1
2
3
2900
4
2600
C2
5
24500
4650
6
4200
C2
7
4650
C2
8
2600
C2
C2
2900
BASES REBAR SCHEDULE
C2
A'
A'
B2
B2
B2
B2
3600
B2
3600
B2
A142 BRC MESH PLACED AT 75mm FROM
THE TOP TO S.E. APPROVAL
C1
A142 BRC MESH PLACED AT 75mm FROM
THE TOP TO S.E. APPROVAL
C1
C1
A
B1
BASE B2
1200X1200X300
T12@200 B1&B2
BASE B3
1300X1300X300
T12@200 B1&B2
BASE B4
1700X1700X500
T12@150 B1&B2
T12@150 T1&T2
B1
C2
C2
B2
B2
3500
B2
A142 BRC MESH PLACED AT
75mm FROM THE TOP TO S.E.
APPROVAL
A142 BRC MESH
PLACED AT 75mm FROM
THE TOP TO S.E.
APPROVAL
C2
BASES CONCRETE SCHEDULE
Type
Mark
C2
3500
B2
A142 BRC MESH
PLACED AT 75mm
FROM THE TOP TO S.E.
APPROVAL
C2
C1
B
B2
B1
5
C1
4
4
C2
115
B2
B1
1817
C2
C2
C1
A142 BRC MESH PLACED AT 75mm
FROM THE TOP TO S.E. APPROVAL
C1
C1
B4
10.37 m³
2
1.01 m³
2
2.89 m³
37
22.37 m³
B1
B1
COLUMN CONRETE SCHEDULE
Type
Mark
Column
Column
Column
COLUMN C1
300X200
4T16
COLUMN C2
200X200
4T12
COLUMN C3
250 Dia
6T10
Mark
Description
Count
Volume
C1
C2
C3
300x200
200x200
250mm Dia
9
28
4
4.25 m³
6.86 m³
0.91 m³
12.03 m³
B2
720
2065
1341
B2
B1
Base
24
CONCRETE
D
B2
B3
8.10 m³
C2
D
B2
Base
9
C
B2
B2
C2
B2
Volume
COLUMNS REBAR SCHEDULE
2570
UP
Base
Count
2400
-
C2
B1
Description
1500x1500x400mm Thick
Base
1200x1200x300mm Thick
Base
1300x1300x300mm Thick
Base
1700x1700x500mm Thick
Base
CONCRETE
5
C2
Base
B2
22848
B2
Mark
C2
B
22848
T12@200 B1&B2
2101
B1
2101
C2
C
1500X1500X400
C1
A
B1
BASE B1
A142 BRC MESH PLACED AT 75mm
FROM THE TOP TO S.E. APPROVAL
A142 BRC MESH PLACED AT 75mm FROM
THE TOP TO S.E. APPROVAL
1350
B2
C2
C2
700
C2
C2
B2
C2
B4
B2
GRND FLR
0
0
SND-002
SND-002
HRD-003
HRD-003
B4
200mm Thick
Foundation Wall
200
200
A142 BRC MESH PLACED AT 75mm
FROM THE TOP TO S.E. APPROVAL
B3
600
SECTION 5-5
1911
1 : 20
Keynote Legend
1 : 20
Key Value
HRD-
2600
299
2500
941
840 71
0
-
76 834
3739
2600
2900
SL-001
SND-002
FOUNDATION/GROUND FLOOR LAYOUT
1
2
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
Strip Footing 25/20 (i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
2. Excavations to be inspected before blinding
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
3
4
5
6
Description
8
PROJECT TITLE
Revisions
Date
7
Remarks
PORTFOLIO PROJECT
G+2
T10 - 1 -200
1 mm B1
200
T10 - 1 -200
1 mm B1
SECTION 4-4
DN
1 : 60
STRUCTURAL ENGINEER
BRIAN GATONYE
GITHENG'U
200
T8 - 2 -200
2 mm B2
600
B3
200
200
200
504
C3 C3
F
341 548
889
200
T8 - 2 -200
2 mm B2
504
DN
C3 C3
1911
F
200mm Thick
Foundation Wall
2442
2442
1252
E'
D.O.S Min 1500mm
B2
C2
402 351
C2
C2
GRND FLR
SL-001
1252
353 400
E'
SL-001
E
700
E
D.O.S MIN 1500mm
1354
A142 BRC MESH PLACED AT 75mm FROM
THE TOP TO S.E. APPROVAL
Keynote Text
300mm Thick Well Compacted hardcore to
Engineer`s Approval
150mm Thick Slab with A142 BRC Mesh
50mm Thick Sand Blinding with 1000gauge
Polythene Membrane
Drawing Title:
FOUNDATION/GROUND
FLOOR LAYOUT
SHEET NO.
Scale:
01
AS
INDICATED
1
2
3
4
5
6
7
8
-
2600
C2
4650
4200
C2
4650
C2
2600
C2
C2
BASES REBAR SCHEDULE
2900
C2
BASE B1
1500X1500X400
T12@200 B1&B2
BASE B2
1200X1200X300
T12@200 B1&B2
BASE B3
1300X1300X300
T12@200 B1&B2
BASE B4
1700X1700X500
T12@150 B1&B2
T12@150 T1&T2
3600
A'
3600
A'
51
49
C1
C1
C1
C1
A
A
50
50
2101
C2
C2
Mark
Base
B1
Base
B2
Base
B3
Base
B4
Description
1500x1500x400mm Thick
Base
1200x1200x300mm Thick
Base
1300x1300x300mm Thick
Base
1700x1700x500mm Thick
Base
CONCRETE
95
46
96
B
C2
C2
C1
95
C2
3500
3500
3500
3500
5601
C2
5601
C2
2101
2101
2101
BASES CONCRETE SCHEDULE
Type
Mark
Count
Volume
9
8.10 m³
24
10.37 m³
2
1.01 m³
2
2.89 m³
37
22.37 m³
B
C1
C2
64
22848
C2
22848
602
2570
C1
65
300X200
4T16
COLUMN C2
200X200
4T12
COLUMN C3
250 Dia
6T10
C2
34
C1
COLUMN CONRETE SCHEDULE
D
15
C2
C1
66
15
C2
15
C2
D
COLUMN C1
C
1817
2570
C2 34
753
C
2515
2515
COLUMNS REBAR SCHEDULE
Type
Mark
Column
Column
Column
3415
3415
1852
Mark
Description
Count
Volume
C1
C2
C3
300x200
200x200
250mm Dia
9
28
4
4.25 m³
6.86 m³
0.91 m³
CONCRETE
12.03 m³
1852
E
C2
C2
C2
C2
C2
700
700
E
C2
753
E'
753
E'
C2
4447
4447
C2
399
405
2900
2600
4650
405
C3 C3
-
399
1052
C3 C3
1052
F
1052
F
4650
2600
2900
COLUMN SETTING OUT LAYOUT
1 : 55
1
2
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
Strip Footing 25/20 (i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
2. Excavations to be inspected before blinding
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
3
4
5
6
PROJECT TITLE
Revisions
Date
Description
7
Remarks
PORTFOLIO PROJECT
G+2
Ground Floor 3D
8
STRUCTURAL ENGINEER
BRIAN GATONYE
GITHENG'U
Drawing Title:
COLUMN SETTING
OUT LAYOUT
SHEET NO.
