150mm Thick RC
Baffle Walls
[300mm × 300mm]
RC Columns
NOTES
1. All foundation excavation
depths to be determined on site
and approved by S.E. (minimum
depth = 1200mm)
Chamfered [200mm × 550mm]
Upstand Beams on 250mm Thick RC
Top Slab
2. Concrete Covers to Main
Reinforcement to be:
· Foundations 50 mm.
· Columns 40 mm.
· Ground Beams 30 mm.
· Slabs and Walls 20 mm.
3. Blinding to be concrete grade
15/20, nominal mix 1:3:6 by weight.
Thickened RC Walls
4. Structural works to be
concrete grade 30/20, nominal
mix 1:1:2.
Thickened RC Treated
Water Tank Slab
5. All cages and formwork to be
inspected and approved by SE
prior to casting.
6. All structural concrete to be
machine mixed and poker
vibrated.
[1000mm × 1000mm × 300mm]
Deep RC Pad Foundations
[500mm wide × 1000mm deep]
RC Shear Key
7. All steel reinforcement bars to
be Type 2 Deformed Bars
fabricated to BS 4449 with a
minimum yield strength of 500 MPa
denoted by letter H.
Rev
Description
Date
3D TREATED WATER TANKS STRUCTURAL MODEL
SCALE 1:40
PORTFOLIO PROJECT
PROJECT TITLE
PROPOSED
TREATED WATER
TANK
CLIENT
N/A
ARCHITECT
N/A
DRAWING TITLE
3D STRUCTURAL MODELS OF
THE WATER TANK AND BAFFLE
WALLS
H8 - 200mm Reinforcement bars each way
to provide adequate anchorage and
anti-crack
STRUCTURAL ENGINEER
BRIAN N. GATONYE
GITHENG'U
SCALE
AS INDICATED
DRAWN BY
CHECKED BY
APPROVED BY
DATE
DRAWING NO.
SHEET
3D BAFFLE WALL REINFORCEMENT DETAIL
SCALE 1:40
01
NOTES
1
2
3
1. All foundation excavation
depths to be determined on site
and approved by S.E. (minimum
depth = 1200mm)
4
-
-
6000
5900
2. Concrete Covers to Main
Reinforcement to be:
· Foundations 50 mm.
· Columns 40 mm.
· Ground Beams 30 mm.
· Slabs and Walls 20 mm.
-
3. Blinding to be concrete grade
15/20, nominal mix 1:3:6 by weight.
7.59°
7.59°
7.59°
2
C
4. Structural works to be
concrete grade 30/20, nominal
mix 1:1:2.
C
6. All structural concrete to be
machine mixed and poker
vibrated.
6000
6000
4.09°
4.09°
5. All cages and formwork to be
inspected and approved by SE
prior to casting.
7.59°
7.59°
1
1
7. All steel reinforcement bars to
be Type 2 Deformed Bars
fabricated to BS 4449 with a
minimum yield strength of 500 MPa
denoted by letter H.
4.09°
-°
Rev
Description
Date
3
3
-
[No Slope]
12000
-
10900
B
12000
[No Slope]
B
PORTFOLIO PROJECT
7.59°
4.09°
4.09°
PROPOSED
TREATED WATER
TANK
6000
7.59°
4.09°
4.09°
6000
PROJECT TITLE
CLIENT
N/A
7.59°
-
7.59°
A
7.59°
A
ARCHITECT
N/A
-
DRAWING TITLE
2
-
PLAN
-
5900
6000
5900
17800
STRUCTURAL ENGINEER
BRIAN N. GATONYE
GITHENG'U
1
2
3
4
SCALE
AS INDICATED
PLAN VIEW
DRAWN BY
CHECKED BY
APPROVED BY
DATE
DRAWING NO.
SHEET
SCALE 1:50
02
1
2
NOTES
1. All foundation excavation
depths to be determined on site
and approved by S.E. (minimum
depth = 1200mm)
5900
2 - Top
2 - Top
3250
1533
250
3250
2. Concrete Covers to Main
Reinforcement to be:
· Foundations 50 mm.
