2014
BUILDING SYSTEMS
REPORT
1 MAINTAINING YOUR
CORE SYSTEMS
2 MECHANICAL
3 PLUMBING
4 ELECTRICAL
SYSTEMS
RHB
2014 Building
Systems Report
Canada Mortgage and Housing Corporation (CMHC)
conducted a survey of high-rise rental stock to determine
the state of repair of older buildings and the costs
required to extend their longevity. According to the
survey, the average cost/unit over a 10-year period
equaled approximately one month’s rent per year. The
electrical power supply and distribution, elevators and
windows required the largest investment. These systems,
as well as mechanical systems in general, tended to
constitute the highest expenses for buildings constructed
prior to the 1970s. Mechanical and electrical systems
had the highest priority costs in the three- to ten-year
periods for urgency.
The RHB 2014 Building Systems Report serves
to inform Canadian apartment building owners and
managers on how to maintain, renovate and upgrade
their buildings’ mechanical, plumbing and electrical
systems. These systems are vital to a building’s health
and the tenants’ well-being. This guide provides
strategies, direction and tips on what to do, what to
look for and what to avoid, as well as the importance of
maintenance and capital work.
The RHB 2014 Building Systems Report is divided into
four sections:
•
Section one covers the importance of creating a
maintenance, repair and upgrade strategy to protect
owners’ assets, particularly the building’s mechanical,
plumbing and electrical components. It discusses
building condition assessments, energy audits and
maintenance service contracts.
Chiller
ADDRESS?,
•
Section two covers the building’s mechanical
systems. It discusses issues and technology that
pertain to boilers, chillers, make-up air units and
related equipment.
•
Section three covers the building’s plumbing network.
It discusses managing plumbing-related issues,
different ways of dealing with pinhole leaks and
installing backflow preventers.
•
Section four covers the building’s electrical systems
and lighting. It discusses how to manage common
electrical issues, building automation systems,
LED lighting retrofits, motion sensors, emergency
generators, and fire alarms and life safety systems.
To ensure that the RHB 2014 Building Systems Report
contains the most current and pertinent information,
RHB Magazine collaborated with Ed Porasz, P.Eng., of
M & E Engineering Ltd. We asked a number of property
owners and managers to share their experiences on
maintaining their buildings’ mechanical systems,
including Dennis Kalish of H&R Property Management
Ltd., Sally Tenenbaum of Tenen Group and Mark Aber of
Northwest Properties. We also received valuable insights,
tips and advice from companies that provide valuable
services to the rental housing industry, including Forrest
Jones of inTact Lighting Group Inc., Joe Longarini of
Brady & Seidner Associates Ltd., Avram Musafija of
Rikos Engineering Ltd., and Kevin Mitchell and Andy
Fahmi of Service Experts Commercial HVAC.
Diesel system
RHB 2014 Building Systems REPORT | 3
1
MAINTAINING YOUR
CORE SYSTEMS
Being proactive in maintaining your building’s
mechanical, plumbing and electrical systems is one of
the best ways to extend the life of your most valuable
asset. It can result in hundreds of thousands of dollars
in savings over the life span of your building. Performing
regular examinations of different building components
and engaging in preventative maintenance can reduce
the need to spend a large percentage of your budget on
major capital repairs.
“Just because equipment has been replaced and is
new, it still requires regular maintenance and service
along with periodic checking of the equipment and set
points,” said Ed Porasz, President, M & E Engineering
Ltd. “If regular maintenance is not maintained, the
efficiency of the equipment could be compromised.”
Before engaging in repairing, replacing or upgrading
a building’s mechanical components, building owners
and managers should work with a qualified consultant
to review all components of the building’s mechanical,
plumbing and electrical systems. It is important to note
that, while proper maintenance is essential for extending
the life of older equipment, it is still necessary to engage
in regular maintenance of new equipment.
“We are big believers in professionalism, so we will
put together a dream team of mechanical engineers,
landscape architects, electrical engineers and other
experts to achieve our goals,” said Sally Tenenbaum,
Partner, Tenen Group. “We work with the best people
in their fields to do layouts, analyze situations and
make propositions to ensure that we get the most out
of our investment.”
Building condition assessment
If an owner is buying or selling a multi-unit residential
building, then having a detailed building condition
assessment (BCA), as well as a specialist’s report on the
building’s mechanical and electrical systems, will provide
a more thorough understanding of what is actually being
purchased, including the potential costs, concerns and life
4 | RHB 2014 Building Systems REPORT
expectancies. A non-specialist review will only provide a
broad overview of the building’s situation with no details,
especially on the mechanical and electrical systems.
A BCA involves an inspection and evaluation of the
condition of a multi-unit rental property. Its purpose is to
identify major defects and deficiencies, areas requiring
maintenance or that have been inadequately maintained,
and building code violations and life expectancy. An
engineer first performs a visual review of mechanical and
electrical systems, such as boilers, chillers, air handlers,
pumps, switch gears, panels and disconnects, as well as
visible plumbing and wiring.
“We will also interview the superintendents and
other personnel to better understand any current or
outstanding issues,” said Ed. “For example, we will
ask about any problems or repairs related to heating
and cooling, power, breakers, hot water pressure and
availability, which they deal with on a regular basis.”
