PROPOSED PARTITIONING OF CS OFFICE FOR MINISTRY OF TOURISM, AND WILDLIFE AT NSSF
ELECTRICAL INSTALLATION WORKS
BILL NO.1: SUB-CONTRACT PRELIMINARIES
ITEM
DESCRIPTION
QTY UNIT
RATE
AMOUNT
SHS.
SHS.
1
Discrepancies clause - Sub-contractor shall include all work either
1
Item
shown on the Contract Drawings or detailed in the specification. No
claim or extra cost shall be considered for works which has been shown
on the drawings or in the specification alone.
2
Payments clause - Payment will be made through certificates to the
Main Contractor, unless he specifically agrees to forego this right, in
which case direct payment can be made to the Domestic Subcontractor. All payments will be less retention as specified in the Main
Contract. No payment will become due until materials are delivered to
site.
1
Item
3
Scope of contract works clause - The sub-contractor shall supply,
deliver, unload, hoist, fix, test, commission and hand-over in
satisfactory working order the complete installations specified
hereinafter and/or as shown on the Contract Drawings attached hereto,
including the provision of labour, transport and plant for unloading
material and storage, and handling into position and fixing
1
Item
4
Extent of contractors duties clause - The Sub- contractor shall be
responsible for verifying all dimensions relative to his work by actual
measurements taken on site.Shall mark accurately on one set of
drawings and indicate all alterations and/or modifications carried out to
the designed system during the construction period. This information
must be made available on site for inspection by the Engineer.
1
Item
5
Government legislation and regulations clause - Sub- contractor shall
allow for providing holidays and transport for work people, and for
complying with Legislation, Regulations and Union Agreements. The
Sub-contractor must also make himself acquainted with current
legislation and any Government regulations regarding the movement,
housing, security and control of labour, labour camps, passes for
transport, etc.
1
Item
6
Insurance company fees clause - Attention is drawn to the tenderers to
allow for all necessary fees, where known, that may be payable in
respect of any fees imposed by Insurance Companies or statutory
authorities for testing or inspection.
1
Item
7
Samples and materials generally clause - The Sub- contractor shall,
when required, provide for approval at no extra cost, samples of all
materials to be incorporated in the works. Such samples, when
approved, shall be retained by the Engineer and shall form the standard
for all such materials incorporated.
1
Item
Sub Total carried to next page
6
ITEM DESCRIPTION
QTY UNIT
Sub-Total B/F from Previous Page
8
Bills of quantities clause - All the Quantities are based on the Contract
Drawings and are provisional and they shall not be held to gauge or to
limit the amount or description of the work to be executed by the Subcontractor but the value thereof shall be deducted from the Sub-contract
Sum and the value of the work ordered by the Engineer and executed
there under shall be measured and valued by the Engineer in accordance
with the contract. All work liable to adjustment under this Sub-contract
shall be left uncovered for a reasonable time to allow measurements
needed for such adjustment to be taken by the Quantity Surveyor or
Engineer. Immediately the work is ready for measuring the Subcontractor shall give notice to the Quantity Surveyor or Engineer to
carry out measurements before covering up. If the Sub-contractor shall
make default in these respects he shall, if the Architect so directs,
uncover the work to enable the necessary measurements to be taken and
afterwards reinstate at his own expense.
1
Item
9
Contractors office in Kenya clause - It shall be the Sub- contractor’s
responsibility to procure work permits, entry permits, licences,
registration, etc., in respect of all expatriate staff. The Sub-contractor
shall prepare a substantial proportion of his Working Drawings at his
office in Kenya. No reasons for delays in the preparation or submission
for approval or otherwise of such drawings or proposals will be
accepted on the grounds that the Sub-contractor’s Head Office is remote
from his office in Nairobi or the site of the Sub- contract Works or
otherwise.
1
Item
10
Identification of plant components clause - Sub-contractor shall supply
and fix identification labels to all plant, starters, switches and items of
control equipment etc with white traffolyte or equal labels engraved in
red lettering denoting its name, function and section controlled.