Scale:
02
AS
INDICATED
1
200
200
1
200
300
1 4
1 4
-
1
1
200
4
1
ø
4
31
ø
25
0
1
1 : 10
1
1
4
1 4
1
SECTION 3-3
1
1
200
1
200
200
1
31
1
SECTION 6-6
1 : 10
25
0
1
1
12 -T12 - 1 1-150 mm B2
1
SECTION 6-6
1
1
1
1 : 10
1
GRND FLR
SECTION 9-9
0
GRND FLR
GRND FLR
GRND FLR
0
0
0
3
D.O.S MIN 1500mm
2 -T16 - 1 Starter
1
Bars
3
6T8 - 4 -200
6
D.O.S MIN 1500mm
D.O.S MIN 1500mm
9
6
9
6T10 - 3 - Starter Bars
400
500
250
7 -T12 - 1 -200
1 mm B1
325
12 -T12 - 1 1-150 mm B1
1700
1300
Base B4 R.C. Details
Base B2 R.C. Details
Base B3 R.C. Details
1 : 15
Base B1 R.C. Details
1 : 15
0
7 -T8 - 1 -200
1 mm B1
1200
-
400
300
300
325
1500
4 - T12 - 1 - Starter Bars
12 -T12 - 1 1-150 mm T1
2 -T12 - 1 Starter
1
Bars
8 -T12 - 1 -200
1 mm B1
6
6T8 - 4 -200
8T8 - 3 -200
8T8 - 3 -200
6T10 - 3 - Starter Bars
2 -T12 - 1 Starter
1
Bars
6T8 - 4 -200
6
4 - T12 - 1 - Starter Bars
6T8 - 4 -200
2 -T16 - 1 Starter
1
Bars
D.O.S MIN 1500mm
1 : 10
1 : 15
11
1 : 15
-
2
-
850
1300
750
850
-
400
450
650
-
12 -T12 - 1 1-150 mm T2
7T8 - 1 -200 B2
754
1700
8
754
12T12 - 1 -150 B2
1300
650
4
7T12 - 1 -200 B2
650
12T12 - 1 -150 T2
650
-
750
750
8T12 - 1 -200 B2
600
1200
8
4
1300
600
1500
1500
600
7T12 - 1 -200 B1
1700
750
750
8T12 - 1 -200 B1
473
12T12 - 1 -150 T1
600
473
600
7T8 - 1 -200 B1
750
600
-
1 : 15
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
Strip Footing 25/20 (i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
2. Excavations to be inspected before blinding
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
400
450
1300
850
850
Base B2 Plan View
2
Base B1 Plan View
450
-
473
473
12T12 - 1 -150 B1
1700
1 : 15
Base B4 Plan View
Base B3 Plan View
PROJECT TITLE
Revisions
Date
Description
Remarks
PORTFOLIO PROJECT
G+2
1 : 15
11
1 : 15
STRUCTURAL ENGINEER
BRIAN GATONYE
GITHENG'U
SHEET NO.
Drawing Title:
BASES R.C.
DETAILS
Scale:
03
AS
INDICATED
Roof Terrace
Roof Terrace
6600
6600
COLUMNS REBAR SCHEDULE
2
15T8 - 4 -200
3300
2 -T12
3 -3
2
2
2
2
2
200
200
3
1
2
4T16
COLUMN C2
200X200
4T12
COLUMN C3
250 Dia
6T10
COLUMN CONRETE SCHEDULE
200
2 -T12
3 -3
300X200
2
15T8 - 4 -200
300
COLUMN C1
ø
4
4
25
0
Type
Mark
Column
Column
Column
Mark
Description
Count
Volume
C1
C2
C3
300x200
200x200
250mm Dia
9
28
4
4.25 m³
6.86 m³
0.91 m³
CONCRETE
12.03 m³
2
4
2
2
800mm Lap
2
9
1st FLR
75mm Kicker
1st FLR
3300
SECTION 4-4
600mm Lap
1:5
3300
2
SECTION
6-6
2
1:5
75mm Kicker
9
SECTION 3-3
1:5
1st FLR
3300
1
4
3750
15T8 - 4 -200
15T8 - 4 -
6T10 - 4
3
2 -T12
2 -2
2 -T12
2 -2
3300
3
4
6
6
4
0
500mm Lap
GRND FLR
0
Column C1
Column C2
1 : 15
1 : 15
75mm Kicker
75mm Kicker
GRND FLR
75mm Kicker
GRND FLR
0
600mm Lap
800mm Lap
14T8 - 3 -200
Column C3
1 : 15
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
Strip Footing 25/20 (i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
2. Excavations to be inspected before blinding
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
PROJECT TITLE
Revisions
Date
Description
Remarks
PORTFOLIO PROJECT
G+2
STRUCTURAL ENGINEER
BRIAN GATONYE
GITHENG'U
SHEET NO.
Drawing Title:
COLUMN R.C.