Once the visual inspection and interviews have been
completed, the engineer will prepare a schedule of
estimated budget costs to repair any of the identified
issues. They will then create a written report that
describes the building’s overall condition, its physical
components or systems, physical deficiencies and issues
that can affect the systems’ and components’ life span.
The engineer will also create a budget that outlines
timelines for repairing and replacing equipment over a
given time period.
A BCA shows good faith and clarity to potential buyers.
But it is also a very good tool for owners who plan
to keep their buildings and use the BCA as a capital
planning and inventory tool. The specialist’s report on the
building’s mechanical and electrical systems will allow an
owner to plan and prepare for upcoming expenses and
understand the timing and potential costs of the work.
Energy audits
Energy audits can be combined with a BCA to provide
building owners with a comprehensive overview of their
property. Audits involve inspections of the building’s
major equipment and systems, such as boilers and
chillers, water-usage devices, toilets, aerators, lighting
and more. They will also examine other areas, such
as the building façade for air leakage, and equipment
controls for energy usage.
Engineers will then evaluate the building’s energy
usage by examining and comparing energy bills for
the last year. This enables them to analyze changes
in energy usage over time and season, and determine
whether there is any unusual usage. They will also
compare the building’s energy usage to similar buildings
to show how it is using electricity in different ways.
The audit includes a list of energy conservation
measures (ECMs) according to category, such as lighting
retrofits and controls, heating and cooling equipment and
controls, hot water equipment, and more. The audit will
show costs of upgrading or replacing equipment along
with the calculated energy savings. Dividing the costs by
the savings will provide the estimated time to pay back
the investment based on the energy savings.
“Some lighting and water retrofits can pay back the
investment in two to three years, while boilers could take
five to eight years,” said Ed. “Six years is the ideal payback
period to determine if the investment is financially sound.”
Companies that perform energy audits will often
provide an executive summary of all potential ECMs,
with weighted recommendations on which measures
should be applied within given timeframes. Once an ECM
is approved, an engineer will design items that should
be replaced and create an investment-grade energy
audit report, which outlines the real-world costs of the
recommended changes. The report will illustrate the
overall building performance based on the upgrades and
how much will be saved.
“Select your representative wisely, ask about other
jobs they’ve done, call for references and check out their
samples,” said Forrest Jones, President, inTact Lighting
Group Inc. “Ask to see demonstrations up front. As a
landlord, the choices you make up front could save you a
lot of troubles later.”
Ed Porasz, P.Eng., President
While energy audits can be fairly priced, building
owners can take advantage of government incentives to
reduce these costs. For example, OPA incents 50% of
the cost of an ASHRAE Level II energy audit. This makes
it much more cost effective for an owner to get a handle
on whether and when to replace equipment. The audit
also details the benefits they would see, what options
there are for energy savings and the potential costs.
Maintenance and service contracts
Before signing a maintenance and service contract,
building owners should clarify what is and is not included
in the contract. Owners often focus on the list equipment
being serviced, and could overlook the cost of labour
involved in doing setup or additional work. The contract
should clearly state who is responsible for what, and
what happens when something breaks or malfunctions,
particularly who should pay for it. It should outline the
details of the actual work being undertaken, and the
timelines involved. For example, a contract should state
that technicians will be on site every three months to
check specific equipment, as opposed to a general
number of times per year to do general maintenance.
Building owners should clarify what is meant by
“all-inclusive,” as the costs of doing any work that
falls outside this definition could escalate greatly. For
example, some contracts excluding non-moving parts,
such as a boiler’s casing, insulation and refractory. This
is often excluded in contracts where it is not specified.
2
Therefore, make sure that the contract explicitly clarifies
what is included by the maintenance and service.
“For maintenance, the owner could ask an engineer
to prepare maintenance specifications as the coverage
is far better when a maintenance company follows
specifications,” said Ed. “Otherwise, the owner should be
careful in reading the maintenance contract as they can
include many exclusions. This work becomes billable,
so the owner has to be comfortable with what will be
charged and at what rate.”
Every maintenance and service contract should
include a 60-day cancellation clause, which allows the
building owner to cancel the contract for any reason.
Regardless of the length of the contract, building owners
can cancel with notice at any time. The contract should
also require service personnel to leave documentation
with the property manager or superintendent that
describes what work was performed on that date, what
changed, what they saw, who worked there and so on.
This will ensure that the service provider is following the
contract’s service schedule and requirements.
“We have monthly maintenance contracts in place,
and have improved on-site training to conduct weekly
inspections and assist in minor maintenance issues,”
said Mark Aber, Northwest Properties. “The regular
maintenance schedules have improved efficiency and
created a proactive approach to addressing issues before
equipment failures occur.”
MECHANICAL
It’s important for building owners to keep their mechanical
systems and equipment regularly maintained. This will
ensure that it operates as efficiently and environmentally
friendly as possible to provide comfort to tenants
12 months a year. Following regular systems review
procedures will help to keep the system operating and
ensure that the equipment stays up to standard with
changing regulations. It also allows the owner to stay
6 | RHB 2014 Building Systems REPORT
on top of possible equipment upgrades and plan future
budgets based on the equipment’s life expectancy.
