REPUBLIC OF KENYA
PROPOSED REHABILITATION WORKS AT HYRAX HILL
PREHISTORIC SITE
W.P ITEM NO. D1134 RV/NKU/2301 JOB NO. 11362A
TENDER SPECIFICATIONS AND BILL OF QUANTITIES
FOR
ELECTRICAL INSTALLATION WORKS
CLIENT
THE DIRECTOR GENERAL
NATIONAL MUSEUMS OF KENYA,
P.O. BOX-,
NAIROBI
WORKS SECRETARY
CHIEF ENGINEER (ELECTRICAL)
MINISTRY OF LANDS, PUBLIC WORKS,
HOUSING & URBAN DEVELOPMENT,
STATE DEPARTMENT FOR PUBLIC WORKS,
P.O BOX 30743 – 00100,
MINISTRY OF LANDS, PUBLIC WORKS,
HOUSING & URBAN DEVELOPMENT,
STATE DEPARTMENT FOR PUBLIC WORKS,
P.O BOX 41191 – 00100,
NAIROBI
NAIROBI
ARCHITECT
CHIEF ARCHITECT
STRUCTURAL ENGINEER
CHIEF STRUCTURAL ENGINEER
MINISTRY OF LANDS, PUBLIC WORKS,
HOUSING & URBAN DEVELOPMENT,
STATE DEPARTMENT FOR PUBLIC WORKS,
P.O BOX 30743 – 00100,
NAIROBI
MINISTRY OF LANDS, PUBLIC WORKS,
HOUSING & URBAN DEVELOPMENT,
STATE DEPARTMENT FOR PUBLIC WORKS,
P.O BOX 30743 – 00100,
NAIROBI
QUANTITY SURVYOR
CHIEF QUANTITY SURVEYOR
MECHANICAL ENGINEER
CHIEF ENGINEER (MECHANICAL (BS))
MINISTRY OF LANDS, PUBLIC WORKS,
HOUSING & URBAN DEVELOPMENT,
STATE DEPARTMENT FOR PUBLIC WORKS,
P.O BOX 30743 – 00100,
MINISTRY OF LANDS, PUBLIC WORKS,
HOUSING & URBAN DEVELOPMENT,
STATE DEPARTMENT FOR PUBLIC WORKS,
P.O BOX 41191 – 00100,
NAIROBI
NAIROBI
June, 2024
i
TABLE OF CONTENTS
TITLE
PAGE
Contents....................................................................................................……… i
PART 1: Tendering Procedures………................................................................... 1-2
PART 1I: Work Requirements
SECTION I: Bill of Quantities………………………………....................................5-21
SECTION II: Specifications......................................................................................22-54
SECTION III: Technical Schedule ………………………......................................55-56
SECTION IV: Schedule Unit of Rates ……………………….................................57-59
ii
PART 1 - TENDERING PROCEDURES
SECTION III - EVALUATION AND QUALIFICATION CRITERIA
1.
General Provision
Wherever a Tenderer is required to state a monetary amount, Tenderers should indicate the
Kenya Shilling equivalent using the rate of exchange determined as follows:
a) For construction turnover or financial data required for each Year-Exchange rate
prevailing on the last day of the respective calendar year (in which the amounts
for that year is to be converted) was originally established.
b) Value of single Contract-Exchange rate prevailing on the date of the contract signature.
c) Exchange rates shall be taken from the publicly available source identified in the
ITT. Any error in determining the exchange rates in the Tender may be corrected
by the Procuring Entity.
This section contains the criteria that the Employer shall use to evaluate tender and
qualify tenderers. No other factors, methods or criteria shall be used other than
specified in this tender document. The Tenderer shall provide all the information
requested in the forms included in Section IV, Tendering Forms. The Procuring Entity
should use the Standard Tender Evaluation Report for Goods and Works for
evaluating Tenders.
Evaluation and contract award Criteria
The Procuring Entity shall use the criteria and methodologies listed in this Section to
evaluate tenders and arrive at the Lowest Evaluated Tender. The tender that (i) meets
the qualification criteria, (ii) has been determined to be substantially responsive to the
Tender Documents, and (iii) is determined to have the Lowest Evaluated Tender price
shall be selected for award of contract.
2.
Preliminary examination for Determination of Responsiveness
The Procuring Entity will start by examining all tenders to ensure they meet in all
respects the eligibility criteria and other requirements in the ITT, and that the tender is
complete in all aspects in meeting the requirements of “Part 2–Procuring Entity's
Services Requirements”, including checking for tenders with unacceptable errors,
abnormally low tenders, abnormally high tenders and tenders that are front loaded. The
Standard Tender Evaluation Report for Goods and Works for evaluating Tenders
provides clear guidelines on how to deal with review of these requirements. Tenders
that do not pass the Preliminary Examination will be considered irresponsive and will
not be considered further.
S/No
PRELIMINARY EVALUATION CRITERIA / MANDATORY REQUIREMENTS
Electrical Installation Works
MR1
Company Certificate of incorporation/registration;
MR2
Valid Tax Compliance Certificate;
MR3
Current certificate of Registration with National Construction Authority (NCA 8 and above) in
Electrical Installation Works;
MR4
Current and Valid NCA contractor’s practicing licence
MR5
Current and Valid Licence with the Energy and Petroleum Regulatory Authority (EPRA) in Class C1
in Electrical Installation Works.
MR6
Current and Valid Licence with the Energy and Petroleum Regulatory Authority (EPRA) in Class T1
for Solar Installation Works.
1
TECHNICAL EVALUATION
At this stage technical evaluation shall be done by comparing each tender to the technical requirements
in the tender document
YES/NO
Item
Description
1.
2.
Compliance with Technical Specifications
(Note: See Compliance to Technical Specifications section on the next page )
Qualification and Experience of Key Personnel
Academic Qualification and Experience (Provide evidence)
a) Director of the firm
• Holder of at least a diploma with 5 years’ experience in Electrical Engineering field
b) Project Manager
• Holder of at least a degree with 5 years’ experience in Electrical Engineering field
c) At least 3 No artisans
•
Holder of at least a certificate with 5 years’ experience in relevant Engineering field
The tenderer MUST fill the forms listed below in the format provided and attach the
necessary qualification certificates:
1. Form PER - 1 Contractor's Representative and Key Personnel Schedule
2. Form PER - 2 Resume and Declaration - Contractor's Representative and Key Personnel.
3.
Experience of the firm in similar services: Electrical Works
a) Provide Three (3No.) projects of similar nature, complexity and magnitude) between the
Period 2019 – 2023: (Provide evidence)
The tenderer MUST fill the forms listed below in the format provided
1. Form EXP – 3.4 Current contract commitments/works in progress
2. Form EXP – 4.1 General Construction and contract Experience
3. Form EXP – 4.2.a Specific and Contract Management Experience
4. Form EXP – 4.2.b Construction Experience and Key Activities
4.
Adequacy of tools and equipment
The tenderer must show proof of ownership or leasing of the following equipment: a) Relevant Transport (at least 3No.)
•
Means of transport
b) Relevant Equipment (at least 3No.)
Electrical Works
•
Phase Sequence meter;
•
Earth loop impedance Tester;
•
Earth resistance tester;
•
Insulation resistance tester;
•
Clamp meter/multimeter;
QUALIFIED YES / NO
2
COMPLIANCE TO TECHNICAL SPECIFICATIONS
Tenderers shall submit offers that comply with the requirements of the tendering documents,
including the basic technical design as indicated in the Drawings and Specifications.
Tenderers shall be required;
a) On compliance with Technical Specifications, bidders shall supply equipment/items that
comply with the technical specifications set out in the bid document. In this regard, the
bidders will be required to submit relevant technical brochures/catalogues with the tender
document, highlighting (using a mark-pen or highlighter) the Catalogue Number/model of
the proposed items. Such brochures/catalogues should indicate comprehensive relevant
data of the proposed equipment/items which should include but not limited to the following:
(i)
Standards of manufacture;
(ii)
Performance ratings/characteristics/ features;
(iii) Material of manufacture;
(iv)
Electrical power ratings; and
(v)
All other requirements as indicated in the technical specifications of the bid.
The bid will then be analyzed, using the information in the technical brochures, to
determine compliance with key technical specifications for the works/items as indicated in
the tender document.
The tenderer shall fill in the Technical Schedule as specified in the tender document for
Equipment and Items indicating the Model/Make/Manufacturer and catalogue numbers of
the Items/Equipment they propose to supply.
Bidders not complying with any of the key technical specifications shall be considered
noncompliant to the technical specifications while those meeting all the key technical
specifications shall be considered compliant.
Compliance in this section shall be as shown below:
3
Description
COMPLIANT /
NONCOMPLIANT
Compliance with Technical Specifications
(Note:
1) Tender Evaluation Committee to evaluate compliance to all
technical specifications for all the Electrical Services
Installation Works as detailed in the Particular specifications
and technical schedule of this document
2) Bidders who do not highlight catalogue number and model of
the proposed items shall be considered non-compliant.
3) Non-compliance to any of the specifications shall render the
whole system non-compliant
4
PART II - WORKS REQUIREMENTS
SECTION I - BILLS OF QUANTITIES
1.
The Bills of Quantities form part of the contract documents and are to be read in conjunction with
the contract drawings and general specifications of materials and works.
2.
The prices quoted shall be deemed to include for all obligations under the sub-contract including
but not limited to supply of materials, labor, delivery to site, storage on site, installation, testing,
commissioning and all taxes (including 16% VAT and all taxes applicable at the time of tender.)
3.
All prices omitted from any item, section or part of the Bills of Quantities shall be deemed to have
been included to another item, section or part.
4.
The brief descriptions of the items given in the Bills of Quantities are for the purpose of
establishing a standard to which the sub-contractor shall adhere to. Otherwise, alternative brands
of equal and approved quality will be accepted.
Should the sub-contractor install any material not specified here-in before receiving approval from
the Project Manager, the sub-contractor shall remove the material in question and, at his own cost,
install the proper material.
5.
The grand total of prices in the price summary page must be carried forward to the Form of
Tender.
6.
Tenderers must enclose, together with their submitted tenders, detailed colored manufacturer’s
Brochures detailing Technical Literature and specifications on all the equipment they intend to
offer.
5
PROPOSED REHABILATION WORKS AT HYRAX HILL PREHISTORIC SITE
ELECTRICAL INSTALLATION WORKS
BILL NO.1: SUB-CONTRACT PRELIMINARIES
ITEM
DESCRIPTION
QTY UNIT
RATE
SHS.
1
Discrepancies clause - Sub-contractor shall include all
1
Item
work either shown on the Contract Drawings or detailed in
the specification. No claim or extra cost shall be
considered for works which has been shown on the
drawings or in the specification alone.
2
Payments clause - Payment will be made through
certificates to the Main Contractor, unless he specifically
agrees to forego this right, in which case direct payment
can be made to the Domestic Sub- contractor. All
payments will be less retention as specified in the Main
Contract. No payment will become due until materials are
delivered to site.
1
Item
3
Insurance company fees clause - Attention is drawn to the
tenderers to allow for all necessary fees, where known,
that may be payable in respect of any fees imposed by
Insurance Companies or statutory authorities for testing or
inspection.
1
Item
4
Extent of contractors duties clause - The Sub- contractor
shall be responsible for verifying all dimensions relative to
his work by actual measurements taken on site.Shall mark
accurately on one set of drawings and indicate all
alterations and/or modifications carried out to the designed
system during the construction period. This information
must be made available on site for inspection by the
Engineer.
1
Item
5
Government legislation and regulations clause - Subcontractor shall allow for providing holidays and transport
for work people, and for complying with Legislation,
Regulations and Union Agreements. The Sub-contractor
must also make himself acquainted with current legislation
and any Government regulations regarding the movement,
housing, security and control of labour, labour camps,
passes for transport, etc.
1
Item
Sub Total carried to next page
6
AMOUNT
SHS.
QTY UNIT
ITEM DESCRIPTION
Sub-Total B/F from Previous Page
6
Samples and materials generally clause - The Subcontractor shall, when required, provide for approval at no
extra cost, samples of all materials to be incorporated in
the works. Such samples, when approved, shall be retained
by the Engineer and shall form the standard for all such
materials incorporated.
1
Item
7
Bills of quantities clause - All the Quantities are based on
the Contract Drawings and are provisional and they shall
not be held to gauge or to limit the amount or description
of the work to be executed by the Sub- contractor but the
value thereof shall be deducted from the Sub-contract Sum
and the value of the work ordered by the Engineer and
executed there under shall be measured and valued by the
Engineer in accordance with the contract. All work liable
to adjustment under this Sub-contract shall be left
uncovered for a reasonable time to allow measurements
needed for such adjustment to be taken by the Quantity
Surveyor or Engineer. Immediately the work is ready for
measuring the Sub- contractor shall give notice to the
Quantity Surveyor or Engineer to carry out measurements
before covering up. If the Sub-contractor shall make
default in these respects he shall, if the Architect so
directs, uncover the work to enable the necessary
measurements to be taken and afterwards reinstate at his
own expense.