· Columns 40 mm.
· Ground Beams 30 mm.
· Slabs and Walls 20 mm.
61H12 - 07 -200mm
62H12 - 06 -200mm
3. Blinding to be concrete grade
15/20, nominal mix 1:3:6 by weight.
200
.
135
200
00°
4. Structural works to be
concrete grade 30/20, nominal
mix 1:1:2.
867
61H12 - 08 -200mm
62H12 - 09 -200mm
.
135
97
.5
9°
-
0
0 - Shear Key
57H12 - 04 -200mm T2
00°
1 - GFL
5. All cages and formwork to be
inspected and approved by SE
prior to casting.
77H12 - 05 -200mm
27H12 - 02 -200mm T1
6. All structural concrete to be
machine mixed and poker
vibrated.
600mm Lap
4.09°
1 - GFL
0
0 - Shear Key
7. All steel reinforcement bars to
be Type 2 Deformed Bars
fabricated to BS 4449 with a
minimum yield strength of 500 MPa
denoted by letter H.
-
-200
78H12 - 01 -200mm B1
106H12 - 03 -200mm B2
Rev
500
Description
Date
RC SHEAR KEY
RC TAPERED MAIN WALL SECTION 1 - 1
PORTFOLIO PROJECT
SCALE 1:25
A
B
PROJECT TITLE
PROPOSED
TREATED WATER
TANK
6000
2 - Top
2 - Top
3250
3250
CLIENT
N/A
89H12 - 07 -200mm
ARCHITECT
3000
600mm Lap
91H12 - 06 -200mm
N/A
RC COLUMN
DRAWING TITLE
RC BAFFLE WALL
600mm Lap
600mm Lap
87H12 - 08 -200mm
85H10 - 10 -200mm
THICKENED MAIN WALL
REINFORCEMENT
DETAILS
57H12 - 04 -200mm T2
1 - GFL
1 - GFL
0
0 - Shear Key
STRUCTURAL ENGINEER
0
0 - Shear Key
-200
BRIAN N. GATONYE
GITHENG'U
-200
106H12 - 03 -200mm B2
600mm Lap
SCALE
AS INDICATED
DRAWN BY
CHECKED BY
APPROVED BY
DATE
DRAWING NO.
SHEET
RC TAPERED MAIN WALL SECTION 2 - 2
SCALE 1:25
03
2
NOTES
2 - Top
1. All foundation excavation
depths to be determined on site
and approved by S.E. (minimum
depth = 1200mm)
2-T
op
3250
3250
op
-T
2
50
32
4H16 - 01 Main Bars
01
2. Concrete Covers to Main
Reinforcement to be:
· Foundations 50 mm.
· Columns 40 mm.
· Ground Beams 30 mm.
· Slabs and Walls 20 mm.
01
6
300
6
14H8 - 02 -200mm Shear Links
01
3. Blinding to be concrete grade
15/20, nominal mix 1:3:6 by weight.
01
300
2H16 - 01 Main
2H16 - 01 Main
4. Structural works to be
concrete grade 30/20, nominal
mix 1:1:2.
C1 SECTION
14H8 - 02 -200mm Shear Links
SCALE 1:15
6
6H16 - 01 -200mm B1
300
4
5. All cages and formwork to be
inspected and approved by SE
prior to casting.
4
6. All structural concrete to be
machine mixed and poker
vibrated.
1-G
FL
6H16 - 01 -200mm B2
1 - GFL
0
0
6
1000
1
-
7. All steel reinforcement bars to
be Type 2 Deformed Bars
fabricated to BS 4449 with a
minimum yield strength of 500 MPa
denoted by letter H.