“Life expectancy for most mechanical equipment,
such as make-up air units, boilers and chillers, is 15
to 30 years,” said Kevin Mitchell, General Manager,
Service Experts Commercial HVAC. “Building owners
need to be concerned with efficiency and environmental
issues. Regulation changes can prompt replacement
of equipment before normal life expectancy, which
occurred with the elimination of R12. Use $1 per square
foot per year to budget for maintenance.”
Some owners only consider the short-term costs of
maintaining their mechanical systems. They either fail to
understand or ignore the fact that there are significant
costs in operating a system that is not reliable, in need
of constant repairs and not energy efficient. Some poorly
maintained mechanical systems might require so many
repairs that these costs and energy savings would pay for
the new equipment in a relatively short period of time.
“When mechanical systems are poorly or irregularly
maintained, they become in constant need of repair,”
said Andy Fahmi, Project Manager, Service Experts
Commercial HVAC. “Ultimately, the equipment will have
to be brought back up to manufacturer’s standards.
Lack of maintenance can also lead to replacement of
equipment sooner than normal life expectancy.”
Make-up air units
The make-up air unit (MUA) is a key component of a
building’s mechanical system, as it provides treated
outside air to the building. They are designed to improve
the efficiency of the building’s heating and cooling
system. MUAs also save money by reducing the amount
of drafts, dust and dirt that enter a building. Since they
also replace exhaust air that comes through kitchen and
bathroom fans, they supply outside treated air to the
building to reduce building odours and odour transfer.
When the MUA is improperly or irregularly maintained,
the filters can become plugged with dust after only a few
months of use, which will negatively affect air flow, indoor
air quality and energy use. Improper setting of the MUA’s
set-point temperature can increase energy usage as it
can affect in-suite heating. The MUA can also experience
cooling problems, which can increase humidity
throughout the building. This can lead to mould growth,
peeling wallpaper and paint, and damaged carpets.
Regular maintenance and monitoring can prevent
most issues that are a result of improperly functioning
MUAs. High humidity can be corrected by retrofitting
the MUA unit to allow it to de-humidify and reheat
the air. Energy efficiency can also be improved by
installing a newer unit at the end of the existing MUA’s
life, particularly those that use hydronic heating (hot
water coils) with condensing boilers that supply the
heated water. Installing variable frequency drives
(VFDs) will also provide greater energy efficiency over
the long run and by-pass on cooling coils to provide
low cost de-humidification.
Heating and cooling
Lack of regular maintenance is one of the primary causes
of problems with a building’s mechanical equipment,
especially boilers and chillers. Failing to maintain
Boilers
equipment can lead to premature failure, even when it
is new, as well as becoming unreliable over time and
inefficient very quickly.
Boilers and chillers offer significant opportunities for
energy savings in buildings. Installing high efficiency
boilers and chillers can drastically reduce gas and
electrical consumption in multi-unit residential buildings.
New technologies, such as magnetic bearing-less /
oil-less and VFD-equipped chillers, can reduce energy
consumption by 30-50%. Building owners can also
take advantage of energy incentives from their gas and
electricity suppliers to cover some of the cost of installing
high-efficiency equipment.
“When reviewing a boiler plant, even if the boilers
are not that old, the installation of one lead high
efficiency (condensing) boiler can dramatically reduce
gas consumption as this boiler can heat the building
during the shoulder seasons (spring and fall) and
operate throughout the wintertime,” said Ed. “For an
older boiler plant, it may be very beneficial to replace
all of the boilers sooner to start realizing the
energy savings.”
It is important to note that replacing older boilers
and chillers with newer, more efficient models will
not automatically produce energy savings, or match
the savings promised by the supplier. Proper system
setup and design are required to get the most out
of installing new equipment. New boilers need to be
matched with the right piping, venting and controls.
Working with an engineer to design and install the
system will help to save energy, reduce maintenance
costs and prevent equipment breakdowns over the
long run.
“Working with engineers is beneficial, particularly
when it comes to retrofitting or replacing mechanical
components,” said Dennis Kalish, General Manager,
H&R Property Management Ltd. “They helped us to
accurately size replacement components, and we have
seen savings in the building’s gas consumption.”
Plumbing & HVAC - 24/7 Sevice
Commercial • Industrial • Residential
The highest quality plumbing and heating service for over 60 years
Mechanical Room Retrofits
Building Re-Pipes
Backflow Service & Testing
Preventative Maintenance
DHW Mixing Valves
www.bradyandseidner.com
Drain Cleaning / Camera
-
RHB 2014 Building Systems REPORT | 9
3
PLUMBING
Many plumbing-related problems are the result of not
keeping up with regular maintenance and testing of
equipment. For example, shut-off and recirculating
values will seize if they are not exercised at least once
a year. Building owners often fail to regularly test their
buildings’ plumbing components, which will end up
costing more to repair over the long run. They should
create a table of all the plumbing components in their
building with dates for testing to ensure that they stay on
top of maintenance issues.
A cut pipe
Piping
“It’s important to note that the water needs of
today are not the same as the water needs of 30 or
40 years ago, as almost everyone has a dishwasher
today,” said Sally. “We replaced all of our building’s
one-inch pipe with two-inch pipe to meet current
demands. We want to ensure that our tenants have
uninterrupted access to hot water, and using higher
quality copper piping means less maintenance and
better water quality.”