DETAILS
Scale:
04
AS
INDICATED
11 -T12 - mm T2
2
3
7 Treads@300mm = 2100mm
1655
3
10 -T12 - mm B2
Beam F7
(450x200)
10
Beam F6 (450x200)
4
2
19
13
12
11
10
17
9
8
7
6
5
4
3
12 -T12 - 9 9-150 mm T2
21
20
9 -T12 - 1414
-150 mm T1
19
300
18
150
C
14
22
175
15
C
2
918-T12
15mm
-T12- 15
-
mmAnti-Crack
B2
3300
8 Risers @150mm = 1200mm
Beam F22
(450x200)
15
23
1st FLR
17
2
1746
3744
17
9 -T12 - 11 -15011mm Starter Bars
16
9 -T12 - 1313
-150 mm B1
2
12 -T12 - 9 9-150 mm B2
15
9 -T12
10 -15010mm Starter Bars
10 -T12 -
mm-T2
19
3
2570
18 -T12 - 6 6-150 mm B1
STAIRCASE SECTION 3
450x200mm Beam
2T16 Bot, 2T16 Top
T8@200 Links
1 : 20
15
5
16
17
18
19
20
21
22
23
3
D
Beam F10 (450x-
4
2
2400
3
10
STAIRCASE PLAN VIEW
1253
17
Beam F23 (450x200)
D
4
4
1 : 20
3
STAIRCASE 3D
2 12 -T12 - 9 9-150 mm T2
10
30 -T12 - 8 8-150 mm B2
13 Treads @300mm =3900mm
1655
17
12 -T12 - 9 9-150 mm B2
18 -T12 - 5 5-150 mm T1
10
4
14
13
12
9 -T12 - 4 -150
4 mm T1
11
18 -T12 - 6 6-150 mm B1
10
450x200mm Beam
2T16 Bot, 2T16 Top
T8@200 Links
9
300
8
7
150
6
9 -T12 - 1 -150 1mm Starter Bars
15 -T12 - 8 8-150 mm T2
5
175
14 Risers@150mm = 2100mm
4
9 -T12 - 3 -150
3 mm B1
3
2
8 -T12 - 8 -150
8 mm T2
1
9 -T12 - 2 -150 2mm Starter Bars
GRND FLR
0
4 -T12 - 7 -150
7 mm B2
STAIRCASE REINFORCEMENT 3D
300
4
Beam F19 (450x200)
2570
8 -T12 - 1919
-150 mm T2
9 -T12 - 12 -150
12mm Anti-Crack
5
18 -T12 - 5 5-150 mm T1
600
STAIRCASE SECTION 2
1 : 20
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
Strip Footing 25/20 (i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
2. Excavations to be inspected before blinding
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
PROJECT TITLE
Revisions
Date
Description
Remarks
PORTFOLIO PROJECT
G+2
STRUCTURAL ENGINEER
BRIAN GATONYE
GITHENG'U
SHEET NO.
Drawing Title:
STAIRCASE R.C.
DETAILS
Scale:
05
AS
INDICATED
1
2
3
2900
4
2600
5
24500
4650
6
4200
7
4650
8
2600
First Floor Solid Slab
First Floor Ribbed Slab
2900
Beam F1 (450x200)
A'
A'
C2
C2
C2
C2
4
Ribs
150
No.
BEAM SIZE
450X200
BOT 3T12, TOP 2T12 ADD 2T12
T8@200
F2
1
450X200
BOT 3T20, TOP 2T20 ADD 2T20
T8@150
F3
1
450X200
BOT 3T12, TOP 3T12
T8@200
F4
1
150X600
BOT 5T20, TOP 5T20 ADD 3T20
T10@200
F5
1
150X600
BOT 5T20, TOP 5T20 ADD 3T20
T10@200
F6
1
450X200
BOT 4T12, TOP 4T12 ADD 3T12
T8@200
F7
1
450X200
BOT 2T12, TOP 2T12
T8@200
F8
1
450X200
BOT 2T12, TOP 2T12
T8@200
14
F9
1
450X200
BOT 2T12, TOP 2T12
T8@200
F10
1
450X200
BOT 3T20, TOP 2T20 ADD 3T20
T8@150
F11
1
450X200
BOT 2T12, TOP 2T12
T8@200
F12
1
450X200
BOT 3T12, TOP 3T12
T8@200
F13
1
450X200
BOT 3T12, TOP 3T12
T8@200
F14
1
450X200
BOT 3T12, TOP 3T12
T8@200
F15
2
450X200
BOT 2T12, TOP 2T12
T8@200
F16
1
450X200
BOT 3T12, TOP 3T12
T8@200
F17
1
450X200
BOT 2T12, TOP 2T12
T8@200
F18
1
450X200
BOT 3T16, TOP 3T16 ADD 2T12
T8@200
F19
1
450X200
BOT 2T12, TOP 2T12
T8@200
F20
1
450X200
F21
1
450X200
F22
1
450X200
BOT 2T12, TOP 2T12
T8@200
F23
1
450X200
BOT 2T16, TOP 2T16
T8@200
F24
1
600X200
BOT 4T20, TOP 2T20 ADD 3T20
T10@100
F25
1
450X200
BOT 3T16, TOP 3T16
T8@200
F26
1
450X200
BOT 4T20, TOP 2T20 ADD 3T20
T10@100
F27
1
450X200
BOT 2T16, TOP 3T12 ADD 3T12
T8@200
C2
14
Beam F11 (450x200)
13
299
150mm Thick Solid Slab
Beam F31 (450x200)
13
1351
Beam F27 (450x200)
7
Beam F14 (450x200)
C2
C2
Beam F15
(450x200)
C2
10
C2
12
C2
4447
Beam F25 (450x200)
C2
4447
E'
Beam F15
(450x200)
C2
Beam F32
(450x200)
Beam F32
(450x200)
C2
E
700
E
150mm Thick Solid Slab
1053
F
1053
F
Beam F16 (450x200)
C3 C3
1287
1287
C3 C3
2900
2600
2799
841
1063
1063
Beam F17 (450x200)
15
4
1011
4200
1011
3639
2600
2900
24500
1
2
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
(i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
Excavations to be inspected before blinding
1 2.: 58
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
1st
FLR
Strip
Footing 25/20
3
4
5
6
Date
Description
7
8
PROJECT TITLE
Revisions
Remarks
HOLLOW BLOCK
1
D
C1
C1
Beam F23 (450x200)
Beam F18 (450x200)
3415
C2
230
Beam Stiffener
BEAM NAME
C
1206
150mm Thick Solid Slab
1206
Beam F10 (450x200)
Beam F30 (450x200)