1
Item
11
Working drawings clause - Sub-contractor shall prepare such Working
Drawings as may be necessary. The Working Drawings shall be
complete in such detail not only that the Sub-contract Works can be
executed on site but also that the Engineer can approve the Subcontractor’s proposals, detailed designs and intentions in the execution
of the Sub- contract Works.
1
Item
12
Records Drawings (As Installed) and instructions clause - Record
Drawings, will be subject to the approval of the Engineer, include
approved Working Drawings adjusted as necessary and certified by the
Sub-contractor as a correct record of the installation of the Sub-contract
Works.
1
Item
Sub Total carried to next page
7
RATE
SHS.
AMOUNT
SHS.
ITEM DESCRIPTION
QTY UNIT
Sub-Total B/F from Previous Page
13
Maintenance Manual clause - Upon Practical
Completion of the Sub-contract Works, the Sub- contractor shall furnish
the Engineer four copies of a Maintenance Manual relating to the
installation forming part of all of the Sub-contract Works.
1
Item
14
Hand over clause - The Sub-contract Works shall be considered
complete and the Maintenance and Defects Liability Period shall
commence only when the Sub-contract Works and supporting services
have been tested, commissioned and operated to the satisfaction of the
Engineer and officially approved and accepted by the Employer,
provided always that the handing over of the Sub-contract Works shall
be coincident with the handing over of the Main Contract Works.
1
Item
15
Testing and inspection - manufactured plant clause - The Engineer
reserves the right to inspect and test or witness of all manufactured
plant equipment and materials. The right of the Engineer relating to the
inspection, examination and testing of plant during manufacture. Subcontractor shall give two weeks’ notice to the Engineer of his intention
to carry out any inspection or tests and the Engineer or his
representative shall be entitled to witness such tests and inspections.
1
Item
16
Testing and inspection - installation clause - Allow for testing each
section of the Sub-contract Works installation.
1
Item
17
Initial Maintenance Clause - The sub-contractor shall make routine
maintenance once a month during the liability for the Defects Period
and shall carry out all necessary adjustments and repairs, cleaning and
oiling of moving parts. A monthly report of the inspection and any
works done upon the installation shall be supplied to the Engineer.
Shall allow in the sub-contract Sum of the initial maintenance,
inspection and break-down service
1
Item
18
Local and other authorities notice clause - The contractor shall comply
with and give all notices required by any Regulations, Act or by Law of
any Local Authority or of any Public Service, Company or Authority
who have any jurisdiction with regard to the works or with those
systems the same are or will be connected and he shall pay and
indemnify the Government against any fees or charges legally
demandable under any regulation or by-law in respect of the works;
provided that the said fees and charges if not expressly included in the
contract sum or stated by way of provisional sum shall be added to the
contract sum.
1
Item
Sub Total carried to next page
8
RATE
SHS.
AMOUNT
SHS.
ITEM DESCRIPTION
QTY UNIT
RATE
SHS.
AMOUNT
SHS.
100,000.00
100,000.00
Sub-Total B/F from Previous Page
19
Temporary Works clause - The contractor shall include for the cost of
and make necessary arrangements with the Project Manager for such
temporary works.
1
Item
20
Patent Rights clause - The contractor shall fully indemnify the
Government of Kenya; against any action, claim or proceeding relating
to infringement of any patent or design rights, and pay any royalties
which may be payable in respect of any article or any part thereof,
which shall have been supplied by the contractor to the Project
Manager.
1
Item
21
Mobilization and Demobilization clause -No claim will be entertained
where the contractor has not made any provision for mobilization and
demobilization of labour, plant and equipment in the preliminary bills
of quantities.
1
Item
22
Supervision by Engineer and site meetings clause - A competent Project
Engineer appointed by the Chief Engineer as his representative shall
supervise the Contract works. The Project Engineer shall be responsible
for issuing all the site instructions in any variations to the works and
these shall be delivered through the Contractor with the authority of the
Project Manager. Any instructions given verbal shall be confirmed in
writing. The Sub Contractor shall in his tender allow for the provision
of management meetings and site inspections, as instructed by the
Engineer, and also profit and attendance on these funds. The funds shall
be expended according to Project Manager’s instructions to the
Contractor.
