MINISTRY OF LANDS, PUBLIC WORKS, HOUSING AND
URBAN DEVELOPMENT
STATE DEPARTMENT FOR PUBLIC WORKS
ELECTRICAL DIRECTORATE
INSPECTION REPORT FOR THE FIRE DETECTION AND SOUND
ALARM SYSTEM DONE ON 22ND JULY, 2024 AT DCI
HEADQUARTERS-KIAMBU-FORENSIC LABORATORY COMPLEX
ISSUED BY:
Chief Engineer (Electrical),
Ministry of Lands, Public Works, Housing and Urban
Development,
State Department of Public Works,
P. O. Box-,
Nairobi
AUGUST, 2024
ATTENDANCE
No. NAME
1.
DESIGNATION
ORGANIZATION
ENG. LAMECK MWAMBI (TEAM
CHIEF SUPERINTENDING FIRE
SDPW
LEADER).
OFFICER
2.
DENNIS KURIA
ELECTRICAL ENGINEER
SDPW
3.
JACKLINE OGONDA
QUANTITY SURVEYOR
SDPW
4.
NICHOLAS SAYIANKA
SENIOR INSPECTOR FIRE
SDPW
OFFICER
5.
Arch. JUSTUS MWENDA
SUPERINTENDING LANDSCAPE
SDPW
ARCHITECT
1.0. INTRODUCTION
The inspection was conducted by a team of technical officers from State Department for
Public Works. The objective of the Inspection was in line with the client’s request for
assessment of the status of the existing fire detection and suppression system. The electrical
inspection was mainly focused on the fire detection and sound alarm system which
comprises of: Fire Alarm Panel, Smoke detectors, Heat detectors, Break glasses, Alarm
sounders, Emergency exit signs and other accessories.
1.1. OBSERVATIONS
Upon inspection of the fire detection and sound alarm system, it was established that:
•
The existing system mainly comprised of break glasses, heat detectors, smoke
detectors and sound alarms.
•
The existing fire detection and sound alarm system was not functional as the fire
alarm panel rechargeable battery had discharged.
•
There was a smoke detector in every room but some had their cover on hence
they could not detect smoke in the event of a fire.
•
There were LED exit signs but some were not functional.
•
There were no lightning arrestors near the auxiliary fuel tanks to protect them
from lightning.
•
Smoke detector covers could not be removed because of ongoing works.
•
The system has never been tested.
1.2.
RECOMMENDATION
Based on observation we recommend the following:
•
Removed components of the fire detection and sound alarm system be reinstalled.
•
Investigate why some of the LED exit signs were malfunctional and replace the
rechargeable battery if necessary.
•
Remove the smoke detector covers during testing and commissioning.
•
The rechargeable battery inside the fire alarm panel be replaced.
•
Testing and commissioning be executed.
•
Installation of lightning arrestor for the auxiliary fuel tanks which are located far
away from other structures.
Report prepared by:
Report checked by:
……………………
……………………
D. Kuria
Eng. Mugendi
Ass. P. E. E.
P. E. E.
1.3. APPENDIX: SITE PHOTOS
Fire alarm control panel-not powered, sound
LED lit Emergency exit sign.
alarm and break-glass.
Fire Break-Glass
Fire break-glass
Smoke detector
Covered Smoke detector
Covered Smoke detector