Beam F19
(450x200)
1625
DN
E'
2T16
F1
22848
12
D
Beam F13 (450x200)
3T12 Bot
FIRST FLOOR BEAM REINFORCEMENT SCHEDULE
10
1852
3T12 Bot
1 : 10
150mm Thick Solid Slab
4
15
700
250
258
C2
Beam F9 (450x200)
2799
2T16
B
C2
Beam F12 (450x200)
150
300
1
VOID
3T12 Bot
375
375
C2
150mm Thick Solid Slab
Y12@200 - T1&T2
150
1 : 15
3242
150mm Thick Solid Slab
C1
375
SECTION 4-4
2515
C2
Beam F6 (450x200)
12
C2
3T12 Bot
C2
C1
Beam F8 (450x200)
150
T8 - 3 -200
3 mm
Beam F5 (150x600)
258
1543
150mm Thick Solid Slab
C2 Beam F3 (450x200)
1364
Beam F22
(450x200)
Beam F7
(450x200)
Upstand Beam F26 (450x200)
Upstand Beam F24 (600x200)
Beam F21 (450x200)
3593
Beam F4 (150x600)
C1
C2
C2
A
375
1049
150mm Thick Solid Slab
C2
Beam F3 (450x200)
1957
150mm Thick Solid Slab
Beam F28 (450x200)
1049
150mm Thick Solid Slab
465
22848
C1
250mmx300mm Beam Stiffener
C2
945
C
C1
250mmx300mm Beam Stiffener
C2
B
C1
1351
2101
1049
C1
150
250
Beam F2 (450x200)
A
A142 BRC MESH
150 100
150mm Thick
Rib Slab
7
with 100mm Topping
Y12@200 - B1&B2
1798
1
Reinforcement
150mm Wide Ribs
2101
12
1049 Beam F29 (450x200)
150mm Thick Rib Slab
with 100mm Topping
1800
250mmx300mm Beam Stiffener
2064
Beam F20 (450x200)
3600
4
150 mm
Thicknesss
250 mm
Thicknesss
1802
C2
1800
C2
PORTFOLIO PROJECT
G+2
REINFORCEMENT
BOT 3T20, TOP 2T16
BOT 3T20, TOP 3T16
LINKS
T8@200
T8@200
F28
1
450X200
BOT 4T16, TOP 2T16 ADD 3T16
T8@150
F29
1
450X200
BOT 3T20, TOP 2T16
T8@200
F30
1
450X200
BOT 3T12, TOP 2T12
T8@200
F31
1
450X200
BOT 3T12, TOP 3T12 ADD 3T12
T8@200
F32
1
450X200
BOT 2T12, TOP 2T12
T8@200
STRUCTURAL ENGINEER
BRIAN GATONYE
GITHENG'U
SHEET NO.
Drawing Title:
FIRST FLOOR
BEAM LAYOUT
Scale:
06
AS
INDICATED
1
2
8T12 - 30 -200 T2
3
2900
2600
4
24500
4650
20T12 - 25 -200 T1 5
6
75T12 - 2 Bot
7
(3T12 Per Rib) 4650
4200
8
2600
2900
A'
First Floor Ribbed Slab
A'
C2
C2
C2
C2
C2
1800
C2
5
15T12 - 1 Bot
3600
3600
4
Ribs
5
12
(3T12 Per Rib)
1
150mm Wide Ribs
7
1800
15T12 - 1 Bot
250 mm
Thicknesss
(3T12 Per Rib)
4
A
A
C1
C1
1049
C1
41T12 - 23 -200 T1
C2
C253T12 - 23 -200 T1
42T12 - 21 -200 B2
150 mm
Thicknesss
C2
Reinforcement
5601
C2
21T12 - 4 -200 B1
56T12 - 20 -200 B2
Y12@200 - B1&B2
9T12 - 28 -200 T2
13T12 - 30 -200 T2
11T12 - 26 -200 T2
Y12@200 - T1&T2
23T12 - 5 -200 B1
16T12 - 3 -200 B1
A142 BRC MESH
21T12 - 25 -200 T1
21T12 - 25 -200 T1
150
13T12 - 32 -200 T2
C2
10T12 - 4 -200 B1
B
C2
C2
C1
250
B
150 100
5601
First Floor Solid Slab
8T12 - 31 -200 T2
1049
C1
375
3T12 Bot
150
375
150
3T12 Bot
375
150
3T12 Bot
3T12 Bot
11T12 - 27 -200 T2
23T12 - 8 -200 B1
4
C1
29T12 - 24 -200 T1
21T12 - 7 -200 B1
C2
C2
9T12 - 13 -150 B1
12
7T12 - 19 -200 B2
8T12 - 18 -200 B2
1
12
2T16
2T16
T8 - 3 -200
3 mm
2570
C2
2570
1 : 15
C
250
6T12 - 47 -200 T2
SECTION 4-4
13T12 - 17 -200 B2
22848
22848
6T12 - 36 -200 T2
C
2515
2515
9T12 - 29 -200 T2
10
15
8T12 - 14 -200 B2
11T12 - 17 -150 T2
12T12 - 33 -200 T2
DN
300
D
D
C2
C2
C1
C1
C1
C2
7
13
9T12 - 6 -200 B1
27T12 - 2 -200 B1
Beam Stiffener Copy 1
27T12
13 - 9 -200 B1
21T12 - 13 -200 B2
1 : 10
21T12 - 16 -200 B2
21T12 - 24 -200 T1
14
13T12
14 - 24 -200 T1
16T12 - 39 -200 T2
17T12 - 1 -200 B1
6T12 - 45 -200 T2
6T12 - 38 -200 T2
150
3415
7T12 - 40 -200 T2
6T12 - 37 -200 T2
6T12 - 35 -200 T2
3415
C2
4T12 - 44 -200 T2
230
700
E
700
E
C2
E'
C2
C2
10
21T12 - 12 -200 B2
6T12 - 41 -200 T2
6T12 - 42 -200 T2
21T12 - 15 -200 B2
C2
C2
375
E'
C2
C2
13T12 - 34 -200 T2
12
C2
HOLLOW BLOCK
4447
4447
17T12 - 43 -200 T2
45T12 - 10 -200 B1
10T12 - 28 -200 T2
32T12 - 22 -200 B2
15T12 - 46 -200 T2
13T12 - 28 -200 T2
F
F
C3 C3
C3 C3
32T12 - 11 -200 B2
15
2900
1
2600
2
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
Strip Footing 25/20 (i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
2. Excavations to be inspected before blinding
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
FIRST FLOOR R.C. DETAILS
4
4650
4650
3
4200
4
5
6
Description
7
Remarks
PORTFOLIO PROJECT
G+2
Rib Slab 3D
1 : 55
2900
PROJECT TITLE
Revisions
Date
2600
8
STRUCTURAL ENGINEER
BRIAN GATONYE
GITHENG'U
Drawing Title:
FIRST FLOOR R.C.