Pinhole leaks
Most domestic piping in apartment buildings consists
of either Type M or Type L copper piping. Type M is the
thinnest copper piping available that also meets current
codes. Since it is thinner, Type M piping can begin failing
in as little as three to five years, but it can last as long as
20 years. Type L piping is thicker, and can last from 35
to 50 years.
10 | RHB 2014 Building Systems REPORT
Sooner or later, hot water pipes in apartment buildings
will develop pinhole leaks. Because units require
immediate access to hot water at all times, pumps
constantly circulate water into and out of the building’s
central hot water tank(s) through a network of horizontal
and vertical pipes. These copper pipes always have
running hot water, which results in internal corrosion and
erosion, hence the pinhole problem. Since cold water
does not need to circulate, these pipes do not face the
same problem and cold water is less corrosive.
Old piping
One detected pinhole leak can mean that it is the
beginning of a problem with your pipes… or it could
be the tip of the iceberg. When a building experiences
pinhole leaks, more leaks are sure to occur. Pipes will
not erode in one spot alone. Erosion occurs throughout
the entire system, with the greatest damage occurring in
areas with the most internal turbulence and water flow.
Too much water pressure can also hasten pinhole leaks.
Every pinhole leak is different, as the resulting
damage will depend on where the leak occurs. A leak
can take place in the boiler room, which is easy enough
to detect and repair, and will often cause very little
damage. However, a pinhole leak in the wrong area
can cause thousands of dollars of property damage,
including mould and structural damage to walls, ceilings
and floors. Building owners should hire an engineer
to do a pipe assessment to evaluate the situation and
recommend a course of action.
“When investigating a water leak that has occurred,
check the condition of the existing pipe and fittings
for signs of wear,” said Joe Longarini, Owner and Vice
President, Brady & Seidner Associates Ltd. “Also, in
older buildings, samples of pipe can be cut out and
examined for excessive wear.”
“The engineered solution gave us the most cost effective
solution through a detailed design and tender process,”
said Mark. “Leaks and the associated common area
damage have been eliminated. Water consumption is on
the decrease, and tenant satisfaction has improved.”
Building owners tend to rely on patchwork repairs to
address pinhole leaks, such as using screw clamps or
other similar methods. However, this is only effective
for treating one leak at a time and will not last, and it
will not address the issue with the overall erosion of
the pipe. The development of a pinhole leak is often
a systemic problem; reacting to symptoms will not
address the root cause of the problem. There are two
ways to resolve the overall issue of pinhole leaks: pipe
replacement and pipe lining.
Backflow preventers
Pipe replacement involves cutting out sections of pipe
with pinhole leaks and replacing them with higher quality
Type L piping. Ideally, this pipe will be more capable of
dealing with the water flow issues that led to the pinhole
leaks. You can also install automatic flow control valves to
adjust hot water recirculation rates to reduce the impact of
erosion and increase the pipe sizing of the new pipes.
Pipe lining involves applying a waterproof epoxy
coating to the pipes’ inside surfaces. The lining fills the
pockmarked areas that lead to pinhole leaks with more
epoxy while coating the rest of the inside surface to
create a smooth surface free of holes.
There are pros and cons to both methods, and much
debate can be had over which will provide the best
solution for your situation. Some would argue that pipe
replacement is more permanent, but others would state
that it is more disruptive to tenants and more expensive
than pipe lining. While pipe lining is slightly less
expensive and disruptive to tenants, it is not as effective
for repairing horizontal piping and there is some risk of
epoxy damaging mechanical equipment.
The best advice is to speak to several reputable
plumbers and engineers about your particular building
and come up with a plan that works best for your
situation. It’s very important to address pinhole leaks
and their cause before the damage becomes too severe.
Reviewing the domestic water plumbing system for
grade of copper pipe, size of recirculating pump and the
addition of circuit balancing valves on the system will
help to prevent premature pinhole leaks from occurring.
Backflow is the undesirable reversal of domestic water
flow against the normal direction of water flow. It is the
result of back pressure or back siphonage, which can
occur when the water pressure in a building’s water
system is greater than the pressure in a city’s water
supply system. This can be due to frozen water pipes,
watermain breaks or unexpected high demands on the
water system. The result of backflow is the drawing of
possible contaminates into water supply pipes, which
can lead to pollution of the water supply. This is very
serious, as drinking contaminated water can lead to
sickness and death.
Backflow preventers (BFPs) are valves that are
designed to stop and protect city water mains against
backflow into supply lines that enter buildings.
Many municipalities and cities across Canada
have by-laws that require most buildings, including
apartment buildings, to install BFPs to protect against
contamination of their water supply. By-laws also require
the owners to conduct annual maintenance and update
their backflow testing records on a regular basis.
“A permit is required to install larger BFPs, which are
typically found in multi-unit residential buildings,” said
Ed. “Owners will be required to employ an engineer to
prepare stamped drawings for submission.”
