHEDULE 10: 20TH FLOOR TELEPHONY WORKS FOR OFFICES IDENTIFIED FOR REFURBISHMENT IP PABX
(TELEPHONY) WORKS
BILL NO 11: IP PABX WORKS FOR 20TH FLOOR OFFICES TO BE REFURBISHED
ITEM
DESCRIPTION
QTY UNIT
RATE
SHS.
Sub total carried from previous page
IP TELEPHONE INSTRUMENTS
Supply, Install, test and Commission the following
A
IP Telephone instruments as Unify OpenScape Desk Phone CP400 or
equal and approved equivalent with all necessary licences
TOTAL C/F TO 20TH FLOOR COLLECTION PAGE
20
1
No.
AMOUNT
SHS.
ITEM
20TH FLOOR ELECTRICAL INSTALLATIONS WORKS COLLECTION PAGE
DESCRIPTION
1
SCHEDULE 6: FINANCE OFFICER'S OFFICE AND 2 OTHER OFFICE SPACES 20TH FLOOR
EASTERN WING C ELECTRICAL INSTALLATION WORKS
2
SCHEDULE 7: FINANCE OFFICER'S OFFICE AND 2 OTHER OFFICE SPACES 20TH
FLOOR EASTERN WING C WING B STRUCTURED CABLING INSTALLATION WORKS
3
SCHEDULE 8: FORMER CFO's OFFICE AND RECEPTION ON 20TH FLOOR ELECTRICAL
INSTALLATION WORKS
4
SCHEDULE 9: CFO's OFFICE AND RECEPTION 20TH FLOOR EASTERN WING A
STRUCTURED CABLING INSTALLATION WORKS
5
SCHEDULE 10: 20TH FLOOR TELEPHONY WORKS FOR OFFICES IDENTIFIED FOR
REFURBISHMENT IP PABX (TELEPHONY) WORKS
GRAND TOTAL C/F TO SUMMARY PAGE
21
AMOUNT
ITEM
BILL NO. 6: SCHEDULE 15 : PROJECT MANAGER'S STATIONERY
DESCRIPTION
QTY UNIT
A
Photocopying Papers size A4 80g/cm2 white
20
Ream
B
Photocopying Papers size A3,80g/cm2 white
5
Ream
C
Letterhead quality paper as CONQUERER or equal and approved cream
80g/cm3
4
Ream
D
A4 size translucent PVC covers as KATKO or approved equivalent, 100
sheets blue in colour and 0.2mm thick
5
Pkts
F
A4 size Embossed covers as KATKO or approved equivalent, 100 sheets
blue in colour
4
Pkts
G
22mm diameter spiral binders black in colour
4
Pkts
TOTAL C/F TO SUMMARY PAGE
22
RATE
SHS.
AMOUNT
SHS.
Item
1.00
SUMMARY PAGE
Description
BILL NO.1: SUB-CONTRACT PRELIMINARIES
2.00
TOTAL FOR 15TH FLOOR WORKS FROM COLLECTION PAGE
3.00
TOTAL FOR 20TH FLOOR WORKS FROM COLLECTION PAGE
4.00
BILL NO. 6: SCHEDULE 15 : PROJECT MANAGER'S STATIONERY
5.00
CONTIGENCY SUM TO BE EXPENDED BY THE PROJECT MANAGER
Amount (Ksh)
200,000.00
GRAND TOTAL C/F TO MAIN SUMMARY (VAT INCLUSIVE)
TOTAL AMOUNT IN WORDS
TENDERER'S NAME & STAMP( DOMESTIC SUB CONTRACTOR)
SIGNATURE ………………………………… DATE……………………………………...…..
P.I.N No.…………………………………V.A.T CERTIFICATE No……………………….
WITNESS………………………………………………...
ADDRESS……………………………………………….
SIGNATURE OF WITNESS……………………...…DATE…………………………………
23