DETAILS
SHEET NO.
Scale:
07
AS
INDICATED
2
3
4
5
18700
6
7
6
2600
4650
2 -T128- 8 Add
2 -T12 7- 7 Add
4200
2 -T128- 8 Add
4650
2
1300
800
23T8 - 6 -200
800
21T8 - 6 -200
1 : 25
2
8
200
800mm Lap
BEAM F1 (450X200)
3T12 BOT, 2T12 TOP, 2T12 ADD
3 -T121- 1 Bot
13T8 - 6 -200
23T8 - 6 -200
800mm Lap
200
3
800mm Lap
13T8 - 6 -200
6
2 -T129- 9 Add
2 -T128- 8 Add
2 -T125- 5 Top
1300
BEAM F1 (450X200)
2600
3
3 -T123- 3 Bot
3 -T122- 2 Bot
6
3
2
2 /9
8
100
2 /4
2 -T1211
- 11 Top
100
450
13T8 - 2 -200
6
3 /3
3 /1
SECTION 3-3
SECTION
2-2
7
1 : 15
1 : 15
2 /11
1 : 20
6
-
12
SECTION 8-8
BEAM F3 (450X200)
2T12 BOT, 2T12 TOP
BEAM F3 (450X200)
2
2 /1
1
2 -T121- 1 Bot
8
350
6
350
450
2 /5
200
450
150 100
2600
1 : 15
5
4
13500
4650
3
4200
8
4650
8
-
6
200
6
1400
150
2 /7
2 -T207- 7 Add
2800
2800
2 /3
2 /4
300
1400
2 -T204- 4 Top
2 -T20 6- 6 Add
1000mm Lap
150
2 -T20 6- 6 Add
450
2 -T203- 3 Top
5
2 -T205- 5 Add
28T8 - 8 -150
29T8 - 8 -150
5
1
-
12
BEAM F2 (450X200)
BEAM F2 (450X200)
3T20 BOT, 2T20 TOP, 2T20 ADD
1
12
3 -T201- 1 Bot
1000mm Lap
8
3 /2
8
29T8 - 8 -150
3 /1
6
3 -T202- 2 Bot
SECTION 5-5
SECTION 6-6
1 : 15
1 : 15
1 : 20
3
8850
21T10 - 5 -200
1000
23T10 - 5 -200
1
600
4
150
2800
1000
5
5 /2
1
6
10
BEAM F4 (150X600)
5T20 BOT, 5T20 TOP, 3T20 ADD
11
5 -T201- 1 Bot
1 : 20
12
4649
SECTION 10-10
SECTION 11-11
1 : 15
1 : 15
2
5
200
2 -T122- 2 Top
20
13
5 -T201- 1 Top
-
3 -T20 5- 5 Add
600
15T8 - 3 -200
14
13
4
5 /1
SECTION
13-13
BEAM F5 (150X600)
5T20 BOT, 5T20 TOP, 3T20 ADD
BEAM F5 (150X600)
1 : 20
1 : 15
1
BEAM F8 (450X200)
2T12 BOT, 2T12 TOP
BEAM F8 (450X200)
4
SECTION
14-14
35 /3
/1
5 /2
5 /2
1 : 15
4
2 -T121- 1 Bot
20
BEAMS F7,F15,F22,F32 (450X200)
2T12 BOT, 2T12 TOP
SECTION 20-20
1 : 15
3
4
4200
4650
602
200
200
17 3 -T12 3- 3 Add
4 -T122- 2 Top
3 /3
21T8 - 5 -200
26T8 - 5 -200
150
4 /2
4 /2
450
150
3 -T12 4- 4 Add
450
1400
4 /1
5
5
300
16
300
3 -T12 3- 3 Add
2 /1
1 : 20
9452
7
3
300
12
5 -T202- 2 Bot
1 : 10
2 /2
150
150
24T10 - 4 -200
41
8
600
800
150
Beam F7,F15,F22,F32
3 -T20 3- 3 Add
5
2T12 BotT8 - 3 -200
3 mm
1
2900
14
2T12 Top
5
5 /2
450
7
BEAM F4 (150X600)
200
8
3 /3
600
3 -T20 4- 4 Add
3 -T203- 3 Add
5 /1
5 /1
-
11
5 -T202- 2 Top
300
10
3 -T204- 4 Add
8
450
7
4650
150
4
4200
150
5
4 /1
1
4
BEAM F6 (450X200)
16
BEAM F6 (450X200)
4T12 BOT, 4T12 TOP, 3T12 ADD
17
4 -T121- 1 Bot
12
SECTION 16-16
SECTION 17-17
1 : 15
1 : 15
1 : 20
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
Strip Footing 25/20 (i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
2. Excavations to be inspected before blinding
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
PROJECT TITLE
Revisions
Date
Description
Remarks
PORTFOLIO PROJECT
G+2
STRUCTURAL ENGINEER
BRIAN GATONYE
GITHENG'U
SHEET NO.
Drawing Title:
FIRST FLOOR
BEAMS R.C.
DETAILS - 1
Scale:
08
AS
INDICATED
7
6
-
4
2
18
2 -T122- 2 Top
150
2 -T122- 2 Top
200
450
150
2 /2
300
28T8 - 3 -200
5
4200
200
2600
21T8 - 3 -200
3
2 /2
300
2 /1
450
8
BEAM F9 (450X200)
10
1 : 20
2 -T121- 1 Bot
2
SECTION 2-2
7
18
2 -T121- 1 Bot
4
Beam F17
1 : 15
7
-
5
2600
3 -T20 7- 7 Add
4650
3 -T208- 8 Add
6
2 -T204- 4 Top
1 : 20
10
27T8 - 12 -150
4
BEAM F10 (450X200)
3T20 BOT, 2T20 TOP, 3T20 ADD
3 -T201- 1 Bot
6
3
1
1000mm Lap
3 -T202- 2 Bot
2
BEAM F10 Cont...