1
Item
23
Allow for Taxes, Profit and Attendance for the above Item
%
24
Contract obligation and employers obligation clause - No claims will be
entertained for pre-financing of the project by the sub-contractor, or for
loss of profit (expectation loss) in case of premature termination,
reduction or increase of works as the sub-contractor shall be deemed to
have taken adequate measures in programming his works and
expenditure and taken necessary financial precaution while executing
the works.
1
Item
25
Any other preliminaries
1
Item
Total for Bill No. 1: Sub-Contract Preliminaries C/F to Summary
Page
9
BILL NO. 2 : SCHEDULE 1: ELECTRICAL INSTALLATION WORKS
DESCRIPTION
ITEM
QTY UNIT RATE
SHS.
Supply, Install, Test and commission the following:
1.01
1.02
1.03
LIGHTING POINTS
Lighting point wired in 3x1.5mm2 SC-PVC-Cu cables drawn in 20mm
diameter HG PVC conduits concealed inside the ceiling complete with
all necessary accessories excluding switches
i) One way Switching
ii) Two way switching
iii) Intermediate Switching
-
No.
No.
No.
10A moulded satin brass switch plates as Schneider Lisse or approved
equivalent as follows:
i) One gang one way switch
ii) Two gang one way Switch
iii) Two gang two way Switch
iv) Intemediate switch
7
12
10
2
No.
No.
No.
No.
a) 1400 lumens, 4000K 12W COB, 85mm Recessed downlighter as
Philips Storeflux or equal and approved equivalent. (Type DL)
28
No.
b) 1400 lumens, 4000K 12W COB, 85mm Recessed downlighter with
3hr emergency kit as Philips Storeflux or equal and approved
equivalent. (Type DL)
8
No.
c) 1000 lumens, 4000K 13W COB, 85mm Surface mounted
downlighter as Philips ClearAscent Downlight or equal and approved
equivalent. (Type N)
18
No.
d) 14W, 4000K, Twin rectangular recessed downlight as Philips
Storeflux or equal and approved equivalent
12
No.
e) 14W, 4000K, Twin rectangular recessed downlight with 3hr
emergency kit as Philips Storeflux or equal and approved equivalent
6
No.
f) 500 Lumens, 4000K 6W 60mm Recessed downlight as Philips Clear
Accent or equal and approved equivalent (Type DL1)
156
No.
g)Self-contained single sided EXIT sign with 8W LED lamp for nonmaintained emergency lighting for 3 hour duration as Thorn EF X3 or
approved equivalent.
4
No.
h) Small Black Bowl pendant light with E27 base type (Type P)
2
No.
i) Supply and install complete Neon LED Rope light 15w per meter
3000k
90
Lm.
LIGHTING FITTINGS
Light fittings complete with all accessories and lamps as follows:-
Sub total carried to next page
10
AMOUNT
SHS.
DESCRIPTION
ITEM
QTY UNIT RATE
SHS.
Sub total carried from previous page
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
j) Supply and install complete 100w power supliers to above LED rope
light
4
No.
k) Mirror Light
1
No.
l) 1200mm width x 7cm height, Black 36W,4000K LED Linear
Pendant (suspension) with a maximum drop of 120cm c/w
polycarbonate diffuser.
1
No.
m) 1.5m white track light with 3No. Track lights for dry kitchen
2
No.
Infrared Motion Sensor/Occupancy sensor
6
No.
11
No.
20
M
a)Powder coated twin punched outlet plate for fixing twin socket outlets
5
No
b)Ditto but for data/telephone outlets
c)Carry out bonding throughout the entire length of the above trunking
and connect to earthing
5
1
No
Item
66
No.
13A switched twin socket outlet mounted on trunking as Satin Brass
Schneider or approved equivalent
62
No
Recessed Floor box, with metal base box, inclusive of covers, twin
punched socket outlet and data/telephone outlet and fixing accessories
as Power Technics or approved equivalent
2
No.