1
Item
8
Scope of contract works clause - The sub-contractor shall
supply, deliver, unload, hoist, fix, test, commission and
hand-over in satisfactory working order the complete
installations specified hereinafter and/or as shown on the
Contract Drawings attached hereto, including the
provision of labour, transport and plant for unloading
material and storage, and handling into position and fixing
1
Item
Sub Total carried to next page
7
RATE
SHS.
AMOUNT
SHS.
QTY UNIT
ITEM DESCRIPTION
Sub-Total B/F from Previous Page
9
Contractors office in Kenya clause - It shall be the Subcontractor’s responsibility to procure work permits, entry
permits, licences, registration, etc., in respect of all
expatriate staff. The Sub-contractor shall prepare a
substantial proportion of his Working Drawings at his
office in Kenya. No reasons for delays in the preparation
or submission for approval or otherwise of such drawings
or proposals will be accepted on the grounds that the Subcontractor’s Head Office is remote from his office in
Nairobi or the site of the Sub- contract Works or
otherwise.
1
Item
10
Identification of plant components clause - Sub-contractor
shall supply and fix identification labels to all plant,
starters, switches and items of control equipment etc with
white traffolyte or equal labels engraved in red lettering
denoting its name, function and section controlled.
1
Item
11
Working drawings clause - Sub-contractor shall prepare
such Working Drawings as may be necessary. The
Working Drawings shall be complete in such detail not
only that the Sub-contract Works can be executed on site
but also that the Engineer can approve the Subcontractor’s proposals, detailed designs and intentions in
the execution of the Sub- contract Works.
1
Item
12
Records Drawings (As Installed) and instructions clause Record Drawings, will be subject to the approval of the
Engineer, include approved Working Drawings adjusted
as necessary and certified by the Sub-contractor as a
correct record of the installation of the Sub-contract
Works.
1
Item
13
Maintenance Manual clause - Upon Practical
Completion of the Sub-contract Works, the Subcontractor shall furnish the Engineer four copies of a
Maintenance Manual relating to the installation forming
part of all of the Sub-contract Works.
1
Item
Sub Total carried to next page
8
RATE
SHS.
AMOUNT
SHS.
QTY UNIT
ITEM DESCRIPTION
Sub-Total B/F from Previous Page
14
Hand over clause - The Sub-contract Works shall be
considered complete and the Maintenance and Defects
Liability Period shall commence only when the Subcontract Works and supporting services have been tested,
commissioned and operated to the satisfaction of the
Engineer and officially approved and accepted by the
Employer, provided always that the handing over of the
Sub-contract Works shall be coincident with the handing
over of the Main Contract Works.
1
Item
15
Testing and inspection - manufactured plant clause - The
Engineer reserves the right to inspect and test or witness
of all manufactured plant equipment and materials. The
right of the Engineer relating to the inspection,
examination and testing of plant during manufacture. Subcontractor shall give two weeks’ notice to the Engineer of
his intention to carry out any inspection or tests and the
Engineer or his representative shall be entitled to witness
such tests and inspections.
1
Item
16
Testing and inspection - installation clause - Allow for
testing each section of the Sub-contract Works
installation.
1
Item
17
Initial Maintenance Clause - The sub-contractor shall
make routine maintenance once a month during the
liability for the Defects Period and shall carry out all
necessary adjustments and repairs, cleaning and oiling of
moving parts. A monthly report of the inspection and any
works done upon the installation shall be supplied to the
Engineer. Shall allow in the sub-contract Sum of the initial
maintenance, inspection and break-down service
1
Item
Sub Total carried to next page
9
RATE
SHS.
AMOUNT
SHS.
QTY UNIT
ITEM DESCRIPTION
18
Sub-Total B/F from Previous Page
Local and other authorities notice clause - The contractor
shall comply with and give all notices required by any
Regulations, Act or by Law of any Local Authority or of
any Public Service, Company or Authority who have any
jurisdiction with regard to the works or with those systems
the same are or will be connected and he shall pay and
indemnify the Government against any fees or charges
legally demandable under any regulation or by-law in
respect of the works; provided that the said fees and
charges if not expressly included in the contract sum or
stated by way of provisional sum shall be added to the
contract sum.
1
Item
19
Temporary Works clause - The contractor shall include for
the cost of and make necessary arrangements with the
Project Manager for such temporary works.
1
Item
20
Patent Rights clause - The contractor shall fully indemnify
the Government of Kenya; against any action, claim or
proceeding relating to infringement of any patent or design
rights, and pay any royalties which may be payable in
respect of any article or any part thereof, which shall have
been supplied by the contractor to the Project Manager.
1
Item
21
Mobilization and Demobilization clause -No claim will be
entertained where the contractor has not made any
provision for mobilization and demobilization of labour,
plant and equipment in the preliminary bills of quantities.
1
Item
Sub Total carried to next page
10
RATE
SHS.
AMOUNT
SHS.
QTY UNIT
ITEM DESCRIPTION
RATE
SHS.
AMOUNT
SHS.
Sub-Total B/F from Previous Page
22
Supervision by Engineer and site meetings clause - A
competent Project Engineer appointed by the Chief
Engineer as his representative shall supervise the Contract
works. The Project Engineer shall be responsible for
issuing all the site instructions in any variations to the
works and these shall be delivered through the Contractor
with the authority of the Project Manager. Any
instructions given verbal shall be confirmed in writing.
The Sub Contractor shall in his tender allow for the
provision of management meetings and site inspections, as
instructed by the Engineer, and also profit and attendance
on these funds. The funds shall be expended according to
Project Manager’s instructions to the Contractor.
1
Item
23
Allow for VAT, Profit and Attendance for the above Item
%
Item
24
Contract obligation and employers obligation clause - No
claims will be entertained for pre-financing of the project
by the sub-contractor, or for loss of profit (expectation
loss) in case of premature termination, reduction or
increase of works as the sub-contractor shall be deemed to
have taken adequate measures in programming his works
and expenditure and taken necessary financial precaution
while executing the works.
1
Item
25
Any other preliminaries
1
Item
TOTAL C/F TO MAIN SUMMARY PAGE
11
60,000.00
60,000.00
BILL NO. 2 : SCHEDULE 1:ABLUTION BLOCK ELECTRICAL INSTALLATION WORKS
DESCRIPTION
ITEM
QTY UNIT RATE AMOUNT
SHS.
SHS.
Supply, Install, Test and commission the following:
1.01
1.02
1.03
LIGHTING POINTS
2
Lighting point wired in 3x1.5mm SC-PVC-Cu cables drawn in
20mm diameter HG PVC conduits concealed inside the ceiling
complete with all necessary accessories excluding switches
i) One way Switching
22
No.
10A moulded ivory switch plates as Crabtree or approved
equivalent as follows:
i) One gang One way switching
ii) Two gang One way switching
2
5
No.
No.
a) 8Watts, 2 feet (L600), 800Lm LED Batten as philips or
approved equivalent
16
No.
b) Glass Rectangular Bulkhead Outdoor light
6
No.
1
No.
1
No
30
Lm.
LIGHTING FITTINGS
Light fittings complete with all accessories and lamps as follows:-
CONSUMER UNIT
4 Ways SPN, flush mounted Consumer Unit completewith 100A
1.04 integral SPN isolator as Schneider or approved equivalent
complete with all accessories but excluding MCBs.
1.05 Miniature Circuit Breakers to fit into the above consumer unit as
follows:
(i) 10A SP
1.06
SUB-MAINS CABLES
3 core 2.5mm² armored PVC copper cables burried in ground to
Ablution Block CLB
1.07
Standard Cable Loop-in Box complete with 20A MCB (DP)
mounted on a rail as schneider or approved equivalent.
1
No.
1.06
3x2.5mm² armored PVC copper cables in 32mm HG PVC
Conduits from the Cable Loop in Box to the Consumer Unit
20
LM
TOTAL C/F TO COLLECTION PAGE
12
ITEM
2.01
2.02
BILL NO. 2 : SCHEDULE 2: GATE HOUSE ELECTRICAL INSTALLATION WORKS
DESCRIPTION
QTY UNIT RATE
AMOUNT
SHS.
SHS.
Supply, Install, Test and commission the following:
LIGHTING POINTS
Lighting point wired in 3x1.5mm2 SC-PVC-Cu cables drawn
in 20mm diameter HG PVC conduits concealed inside the
ceiling complete with all necessary accessories excluding
switches
i) One way Switching
7
No.
10A moulded ivory switch plates as Crabtree or approved
equivalent as follows:
i) One gang One way switching
3
No.
1
No.
4
No.
1
No.
2
No.
SOCKET OUTLETS
Socket outlet point comprising wiring in 3x2.5mm2 PVC-SCCu cables in concealed in trunking/in conduit.
3
No.
13A switched twin socket outlet mounted on trunking as
Crabtree or approved equivalent
3
No
1
No.
ii) IP66 10A weather proof switch as schneider or equal and
approved equivalent
2.03
LIGHTING FITTINGS
Light fittings complete with all accessories and lamps as
follows:a) IP65, Base type:E27, 90º Black Ornamental Outdoor Gate
Lamp mounted 2 meters above the ground on the masonry
column of the gate (two inside and two outside).
b) 1200mm,19W, 2500lm, TrueLine Surface mounted as
Philips TrueLine ceiling mounted or equal and approved
equivalent.
c) 8Watts, 2 feet (L600), 800Lm LED Batten as philips or
approved equivalent
2.04
2.05
CONSUMER UNIT
4 Ways SPN, flush mounted Consumer Unit completewith
2.06 100A integral SPN isolator as Schneider or approved
equivalent complete with all accessories but excluding MCBs.
Sub total carried to next page
13
ITEM
QTY UNIT RATE
SHS.
DESCRIPTION
Sub total carried from previous page
2.07 Miniature Circuit Breakers to fit into the above consumer unit
as follows:
(i) 10A SP
(ii) 32A SP
1
1
No
No
SOLAR POWER
2.08 Solar Panel 575 watts c/w solar connecting cables
2
No.
2.09 12VDC, 200AH deep cycle AGM Solar batteries
(Maintenance Free) c/w battery connector/cables and
mounting structure
2
No.
2.10 850 watts hybrid inverter with inbuilt charge controller
1
No.
SUB-MAINS CABLES
2.11 3x2.5mm² SC PVC/PVC copper cables strapped on a cable
tray/ inside an electrical duct .
50
LM
Item
Item
2.12 Any other items necessary to complete the above installation
as per the system you propose to install.
a)
b)
TOTAL C/F TO COLLECTION PAGE
14
AMOUNT
SHS.
BILL NO. 2 : SCHEDULE 3:SERVANT QUARTERS ELECTRICAL INSTALLATION WORKS
DESCRIPTION
ITEM
QTY UNIT RATE AMOUNT
SHS.
SHS.
Supply, Install, Test and commission the following:
3.01
3.02
3.03
LIGHTING POINTS
Lighting point wired in 3x1.5mm2 SC-PVC-Cu cables drawn in
20mm diameter HG PVC conduits concealed inside the ceiling
complete with all necessary accessories excluding switches
i) One way Switching
8
No.
10A moulded ivory switch plates as Crabtree or approved
equivalent as follows:
i) One gang One way switching
4
No.
4
No.
4
No.
LIGHTING FITTINGS
Light fittings complete with all accessories and lamps as
follows:a) 1200mm,19W, 2500lm, TrueLine Surface mounted as
Philips TrueLine ceiling mounted or equal and approved
equivalent.
b) Glass Rectangular Bulkhead Outdoor light
3.04
SOCKET OUTLETS
Socket outlet point comprising wiring in 3x2.5mm2 PVC-SCCu cables in concealed in trunking/in conduit.
5
No.
3.05
13A switched twin socket outlet mounted on trunking as
Crabtree or approved equivalent
5
No
1
No.
1
1
No
No
50
LM
CONSUMER UNIT
3.06 4 Ways SPN, flush mounted Consumer Unit completewith
100A integral SPN isolator as Schneider or approved
equivalent complete with all accessories but excluding MCBs.
3.07
3.08
Miniature Circuit Breakers to fit into the above consumer unit
as follows:
(i) 10A SP
(ii) 32A SP
SUB-MAINS CABLES
3 core 4mm² armored PVC copper cables burried in ground
from the existing meterboard to Cable Loop in Box at the SQ
Sub total carried to next page
15
ITEM
DESCRIPTION
QTY UNIT RATE AMOUNT
.
SHS.
SHS.
Sub-Total B/F from Previous Page
3.09
3x2.5mm² armored PVC copper cables in 32mm HG PVC
Conduits from the Cable Loop in Box to the Consumer Unit
20
Lm.