L
GF
0
BASE B1 ELEVATION DETAIL
3D MODEL OF RC COLUMN
SCALE 1:15
Rev
Description
Date
300
SCALE 1:20
1 - GFL
0
1000
PORTFOLIO PROJECT
1
COLUMN C1 ELEVATION
2
2H12 - 01 Top
PROJECT TITLE
62H12 - 04 -200mm T1
SCALE 1:15
2 - Top
91H12 - 05 -200mm T2
PROPOSED
TREATED WATER
TANK
63H8 - 03 -200mm Shear Links
3250
2H12 - 01 Bot
91H12 - 05 -200mm B2
62H12 - 04 -200mm B1
300
CLIENT
5900
-
600mm Lap
N/A
350
TOP SLAB SECTION 1 - 1 DETAILS
ARCHITECT
300
6H16 - 01 -200mm B1
N/A
DRAWING TITLE
A
2H12 - 02 Top
2 - Top
6H16 - 01 -200mm B2
TOP SLAB, COLUMNS, TOP
BEAMS AND COLUMN BASE
REINFORCEMENTS
B
63H12 - 04 -200mm T1
91H12 - 05 -200mm T2
350
1000
350
SCALE 1:15
600mm Lap
2 - Top
92H8 - 03 -200mm
3250
3250
2H12 - 02 Bot
91H12 - 05 -200mm B2
STRUCTURAL ENGINEER
BRIAN N. GATONYE
GITHENG'U
63H12 - 04 -200mm B1
6000
SCALE
BASE B1 PLAN DETAILS
SCALE 1:15
AS INDICATED
TOP SLAB SECTION 2 - 2 DETAILS
DRAWN BY
CHECKED BY
APPROVED BY
DATE
DRAWING NO.
SHEET
SCALE 1:15
04
NOTES
1. All foundation excavation
depths to be determined on site
and approved by S.E. (minimum
depth = 1200mm)
4
63H12 - 04 - 200 mm B1
63H12 - 04 - 200 mm T1
3
62H12 - 04 - 200 mm T1
2
62H12 - 04 - 200 mm B1
1
2. Concrete Covers to Main
Reinforcement to be:
· Foundations 50 mm.
· Columns 40 mm.
· Ground Beams 30 mm.
· Slabs and Walls 20 mm.
3. Blinding to be concrete grade
15/20, nominal mix 1:3:6 by weight.
C
4. Structural works to be
concrete grade 30/20, nominal
mix 1:1:2.
C
5. All cages and formwork to be
inspected and approved by SE
prior to casting.
91H12 - 05 - 200 mm T2
6000
6. All structural concrete to be
machine mixed and poker
vibrated.
7. All steel reinforcement bars to
be Type 2 Deformed Bars
fabricated to BS 4449 with a
minimum yield strength of 500 MPa
denoted by letter H.
91H12 - 05 - 200 mm B2
Rev
B
Description
Date
B
PORTFOLIO PROJECT
6000
PROJECT TITLE
PROPOSED
TREATED WATER
TANK
91H12 - 05 - 200 mm B2
CLIENT
91H12 - 05 - 200 mm T2
A
N/A
A
ARCHITECT
N/A
5900
1
6000
2
5900
3
DRAWING TITLE
TOP SLAB PLAN
REINFORCEMENT
DETAIL
4
STRUCTURAL ENGINEER
BRIAN N. GATONYE
GITHENG'U
TOP SLAB PLAN REINFORCEMENT DETAIL
SCALE 1:50
SCALE
AS INDICATED
DRAWN BY
CHECKED BY
APPROVED BY
DATE
DRAWING NO.