1
4
1852
2799
3 -T20 9- 9 Add
2600
10
2900
2 -T2076- 6 Top
1000mm Lap
200
- 11 Add
5 3 -T2011
3 -T2010
- 10 Add
200
150
3 /11
4
1000mm Lap
3 -T202- 2 Bot
BEAM F10 (450X200)
15
BEAM F10 (450X200)
3T20 BOT, 2T20 TOP, 3T20 ADD
3395
150
4
450
3 /2
300
3 -T121- 1 Bot
1 : 20
1
2
Beam F16
15
2600
-
BEAM F16 (450X200)
3T12 BOT, 3T12 TOP
450
Beam F16 Section 1
1 : 20
-
7
12
4
3 -T122- 2 Top
14
10
4
2799
3 /12
15
4
1 : 20
3
10151
15 10
3 /13
-
2 -T122- 2 Top
3 /2
8
200
8
15T8 - 3 -200
3 /1
3
450
42T8 - 3 -200
2 /2
300
9T8 - 3 -200
300
450
150
150
15
3 -T1212
- 12 Bot
1 : 15
2900
1 : 15
1
17T8 - 14 -200
3
3 /1
SECTION 10-10
BEAM F12 (450X200)
3T12 BOT, 3T12 TOP
10
SECTION 5-5
1 : 15
399
21T8 - 3 -200
Beam F12
SECTION 6-6
3 -T1213
- 13 Top
10
1
12
3 /3
15
4200
10
300
5
5
-
-
12
3 -T203- 3 Bot
4
5
3 -T122- 2 Top
2 /6
3 /1
BEAM F10 Cont...
4
4
19T8 - 12 -150
2 /4
450
-
-
-
1 : 20
15
35T8 - 12 -150
12T8 - 12 -150
15
150
12
3 -T20 9- 9 Add
1400
31T8 - 12 -150
15
4
3 -T208- 8 Add
1400
1400
36T8 - 12 -150
-
2 -T205- 5 Top
1000mm Lap
1400
1400
BEAM F10 (450X200)
1 : 15
6
2900
3
SECTION 18-18
1 : 20
8
2 /1
BEAM F17 (450X200)
2T12 BOT, 2T12 TOP
300
12
BEAM F9 (450X200)
2T12 BOT, 2T12 TOP
2 /1
3
4
Beam F13
3 -T121- 1 Bot
BEAM F13 (450X200)
3T12 BOT, 3T12 TOP
12
1 : 20
5
6
SECTION 12-12
7
10150
8
1 : 15
4650
2600
8
BEAM F11 (450X200)
2T12 BOT, 2T12 TOP
SECTION 8-8
1 : 15
1 : 20
12
2900
1
10
15
200
14
150
3 -T122- 2 Top
2 -T121- 1 Bot
Beam F11
-
10
450
3 /2
Beam F14
1 : 20
3 -T121- 1 Bot
300
15T8 - 3 -200
36T8 - 3 -200
BEAM F14 (450X200)
3T12 BOT, 3T12 TOP
14
3
SECTION 14-14
1 : 15
4
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
Strip Footing 25/20 (i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
2. Excavations to be inspected before blinding
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
3 /1
PROJECT TITLE
Revisions
Date
Description
Remarks
PORTFOLIO PROJECT
G+2
STRUCTURAL ENGINEER
12
BRIAN
GATONYE
GITHENG'U
SHEET NO.
Drawing Title:
FIRST FLOOR
BEAMS R.C.
DETAILS - 2
Scale:
09
AS
INDICATED
E
E'
D
700
200
200
300
9T8 - 5 -200
21T8 - 5 -200
3 -T161- 1 Bot
3
BEAM F18 (450X200)
3T16 BOT, 3T16 TOP, 2T12 ADD
2
BEAM F18 (450X200)
10T8 - 3 -200
5
SECTION 3-3
1 : 15
1 : 15
1 : 20
BEAM F19 (450X200)
2T12 BOT, 2T12 TOP
C
2 -T162- 2 Top
D
100
7
1 : 15
5
BEAM F19 (450X200)
A
5701
2101
E
6685
2570
2 /2
3415
E'
200
700
11
2 -T162- 2 Top
450
3 /1
300
29T8 - 3 -200
14T8 - 3 -200
3 -T201- 1 Bot
7
1 : 15
B
-
2099
SECTION 11-11
1 : 15
C
96
-
9
150
3 -T162- 2 Top
3 /2
450
14T8 - 3 -200
17T8 - 3 -200
300
11T8 - 3 -200
-
3 -T201- 1 Bot
3 /1
BEAM F21 (450X200)
3T20 BOT, 3T16 TOP
9
BEAM F21 (450X200)
3
SECTION 9-9
1 : 15
1 : 20
B
8115
C
5601
14
200
2515
13
3 -T2013
- 13 Add
2 -T2010
- 10 Top
-
200
3 /12
3 -T2011
- 11 Add
2 /10
23T10 - 14 -100
14
BEAM F24 (600X200)
4T20 BOT, 2T20 TOP, 3T20 ADD
4 -T209- 9 Bot
13
E
E'
SECTION 14-14
SECTION 13-13
1 : 15
1 : 15
BEAM F24 (600X200)
1 : 20
4 /9
150
4 /9
150
54T10 - 14 -100
14
600
600
14
450
2 /10
450
1200
D
3
1 : 20
1 : 20
A
3 -T2012
- 12 Add
BEAM F23 (450X200)
2T16 BOT, 2T16 TOP
11
2 -T161- 1 Bot
BEAM F23 (450X200)
BEAM F20 & BEAM F29 (450X200)
A
2 /1
20T8 - 3 -200
SECTION 7-7
BEAM F20 & BEAM F29 (450X200)
3T20 BOT, 2T16 TOP
-
2 /2
3
350
450
3
SECTION 5-5
2 -T121- 1 Bot
200
A'
2 /1
3 /1
SECTION 2-2
1 : 20
3600
5
450
3 /2
3 /1
2 /2
450
150
3 /2
300
2 -T12 4- 4 Add
450
2
150
2 -T123- 3 Add
3
5
2 -T122- 2 Top
2 /3
3 -T162- 2 Top
150
3415
150
5840
300
D
1725
F-
3694
1388
3 /2
300
3 -T162- 2 Top
1052
16
150
700
-
450
3415
24T8 - 3 -200
24T8 - 3 -200
3 /1
7T8 - 3 -200
SECTION 16-16
16
3 -T161- 1 Bot
1 : 15
BEAM F25 (450X200)
3T16 BOT, 3T16 TOP
BEAM F25 (450X200)
1 : 20
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
Strip Footing 25/20 (i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
2. Excavations to be inspected before blinding
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
PROJECT TITLE
Revisions
Date
Description
Remarks
PORTFOLIO PROJECT
G+2
STRUCTURAL ENGINEER
BRIAN GATONYE
GITHENG'U
SHEET NO.