3.10
Standard Cable Loop-in Box complete with 32A MCB (DP)
mounted on a rail as schneider or approved equivalent.
1
No.
3.11
Excavate trenches for the above duct average depth 600mm,
remove soft earth, lay duct, cover with "DANGER-HATARI"
tape, back-fill with soil and compact to natural ground level and
to KPLC approved design layout.
50
Lm.
3.12
600x600x600mm Power manhole, PMH complete with
E.A.F.W heavy duty steel cover engraved POWER- DANGER
4
No.
TOTAL C/F TO COLLECTION PAGE
16
BILL NO. 2 : SCHEDULE 4: TICKETING OFFICE ELECTRICAL INSTALLATION WORKS
DESCRIPTION
ITEM
QTY UNIT RATE AMOUNT
SHS.
SHS.
Supply, Install, Test and commission the following:
4.01
4.02
4.03
4.04
4.05
LIGHTING POINTS
2
Lighting point wired in 3x1.5mm SC-PVC-Cu cables drawn in
20mm diameter HG PVC conduits concealed inside the ceiling
complete with all necessary accessories excluding switches
i) One way Switching
1
No.
10A moulded ivory switch plates as Crabtree or approved
equivalent as follows:
i) One gang One way switching
1
No.
a) 1200mm,19W, 2500lm, TrueLine Surface mounted as Philips
TrueLine ceiling mounted or equal and approved equivalent.
1
No.
b) Glass Rectangular Bulkhead Outdoor light
4
No.
SOCKET OUTLETS
Socket outlet point comprising wiring in 3x2.5mm2 PVC-SC-Cu
cables in concealed in trunking/in conduit.
3
No.
13A switched twin socket outlet mounted on trunking as Crabtree
or approved equivalent
3
No
1
No.
1
2
No
No
LIGHTING FITTINGS
Light fittings complete with all accessories and lamps as follows:-
CONSUMER UNIT
4.06 4 Ways SPN, flush mounted Consumer Unit completewith 100A
integral SPN isolator as Schneider or approved equivalent
complete with all accessories but excluding MCBs.
4.07 Miniature Circuit Breakers to fit into the above consumer unit as
follows:
(i) 10A SP
(ii) 32A SP
TOTAL C/F TO COLLECTION PAGE
17
BILL NO. 2 : SCHEDULE 5: GALLERY ELECTRICAL INSTALLATION WORKS
DESCRIPTION
ITEM
QTY UNIT RATE
SHS.
Supply, Install, Test and commission the following:
5.01
5.02
5.03
LIGHTING POINTS
Lighting point wired in 3x1.5mm2 SC-PVC-Cu cables drawn in
20mm diameter HG PVC conduits concelaed inside ceiling and
steel galvanised conduits to switching outlet box complete
with all necessary accessories excluding switches
i) One way Switching
ii) Two way Switching
8
2
No.
No.
10A moulded ivory switch plates as Crabtree or approved
equivalent as follows:
i) One gang One way switch
ii) One gang Two way switch
iii) Intermediate switch
6
2
1
No.
No.
No.
a) 1200mm,19W, 2500lm, TrueLine Surface mounted as
Philips TrueLine ceiling mounted or equal and approved
equivalent.
10
No.
b) Glass Rectangular Bulkhead Outdoor light
4
No.
LIGHTING FITTINGS
Light fittings complete with all accessories and lamps as
follows:-
SOCKET OUTLETS
5.04
Socket outlet point comprising wiring in 3x2.5mm2 PVC-SCCu cables in concealed in 32mm galvanised steel conduit
complete with all necessary accessories excluding sockets.
17
No.
5.05
13A switched twin socket outlet mounted on trunking as
Crabtree or approved equivalent
17
No
1
No.
1
1
No
No
CONSUMER UNIT
5.06
5.07
4 Ways SPN, flush mounted Consumer Unit completewith
100A integral SPN isolator as Schneider or approved
equivalent complete with all accessories but excluding MCBs.
Miniature Circuit Breakers to fit into the above consumer unit
as follows:
(i) 10A SP
(ii) 32A SP
Sub total carried to next page
18
AMOUNT
SHS.
ITEM
DESCRIPTION
QTY UNIT RATE
.
SHS.
Sub-Total B/F from Previous Page
METER BOX
5.08 IP46 powder coated (L30W30H15) cm lockable meter box
with space to house 1No. Single phase meters, space to
accommodate 4No. MCB (DP) outgoers
TOTAL C/F TO COLLECTION PAGE
19
1
No.
AMOUNT
SHS.
ITEM
6.01
BILL NO. 2 : SCHEDULE 6: AREA LIGHTING INSTALLATION WORKS
DESCRIPTION
QTY UNIT RATE
AMOUNT
SHS.
SHS.
Supply, Install, Test and commission the following:
AREA LIGHTING COLUMNS
LIGHTING COLUMNS
6m rooted galvanized steel column powder coated, stepped
(with decorative waist finial) , complete with 60mm Spigot
designed to the EN40 as Thorn PLURIO columns and
brackets or equal and approved equivalent.
No.
5
6.02
Brackets to be used on the above able to mount four flood
lights together with four solar panels
No.
5
6.03
9m rooted galvanized steel column powder coated, stepped
(with decorative waist finial) , complete with 60mm Spigot
designed to the EN40 as Thorn PLURIO columns and
brackets or equal and approved equivalent.
No.
2
6.04
Brackets to be used on the above able to mount four flood
lights together with four solar panels
No.
2
6.05
Allow for Earthing. The contractor to ensure that the earth
resistance does not exceed 10 Ohms.
Item
7
6.06
Excavate holes to a depth of 1000mm by L600mm by
W600mm to take area/security light poles and backfill after
installation of the poles
No.
7
6.07
Mix and place 1:3:6 concrete pad at the base of every pole
No.
7
6.08
LIGHTING FITTINGS
200 W, 4188lm, 6500K LED solar flood lights with street
No.
distribution. Class I electrical, IP66, IK08 as Thorn Avenue
F2 LED or equal and approved equivalent
TOTAL C/F TO SUMMARY PAGE
20
28
SUMMARY PAGE
Item
Description
1.00
BILL NO.1: SUB-CONTRACT PRELIMINARIES
2.00
BILL NO. 2 : SCHEDULE 1: ABLUTION BLOCK ELECTRICAL
INSTALLATION WORKS
3.00
BILL NO. 2 : SCHEDULE 2: GATE HOUSE ELECTRICAL INSTALLATION
WORKS
4.00
BILL NO. 2 : SCHEDULE 3:SERVANT QUARTERS ELECTRICAL
INSTALLATION WORKS
5.00
BILL NO. 2 : SCHEDULE 4: TICKETING OFFICE ELECTRICAL
INSTALLATION WORKS
6.00
BILL NO. 2 : SCHEDULE 5: GALLERY ELECTRICAL INSTALLATION
WORKS
7.00
BILL NO. 2 : SCHEDULE 6: AREA LIGHTING INSTALLATION WORKS
8.00
CONTIGENCY SUM
Amount (Ksh)
100,000.00
GRAND TOTAL C/F TO MAIN SUMMARY (VAT INCLUSIVE)
TOTAL AMOUNT IN WORDS
TENDERER'S NAME & STAMP( DOMESTIC SUB CONTRACTOR)
SIGNATURE ………………………………… DATE……………………………………...…..
P.I.N No.…………………………………V.A.T CERTIFICATE No……………………….
WITNESS………………………………………………...
SIGNATURE OF WITNESS……………………...…DATE…………………………………
21
SECTION II - SPECIFICATIONS
Notes for preparing Specifications
1.
Specifications must be drafted to present a clear and precise statement of the required
standards of materials, and workmanship for tenderers to respond realistically and
competitively to the requirements of the Procuring Entity and ensure responsiveness of
tenders. The Specifications should require that all materials, plant, and other supplies to be
permanently incorporated in the Works be new, unused, of the most recent or current models,
and incorporating all recent improvements in design and materials unless provided
otherwise in the Contract. Where the Contractor is responsible for the design of any part of
the permanent Works, the extent of his obligations must be stated.
2.
Specifications from previous similar projects are useful and may not be necessary to re-write
specifications for every Works Contract.
3.
There are considerable advantages in standardizing General Specifications for repetitive
Works in recognized public sectors, such as high ways, urban housing, irrigation and water
supply. The General Specifications should cover all classes of workmanship, materials and
equipment commonly involved in constructions, although not necessarily to be used in a
particular works contract. Deletions or addenda should then adapt the General Specifications
to the particular Works.
4.
Care must be taken in drafting Specifications to ensure they are not restrictive. In the
Specifications of standards for materials, plant and workmanship, existing Kenya Standards
should be used as much as possible, otherwise recognized international standards may also
be used.
5.
The Procuring Entity should decide whether technical solutions to specified parts of the
Works are to be permitted. Alternatives are appropriate in cases where obvious (and
potentially less costly) alternatives are possible to the technical solutions indicated in tender
documents for certain elements of the Works, taking into consideration the comparative
specialized advantage of potential tenderers.
6.
The Procuring Entity should provide a description of the selected parts of the Works with
appropriate reference to Drawings, Specifications, Bills of Quantities, and Design or
Performance criteria, stating that the alternative solutions shall be at least structurally and
functionally equivalent to the basic design parameters and Specifications.
7.
Such alternative solutions shall be accompanied by all information necessary for a complete
evaluation by the Procuring Entity, including drawings, design calculations, technical
specifications, breakdown of prices, proposed construction methodology, and other relevant
details. Technical alternatives permitted in this manner shall be considered by the Procuring
Entity each on its own merits and independently of whether the tenderer has priced the item
as described in the Procuring Entity's design included with the tender documents.
22
A. GENERAL SPECIFICATIONS
1.1
General
1.2
Standard of Materials
1.3
Workmanship
1.4
Procurement of Materials
1.5
Shop Drawings
1.6
Record Drawings
1.7
Regulations and Standards
1.8
Setting out Works
1.9
Position of Electrical Plant and Apparatus
1.10
M.C.B Distribution Panels and Consumer Units
1.11
Fused Switchgear and Isolators
1.12
Conduits and Conduit Runs
1.13
Conduit Boxes and Accessories
1.14
Labels
1.15
Earthing
1.16
Cables and Flexible Cords
1.17
Armored PVC Insulated and Sheathed Cables
1.18
Cable Supports; Markers and Tiles
1.19
PVC Insulated Cables
1.20
Heat Resisting Cables
1.21
Flexible Cords
1.22
Cable Ends and phase Colors
1.23
Cable Insulation Colors
23
1.24
Sub-circuit Wiring
1.25
Space Factor
1.26
Insulation
1.27
Lighting Switches
1.28
Sockets and Switched sockets
1.29
Fused Spur Boxes
1.30
Cooker Outlets
1.31
Connectors
1.32
Lamp holders
1.33
Lamps
1.34
lighting Fittings Street lighting Lanterns
1.35
Position of Points and Switches
1.36
Street/Security Lighting Columns
1.37
Timing Control Switch
1.38
Wiring System for Street Lighting
1.39
Metal control Pillar
1.40
Current Operated Earth leakage circuit breaker
1.41
MV Switchboard
1.42
Steel Conduits and Steel Trunking
1.43
Testing on Site
24
1.1. GENERAL
This specification is to be read in conjunction with the drawings which are issued with it.
Bills of quantities shall be the basis of all additions and omissions during the progress of the
works.
1.2. STANDARD OF MATERIALS
Where the material and equipment are specifically described and named in the Specification
followed by approved equal, they are so named or described for the purpose of establishing a
standard to which the sub-contractor shall adhere.
Should the Sub-contractor install any material not specified herein before receiving approval
from the proper authorities, the Engineer shall direct the Sub-contractor to remove the material
in question immediately. The fact that this material has been installed shall have no bearing
or influence on the decision by the Engineer.
All materials condemned by the Engineer as not approved for use, are to be removed from the
premises and suitable materials delivered and installed in their place at the expense of the
Sub-contractor. All materials required for the works shall be new and the best of the
respective kind and shall be of a uniform pattern.
1.3. WORKMANSHIP
The workmanship and method of installation shall conform to the best standard practice. All
work shall be performed by a skilled tradesman and to the satisfaction of the Engineer.
Helpers shall have qualified supervision.
Any work that does not in the opinion of the Engineer conform to the best standard practice
will be removed and reinstated at the Sub-contractors expense.
Permits, Certificates or Licenses must be held by all tradesmen for the type of work; in which
they are involved where such permits, certificates or licenses exist under Government
legislation.
1.4. PROCUREMENT OF MATERIALS
The sub-contractor is advised that no assistance can be given in the procurement or allotment
of any materials or products to be used in and necessary for the construction and completion
of the work.
Sub-contractors are warned that they must make their own arrangements for the supply of
materials and/or products specified or required.