4
No.
4
No
DATA
CCTV, WIFI, ACCESS Control points, Data appoximately 20m for
each point from the communication room done in 25mmsq. Size
conduits concealed in ceiling/trunking
TRUNKING
200x50mm two compartment powder coated steel trunking
manufactured in 14 swg galvanized mild steel sheet and finished in
cream powder coating to details shown complete with covers, bends
and all fixing accessories. The trunking to be angular section. Allow for
colour change to Architect’s detail. (in server room)
SOCKET OUTLETS
Socket outlet point comprising wiring in 3x2.5mm2 PVC-SC-Cu cables
in concealed in trunking/in conduit.
TELEVISION
TV outlet point wired in 75 Ohms Screened Coaxial TV cables drawn
in concealed 20mm diameter HG/PVC conduits and linked to the
tenant's TV poimt provision.
TV outlet plate with polished brass finish as Crabtree or approved
equivalent
Sub total carried to next page
11
AMOUNT
SHS.
ITEM
DESCRIPTION
QTY UNIT RATE
SHS.
Sub total carried from previous page
1.12
OTHER POWER POINTS
Boadroom Air Conditioning Unit power point comprising wiring in 3
x 4mm2 PVC/SC/CU cables drawn in trunking/32mmØ concealed HG
PVC conduits(Approx 20M)
2
No.
1.13
45A polished brass finish switched DP switch with neon light
2
No
1.14
CS-Air Conditioning Unit power point comprising wiring in 3 x 6mm2
PVC/SC/CU cables drawn in trunking/32mmØ concealed HG PVC
conduits(Approx 20M)
2
No.
1.15
45A polished brass finish switched DP switch with neon light
2
No
1.16
Undersink Heater power point wired in 3 x 2.5mm² SC/PVC insulated
copper cables drawn in concealed 25mm diameter HG/PVC conduits
and including all the other accessories.
1
No
1.17
20A polished brass finish switched DP switch with neon light
2
No
Hand dryer power point wired in 3 x 2.5mm SC/PVC Insulated
1.18 Copper cables drawn in concealed 25mm diameter HG/PVC conduits
and including all the other accessories.
3
No.
1.19
20A polished brass finish switched DP switch with neon light
3
No
1.20
Instant Shower power point comprising wiring in 3 x 4mm2
PVC/SC/CU cables drawn in trunking/32mmØ concealed HG PVC
conduits(Approx 20M)
1
No.
1.21
45A polished brass finish switched DP switch with neon light
1
No.
1
No.
1
No.
1
No.
2
No.
2
COOKER CONTROL UNIT point comprising wiring drawn in 3 x
4.0mm2 PVC-SC-Copper cables in concealed 25mm Diameter HG/PVC
1.22
conduits/trunking complete with all accessories but excluding the
cooker control unit.
1.23 40A Cooker Connection Unit as MK electric cat No. K5045WHI or
equal and approved equivalent.
1.24
40A Cooker Control Unit c/w neon indicator as MK Electric Cat No.
K5061WHI or equal and approved equivalent.
CONSUMER UNIT
12 Ways SPN, flush mounted Consumer Unit completewith 100A
1.25 integral SPN isolator as HAVELLS or approved equivalent complete
with all accessories but excluding MCBs.
Sub total carried to next page
12
AMOUNT
SHS.
ITEM
QTY UNIT RATE
SHS.
DESCRIPTION
Sub total carried from previous page
1.26
1.27
Miniature Circuit Breakers to fit into the above consumer unit as
follows:
(i) 10A SP
(ii) 20A SP
(iii) 32A SP
(iv)40A SP
FIRE ALARM SYSTEM
Firealarm outlet point comprising wiring in 2x1.5mm2 special fire
resistant-SC-Cu cables in 20mm diameter HG conduits in concealed in
the ceiling
6
5
7
2
No
No
No
No
18
No.