Drawing Title:
FIRST FLOOR
BEAMS R.C.
DETAILS - 3
Scale:
10
AS
INDICATED
-
A
B
C
2515
3 /3
3 -T20 4- 4 Add
6
6
4 /1
150
4 /1
25T10 - 6 -100
54T10 - 6 -100
3
2 /2
300
2 /2
150
1200
2
2 -T202- 2 Top
450
3 -T20 5- 5 Add
3
450
95
300
5506
3 -T20 3- 3 Add
200
200
8115
2
4 -T201- 1 Bot
SECTION 2-2
SECTION 3-3
1 : 15
1 : 15
-
BEAM F26 (450X200)
4T20 BOT, 2T20 TOP, 3T20 ADD
-
BEAM F26 (450X200)
D
E
65
3 -T1222
- 22 Add
700
3 -T125- 5 Add
E'
3350
754
3694
1052
1388
200
200
3 -T122- 2 Top
1200
F
13572
698
5
3 -T12 7- 7 Add
6
1200
3 /6
3 -T124- 4 Top
800mm Lap
3 -T126- 6 Add
1240
150
2570
150
1 : 20
C
3 /4
7T8 - 8 -200
23T8 - 8 -200
450
8
300
24T8 - 8 -200
13T8 - 8 -200
300
450
3 /4
8
2 /3
2 /3
800mm Lap
BEAM F27 (450X200)
2 -T163- 3 Bot
BEAM F27 (450X200)
2T16 BOT, 3T12 TOP, 3T12 ADD
2 -T161- 1 Bot
5
6
1 : 20
-
A
B
C
Beam F27 Section 1
Beam F27 Section 2
1 : 15
1 : 15
D
-
3405
95
2515
2570
9
3 -T16 4- 4 Add
1200
1400
450
3 /2
300
11T8 - 6 -200
26T8 - 6 -200
17T8 - 6 -200
3 /2
150
3 /5
450
3 -T162- 2 Top
800
200
200
3 -T16 5- 5 Add
3 -T1626
- 26 Add
4 /1
300
8
150
3 -T16 3- 3 Add
6
4 /1
BEAM F28 (450X200)
4T16 BOT, 3T16 TOP, 3T16 ADD
8
BEAM F28 (450X200)
4 -T161- 1 Bot
9
SECTION 8-8
1 : 20
1 : 15
-
D
E
-
1351
2 -T124- 4 Top
SECTION 9-9
1 : 15
E'
700
11
150
2 /4
3 /3
450
21T8 - 2 -200
300
200
3 -T123- 3 Bot
SECTION 11-11
BEAM F30 (450X200)
3T12 BOT, 2T12 TOP
11
BEAM F30 (450X200)
2
-
1 : 15
1 : 20
E
-
700
200
3 -T12 4- 4 Add
3 -T122- 2 Top
1050
3 /3
1000
300
20T8 - 5 -200
7T8 - 5 -200
3 /2
450
150
3 -T12 3- 3 Add
14
3 /1
5
3 -T121- 1 Bot
13
3 /2
3 /1
5
SECTION 14-14
14
SECTION 13-13
BEAM F31 (450X200)
1 : 15
1 : 15
1 : 20
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
Strip Footing 25/20 (i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
2. Excavations to be inspected before blinding
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
150
13
450
1306
E'
300
D
-
PROJECT TITLE
Revisions
Date
Description
Remarks
PORTFOLIO PROJECT
G+2
STRUCTURAL ENGINEER
BRIAN GATONYE
GITHENG'U
SHEET NO.
Drawing Title:
FIRST FLOOR
BEAMS R.C.
DETAILS - 4
Scale:
11
AS
INDICATED
1
2
3
2900
4
2600
5
6
-
4650
4650
7
414
8
2186
2900
Beam RT1 (450x200)
1886
1886
Timber RAFTER (100x50)
Timber RAFTER (100x50)
175mm Thick Slab
C1
C1
Beam RT 2 (450x200)
C1
C1
TRUSS T1
A
A
TRUSS T1
Beam RT 4 (450x200)
600
C2
600
600
Timber RAFTER (100x50)
TRUSS T1
C2
600
B
95
C2
C1
600
1543
Timber RAFTER (100x50)
C2
3605
Beam RT 26 (450x200)
TRUSS T1
Beam RT 27 (450x200)
600
Timber RAFTER (100x50)
600
Beam RT 5 (175x600)
Timber RAFTER (100x50)
Beam RT 24 (450x200)
Beam RT 21 (450x200)
2157
Beam RT 19 (450x200)
C2
1901
Timber RAFTER (100x50)
175mm Thick Slab
600
1901
600
Beam RT3 (450x200)
Timber RAFTER (100x50)
B
Timber RAFTER (100x50)
600
175mm Thick Slab
600
Beam (450x200)
14801
TRUSS T1
14801
2515
600
2515
Timber RAFTER (100x50)
Beam RT 6 (450x200)
C1
Timber RAFTER (100x50)
C2
600
C2
C
C
Timber RAFTER (100x50)
2799
932
1326
600
600
400
600
599
601
C2
600
600
600
600
600
600
600
844
600
3415
Beam RT 29 (450x200)
TRUSS T7
Timber Rafter (100x50)
Timber Rafter (100x50)
TRUSS T7
Timber Rafter (100x50)
Timber Rafter (100x50)
Timber Rafter (100x50)
TRUSS T7
Beam RT 28 (450x200)
Timber Rafter (100x50)
Timber Rafter (100x50)
TRUSS T7
Timber RAFTER (100x50)
600
TRUSS T3
600
600
Timber Rafter (100x50)
600
Timber RAFTER (100x50)
TRUSS T4
C2
E
C2
C2
E'
Beam RT 25
(450x200)
Beam RT 25
(450x200)
2600
600
Timber RAFTER (100x50)
E'
2900
C2
700
C2
Beam RT 9 (450x200)
C1
D
Timber Rafter (100x50)
Upstand Beam RT 11
(450x200)
Beam RT 13 (450x200)
TRUSS T5
Timber RAFTER (100x50)
E
C2
Upstand Beam RT 23
(450x200)
Upstand Beam RT 23
(450x200)
Beam RT 22 (450x200)
VOID
C1
600
Beam RT 10 (450x200)
C2
Beam RT 8 (450x200)
Timber RAFTER (100x50)
Timber RAFTER (100x50)
C1
175mm Thick Slab
700
1185
600
1850
DN
C2
Beam RT 20 (450x200)
Beam RT 16 (450x200)
3415
D
1165
Beam RT 17 (450x200)
1617
C2
TRUSS T1
175mm Thick Slab
Beam RT 7 (450x200)
Timber Rafter (100x50)
953
C2
C2
920
Beam RT 15 (450x-
1850
C2
1185
911
3739
850
1750
2900
24500
1
2
3
4
5
6
7
8
ROOF TERRACE LAYOUT
1 : 45
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
Strip Footing 25/20 (i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
2. Excavations to be inspected before blinding
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
PROJECT TITLE
Revisions
Date
Description
Remarks
PORTFOLIO PROJECT
G+2
STRUCTURAL ENGINEER
BRIAN GATONYE
GITHENG'U
SHEET NO.