SHEET
05
NOTES
RC MAIN WALLS BBS
STRUCTURAL
ELEMENT
BAR SIZE
BAR
MARK
BAR
LENGTH
QUANTITY
MAIN WALL
H12
06
4600 mm
306
MAIN WALL
H12
07
1600 mm
MAIN WALL
H12
07
MAIN WALL
H12
MAIN WALL
MAIN WALL
FOUNDATION SLAB CONCRETE SCHEDULE
TOTAL
BAR
LENGTH
SHAPE
CODE
SHAPE
IMAGE
A
B
C
D
E
REINFORCEMENT
VOLUME
REBAR
WEIGHT
21
150 mm
4140 mm
350 mm
0 mm
0 mm
- cm³
1312.17 kg
122
-
mm
195200 mm
12
150 mm
1465 mm
0 mm
0 mm
0 mm
- cm³
181.97 kg
1600 mm
178
284800 mm
12
1465 mm
150 mm
0 mm
0 mm
0 mm
- cm³
265.49 kg
08
3625 mm
174
630750 mm
34
2380 mm
300 mm
605 mm
220 mm
350 mm
- cm³
587.99 kg
H12
08
3625 mm
122
442250 mm
34
2420 mm
285 mm
600 mm
205 mm
350 mm
- cm³
412.27 kg
H12
09
1750 mm
124
217000 mm
24
575 mm
800 mm
375 mm
565 mm
565 mm
- cm³
202.29 kg
MAIN WALL
H10
10
1975 mm
170
335750 mm
24
610 mm
765 mm
600 mm
555 mm
525 mm
- cm³
217.35 kg
MAIN WALL
H10
11
6550 mm
88
576400 mm
11
6315 mm
250 mm
0 mm
0 mm
0 mm
- cm³
373.14 kg
MAIN WALL
H10
12
6375 mm
6
38250 mm
11
250 mm
6140 mm
0 mm
0 mm
0 mm
3004.15 cm³
24.76 kg
MAIN WALL
H10
12
6400 mm
60
384000 mm
11
250 mm
6150 mm
0 mm
0 mm
0 mm
- cm³
248.59 kg
MAIN WALL
H10
13
9350 mm
56
523600 mm
11
245 mm
9115 mm
0 mm
0 mm
0 mm
- cm³
338.96 kg
MAIN WALL
H10
13
9350 mm
2
18700 mm
11
250 mm
9105 mm
0 mm
0 mm
0 mm
1468.69 cm³
12.11 kg
MAIN WALL
H10
13
9350 mm
126
-
mm
11
250 mm
9115 mm
0 mm
0 mm
0 mm
- cm³
762.66 kg
TOTAL
ELEMENT SIZE
CONCRETE VOLUME
200mm Thick
64.57 m³
64.57 m³
RC FOUNDATION SLAB
TOTAL
- cm³
2. Concrete Covers to Main
Reinforcement to be:
· Foundations 50 mm.
· Columns 40 mm.
· Ground Beams 30 mm.
· Slabs and Walls 20 mm.
PAD FOOTING CONCRETE SCHEDULE
CONCRET
E
NO. OF ELEMENTS VOLUME
STRUCTURAL ELEMENT
ELEMENT SIZE
RC PAD FOOTING
[1000mm × 1000mm ×
300mm]
2
3. Blinding to be concrete grade
15/20, nominal mix 1:3:6 by weight.
4. Structural works to be
concrete grade 30/20, nominal
mix 1:1:2.
0.60 m³
TOTAL
0.60 m³
5. All cages and formwork to be
inspected and approved by SE
prior to casting.
6. All structural concrete to be
machine mixed and poker
vibrated.
RC SHEAR KEY CONCRETE SCHEDULE
STRUCTURAL ELEMENT
ELEMENT SIZE
LENGTH IN MM
CONCRETE VOLUME
RC SHEAR KEY
RC SHEAR KEY
[1000mm × 500mm]
[1000mm × 500mm]
-
11.80 m³
17.60 m³
29.40 m³
TOTAL
-
mm
1534
STRUCTURAL ELEMENT
1. All foundation excavation
depths to be determined on site
and approved by S.E. (minimum
depth = 1200mm)
7. All steel reinforcement bars to
be Type 2 Deformed Bars
fabricated to BS 4449 with a
minimum yield strength of 500 MPa
denoted by letter H.