1.28
Addressable Photoelectric Smoke Detector as Menvier or Approved
Equivalent
14
No.
1.29
Addressable Photoelectric Heat Detector as Menvier or Approved
Equivalent
2
No.
1.30
Addressable Manual Fire Alarm 'Break Glass' call points as MENVIER
or approved equivalent.
1
No.
1.31
Addressable Electronic Fire Alarm sounder complete with Red Flashing
beacon(Visual alarm) as MENVIER or approved equivalent
1
No.
1.32
Allow for interconnection with main building Fire Alarm System
1
No.
1
No.
10
LM
1.33 2 Zone/Loop Addressable Fire Alarm control panel
1.34
SUB-MAINS CABLES
3x16mm² SC PVC/PVC copper cables strapped on a cable tray/ inside
an electrical duct .
TOTAL C/F TO MAIN SUMMARY PAGE
13
AMOUNT
SHS.
BILL NO. 2 -SCHEDULE 2: STRUCTURED CABLING INSTALLATION WORKS
DESCRIPTION
UNIT QTY.
ITEM
Supply, Install, Test and commission the following:
HORIZONTAL CABLING
A
RJ45 cat 6 UTP (Dual) Data and voice outlets complete with
faceplates and labelling system as Siemons or its equal and approved
equivalent
20
No.
B
3m RJ45- RJ45 Cat 6 UTP factory terminated patch cord as Siemons
for use at workstation areas
25
No.
C
1m, RJ45- RJ45 cat 6 UTP factory terminated patch cord as Siemons
to be used in cabinet.
30
No.
D
Cat 6 UTP 4-pair screened cable as Siemons pulled between cabinet
and work stations.
2100
Lm.
A
CABINETS
22U Wall/ground Mounted cabinet with low noise (low dB) fans and
power outlet sockets, as described in particular specifications
1
No.
B
24 port RJ45 cat 6 Data patch panel for UTP termination as Siemon.
1
No.
C
2U Cable Manager
1
No.
4
No.
20
Lm
A
A
ACTIVE COMPONENTS
Wireless Access point , versatile, high-performance wireless solution
that supports t 802.11ac Wave 2 wireless connectivity, as Cisco WAP
200 Wireless Access Point or approved equivalent
BACKBONE CABLING
8 core multimode fibre optic cable complete with connectors
TOTAL CARRIED FORWARD TO MAIN SUMMARY
14
RATE
SHS.
AMOUNT
SHS.
BILL NO: 2: SCHEDULE 3: CCTV INSTALLATION WORKS
ITEM
DESCRIPTION
A
INDOOR/OUTDOOR CAMERAS
Supply, Install, Test and commission the following:
Type A Camera with installation Accessories and as described in the
particular specifications of this document
UNIT QTY.
No.
3
B
Cat 6-E, 4 pair STP terminated in RJ 45 as appropriate and drawn in
new conduits and trunking.
LM.
150
C
8 channels Network video recorder as described in the particular
specifications of this document
No.
1
D
4 TB Surveillance hard disk
No.
1
E
1M RJ45-RJ45 Cat 6 UTP factory terminated patch cord as Siemon or
approved equivalent to be used in cabinet.
No
3
F
24 port RJ45 cat 6 patch panel for UTP termination as Siemon.
No
1
G
Cable managers as Siemon or Approved Equivalent
No.
1
H
LCD LED panel display 32”,HDMI input,4K, Component video input,
composite video input, S-video input, VGA/HDMI input,VGA/HDMI
output and composite video output. 3 USB, RF In (Antenna/Cable),
Ethernet, Optical, RS232C (Mini Jack) Smart TV Operating
Systemweb OS 3.5 as Samsung, Hisense Panaboard or equal and
approved equivalent
No.
1
I
5M HDMI Cable
LM
10
J
Fittings, Accessories and Consumables
Item
Item
TOTAL CARRIED FORWARD TO SUMMARY PAGE
15
RATE
SHS.
AMOUNT
SHS.