Drawing Title:
ROOF TERRACE
BEAM LAYOUT
Scale:
12
AS
INDICATED
1
2
3
2900
4
2600
5
6
-
4650
5T12 - 26 -200 T2
13T12 - 11 -200 T1
6T12 - 29 -200 T2
4650
7
414
2186
8
2900
52T12 - 2 -200 B1
1886
1886
50T12 - 12 -200 B2
6T12 - 26 -200 T2
C1
C1
C1
C1
A
1901
6T12 - 26 -200 T2
1901
A
7T12 - 28 -200 T2
53T12 - 1 -200 B1
6T12 - 29 -200 T2
C2
C2
12T12 - 29 -200 T2
2157
5T12 - 26 -200 T2
3605
13T12 - 11 -200 T1
1543
5T12 - 27 -200 T2
20T12 - 13 -200 B2
C2
C2
C1
C2
8T12 - 20 -200 B2
95
10T12 - 21 -200 B2
B
B
51T12 - 10 -200 T1
2515
2515
9T12 - 25 -200 T2
C
11T12 - 11 -200 T1
C1
C2
14801
14801
15T12 - 14 -200 B2
C2
C
6T12 - 3 -200 B1
5T12 - 22 -200 T2
1326
C2
1850
-
-
9T12 - 5 -200 B1
DN
C2
C2
C1
C1
C1
C2
D
C2
844
953
16T12 - 18 -200 B2
D
7T12 - 16 -200 B2
3415
3415
23T12 - 6 -200 B1
VOID
16T12 - 15 -200 B2
22T12 - 17 -200 B2
5T12 - 23 -200 T2
C2
C2
C2
C2
21T12 - 11 -200 T1
Beam RT 25
(450x200)
5T12 - 24 -200 T2
17T12 - 7 -200 B1
2900
2600
2799
932
C2
E'
Beam RT 25
(450x200)
E'
C2
700
E
700
E
C2
920
C2
1165
1850
1185
911
5T12 - 8 -200 B1
3739
850
1750
2900
24500
7T12 - 4 -200 B1
1
2
3
17T12 - 9 -200 B1
4
ROOF TERRACE SLAB R.C. DETAILS
5
6
7
8
8T12 - 19 -200 B2
1 : 45
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
Strip Footing 25/20 (i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
2. Excavations to be inspected before blinding
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
PROJECT TITLE
Revisions
Date
Description
Remarks
PORTFOLIO PROJECT
G+2
STRUCTURAL ENGINEER
BRIAN GATONYE
GITHENG'U
Drawing Title:
ROOF TERRACE
SLAB R.C. DETAILS
SHEET NO.
Scale:
13
AS
INDICATED
5.50°
5.50°
ALL EXTERNAL MEMBERS 150X50
ALL INTERNAL MEMBERS 100X50
5.50°
596
598
200X200 DEEP
CONCRETE GUTTER
Roof Terrace
200
-
1200
1200
1200
1468
2250
ALL EXTERNAL MEMBERS 150X50
ALL INTERNAL MEMBERS 100X50
TRUSS T2
1 : 15
TRUSS T1
1 : 15
ALL EXTERNAL MEMBERS 150X50
ALL INTERNAL MEMBERS 100X50
ALL EXTERNAL MEMBERS 150X50
ALL INTERNAL MEMBERS 100X50
ALL EXTERNAL MEMBERS 150X50
ALL INTERNAL MEMBERS 100X50
5.50°
5.50°
618
1200
1200
397
Roof Terrace
Roof Terrace
6600
-
599
5.50°
328
Roof Terrace
6600
5.50°
599
597
5.50°
831
1468
1200
1200
TRUSS T3
TRUSS T4
1 : 15
1 : 15
TRUSS T5
1 : 15
ALL EXTERNAL MEMBERS 150X50
ALL INTERNAL MEMBERS 100X50
5.50°
619
200X200 DEEP
CONCRETE GUTTER
Roof Terrace-
1200
1200
525
200
859
TRUSS T7
1 : 15
500
4.20°
4.20°
ALL EXTERNAL MEMBERS 150X50
ALL INTERNAL MEMBERS 100X50
Roof Terrace-
1200
1200
3260
VALLEY TRUSS VT1
1 : 15
NOTES:
1. Concrete Class:Foundation 25/20, Column 25/20, Ground Beam 25/20;
Strip Footing 25/20 (i.e. Class 25N/mm2 and Maximum Agg. Size 20mm)
2. Excavations to be inspected before blinding
3. All reinforcement to be inspected before Concreting
4. Cover to Main Reinforcement: Foundations 50; Columns 30;
Ground Beams 40; Strip Footing 50;
5. Dimensions to be read and not scaled
6. This drawing to be read in conjunction with Architectural Drawings
PROJECT TITLE
Revisions
Date
Description
Remarks
PORTFOLIO PROJECT
G+2
STRUCTURAL ENGINEER
BRIAN GATONYE
GITHENG'U
SHEET NO.
Drawing Title:
TRUSS DETAILS
Scale:
14
AS
INDICATED