1.5. SHOP DRAWINGS
Before manufacture or Fabrication is commenced the sub-contractor shall submit Two copies
of detailed drawings of all control pillars, meter cubicles, medium voltage switchboards
including their components showing all pertinent information including sizes, capacities,
construction details, etc, as may be required to determine the suitability of the equipment for
the approval of the Engineer. Approval of the detailed drawings shall not relieve the subcontractor of the full responsibility of errors or the necessity of checking the drawings himself
or of furnishing the materials and equipment and performing the work required by the plans
and specifications.
25
1.6. RECORD DRAWINGS
These diagrams and drawings shall show the completed installation including sizes, runs and
arrangements of the installation. The drawings shall be to scale not less than 1:50 and shall
include plan views and section.
The drawings shall include all the details which may be useful in the operation, maintenance
or subsequent modifications or extensions to the installation.
Three sets of diagrams and drawings shall be provided, all to the approval of the Engineer.
One coloured set of line diagrams relating to operating and maintenance instructions shall be
framed and, mounted in a suitable location.
1.7. REGULATIONS AND STANDARDS
All work executed by the contractor shall comply with the current edition of the “Regulations”
for the Electrical Equipment of Buildings, issued by the Institution of Electrical Engineers,
Electric Power Act, Kenya Bureau of Standards (KEBS), Institution of Electrical Engineers
(I.E.E) Wiring Regulations, Current recommendation of CCITT and CCIR, and with the
Regulations of the Local Electricity Authority and the Communications Authority of Kenya
(CA)
Where the two sets of regulations appear to conflict, they shall be clarified with the Engineers.
All materials used shall comply with relevant Kenya Bureau of Standards Specification.
1.8. SETTING OUT WORK
The sub-contractor at his own expenses; is to set out works and take all measurements and
dimensions required for the erection of his materials on site; making any modifications in
details as may be found necessary during the progress of the works, submitting any such
modifications or alterations in detail to the Engineer before proceeding and must allow in his
Tender for all such modifications and for the provision of any such sketches or drawings
related thereto.
1.9. POSITIONS OF ELECTRICAL PLANT AND APPARATUS
The routes of cables and approximate positions of switchboards etc, as shown on the drawings
shall be assumed to be correct for purpose of Tendering, but exact positions of all electrical
Equipment and routes of cables must be agreed on site with the Engineer before any work is
carried out.
1.10. MCB DISTRIBUTION PANELS AND CONSUMER UNITS
All cases of MCB Panels and consumer units shall be constructed in heavy gauge sheet with
hinged covers.
Removable undrilled gland plates shall be provided on the top and bottom of the cases.
Miniature circuit breakers shall be enclosed in moulded plastic with the tripping mechanism
and arc chambers separated and sealed from the cable terminals.
The operating dolly shall be tripfree with a positive movement in both make and break
position. Clear indication of the position of the handle shall be incorporated.
The tripping mechanism shall be on inverse characteristic to prevent tripping in temporary
26
overloads and shall not be affected by normal variation in ambient temperature.
A locking plate shall be provided for each size of breaker; A complete list of circuit details on
typed cartridge paper glued to stiff cardboards and covered with a sheet of perspex, and held
in position with four suitable fixings, shall be fitted to the inner face of the lids of each
distribution panel. The appropriate MCB ratings shall be stated on the circuit chart against
each circuit in use: Ivorine labels shall be secured to the insulation barriers in such a manner
as to indicate the number of the circuits shown on the circuit chart.
Insulated barriers shall be fitted between phases, and neutrals in all boards, and to shroud live
parts.
Neutral cables shall be connected to the neutral bar in the same sequence as the phase cables
are connected to the MCB’s. This shall also apply to earth bars when installed.
1.11. FUSED SWITCHGEAR AND ISOLATORS
All fused switchgear and isolators whether mounted on machinery, walls or industrial panels
shall conform to the requirements of KS 04 – 226 PART: 1: 1985.
All contacts are to be fully shrouded and are to have a breaking capacity on manual operations
as required by KS 04 – 182: 1980.
Fuse links for fused switches are to be of high rupturing capacity cartridge type, conforming
to KS 04 – 183: 1978.
Isolators shall be load breaking/fault making isolators.
Fused switches and isolators are to have separate metal enclosures. Mechanical interlocks are
to be provided between the door and main switch operating mechanism so arranged that the
door may not be opened with the switch in the ‘ON’ position. Similarly; it shall not be possible
to close the switch with the door open except that provision to defeat the mechanical interlock
and close the switch with the door in the open position for test purposes. The ‘ON’ and ‘OFF’
positions of all switches and isolators shall be clearly indicated by a mechanical flag indicator
or similar device. In T.P & N fused switch units, bolted neutral links are to be fitted.
1.12. CONDUITS AND CONDUIT RUNS
Conduit systems are to be installed so as to allow the loop-in system of wiring:
All conduits shall be black rigid super high impact heavy gauge class ‘A’ PVC in accordance
with KS 04 – 179: 1988 and IEE Regulations. No conduit less than 20mm in diameter shall
be used anywhere in this installation.
Conduit shall be installed buried in plaster work and floor screed except when run on wooden
or metal surface when they will be installed surface supported with saddles every 600mm.
Conduit run in chases shall be firmly held in position by means of substantial pipe hooks
driven into wooden plugs.
The Sub-contractors attention is drawn to the necessity of keeping all conduits entirely
separate from other piping services such as water and no circuit connections will be permitted
between conduits and such pipes.
All conduits systems shall be arranged wherever possible to be self-draining to switch boxes
and conduit outlet points for fittings:
The systems, when installed and before wiring shall be kept plugged with well-fitting plugs
27
and when short conduit pieces are used as plugs, they shall be doubled over and tied firmly
together with steel wire; before wiring all conduit systems shall be carried out until the
particular section of the conduit installation is complete in every respect.
The sets and bends in conduit runs are to be formed on site using appropriate size bending
springs and all radii of bends must not be less than 2.5 times the outside diameter of the
conduit. No solid or inspection bends, tees or elbows will be used.
Conduit connections shall either be by a demountable (screwed up) assembly or adhesive
fixed and water tight by solution. The tube and fittings must be clean and free of all grease
before applying the adhesive. When connections are made between the conduit and switch
boxes, circular or non-screwed boxes, care shall be taken that no rough edges of conduit stick
out into the boxes.
Runs between draw in boxes are not to have more than two right angle bends or their
equivalent. The sub-contractor may be required to demonstrate to the Engineers that wiring
in any particular run is easily withdrawable and the sub-contractor may, at no extra cost to the
contract; be required to install additional draw-in boxes required. If conduit is installed in
straight runs in excess of 6000mm, expansion couplings as manufactured by Egatube shall be
used at intervals of 6000mm.
Where conduit runs are to be concealed in pillars and beams, the approval of the Structural
Engineer, shall be obtained. The sub-contractor shall be responsible for marking the accurate
position of all holes chases etc, on site, or if the Engineer so directs, shall provide the Main
Contractor with dimensional drawings to enable him to mark out and form all holes and
chases. Should the sub-contractor fail to inform the main contractor of any inaccuracies in this
respect they shall be rectified at the sub-contractors expense.
It will be the Sub-contractors responsibility to ascertain from site, the details of reinforced
concrete or structural steelwork and check from the builder’s drawings the positions of walls,
structural concrete and finishes. No reinforced concrete or steelwork may be drilled without
first obtaining the written permission of the Structural Engineer.
The drawings provided with these specifications indicate the appropriate positions only of
points and switches, and it shall be the Sub-Contractors responsibility to mark out and centre
on site the accurate positions where necessary in consultation with the Architect and the
Engineer. The sub-contractor alone shall be responsible for the accuracy of the final position.
1.13. CONDUIT BOXES AND ACCESSORIES
All conduit outlets and junction boxes are to be either malleable iron and of standard circular
pattern of the appropriate type to suit saddles being used or super high impact PVC
manufactured to KS 04 – 179 : 1983.
Small circular pattern boxes are to be used with conduits up to and including 25mm outside
diameter. Rectangular pattern adaptable boxes are to be used for conduits of 32mm outside
diameter and larger. For drawing in of cables in exposed runs of conduit, standard pattern
through boxes are to be used:
Boxes are to be not less than 50mm deep and of such dimensions as will enable the largest
appropriate number of cables for the conduit sizes to be drawn in without excessive bending.
Outlet boxes for lighting fittings are to be of the loop-in type where conduit installation is
concealed and the sub-contractor shall allow one such box per fitting, except where
fluorescent fittings are specified when two such boxes per fitting shall be fitted flush with
28
ceiling and if necessary fitted with break joint rings. Pattresses shall be fitted where required
to outlets on surface conduit runs.
Adaptable boxes are of PVC or mild steel (of not less than 12swg) and black enameled or
galvanized finish according to location. They shall be of square or oblong shape location.
They shall be of square or oblong shape complete with lids secured by four 2 BA brass
roundhead screws; No adaptable box shall be less than 75mm x 75mm x 50mm or larger than
300mm x 300mm x 75mm and shall be adequate in depth in relation to the size of conduit
entering it. Conduits shall only enter boxes by means of conduit bushes.
1.14. LABELS
Labels fitted to switches and fuseboards;(i)
Shall be Ivorine engraved black on white.
(ii)
Shall be secured by R.H brass screws of same manufacturing throughout.
(iii)
a)
Shall be indicated on switches:Reference number of switch
b)
Special current rating
c)
Item of equipment controlled
(iv)
a)
b)
c)
d)
Shall indicate on MCB panels
Reference number
Type of board, i.e; lighting, sockets, etc,
Size of cable supplying panel
where to isolate feeder cable
(v)
Shall be generally not less than 75mm x 50mm.
1.15. EARTHING
The earthing of the installation shall comply with the following requirements;(i)
It shall be carried out in accordance with the appropriate sections of the current edition
of the Regulations, for the Electrical Equipment of Buildings issued by Institute of
Electrical Engineers of Great Britain.
(ii)
At all main distribution panels and main service positions a 25mm x 3mm minimum
cross sectional area Copper tape shall be provided and all equipment including the
lead sheath and armoring of cables, distribution boards and metal frames shall be
bonded thereto.
The earth tape in Sub-clause (ii) shall be connected by means of a copper tape or cable
of suitable cross sectional area to an earth electrode which shall be a copper earth rod
(see later sub-clause).
(iii)
(iv)
All tapes to be soft high conductivity copper, untinned except where otherwise
specified and where run underground on or through walls, floors, etc., it shall be
served with corrosion resisting tape or coated with corrosion compound and braided
(v)
Where the earth electrode is located outside the building a removable test link shall
be provided inside the building as near as possible to the point of entry to the tape,
29
for isolating the earth electrode for testing purposes.
(vi)
Earthing of sub-main equipment shall be deemed to be satisfactory where the submain cables are M.I.C.S. or conduit with separate earth wire, and installation is carried
out in accordance with the figures stated in the current edition of the I.E.E
Regulations.
(vii)
Where an earth rod is specified (see Sub-clause (iii) it shall be proprietary
manufacture, solid hand drawn copper of 15mm diameter driven into the ground to a
minimum depth of 3.6M. It shall be made up to 1.2m sections with internal screw and
socket joints and fitted with hardened steel tip and driving cap.
(viii)
Earth plates will not be permitted
(ix)
Where an earth rod is used the earth resistance shall be tested in the manner described
in the current edition of the IEE Regulations, by the Sub-Contractor in the presence
of the Engineer and the Sub-Contractor shall be responsible for the supply of all test
equipment.
(x)
Where copper tape is fixed to the building structure it shall be by means of purpose
made non-ferrous saddles which space the conductor away from the structure a
minimum distance of 20mm. Fixings, shall be made using purpose made plugs; No
fixings requiring holes to be drilled through the tape will be accepted.
(xi)
Joints in copper tape shall be tinned before assembly riveted with a minimum of two
copper rivets and seated solid.
(xii)
Where holes are drilled in the earth tape for connection to items of equipment the
effective cross sectional area must not be less than required to comply with the IEE
regulations.
(xiii)
Bolts, nuts and washers for any fixing to the earth tape must be of non-ferrous
material.
(xiv)
Attention is drawn to the need for the earthing metal parts of lighting fittings and for
bonding ball joint suspension in lighting fittings.
1.16. CABLES AND FLEXIBLE CORDS
All cables used in this Sub-Contract shall be manufactured in accordance with the current
appropriate Kenya standard Specification which are as follows:P.V.C. Insulated Cables and Flexible Cords
--Ks 04-192:1988
P.V.C Insulated Armored Cables
---
Ks 04-194:1990
Armoring of Electric cables
---
Ks 04-290:1987
The successful Sub-Contractor will, at the Engineers discretion be required to submit samples
of cables for the Engineers approval; the Engineer reserves the right to call for the cables of
an alternative manufacture without any extra cost being incurred.