BILL NO. 2: SCHEDULE 4: ACCESS CONTROL INSTALLATION WORKS
DESCRIPTION
QTY. UNIT
ITEM
Supply, install , test and commissionioning the following:
A
B
C
D
E
F
G
H
I
J
K
L
CONTROL PANEL
Access Control Module complete with Integrated Power Supply
and batteries as specified in Particular Specifications as Impro
IPS Combo Cluster box or approved equivalent.
Door Controller Module as Impro Weigand Reader Module
READERS
Multi-Discipline Reader, 125kHz & 13.56MHZ Reader,
Wiegand Interface, Second Edition with pigtail as Impro or equal
and approved equivaleent
Door Exit switch
Override Key switch
Emergency Break Glass
ELECTOMAGNETIC LOCK
An Electromagnetic Lock of 600Kg Force complete with
installation accessories, door closure & power supply as
described in particular specification or equal and approved
equivalent.
CARDS AND CABLES
Proximity Cards with the individual employee's name as
specified in Particular Specifications.
Mylair cable for access control system .
2
1mm cable for wiring door exit switches
WORKSTATION
Specifications:- Processor: Intel i7 8th Gen Memory: 8GB
DDR3 RAM Internal Storage: 1 TB 7.2K RPM DVD: LAN:
Dual Port Gigabit Ethernet, Chassis: Tower Monitor: 24 inch or
larger with minimum display resolution of 2560 x 1440
Operating System: Windows, Peripherals: Keyboard, Optical
Mouse, Warranty: 03 Years
Any other item required
1)
2)
3)
TOTAL CARRIED FORWARD TO MAIN SUMMARY
16
1
No.
2
No.
4
No.
4
4
4
No.
No.
No.
4
No.
10
No.
200
250
Lm.
Lm
1
No.
Item
Item
RATE
SHS.
AMOUNT
SHS.
BILL NO. 2: SCHEDULE 5: PROJECT MANAGER'S STATIONERY
DESCRIPTION
ITEM
QTY UNIT RATE
SHS.
20 Ream
AMOUNT
SHS.
A
Photocopying Papers size A4 80g/cm2 white
B
Photocopying Papers size A3,80g/cm2
5
Ream
C
Letterhead quality paper as CONQUERER or equal and approved cream
80g/cm3
4
Ream
D
5 blue
Pkts
A4 size translucent PVC covers as KATKO or approved equivalent, 100 sheets
in colour and 0.2mm thick
E
Pkts
A4 size Embossed covers as KATKO or approved equivalent, 100 sheets blue4in colour
F
22mm diameter spiral binders black in colour
4
TOTAL CARRIED FORWARD TO SUMMARY PAGE
17
Pkts
SUMMARY PAGE
Item
Description
1.00
BILL NO.1: SUB-CONTRACT PRELIMINARIES
Amount (Ksh)
2.00
BILL NO. 2 : SCHEDULE 1: ELECTRICAL INSTALLATION WORKS
3.00
BILL NO. 2 -SCHEDULE 2: STRUCTURED CABLING INSTALLATION WORKS
4.00
BILL NO: 2: SCHEDULE 3: CCTV INSTALLATION WORKS
5.00
BILL NO. 2: SCHEDULE 4: ACCESS CONTROL INSTALLATION WORKS
6.00
BILL NO. 2: SCHEDULE 5: PROJECT MANAGER'S STATIONERY
7.00
ALLOW FOR CPD TRAINING FOR ENGINEERS
100,000
8.00
CONTIGENCY SUM TO BE EXPENDED BY THE PROJECT MANAGER
200,000
GRAND TOTAL C/F TO MAIN SUMMARY (VAT INCLUSIVE)
TOTAL AMOUNT IN WORDS
TENDERER'S NAME & STAMP( DOMESTIC SUB CONTRACTOR)
SIGNATURE ………………………………… DATE……………………………………...…..
P.I.N No.…………………………………V.A.T CERTIFICATE No……………………….
WITNESS………………………………………………...
ADDRESS……………………………………………….
SIGNATURE OF WITNESS……………………...…DATE…………………………………