Booster pumps
Tenants often complain about poor water pressure in
their unit. Some will say that it’s because they live on an
upper floor and in an older building. However, it’s not
necessarily true that older buildings have lower water
pressure. Some people confuse water pressure with
water volume. There are instances where showers and
faucets will emit less water than usual, but it’s often a
matter of blocked pipes restricting water flow rather than
poor water pressure.
Building owners will often install booster pumps
to provide all units on all floors with sufficient water
pressure. They receive the water from the city main
RHB 2014 Building Systems REPORT | 11
that enters the building and boost the pressure to reach
the top floors of the building. The city typically supplies
enough water pressure to reach about six floors, and
booster pumps provide the added pressure to provide
the remaining floors with 30 to 60 psi of water pressure.
The three main types of booster pumps are vertical
multi-stage pumps, in-line pumps and end suction
pumps. In-line pumps are the most common type, but
they are relatively inefficient compared to newer pumps.
While these pumps are effective in boosting the pressure
at the top of the building, their motors always run at 100%
capacity. In-line pumps run at a higher RPM and produce
more pressure than needed, so they use more power
to run their motor. Since in-line pumps produce more
pressure, they are often combined with pressure reducing
valves (PRVs). Pumps typically come in pairs or trios and
at least one pump runs at full capacity all day every day.
“This is like a person pushing the gas pedal all the way
down while they drive, and at the same time regulating
their speed with their brakes,” said Avram Musafija,
Project Consultant, Rikos Engineering Ltd. “As you can
imagine, it is not a very efficient way to drive or run a
pump system. The PRVs waste a lot of energy because
4
they have to discard the extra pressure produced by the
existing pump system.”
Vertical multi-stage pumps are more popular today.
These pumps accommodate for lower flows and maintain
pressure levels. This type of system does not require a
PRV, so there is no wasted energy. Vertical multi-stage
pumps were designed to respond to a building’s water
demand. When paired with a variable frequency drive
(VFD), they save on energy and are less expensive to
run. A VFD allows the booster pump’s motor to alter its
output based on water demand. This ensures that the
booster pump does not use more energy than required to
meet the building’s needs.
“If a pump is properly sized and designed for the
system it is servicing, it can last 15 years or more
with proper maintenance of the PRVs,” said Avram.
“However, older pump sets are inefficient and end up
costing the building more in energy consumption and
have an annual PRV maintenance expense. New systems
using vertical multi-stage pumps and VFDs can save
buildings up to 40 per cent of the booster pump’s energy
usage and are maintenance free.”
ELECTRICAL
SYSTEMS
Older multi-unit residential buildings have older electrical
equipment, which has a tendency to break down more
often over time. Building owners should replace any
remaining fuse panels with more modern breaker panels.
Fuse panels are prone to regular breakdowns and
failures, and can be difficult and expensive to maintain
as parts are not available. They are also not up today’s
code standards, and are more prone to tampering, so
replacing them with breaker panels should be a priority.
Building owners and managers should ensure that
they service main switchgears every two years, as
they are often ignored until they fail. Breakdowns
in main switches can be quite serious, as they can
cause significant damage (including fires) and incur
12 | RHB 2014 Building Systems REPORT
unnecessary costs. Infrared scans should be conducted
every two years to check the condition of the terminal,
disconnects and fuses, particularly in the main
switchgear and main disconnects.
“We have found in the last couple of years some main
disconnects are not functioning properly and infrared
scans do not detect these problems and there are no
visual clues,” said Ed. “Therefore, the only way to test for
this is to have an electrician physically test each of the
main disconnects by opening and closing them.”
Building automation systems
A building automation system (BAS), which is also
known as a building control system (BCS) or building
automation and control (BAC) system, is a centralized
and interconnected network of hardware and software
that monitors and controls a building’s equipment and
environment. This technology can be used to control the
specific usage of boilers and chillers, monitor and change
hallway temperatures, track hot water usage on a suite
to suite basis, identify equipment failures and contact
maintenance people when repairs are required.
is a guarantee on the energy savings, this is one way
to help with measurement, verification and monitoring
of the building and its systems. Compared with good
standalone control systems, there is minimal increased
savings, while compared to poor or relative no controls
the savings are substantial.”
A BAS is useful in that it can make the equipment
more energy efficient over time through regular
monitoring, equipment control and energy reduction.
However, they are usually not very cost effective for
multi-unit residential buildings. While a BAS does
provide better control and visibility, it might not provide
sufficient savings over time to justify the cost. Proper
individual controls on boilers, chillers, cooling towers,
booster pumps and MUAs might be more effective in
realizing savings.
Replacing CFL or less efficient light bulbs in the building
with LED lighting is one of the easiest ways to produce
significant energy savings. There have been great
improvements in LED lighting, including better colour,
more varieties for wider applications, better fixtures
and more options for retrofit kits. The overall quality of
light has also improved to the point where most current
retrofit projects are using LED lighting.