P.V.C. insulated cables shall be 500/1000-volt grade. No cables smaller than 1.5mm² shall be
used unless otherwise specified. The installation and the finish of cables shall be as detailed
in later clauses. The color of cables shall conform to the details stated in the “Cable Braid
and insulation Colors” Clause.
30
1.17. ARMOURED P.V.C. INSULATED AND SHEATHED CABLES:
Shall be 600/1000-volt grade manufactured to Ks 04-194:1988 and Ks 04-187/188 with
copper stranded conductors.
The wire armor of the cable shall be used wholly as an earth continuity conductor and the
resistance of the wire armor shall have a resistance not more than twice of the largest current
carrying conductor of the cable.
P.V.C./S.W.A./P.V.C. cables shall be terminated using “Telecom” “B” type or approved
equal or approved equal glands and a P.V.C. tapered sleeve shall be provided to shroud each
gland.
1.18. CABLE SUPPORTS, MARKERS AND TILES
All PVC/SWA/PVC cables run inside the building shall be fixed in rising ducts or on ceilings
by means of die cast cable hooks or clamps, of appropriate size to suit cables, fixed by studs
and back nuts to their channel sections.
Alternatively, fixing shall be by BICC claw type cleating system with die-cast cleats and
galvanized mild steel back straps or similar approved equal method. For one or two cables
run together the cleats shall be fixed a special channel section supports or backstraps described
above which shall in turn be secured to walls or ceilings of ducts by raw bolts.
In excessively damp or corrosive atmospheric conditions special finishes may be required and
the Sub-contractor shall apply to the Engineer for further instructions before ordering cleats
and channels for such areas.
The above type of hooks and clamps and channels or cleats and black-straps shall also be used
for securing cables in vertical ducts.
Cables supports shall be fixed at 600mm maximum intervals, the supports being supplied and
erected under this Sub-contract. Saddles shall not be used for supporting cables nor any other
type of fixing other than one of the two methods described above or other system which has
received prior approval of the Engineer;
Cables are to be kept clear of all pipe work and the Sub-contractor shall work in close liaison
with other services Sub-contractors.
The Sub-Contractor shall include for the provision of fixing of approved type colored slip on
cables end markers to indicate permanently the correct phase and neutral colors on all ends.
Provision shall be made for supplying and fixing approved non-corrosive metal cable markers
to be attached to the outside of all PVC/SWA/PVC cables at 15mm intervals indicating cable
size and distinction.
Where PVC/SWA/PVC cables are outside the building they shall be laid underground 750mm
deep with protecting concrete interlocking cover tiles laid over which shall be provided and
laid under this Sub-contract.
All necessary excavations and reinstatement of ground including sanding or trenches will be
carried out by the Sub-Contractor, unless otherwise stated.
31
1.19. PVC INSULATED CABLES
Shall be of non-braided type as CMA reference 6491 x 600/1000/1000 volt grade cables, or
equal approved.
PVC cables shall conform to the details of the “Cables and Flexible cords” and “Cable Braid
and Insulation Colors” clauses.
1.20. HEAT RESISTING CABLES
Final connections to cookers, water heaters, etc., shall be made using butyl rubber insulated
cable as CMA reference 610 butyl (Single core 600/1000 Volt).
This type of cable shall be used in all instances where a temperature exceeding 100°F, but not
exceeding 150°F is likely to be experienced. Final connections to all lighting fittings (and
other equipment where a temperature in excess of 150°c likely to be experienced) shall be
made using silicon rubber insulated cable or equal and approved.
1.21. FLEXIBLE CORDS
Shall be in accordance with the “Cable and Flexible Cords” clause. No cord shall be less than
24/0.2mm in size unless otherwise specified.
Circular white twin TRS flex shall be used for plain pendant fittings up to 100 watts. For all
other types of lighting fittings, the flexible cable shall be silicone rubber insulated.
No polythene insulated flexible cable shall be used in any lighting fitting or other appliance
(see “Heat Resisting Cables” Clause 30).
1.22. CABLE ENDS AND PHASE COLOURS
All cable ends connected up in switchgear, MCB panels etc;, shall have the insulation
carefully cut back and the ends sealed with Hellerman rubber slip on cable end markers.
The markers shall be of appropriate phase color for switch and all other live feeds to the
details of the “Cable Insulation Colors” clause. Black cable with black end markers shall only
be used for neutral cables.
1.23. CABLE INSULATION COLOURS
Unless otherwise stated in later clauses the insulation colors shall be in accordance with the
following table.
Where other systems are installed the cable colors shall be in accordance with the details
stated in the appropriate clause.
1. SYSTEM
CABLE END
INSULATION COLOUR
MARKER
1) Main and Sub-Main
a) Phase
Red
Red
b) Neutral
Black
Black
32
2) Sub-Circuits Single Phase
a) Phase
b) Neutral
Red
Red
Black
Black
1.24. SUB-CIRCUIT WIRING
For all lighting and sockets wiring shall be carried out in the “looping in” system and there
shall be no joints whatsoever. No lighting circuits shall comprise more than 20 points when
protected by 10A MCB. Cables with different cross-section area of copper shall not be used
in combination.
Lighting circuits P.V.C. cable.
(i)
1.5mm² for all lighting circuits indicated on the drawing.
Power circuits P.V.C cable (minimum sizes).
(ii)
2.5mm² for one, two or three 5Amp sockets wired in parallel.
(iii)
2.5mm² for one 15Amp socket.
(iv)
2.5mm² for maximum of ten switched 13 Amp sockets wired from 30 Amp MCB.
The wiring sizes for lighting circuits and sockets are shown on the drawings. In such cases,
the sizes shown on the drawings shall prevail over the sizes specified.
Wiring sizes for other appliances shall be shown on the drawing or specified in later clauses
of this specification.
1.25. SPACE FACTOR
The maximum number of cables that may be accommodated in a given size of conduit or
trunking or duct is not to exceed the number in Tables B.5 and B.6 or as stated in Regulation
B.91, B.117 and B.118 of the I.E.E Regulations whichever is appropriate.
1.26. INSULATION
The insulation resistance to earth and between poles of the whole wiring system, fittings and
lumps, shall not be less than the requirements of the latest edition of the I.E.E Regulations.
Complete tests shall be made on all circuits by the Sub-contractor before the installations are
handed over.
A report of all tests shall be furnished by the Sub-Contractor to the Engineer. The Engineer
will then check test with his own instruments if necessary.
1.27. LIGHTING SWITCHES
These shall be mounted flush with the walls, shall be contained in steel or alloy boxes and
shall be of the gangs’ ratings and type shown in the drawings. They shall be as manufactured
by M.K. Electrical Ltd., or other equal and approved to KS 04 – 247: 1988
33
1.28. SOCKETS AND SWITCHED SOCKETS
These shall be flush pattern in steel/pvc box and shall be of the gangs and type specified in
the drawings.
They shall be 13- Amp, 3-pin, shuttered, switched and as manufactured by “M.K. Electrical
Co. Ltd.”, or other approved equal to KS 04 – 246:-. FUSED SPUR BOXES
These shall be flush, D.P switched as in steel/pvc box and of type and make specified in the
drawings complete with pilot light and as manufactured by “M. K. Electrical Company Ltd”,
or other approved equal. KS 04 – 247:-. COOKER OUTLETS
These shall be flush mounted with 13-A switched socket outlet and neon indicator Lamps.
The cooker control units shall be as manufactured by “M.K. Electrical Company Ltd”, or other
approved equal KS 04 – 247:-. CONNECTORS
Shall be specified in the drawings and appropriate rating. These shall be fitted at all conduit
box lighting point outlets for jointing of looped P.V.C cables with flexible cables of specified
quality.
1.32. LAMPHOLDERS
Shall be of extra heavy H.O skirted and shall be provided for every specified lighting fitting
and shall be B.C;, E.S;, or G.E.S as required. All E.S. and G.E.S. holders shall be heavy brass
type (except for plain pendants where the reinforced bakelite type shall be used). The screwed
cap of the E.S and G.E.S. holders shall be connected to the neutral.
Where lampholders are supported by flexible cable, the holders shall have “cord grip”
arrangements and in the case of metal shades earthing screws shall be provided on each of the
holders.
The Sub-Contractor must order the appropriate type of holder when ordering lighting fittings,
to ensure that the correct types of holders are provided irrespective of the type normally
supplied by the manufacturers.
1.33. LAMPS
All lamps shall be suitable for normal stated supply voltage and the number and sizes of lamps
detailed on the drawings shall be supplied and fixed. The Sub-Contractor must verify the
actual supply voltage with the supply authority before ordering the lamps.
Tungsten filament lamps shall be manufactured in accordance with KS 04 – 112:1978 for
general service lamps and KS 04 – 307:1985 for lamps other than general services. Tubular
fluorescent lamps shall comply with KS 04 – 464:1982
Pearl lamps shall be used in all fittings unless otherwise specified.
34
1.34. LIGHTING FITTINGS AND STREET LIGHTING LANTERNS
This Sub-Contract shall include for the provision, handling charges, taking the delivery, safe
storage, wiring (including internal wiring) assembling and erecting of all lighting fittings
shown on the drawings.
All fittings and pendants shall be fixed to the conduit boxes with brass R/H screws. These to
be in line with metal finish of fittings. The lighting fittings are detailed for the purpose of
establishing a high standard of finish and under no circumstances will substitute fittings be
permitted.
In case of rectangular shaped ceiling fittings, the extreme ends of the fittings shall be secured
to suitable support in addition to the central conduit box fittings. Supports shall be provided
and fixed by the Sub-Contractor.
The whole of the metal work of each lighting fittings shall be effectively bonded to earth. In
the case of ball and/or knuckle joints short lengths of flexible cable shall be provided, bonded
to the metal work on either side of the joints. If the above provisions are not made by the
manufacturers -, the Sub-contractor shall include cost of additional work necessary in his
tender. See “Flexible Cords” clause for details of internal wiring of lighting fittings. Minimum
size of internal wiring shall be 20/0.20mm (23/0067). Each lighting fitting shall be provided
with number type and size of lamps as detailed on the drawings. It is to be noted that some
fittings are suspended as shown on the drawings.
Where two or more points are shown adjacent to each other on the drawings, e.g socket outlet
and telephone outlet, they shall be lined up vertically or horizontally on the centre lines of the
units concerned.
Normally, the units shall be lined up on vertical centre lines, but where it is necessary to mount
units at low level they shall be lined up horizontally.
1.35. POSITIONS OF POINTS AND SWITCHES
Although the approximate positions of all points are shown on the drawings, enquiry shall be
made as to the exact positions of all M.C.B panels, lighting points, socket outlets etc, before
work is actually commenced. The Sub-contractor must approach the Architect with regard to
the final layout of all lights on the ceiling and walls.
The Sub-contractor must consult with the Engineer in liaison with the Clerk of Works, or the
General Foreman on site regarding the positions of all points before fixing any conduit etc.
The Sub-Contractor shall be responsible for all alterations made necessary by the noncompliance with the clause.
1.36. STREET/SECURITY OUTDOOR LIGHTING COLUMNS:
The column shall be at a minimum of 225mm in the ground on 75mm thick concrete
foundations and the pole upto 150mm shall be surrounded with concrete. The top bracket and
plain section of the columns shall be common to and interchangeable with all brackets with
maximum mismatching tolerance of 3mm between any pole and bracket. After manufacture
and before erection the columns shall be treated with an approved mordant solution which
shall be washed off and the whole allowed to dry. Thereafter, the columns shall be painted
with one undercoat and two coats of gloss paint to an approved colour. All columns shall be
complete with fused cut-outs.
35
1.37. TIMING CONTROL SWITCH
These shall be installed where shown on the drawings. Photocell timing control circuits which
will operate ‘on’ with a specified level of darkness and ‘off’ with a given level of light. The
initial adjustment will be done with approval of the Electrical Engineer.
1.38. WIRING SYSTEM FOR STREET LIGHTING
Cables shall be as indicated on the drawings, and shall be laid in a cable trench 450mm deep
along the road sides and 600mm deep across the roads and 900mm away from the road kerb
or 1500mm away from the edges of the road. ‘Loop-in’ and ‘Loop-out’ arrangement shall be
used at every pole. Wiring to the lanterns on each pole shall be with 1.5mm² PVC twin
insulated and sheathed cable with earth wire shall be laid at least 600mm below the finished
road level on a compact bed of murram at least 50mm thick and covered with a concrete
surrounded 150mm thick.
1.39. METAL CONTROL PILLAR
These shall be metal clad and fabricated as per contract drawings and specification. The SubContractor shall supply, install, test and commission control pillars including supplying, fixing
connecting switchgears as detailed on the appropriate drawings.
1.40. CURRENT OPERATED EARTH LEAKAGE CIRCUIT BREAKER
Current operated earth leakage circuit breaker shall conform to B.S.S. 4293:68 rated at 240
volts D.P. 50 cycles A.C. Mains.