“A BAS can be useful for an owner who has multiple
buildings and wants to see what is happening in each
building at anytime from anywhere,” said Ed. “If there
36 Kelfield Street
Toronto, Ontario M9W 5A2
Tel: -
Fax: -
• Plumbing • Hydronic/DHW Systems • HVAC/R
LED lighting
“When we first started replacing light fixtures five
years ago, there was a real debate between CFL and
LED, while today it’s quite obvious that LED is the
popular choice,” said Sally. “Even though there were
limited options for LED at the time, and it was much
36 Kelfield Street
Toronto, Ontario M9W 5A2
Tel: -
Fax: -
• Drain Services • Sump Pit and Catch Basin Pumping
• High Pressure Flushing and Power Washing
• Drain Locating and Video Inspection
RHB 2014 Building Systems REPORT | 13
more expensive, we made the decision to install LED
lighting in our garage. I have always believed that design
and sustainability go hand in hand, and LED makes it
possible to limit your carbon footprint.”
The most common changes involve switching T12 and
T8 fluorescent lighting to LED tube lighting. These new
bulbs last significantly longer than fluorescent lighting
– 50,000 hours or more compared to 14,000 hours for
T8 fluorescent bulbs. LED lighting uses 50% or less of
the energy, contains no mercury (which is great for the
environment), reduces greenhouse gas emissions and
eliminates maintenance needs for years. Pot lights are
another growing area for LED lighting, as they offer great
flexibility in design, lighting for different rooms and are
easy to retrofit without replacing the pot light fixture.
“Another common LED lighting retrofit involves
replacing traditional parking lot lighting with LED
fixtures,” said Forrest. “Switching to LED lighting
changes everything, as it provides greater clarity along
with improved energy savings. People are able to see
better and feel safer in these areas.”
Even though the price of LED lighting has decreased
over time, they are still more expensive when compared
to other forms of lighting. It does not always make shortterm financial sense to retrofit some lighting fixtures with
LED lighting, and building owners cannot assume that
converting to LED lighting will result in immediate financial
payback. It should also be noted that not all LED lighting
options are built to the same standards. Some products
are not engineered to the same quality, and do not result
in the projected life expectancy. For example, some LED
lighting will fail after 10,000 to 20,000 hours instead of the
projected 50,000 hours of use.
“Building owners should be careful in knowing what
system they are buying and who makes it, along with the
warrantee, costs and savings,” said Ed. “LED lighting can
be a very good looking and energy savings retrofit that is
easy to do, with paybacks in less than three years.”
Motion sensors
Motion sensors are now allowed in retrofits in Ontario
and many areas of Canada, and are mandatory in certain
areas for new buildings. Owners should check with local
codes if and where they are allowed. For retrofits, motion
sensors can give owners substantial savings, especially
when combined with an energy efficient lighting system,
14 | RHB 2014 Building Systems REPORT
such as LED lighting. In essence, the lights remain off
until something or someone triggers the motion sensor.
Motion sensors can be installed in stairwells, corridors
and garage areas. Most stairwells are unoccupied almost
all of the time, and the lights remain on through all those
unused periods. Occupancy and motion sensors installed
in stairwells and other areas can contribute significant
savings. Corridors are used more often than stairwells,
but are often empty when people are at work or sleeping.
Garage areas can produce substantial savings when
controlled with motion sensors.
It should be noted that motion sensors cannot be
installed everywhere due to either code or by-law
requirements. For example, motion sensors cannot be
installed in lobbies or elevator lobbies, as lights must be
on at all times. Also, all areas must maintain a minimum
emergency light level at all times to ensure that code
requirements and city by-laws are followed.
“Owners should understand how motion sensors work
and where they will be installed to ensure the proper
security of their tenants,” said Ed. “Other areas to review
are corridors and stairwells, but security and cost of
installation may be deciding factors.”
Emergency generators
Emergency generators play a key role in life safety; they
power emergency lighting and underground garages, and
supply power to the fire alarm systems and fire pump(s).
They also supply power to elevator(s), which maybe
critical if you have tenants that need them during a nonemergency power outage. Emergency generators may
also supply minimal heat, power to booster pumps to
supply water to all floors, garage doors, emergency plug
outlets for tenant use, etc.
“Gas-fired generators are being installed for new
installations and even some retrofits,” said Ed.
“Natural gas is allowed in most parts of Canada, if
certain rules are followed, but this means during a
long power failure the owner does not have to worry
about re-fueling the generator.”
Code compliance can be a serious concern for
emergency generators, particularly those that run on
diesel fuel. Many existing installations are not code
compliant, and some newly installed emergency
generators may contain items that are not in line
C O N T R A C T I N G
LT D .
Eyecon Contracting has over 60 years of construction /
restoration experience as a general contractor.
We bring quality, honesty, and integrity to our clients.
inTact Lighting Group is bringing dozens of lighting manufacturers
from around the world to Ontario.
Our services for residential / commercial / industrial include:
Offering TURN-KEY or LEASE programs for the commercial,
municipal, industrial and institutional markets:
24 hour Emergency Response: Fire & Water Restoration.
We are IICRC Certified.
·
·
·
·
Fire / Smoke Damage
Water / Flood Damage
Wind Damage
Catastrophe / Disaster
Restoration
· LED Lighting installations
· Mold Remediation
· Restoration – Painting,
Drywall, Carpentry,
Plumbing, Electrical,
Kitchens, Bathrooms etc.