The breaker shall be provided with test switch and fitted in weather proof enclosure for surface
mounting. The rated load current and earth fault operating current shall be as specified in the
drawings. These shall be as manufactured by Crabtree, Siemens or other equal and approved.
1.41. M.V. SWITCHBOARD AND SWITCHGEAR
The switchboard shall be manufactured in accordance with KS04-226 which co-ordinates the
requirements for electrical power switchgear and associated apparatus. It is not intended that
this K.S. should cover the requirements for specified apparatus for which separate Kenyan
Standard exist. All equipment and material used in the switchboard shall be in accordance
with the appropriate Kenya Standard.
The switchboard shall comprise the equipment shown on the drawings together with all
current transformers, auxiliary fuses, labels, small wiring and interconnections necessary for
the satisfactory operation of the switchboard.
The Switchboard shall be of the flush fronted, enclosed, metal clad type with full front or rear
access as called for in the particular specifications, suitable for indoor use, sectionalized as
necessary to facilitate transport and erection. The maximum height of the switchboard is to
be approximately 2.0 metres. A suitable connection chamber containing all field terminals
shall be provided at the top or bottom of the switchboard as appropriate.
Before manufacture, the Sub-Contractor shall submit to the consulting Engineer for approval
of detailed drawings showing the layout, construction and connection of the switchboard.
All bus-bars and bus-bar connections shall consist of high conductivity copper and be
provided in accordance with KS 04-226: 1985. The bus-bars shall be clearly marked with the
appropriate phase and neutral colours which should be red, yellow, blue for the phases and
36
black for neutral. The bus-bars shall be so arranged in the switchboard that the extensions to
the left and right may be made in the future with ease should the need arise.
Small wiring, which will be neatly arranged and cleated, shall be executed in accordance with
B.S. 158 and the insulation of the wiring shall be coloured according to the phase or neutral
connection.
Switches and fuse switches, shall be in strict accordance with KS04-183:1978 Class 2
switches. Means of locking the switch in the “OFF” position shall be provided.
All fuse switches shall comply with KS04-183:1978, PARTS 2 and 3 a fault rating at least
equal to the fault rating of the switchboard in which they are installed. Cartridge fuse links to
KS 04-183:1978 category A.C. 46, class Q1 and fusing factor not exceeding 1.5 shall be
supplied with each fused switch.
Mounting arrangements shall be such that individual complete fuse switches may be
disconnected and withdrawn, when necessary, without extensive dismantling work.
When switches are arranged in their formation all necessary horizontal and vertical barriers
shall be provided to ensure segregation from adjacent units. Means of locking the switch in
the “OFF” position shall be provided.
1.42. STEEL CONDUITS AND STEEL TRUNKING
Conduits shall be of heavy gauge class “B” welded to Standard specification KS 04-180:1985.
In no case will conduit smaller than 20mm diameter be used on the works. Conduits installed
within buildings shall be black enamelled finish except where specified otherwise. Where
installed externally or in damp conditions they shall be galvanised. Conduit fittings,
accessories or equipment used in conjunction with galvanised conduits shall also be
galvanised or otherwise as approved by the service engineer.
Metal trunking shall be fabricated from mild steel of not less than 18 swg. All sections of
trunking shall be rigidly fixed together and attached to the framework or fabric or the building
at intervals of not less than 1.2m. Joint trunking shall not overhang fixing points by more than
0.5m.
All trunking shall be made electrically continuous by means of 25 x 3mm copper links across
each joint and where the trunking is galvanised, the links shall be made by galvanised flat iron
strips.
All trunking fittings (i.e. Bends, tees, etc) shall leave the main through completely clear of
obstructions and continuously open except through walls and floors at which points suitable
fire resisting barriers shall be provided as may be necessary. The inner edge of bends and tees
shall be chamfered where cables larger than 35mm² are employed.
Where trunking passes through ceilings and walls the cover shall be solidly fixed to 150mm
either side of ceilings and floors and 50mm either side of walls.
Screws and bolts securing covers to trunking or sections of covers together shall be arranged
so that damage to cables cannot occur either when fixing covers or when installing cables in
the trough.
Where trunking is used to connect switchgear of fuseboards, such connections shall be made
by trunking fittings manufactured for this purpose and not by multiple conduit couplings.
37
Where vertical sections of trunking are used which exceed 4.5m in length, staggered tie off
points shall be provided at 4.5m intervals to support the weight of cables.
Unless otherwise stated, all trunking systems shall be painted as for conduit.
Where a wiring system incorporates galvanised conduit and trunking, the trunking shall be
deemed to be galvanised unless specified otherwise.
The number of cables to be installed in trunking shall be such as to permit easy drawing in
without damage to the cables, and shall in no circumstances be such that a space factor of 45%
is exceeded.
Conduit and trunking shall be mechanically and electrically continuous. Conduit shall be
tightly screwed between the various lengths so that they butt at the socketed joints. The
internal edges of conduit and all fittings shall be smooth, free from burrs and other defects.
Oil and any other insulating substance shall be removed from the screw threads; where
conduits terminate in fuse-gear, distribution boards, adaptable boxes, non-spouted
switchboxes, etc., they shall, unless otherwise stated, be connected thereto by means of
smooth bore male brass bushes, compression washers and sockets. All exposed threads and
abrasions shall be painted using an oil paint for black enameled tubing and galvanizing paint
for galvanised tubing immediately after the conduits are erected. All bends and sets shall be
made cold without altering the section of the conduit.
The inner radius of the bed shall not be less than four (4) times the outside diameter of the
conduit. Not more than two right angle bends will be permitted without the inter-position of
a draw-in-box. Where straight runs of conduit are installed, draw-in-boxes shall be provided
at distances not exceeding 15mm. No tees, elbows, sleeves, either of inspection or solid type,
will be permitted.
Conduit shall be swabbed out prior to drawing in cables, and they shall be laid so as to drain
of all condensed moisture without injury to end connections.
Conduits and trunking shall be run at least 150mm clear of hot water and steam pipes, and at
least 75mm clear of cold water and other services unless otherwise approved by the services
engineer.
All boxes shall conform to KS 04 – 668: 1986, to be of malleable iron, and black enamelled
or galvanised according to the type of conduit specified. All accessory boxes shall have
threaded brass inserts.
Box lids where required shall be heavy gauge metal, secured by means of zinc plated or
cadmium plated steel screws.
All adaptable boxes and lids of the same size shall be interchangeable.
Boxes used on surface work are to be tapped or drilled to line up with the conduit fixed in
distance type saddles allowing clearance between the conduit and wall without the need for
setting the conduit.
Where used in conjunction with mineral insulated copper sheathed cable, galvanized boxes
shall be used and painted after erection.
Draw-in boxes in the floors are generally to be avoided but where they are essential they must
be grouped in positions approved by the services engineer and covered and by the suitable
floor traps, with non-ferrous trays and covers.
38
The floor trap covers are to be recessed and filled in with a material to match the floor surface.
The Sub-contractor must take full responsibility for the filling in of all covers, but the filling
in material will be supplied and the filling carried out by the main building contractor.
Where buried in the ground outside the building the whole of the buried conduit is to be
painted with two coats of approved bitumastic composition before covering up.
Where run on the surface, unpainted fittings and joints shall be painted with two coats of oil
bound enamel applied to rust and grease free metalwork.
1.43. TESTING ON SITE
The Sub-contractor shall conduct during and at the completion of the installation and, if
required, again at the expiration of the maintenance period, tests in accordance with the
relevant section of the current edition of the Regulations for the electrical equipment of
buildings issued by the I.E.E of Great Britain, the Government Electrical Specification and
the Electric Supply Company’s By-Laws.
(a)
Tests shall be carried out to prove that all single pole switches are installed in the ‘live’
conductor.
(b) Tests shall be carried out to prove that all socket outlets and switched socket outlets are
connected to the ‘live’ conductor in the terminal marked as such, and that each earth pin
is effectively bonded to the earth continuity system. Tests shall be carried out to verify
the continuity of all conductors of each ‘ring’ circuit.
(c) Phase tests shall be carried out on completion of the installation to ensure that correct
phase sequence is maintained throughout the installation. Triplicate copies of the results
of the above tests shall be provided within 14 days of the witnessed tests and the Subcontractor will be required to issue to the service engineer the requisite certificate upon
completion as required by the regulations referred to above.
(d) Any faults, defects or omissions or faulty workmanship, incorrectly positioned or installed
parts of the installation made apparently by such inspections or tests shall be rectified by
the Sub-contractor at his own expense.
(e) The Sub-contractor shall provide accurate instruments and apparatus and all labour
required to carry out the above tests. The instruments and apparatus shall be made
available to the services engineer to enable him to carry out such tests as he may require.
(f) The Sub-contractor shall generally attend on other contractors employed on the project
and carry out such electrical tests as may be necessary.
(g) The Sub-contractor shall test to the services engineer’s approval and as specified
elsewhere in this specification or in standards and regulations already referred to, all
equipment, plant and apparatus forming part of the works and before connecting to any
power or other supply and setting to work.
(h) Where such equipment, etc., forms part of or is connected to a system whether primarily
or of an electrical nature or otherwise (e.g. air conditioning system) the Sub-contractor
shall attend on and assist in balancing, regulating testing and commissioning, or if
primarily an electrical or other system forming part of works, shall balance, regulate, test
and commission the system to the service engineer’s approval.
39
APPENDIX TO GENERAL SPECIFICATIONS OF MATERIALS AND WORKS
The electrical sub-contractor shall comply with the following: 1. Government Electrical Specifications No. 1 and No. 2.
2. All requirements of Kenya Power Company Limited, and Communications Authority of Kenya (CA).
40
B. PARTICULAR SPECIFICATIONS FOR ELECTRICAL WORKS
1.00
SITE LOCATION
The site of the proposed works is at Hyrax Hill Pre-historic site, Nakuru.
2.00
SCOPE OF WORKS
The works to be carried out under this sub-contract comprise supply, installation, testing and
commissioning of the following: a)
3.00
Electrical Works
This shall include conduiting, cabling, fittings and accessories.
MATERIALS FOR THE WORKS
Materials shall be as specified in General Specifications and in the Bills of Quantities of this
document which shall be read in conjunction with contract drawings. Alternative materials shall
be accepted only after approval by the Project Manager.
MINIMUM TECHNICAL SPECIFICATIONS FOR LED LAMPS/ LIGHTING FITTINGS
LED TUBES, PANELS & BULBS LIGHT FITTING
TECHNICAL SPECIFICATIONS
IEC Compliant
Item
Minimum Specifications
Proposed solution
Brand
State the brand, model and attach Technical
Brochure (Mandatory)
Operating
➢ Voltage range: 130-300 V ac
➢ Frequency range: 50-60Hz
➢ Power factor ≥ 0.9 lagging
➢ Total Harmonic Distortion (THD)<15%
➢ Ambient temperature range -10 to +35
°Operating
➢ Colour Consistency ≤ 5SDCM
Performance
Standards
Compliance
➢
➢
➢
➢
System efficacy ≥= 100lm/W
Lamp colour temperature: 4000K - 6500K
Colour Rendering Index >=80
Median useful life >= 30000 h
CB/EMC/CE
➢ Driver/power unit/transformer - PSU-E
General
➢ Optical cover/lens type
bowl/cover prismatic
-
Polystyrene
➢ Protection class IEC - Safety class II (II)
41
C. PARTICULAR SPECIFICATIONS FOR SOLAR INSTALLATION WORKS
1.00
LOCATION OF SITE
The site for the proposed Contract Works is at Hyrax Hill Pre-historic site,
Nakuru.Kenya.
2.00
MINIMUM REQUIREMENTS
This specification defines minimum requirements, but tenderers who offer superior
facilities will be considered. Any tender which does not comply with the minimum
requirements will be rejected.
3.00
BATTERY BANK
Each battery in the battery bank shall be Lead Acid battery of the flooded type. The
Electrolyte shall be Concentrated Sulphuric Acid while the anode (Positive) plate
shall be a grid type with each grid holding lead oxide paste as the active
electrochemical ingredient and the grid mesh made of pure lead as current conductor
to the terminal. The Cathode (negative) plate shall be of similar construction with the
plate being of pure lead paste. Several parts of positive and negative plates the
minimum being suitably interlinked shall form a cell. The battery shall be composed
of minimum six cells all interlinked with positive plate connected to negative plates
and all terminations of positive and negative plate brought to single termination of
positive and negative respectively.
Each battery shall have a voltage rating 12 V as specified and have a rated charge
capacity of 200Ampere Hour as specified when fully charged. Each battery shall be
of such construction that during its operation its rate of discharge shall reach a
minimum of 80% within 1seconds and 100% within 10 seconds respectively, when
operated on full load.
The batteries shall be long lasting, maintenance free and capable of a 3 year optimal
operation with little or no change of Electrolyte. The number of batteries in the bank
shall be predetermined taking into consideration the load requirement, climatic factor,
Electricity supply panel’s specification, and the type of battery to be supplied. The
tenderer is required to supply batteries as specified.