1-855-EYECON1
Solid state lighting | LED Area Lighting | Architectural Lighting |
Horticultural Lighting | Solar Lighting
Rely on us for all of your interior and exterior project needs. We have
the resources and relationships in place to deliver the right solutions
while meeting and surpassing your expectations- | intactlightinggroup.com
Showroom at 1160 Kerrisdale Blvd, Unit 7 in Newmarket
-www.eyeconcontracting.com
The power to customize your __________ project.
A.
B.
C.
D.
E.
F.
G.
H.
Lighting design
Lighting education
LED luminaires
Arms & banner arms
Poles & base covers
Bollards
Signage
Site furniture
I. All of the Above
www.hcilighting.com
-
RHB 2014 Building Systems REPORT | 15
with today’s code. Emergency generators, as well as
ventilation, fuel delivery and storage, are life safety
requirements, and must comply with Canadian
Standards Association (CSA) requirements. The
Technical Standards and Safety Authority (TSSA)
enforces all CSA regulations in Ontario, and life safety
equipment must meet all current standards.
“There is no grandfather clause for emergency
generators, so owners cannot argue that their generator
was inspected or approved five to ten years ago,” said Ed.
“If the installation does not meet current codes and/or does
not have applicable variances approved, the system is
not code compliant and therefore may be red tagged (not
allowed to operate) or fuel may not be able to be delivered
until the systems are brought up to code compliancy.”
The TSSA mandates in Ontario that fuel delivery
people must note non-compliant items on the emergency
generator or other areas, which will prevent them from
delivering fuel. If this happens, they will issue a form
stating that fuel cannot be delivered as certain items are
not up to code. The building owner should understand
that this is not a TSSA order and the list is not complete.
If an owner receives this notice, they should contact an
engineer to review their emergency generator to prepare
a complete list of non-compliant items, a list of variances
that may be applied for to save money and a full design
for tender. Once the building owner retains an engineer,
fuel can be delivered to allow the building to keep life
safety systems operational while upgrades are being
designed and completed.
Emergency generators should be operated every week
and yearly with a full load test. Owners should consult
their service contractors to help them set up these tests
to be code compliant. As generators get older there is a
possibility that they will not be able to pass the full load
test. Generators have a life expectancy of 35 years but
some may not make it that long in that they will fail the
full load test. As this is a life safety issue and it is very
costly to replace, the building owner should budget for
this situation so that it does not come as a surprise when
the generator does not pass the yearly full load test and
requires replacement.
Fire alarm and life safety systems
Different building types will require different levels of
life safety systems. However, all fire alarm systems,
16 | RHB 2014 Building Systems REPORT
suppression systems and life safety equipment,
including emergency generators and lighting, require
annual testing and certification. Every component in the
life safety system has a specific life expectancy; even
when it is certified year to year, it is possible that it will
fail the following year. Systems that contain electronic
equipment tend to have a shorter life span, and some
parts needed for older systems can become difficult or
impossible to obtain.
During yearly certification, contractors will let the
building owner know if there are concerns with the
systems or if they find something non-compliant. Each
contractor that certifies life safety equipment needs to be
certified. It is good practice to get a different company
in every three to five years to certify the equipment,
therefore verifying what the other company was doing.
“When we retrofit fire alarms, we will often specify that
the contractor should install an addressable system,
although for smaller buildings, this would not be true,”
said Ed. “This system is tied to each device and knows
where each device is. The migration to this system
has become more commonplace because of computer
technologies becoming better and more affordable.”
Carbon monoxide (CO) monitoring is an essential
component of the garage’s ventilation system. It can only
operate in two ways: ON for 24 hours, 7 days a week or
controlled by a CO monitoring system. Some owners install
timers on the exhaust system, which is against code and
very unsafe. They have a very good payback if fans are left
ON all the time. CO sensors should be installed to bring
the garage into code compliance, if timers are used, for
safety reasons and for energy savings.
Note: The regulations under the Ontario Fire Code
state that, effective October 15, 2015, CO alarms will
be required in the service rooms for any fuel burning
appliance, and near sleeping areas in adjacent multiresidential units. For buildings of six units or less, the
requirement applies as of April 15, 2015. A fireplace or
an attached garage also triggers the requirement. For
a single family house (or other unit that contains a fuel
burning appliance), an alarm is required adjacent to any
sleeping area(s). CO alarms can be hardwired, batteryoperated or plugged into the wall outlet. They should also
be checked annually, during tenant turnover, when the
battery is replaced and when there are changes to the
connecting circuits.
MC
Quality and Service
Did
You
Know
Mechanical
Services
We have over 28 years of trade experience. All our work is
fully insured and guaranteed, we remain price conscious but
offer quality service.
We are dedicated to provide every customer with superior
service; we will always be courteous and helpful to our
customer’s needs, concerns and questions.
CIMCO is the best kept SECRET
in heating and cooling systems!
Yes, we are known by industry professionals as a premium
supplier to the industrial refrigeration market, but did you
know that CIMCO Refrigeration provides services to the
commercial and multi-residential markets? Our services include
turn-key solutions for both heating and cooling systems.
HEATING | VENTILATION
AIR CONDITIONING | REFRIGERATION
21 Signal Hill Ave., Unit # 2 Toronto, Ont. M9W 6V8
Phone:-
www.mcmechanical.ca
Call us today to learn more:- or for
24-hour emergency service—-.
www.cimcorefrigeration.com
EFFICIENT
BUILDINGS
START WITH EFFICIENT SYSTEMS
Service Experts Commercial HVAC, we possess all necessary
equipment and tools to service and maintain the equipment
at your facilities. Our service vehicles are equipped with
stepladders, extension ladders, vacuum pump, recovery unit,
multi-meters & thermostats, and a wide variety of filters and
belts. At Service Experts we offer all HVAC services including
estimates, installations, service and repairs, basic and
comprehensive maintenance plans.
Let Grundfos show you the hidden savings in your
HVAC and booster systems. With the Grundfos audit
program, your systems will be accurately monitored
and energy consumption demonstrated. See the
difference a Grundfos high efficiency pump and
system can make for your building. For more
information contact:
Janusz Kic P. Eng
Grundfos Sales Manager--
We specialize in all commercial/ industrial units ranging from
unit heaters to cooling towers and everything in between. All of
the units we provide are Energy Star rated and CSA approved.
Expert Service, Guaranteed!-
www.serviceexperts.ca
RHB 2014 Building Systems REPORT | 17
CONCLUSION
A building’s mechanical, plumbing and electrical systems are akin to your body’s cardiopulmonary, respiratory,
digestive and nervous systems. These important systems must be kept at optimum efficiency, or the body will suffer.
However, because these systems are beneath the surface, problems often get overlooked or ignored. Failure to deal
with issues when symptoms arise can have serious consequences.
Use the following checklist to help you stay on top of your maintenance schedule. It pays to know what’s going on in
your building, particularly when other professionals are doing the work. Being informed means that you are taking the
necessary steps to maintain your building’s most important systems. Therefore, whenever you have a problem, issue or
question related to your building’s mechanical, electrical or plumbing systems, you should first contact an engineer. It will
save you time, money and aggravation over the long term, and it will ensure that you get the right answers the first time.
CHECKLIST FOR MAINTENANCE ITEMS
Heating and cooling system
Centrifugal chiller
c
Spring startup
c
Monthly service (during cooling season)
c
Fall inspection and winter turnover
Cabinet hot water radiators (lobby and corridor)
c
Annually (start of heating season)
Electric unit heaters (common area and service rooms)
c
Annually (start of heating season)
Gas-fired boilers
c
Compressor
c
Fall startup
c
Compressor oil system
c
Monthly service (during operating season)
c
Motor starter
c
Control panel
c
Control system
c
Monthly service (during operating season)
c
Evaporator and condenser
c
Annually
c
Refrigerant system
c
Purge system
c
Monthly
c
Leak test
c
Quarterly
c
Unit
c
Every six months
Cooling tower
Vertical in-line pumps (heating and cooling circulation
pumps, condenser water pumps)
Two-pipe fan coil units (lobby and common areas)
Hydronic heating units (common areas, service rooms,
plenum hot water fan heaters)
c
Spring startup
c
Monthly service (during cooling season)
c
Annually (start of heating season)
c
Bi-monthly service (during cooling season)
c
Bi-monthly (during heating season)
c
Winter shutdown and inspection
c
General maintenance
c
Electrical and controls
18 | RHB 2014 Building Systems REPORT
HEATING AND COOLING SYSTEM (CONTINUED)
DX fan coil / DX cooling units (elevator machine room,
management office, library, kitchen, swimming pool,
common area cooling units)
c
Monthly
c
Quarterly
c
Every six months
Air-cooled condensing units for split DX systems (elevator
machine room, management office, library, kitchen,
swimming pool, common area cooling units)
c
Bi-monthly (operating season)
c
Annually
Rooftop packaged gas heating and electrical cooling
units (recreation area)
c
Monthly
c
Every three months (filters)
c
Quarterly (twice during cooling season)
c
Annually
Gas-fired boilers (domestic hot water boilers)
c
Monthly
c
Annually
Ventilation
Hydronic heating and cooling air-handling units (makeup air units)
c
Monthly
c
Semi-annually
Fans (garage, garbage room, common room,
mechanical/electrical room ventilation fans,
pressurization fans)
c
Quarterly
Dampers and operators (make-up air units,
ventilation fans)
c
Every six months
Domestic hot water system
Domestic hot water tank (storage tanks)
c
Monthly
c
Annually
Electric hot water heater (domestic hot water
recirculation booster heaters)
c
Monthly
c
Annually
Plumbing and drainage
Pumps (domestic cold water booster pumps, domestic
hot water boiler booster pumps, domestic hot water
recirculation pumps, primary heating pump, pool
circulation pumps, fountain circulation pumps, sump
pumps)
c
Bi-monthly
c
Annually
Water treatment
Automatic chemical feed and bleed system (cooling
tower loop)
c
Monthly (during operating season)
Closed loop chemical bypass feeder (heating and
cooling loop pumps, primary heating pumps,
condenser water pump)
c
Monthly
c
Annually
General control systems
Pneumatic and electronic or DDC control systems (dry
sprinkler compressed air system, boiler plant, chiller
plant, make-up air unit control systems and panels)
c
Monthly
Valves (heating/cooling circulation loops, domestic cold
and hot water main loops, water treatment system)
c
Annually
RHB 2014 Building Systems REPORT | 19