4.00
SOLAR PANEL
Each panel shall be capable of providing maximum power output at maximum solar
input (at midday). The minimum power output at the lowest level of sunlight (sunset
or cloudy weather) shall not be below the specified output.
All panels shall be fixed securely on a platform as shown in Drawings showing the
position, and layout of the panel. They shall be installed tilted at the specified angle
designed for maximum sunlight at the lowest point and such that the entire sun rays
are approximately directly perpendicular to the panel throughout the day.
5.00
CONDUIT AND TRUNKING
42
All cables shall be drawn in Heavy gauge PVC conduit concealed in the fabrics of the
Building or in Trunking. The conduit runs shall be close from the distribution point to
the lighting or power point. The minimum size of conduit shall be 20mm and
maximum 32mm.
Not more than two right angle bends shall be allowed in any conduit run without a
draw box. Conduit runs shall terminate on boxes for switches and socket outlets or
circular boxes for lighting points.
Terminal boxes with knockouts shall be terminated to the conduit by means of PVC
Half Threaded couples with smooth male bushes. Circular Boxes with insitu sprout
shall be terminated to the conduit by means of adhesive as Ega weld or equivalent.
Conduit work including all accessories must be installed first before wiring
commences. The conduit shall be free from moisture, burrs, and debris. Where single
cables of the opposite poles are to run in the same direction they should not be drawn
in the same conduit while cables from another pole shall be segregated and drawn in
separate conduit and these conduit runs shall be installed parallel up to the conduit
and Trunking .The distribution board, conduit system shall be separate from KPLC
supply system but the installation shall be similar to AC system.
All cabling and associated ancillary equipment shall be selected and installed in
accordance with the general requirements of KS 662(Kenya wiring Regulations).
6.00
ISOLATORS
Modules shall be arranged and interconnected to form an array. Each has inbuilt diode
to prevent reverse current flowing to any of the module. Each Array shall have an
isolator separating the array from each additional array or string of series connected
modules.
The drawing indicates the position of the isolators among the arrays of modules. At
the isolator point the open circuit voltage (VOC) and short circuit current (ISC) for
each array can be measured. Both positive and negative poles of each shall be
simultaneously isolated.
The isolator shall be of quick make and break time to avoid appreciable arcing at the
terminals of the isolator. The contactors of the isolator shall be of copper alloy heat
resistant type. All live and neutral terminals shall be shrouded and terminals firmly
supported by appropriate insulation material (porcelain Bakelite etc). The isolator
shall be rated to isolate currents not exceeding its maximum operating isolator
current. (e.g 30A rated DC current to isolate 30A maximum current).
The isolator shall conform to KS IEC 60947 – 3:1999 (Specification for Low-Voltage
switchgear and control gear) specifications and requirements.
7.00
CABLES
The DC cable length from the panel to the battery or inverter or distribution point
shall be as short as possible. It should be noted that the short circuit current from a
PV module is limited by the internal resistance of the module and is only slightly
higher than the normal operating current so fuses are of little use in protecting
43
apparatus, cables, distribution, lighting points or power points supplied from the
modules directly. Thus, when short circuit occurs in such a system it can continue
undetected for a long time as long as the panel is exposed to light and can cause fire.
Precaution must be taken to ensure safety for the installed solar system.
Minimum lengths of DC cable shall ensure low cost and low voltage drop. The
installation shall be ground fault proof and short circuit proof.
Cables from the modules shall be drawn into conduits and terminated at Distribution
Board terminal Blocks. Cables from the batteries shall also be linked to this cable at
the terminal blocks. From the distribution board short lengths of cable shall supply a
Consumer Unit. All lighting points and power points final sub-circuits shall be from
this consumer unit. All final sub-circuits shall have isolator switches at the start of the
final sub-circuit.
All cables conduits, junction boxes need to be suitable for environment and load
carried. Where the cables are to run outdoor, they shall be resistant to chemical and
ultraviolet (UV) light and when run in wet places or dump atmosphere, they shall be
marine type of cables. The cables shall be protected against sunlight and mechanical
damage.
The size and type of the cable shall be such as to operate and withstand the operating
temperature range, to withstand the rated current and have acceptable voltage drop.
Single core cable with non-metallic sheath shall be drawn as a bunch with negative
and positive drawn in the same conduit. Single core cables with basic insulation shall
be drawn singularly in conduit.
Cables with basic insulation only and earth screened shall be drawn singularly
together with cables of the same poles in the same conduit. Cables of opposite pole
shall not be drawn in those conduits but segregated and drawn in separate conduits
The cable size shall be such as to comply with requirements of IEC 60304 and KS 04
187 -1987 (Specification for conductors of insulated cables, 2nd Edition) specification
for conductors for nominal cross –section 0.5 mm sq. to 2000mmsq., which also
specifies resistance value of conductors as well as flexible cord.
The number of junctions and interconnections in the final circuit shall be as low as
possible. AC cables shall be run or drawn in separate conduits or ways. AC cables
shall have different coloring of the insulation from DC. The color scheme of
insulating materials of various cables is shown in the drawing. All cable conductors
shall be of copper unless otherwise specified.
The current carrying capacity of a cable is largely determined by operating
temperature range shall be 25ºC to 65ºC.Wiring system components including cables
and wiring accessories shall be handled only at temperatures within the limits stated
in the relevant product specification or as given by the manufacturers.
Cables used for string wiring must be selected taking into account higher ambient
temperatures than other cables at temperatures behind the modules may exceed
44
80ºC.The voltage drop from the array to inverter or Distribution board shall not
exceed 2.5% of the nominal voltage at the Distribution board or inverter.
8.00
PHOTO-VOLTAIC ARRAY
The Photovoltaic (PV) cell shall either be of the three types:
a)
Mono crystalline silicon – made using a slice from a single crystal of silicon
b) Polycrystalline silicon cell made from silicon cast in a mould and cells are
larger than above
c)
Thin film amorphous silicon deposited as coating only a few microns thick.
The installer shall state the type of cell the PV module is made from. Each solar panel
shall be composed of silicon cell of size 100mm x 100mm capable of producing 3A at
0.5volts in bright sunshine (1.5watts). These cells are then interconnected in series to
make a module panel. It is preferred that each panel shall have a minimum of 36 cells
while a panel of 72 cells shall be of added advantage (more power).
The cells are protected by encapsulating them between a transparent front cover and a
backing sheet to form a PV module. The front cover shall be of low-iron toughened
glass and the backing sheet shall be glass or an opaque material. The cells shall be
hermetically sealed using silicon (for transparent module or ethylene vinyl acetate
(EVA) – (This sandwich is called a laminate)
A flexible PV can be produced by encapsulating the cells in plastic material, the cell
being made of amorphous silicon. The module or laminate sheet can either be framed
to form framed modules or remain unframed (laminates) or constructed as to be Roof
tile or cladding of a building. The PV shall either be opaque type semi – transparent –
with cells sandwiched between two sheets of glass and spaced to allow light through
between the cells.
Or
Be translucent (of amorphous cell which are pervious to or allows light to diffuse
through. Cells shall either be blue or black in color for better efficient light to power
conversion. Note colored cells reflect more light.
Panels shall be tested under Standard Test Conditions (STC) at 1000W/ M² at air
mass of 1.5KG/M3 and cell temperature of 25ºC. The result shall be presented in a
current/voltage curve or graph.
The nominal peak power for each module as measured in the test in watts peak (WP)
shall not be below 16 – 18 Volt range.
Each module shall have at its output terminals Blocking diodes connected in series
with a string to protect the module from reverse current flow from either the adjacent
module or battery bank.
45
The panels shall be protected from lightning and surges. The surge protecting devices
shall be Circuit Breakers, fuses or surge diverters installed at the final output of PV
array. It shall protect the array from reverse surges from battery bank or inverters.
Bypass diodes may be placed around a module that is likely to have localized shading.
It provides a current path around such a shaded module.
9.00
SOLAR RADIATION
Though Geographical location determines the performance of the solar Energy, the
installer shall ensure his panels are properly installed tilted appropriately and oriented
such as to maximize receipt of solar radiation.The tilt and orientation shall ensure at
least 90% of the maximum energy is received by the panels.
10.00 SHADING
Shading is unethical and shall be avoided as much as possible. Shading results in
significant loss of energy from the panels.
11.00 MISMATCH
All cells in the module must have similar characteristic. Similarly, all modules must
have similar characteristic as poor-quality modules leads to significant loss of energy
since the inferior module determines the current.
12.00 TEMPERATURES
Any radiation not converted into electricity is converted to heat. The waste heat can
cause temperatures around the modules to rise. At 90ºC EVA encapsulate will be
damaged. The panel shall be installed raised at least 150mm above roof, façade etc to
allow for natural ventilation of the panel both on the front side and the back side.
The efficiency of the PV cells drops significantly as the temperature of the cell rises:
▪ 0.45% for every degree rise in temperature for mono crystalline silicon
▪
It is less for amorphous silicon cell – 0.25%. Care shall be taken to ensure the
panels are well ventilated and where this cannot be achieved naturally then
mechanical ventilation shall be provided.
13.00 CLEANLINESS
The panels shall be installed tilted to reduce dust accumulation and allow for self
cleaning. Tilt angle should be selected to optimize the energy collection during the
worst month i.e the month with the lowest ratio of monthly mean daily irradiation to
the monthly man daily load. Generally, the following formula shall be used.
Tilt (degrees)|Ø| + 150;0} where Ø is the latitude of the installation
Dust may cause power reduction of about 10%.Tilts also allow for rain cleaning of the
panels. However the panels shall be cleaned every month during the 6 months liability
period.
46
14.00 DISTRIBUTION BOARD – NON-INVERTER SYSTEM
The Distribution Board shall be suitable for DC current application with high rapture
cartridge (HRC) fuses installed to offer class 1 protection. The rating of each fuse
shall be equal to the current rating of the final circuitcable it protects.
The supply cable from the PV array to the Battery bank and from the battery bank a
sub-main cable of the size shown in the drawing shall supply the distribution board.
Isolators shall be placed immediately at termination point of the array and another
isolator shall be placed between the Battery Bank and the Distribution board.
15.00 WIRING
The live conductor of the final circuit for lighting point or power point shall emanate
from one way of the Distribution board, protected by HRC fuses and looped to
switches as switch line. From the switches, the live conductor shall be looped to
various lighting points controlled by the switch.
For Ring Main power points the Final circuit shall originate from one way of the
Distribution board protected by HRC fuses, looped in each socket outlet and return to
the same way thus making a ring circuit.
For lighting point the neutral conductor shall be drawn in separate conduit and looped
directly to the terminal of each lighting point controlled by several switches.
For Ring main power points, the neutral conductor shall be looped in similar way to
the live conductor.
16.00 INVERTER
Where the PV array are to generate and supply DC power which is to be converted to
AC before utilization, then the supply cable from the PV array shall be terminated to
an inverter or inverters through DC isolator/Isolators.
The inverter shall have in built maximum power point tracker (MPPT) which varies
the input voltage to try and ensure that it operates close to maximum power point
(MPP).
The Inverter shall be protected by Surge Arresters and input over voltage relay or
circuit breakers. The Inverter shall be a power conditioning unit (PCU) which covert
the DC power to AC power and associated control and protection equipment.
One of the two types of Inverters shall be installed: a) Line commutated – This a single inverter where the PV array are connected. Care
must be taken to improve the power factor and harmonics.
b) Self-commutated- This type uses their own internal switching (pulse width
modulated (PWM).
47
All shall comply to electromagnetic compatibility BS EN 50081 standard and Generic
emission standard as well as BS EN- INVERTER PROTECTION
Inverter shall be protected from PV by either;
a) Surge protectors.
b) Circuit Breakers placed between the PV and Inverter.
c) Over-voltage protection between the PV and Inverter to protect the inverter against
voltage higher than the rated input.
18.00 PV SYSTEM WITH BATTERY BANK
Where the Battery Banks shall be the source of Solar Energy after being charged by
PV array, the installation for Distribution of the power supply shall be as follows:From the battery bank the sub-main supply cable shall be drawn in Heavy gauge PVC
conduits or in trunking as described in clause 2.06 and the cables shall terminate at
suitable DC fuse board specified below. The cable shall be protected by a suitable
Double pole switch fuse of rating as specified in the drawings. The minimum supply
voltage shall be 50V and maximum 150V.
19.00 DISTRIBUTION BOARD – INVERTER SYSTEM
The Distribution shall have adequate ways for Distribution to the various final subcircuits. The minimum number ways shall be 4 ways. Power points shall be supplied
from final sub-circuits that are separate from Lighting point final sub-circuit.
Each lighting final circuit shall be protected by an appropriately rated protective
device to the total current demand of lighting fittings supplied by the circuit.
Each socket outlets final circuit shall also be protected by a protective device rated at
30A/32A for ring final sub-circuit. However the rating of Radial power point final
circuit shall depend on the power requirement of the appliance, apparatus or
equipment it is supplying.
The power requirement of the whole installation has been predetermined and no
additional lighting points, appliances, or apparatus or equipment shall be added as
load to the installation.
20.00 LIGHTING POINTS FINAL CIRCUIT
Live conductors shall be looped to switches controlling lighting points while neutral
conductors shall be looped to each light fitting supplying the final sub-circuit. See
drawing showing the recommended wiring system of DC supply. No termination of
cables shall be allowed in junction boxes, inspection boxes etc and all pointing,
termination, looping shall be at the either the switch terminals, or lighting fitting
terminals.
48
Lighting point supply cable from the switch shall be drawn in separate or same
conduit as the switch supply (switch line) and shall terminate at the lighting point.
The installation shall be such that no terminals at the lighting point shall be “Live”
when the switch is on “off” position.
21.00 RADIAL FINAL CIRCUIT
All cables in the Radial final circuit shall be of basic insulation or insulated and
sheathed copper conductor of appropriate current rating at supply voltage (50-150V).
The rating of the cable shall not be less than the current demand of the equipment
apparatus alliance, etc being supplied by the cable.
All the cables, neutral and live shall be drawn as described in clause 2.06. The
conduit shall terminate at the conduit box where the socket outlet, fused spur, or a
connection plate with cord outlet shall be fixed.
22.00 RING FINAL CIRCUIT
The installation shall be similar to the Radial final circuit except the live and neutral
cable will leave one way from Distribution Board looped at each power point and
return to the same way.
23.00 EARTHING – BATTERY BANK SYSTEM
All switches, socket outlets including their boxes, that are metallic shall be bonded to
an earth protective conductor. All metal enclosure of protective switchgear shall be
bonded to the earth continuity conductor.
The supporting structure for the PV array shall also be bonded to earth continuity
conductor when the PV system is framed with metallic frame, unless the PV is double
insulated in accordance with the current edition of “Requirements of Electrical
Installations” (IEE Regulations).
The output of the array under any circumstance shall not be connected to earth
continuity conductor. The neutral conductor shall not be connected to earth
continuity conductor in a Battery Bank supply system.
The earth continuity conductor shall be drawn in separate conduit from line and
neutral conductors if it is of basic insulation, and in the same conduit if it is insulated
and sheathed. At the Distribution board all earth continuity conductors shall be
terminated on an Earth bus-bar in the same sequence as that of the live and neutral
conductors of the final circuit which the earth continuity conductor is part.
Earth lead shall be drawn in a separate conduit concealed in the fabric of the building
and terminate at Earth Inspection Chamber.
The earth lead shall be as per the current edition of “Requirements of Electrical
Installations” (IEE Regulations). The earth lead shall be clamped to the copper earth
electrode rod to be driven to the ground. The Earth Inspection Chamber shall be
special purpose concrete construction minimum size 300mm x 300mm as shown in
the drawing.
49
24.00 EARTHING –INVERTER SYSTEM
The normal AC earthing method shall be followed when the system is an inverter
type. Earthing shall be in accordance to Requirements of Electrical Installations.
50
MINIMUM TECHNICAL SPECIFICATIONS FOR SOLAR POWER FITTINGS
A. INVERTERS-850W
Item-
Minimum Specifications
Rated Continuous Output
850W Pure sine wave for
power –
Power Inverter
Surge Power Capability
200% of rated continuous
Power
Peak Efficiency (Minimum)
85%
Frequency
50HZ
Nominal Input voltage
24VDC
Output Voltage Range
220 - 240V AC (RMS)
Output Voltage Regulation
+/- 5%
Battery low shut down
(10.5+/-0.5) VDC
Protection (electrical)
Overload and short circuit
Low battery disconnect
Power factor capability
-1 to +1
Charging algorithm of
Constant voltage
charger
Charger input voltage range
200V to 250V AC
Minimum rated Charging
20A
Current
Guarantee
5 years
51
Proposed Solution
B. CHARGE CONTROLLER
Item
1
Main features
2
3
4
Minimum Specifications
Series or Shunt type,
constantvoltage, pulse width modulation (PWM)
charging, with battery type
(sealed/gel
and flooded lead acid)
selection provision and
temperature compensation.
Nominal Voltage
24V DC
Rated solar charging current
As per description in the
Bills
of Quantities
Earthing
Negative earth
Item
5
Metering
6
7
8
9
10
Minimum Specifications
Digital metering for
currents
and voltages
Operating temperature
40 to + 60o C
Protection
Reversed polarity
protection,
Overload and short circuit
protection, lightning and
transients surge protection,
Night reverse current
protection (blocking diode
or equivalent.)
Self- Consumption
0.5% (Maximum) of rated
current
Status Indicators (minimum)
Charging and low battery
visual
indicators
Guarantee
5 years
52
Proposed Solution
Proposed Solution
C. STORAGE BATTERIES - 12V/200AH
Item
1
Rated capacity
2
3
Minimum Specifications
As per Description in the Bills
of
Quantities
4
Deep Cycle
Discharge rate to 1.75V/Cell for
the
Specified Capacities
Battery Type
5
6
7
Plate type
Electrolyte
Nominal Voltage
8
Minimum Cycle Life
9
Casing material
10
11
Minimum charge retention
Monthly self-discharge ratio
Proposed Solution
Maximum 20 Hours
Dry sealed batteries
(Maintenance
Free)
Flat plate or Tubular acceptable
Gel Type
12V. Supply may be in 12V or
6V
mono-blocks
1,500 cycles at 50% daily
depth of
discharge
Polypropylene or similar
translucent/transparent case
60% in 8 months
<3%
D. SOLAR PV MODULES- 575W
Item
Minimum Specifications
1
Cell type
Mono crystalline
2
Originality Verification
Barcode or Serial number
System
with batch number
3
Solar cells encapsulated in EVA (ethylene-vinyl acetate); antireflection coating; Module on the front side protected by
tempered, highly translucent glass.
4
Dimensions
2385x1122x35mm
5
Weight
30.3kg
6
Glass-foil laminated in anodized aluminum-frame
7
Wind load certification 0.024 bars
8
Front glass
High transmission, low iron,
Tempered glass
9
Weather resistant Junction box with 3 Bypass-diodes on the
backside of the modules with protection class min. IP 65
53
Proposed Solution
10
-
30
31
32
Wiring of the modules with pin-and-socket connector
according
to EN 50521
Quantity of cells
156 (2x78)
Temperature coefficient PMAX: <=-0.35%/C
Temperature coefficient Voc:
<=-0.28%/C
Temperature coefficient Isc:
<=0.048%/C
Operating temperature range:
-0°C < =T< =45 °C
Nominal operating cell
45+/- 2 °C
temperature (NOCT)
Module efficiency
at STC-conditions > 21.49%
Current at maximum power
12.88A
point (A) (maximum)
Voltage at maximum Power
44.67V
Point (V) (minimum)
Open Circuit voltage (Voc)
53.20V
Short circuit current (Isc)
13.74A
Minimum rating
575W
10 years product warranty
25 years linear performance guarantee (90% up to 12 years and
80% up to 25 years)
CE- conformity, DVE GS, TUV quality certified for product
Horizontal and vertical assembly possible
High Mechanical load (acc. IEC 61215 (5400Pa superimposed
load and 2400Pa suction load))
Pre-cabled with MC4 Plug –connectors (IP 67)
Nominal power at IEC-Conditions (radiation 1000W/m2, AirMass 1.5 25°C)
Product
certification
Protection class
Salt mist
corrosion test
IEC 61215 (Ed.2)
II/ IEC 61730
IEC 61701 (Ed. 2)
1.0 BROCHURES AND TECHNICAL LITERATURE
Tenderers must enclose together with their submitted bids brochures detailing technical Literature and
specifications of the active components of the access control system. The brochures shall be used to
evaluate the suitability of these components. Any bid submitted without the brochures shall be
considered technically non-responsive, and may subsequently be disqualified.
54
SECTION III – TECHNICAL SCHEDULE
1. The technical schedule shall be submitted by tenderers to facilitate and enable the Project
Manager to evaluate the tenders, especially where the tenderer intends to supply or has based
his tender sum on equipment which differs in manufacture, type or performance from the
specifications indicated by the Project Manager.
2. The filling of this schedule forms part of Technical Evaluation of the tenders, and bidders
shall therefore be required to indicate the type/make and country of origin of all the materials
and equipment they intend to offer to the employer in this schedule.
3. This schedule shall form part of the technical evaluation criterion, and tenderers are therefore
advised to complete the schedule as they shall be considered responsive.
55
TECHNICAL SCHEDULE OF ITEMS TO BE SUPPLIED
(To be completed by the Tenderer)
ITEM
1
DESCRIPTION
TYPE/MAKE
MODEL
COUNTRY
OF ORIGIN
LIGHTING FITTINGS
i.
2 feet (L600), LED Batten
ii.
TrueLine Surface mounted LED Light
iii.
Solar flood light
iv.
Black Ornamental Outdoor Gate Lamp
v.
Glass Rectangular Bulkhead Outdoor light
2
Lighting Switches
3
Socket outlet plates
4
Consumer Units/ Distribution Boards
5
MCBs
6
7
Cables
❖ single core PVC Copper
❖ Armoured Copper (PVC/SWA/PVC)
8
HG PVC conduits
9
PVC Conduits
10
Cable Trunking
11
Cable Accessories
12
Solar Inverter
13
Charge Controller
14
Storage Battery
15
Solar PV Module
Detailed manufacturer’s Brochures detailing Technical Literature and specifications on the above
items MUST be attached and Items to be supplied highlighted (Model and Make)
56
SECTION IV – SCHEDULE OF UNITS RATES
1.
The tenderer shall insert unit rates against the items in the following schedules and may
add such other items as he considers appropriate.
2.
The unit rates shall include for supply, transport, insurance, delivery to site, storage as
necessary, assembling, cleaning, installing, connecting, profit and maintenance in defects
liability and any other obligation under this contract.
3.
The unit rates will be used to assess the value of additions or omissions arising from
authorized variations to the contract works.
4.
Where trade names or manufacturer’s catalogue numbers are mentioned in the
specification, the reference is intended as a guide to the type of article or quality of
material required. Alternative brands of equal and approved quality will be accepted.
The prices quoted shall be deemed to include for all obligations under the sub-contract
including but not limited to supply of materials, labour, delivery to site, storage on site,
installation, testing, commissioning and all taxes (including V.A.T, Withholding tax and
all other taxes applicable at the time of tender).
5.
6.
Any bid returned with unfilled Schedule of Unit Rates shall be considered technically
non- responsive, and the bidder shall automatically be disqualified.
57
SCHEDULE OF UNIT RATES
(To be completed by the Tenderer)
UNIT RATE
NO
DESCRIPTION
QTY
UNIT
(KSHS)
1
2
3
4
5
6
7
PVC/SWA/PVC Armoured Copper cables per metre
a) 10.0mm sq. 2 core
b ) 10.0 mm sq 4 core
c) 16.0 mm sq 2core
d)
16.0 mm sq 4core
1
1
1
1
M
M
M
M
IP 65 rated Isolators as KATKO, 3 Phase
a) 20A
b) 6 3 A
c) 100A
1
1
1
NO
NO
NO
IP 65 rated Isolators as KATKO, single phase
a) 32A
b) 6 3 A
c) 100A
1
1
1
NO
NO
NO
Emergency shutdown switch
1
NO
Cables:
a) Single Core PVC Cables
i)
10mm2
ii)
16mm2
iii)
25mm2
Consumer Units and Distribution Boards:
Lockable 12 Way TPN Consumer Unit/Distribution
Board as Merlin Gerlin or an approved equivalent
a) 10 Way SPN with integral 100A Isolating
Switch
b) 10 Way TPN with integral 125A Isolating
Switch
c) 12 Way SPN with integral 100A Isolating
Switch
d) 12 Way TPN with integral 150A Isolating
Switch
IP65 rated Isolators as KATKO:
a)63TPIsolator
b) 6 3 A SP Isolator
c) 100A TP Isolator
d) 1 0 0 A SP Isolator
58
1
1
1
M
M
M
1
NO
1
NO
1
NO
1
NO
1
1
1
1
NO
NO
NO
NO
(CTS)
UNIT RATE
NO
DESCRIPTION
QTY
UNIT
(KSHS)
9
10
Cable Trunking
Two compartment powder coated steel trunking manufactured
in14 SWG galvanized mild steel sheet and finished in cream
powder coating with the following dimensions;
a) 50x25mm
b) 75x50mm
c) 200x50mm
1
1
1
M
M
M
Cable Trunking
Two compartment powder coated HG PVC trunking
manufactured in heavy gauge material and finished in cream
powder coating with the following dimensions;
a) 50x25mm
b) 75x50mm
1
1
M
M
59
(CTS)