4939.74 kg
Rev
Description
Date
RC TOP SLAB CONCRETE SCHEDULE
RAFT FOUNDATION BBS
STRUCTURAL
ELEMENT
BAR SIZE
BAR
MARK
BAR
LENGTH
Raft
H12
01
Raft
H12
02
QUANTITY
TOTAL BAR
LENGTH
SHAPE
CODE
10900 mm
192
- mm
9550 mm
114
- mm
SHAPE
IMAGE
A
B
C
D
E
REINFORCEMENT
VOLUME
REBAR
WEIGHT
12
10810 mm
100 mm
0 mm
0 mm
0 mm
- cm³
1950.92 kg
24
250 mm
3425 mm
5880 mm
3415 mm
240 mm
- cm³
1014.89 kg
STRUCTURAL ELEMENT
ELEMENT SIZE
CONCRETE
VOLUME
RC TOP SLAB
TOTAL
250mm Thick
58.74 m³
PORTFOLIO PROJECT
PROJECT TITLE
Raft
H12
03
7975 mm
248
- mm
11
7905 mm
75 mm
0 mm
0 mm
0 mm
- cm³
1843.71 kg
Raft
H12
04
6650 mm
170
- mm
24
250 mm
3525 mm
2880 mm
3515 mm
235 mm
- cm³
1053.86 kg
STRUCTURAL COLUMN CONCRETE SCHEDULE
STRUCTURAL
ELEMENT
RC COLUMN
TOTAL
ELEMENT SIZE
LENGTH
IN MM
CONCRETE VOLUME
[300mm × 300mm]
2360
0.39 m³
PROPOSED
TREATED WATER
TANK
CLIENT
Raft
H12
05
2250 mm
332
747000 mm
26
670 mm
1530 mm
80 mm
1520 mm
0 mm
- cm³
696.36 kg
N/A
TOTAL
1056
- mm
- cm³
6559.74 kg
TAPERED WALL CONCRETE SCHEDULE
ARCHITECT
STRUCTURAL
ELEMENT
ELEMENT SIZE
LENGTH IN MM
CONCRETE VOLUME
N/A
RC TANK WALL
RC TANK WALL
TOTAL
BAFFLE WALLS BBS
STRUCTUR
AL
ELEMENT BAR SIZE
BAFFLE
WALL
BAFFLE
WALL
BAR
MARK
BAR
LENGTH
QUANTITY
TOTAL
BAR
LENGTH
H8
01
2925 mm
29
169650 mm
H12
02
11975 mm
14
167650 mm
TOTAL
SHAPE
CODE
SHAPE
IMAGE
REINFOR
CEMENT
VOLUME
A
B
C
D
E
11
250 mm
2685 mm
0 mm
0 mm
0 mm
11
11600 mm
390 mm
0 mm
0 mm
0 mm
337300 mm
8527.54
cm³-
cm³-
cm³
REBAR
WEIGHT
70.29 kg
156.28 kg
TAPERED AND THICKENED
TAPERED AND THICKENED
-
38.27 m³
57.57 m³
95.84 m³
DRAWING TITLE
MATERIALS TAKE-OFFS AND
BAR BENDING SCHEDULES
[PART 1 OF 2]
UPSTAND RC BEAM CONCRETE SCHEDULE
STRUCTURAL
ELEMENT
UPSTAND BEAM
226.57 kg
UPSTAND BEAM
TOTAL
ELEMENT SIZE
LENGTH IN MM
CONCRETE VOLUME
[550mm ×
200mm]
[550mm ×
200mm]
25000
1.48 m³
36600
2.17 m³
61600
3.66 m³
STRUCTURAL ENGINEER
BRIAN N. GATONYE
GITHENG'U
COLUMN BASE BBS
STRUCTUR
AL
ELEMENT BAR SIZE
COLUMN
BASE
TOTAL
H16
BAR
MARK
BAR
LENGTH
QUANTITY
TOTAL
BAR
LENGTH
01
1300 mm
24
31200 mm
24
31200 mm
SHAPE
CODE
21
SHAPE IMAGE
A
B
C
220 mm
920 mm
220 mm
STRUCTUR
AL
ELEMENT
6273.13
cm³
6273.13
cm³
REBAR
WEIGHT
51.71 kg
SCALE
AS INDICATED
DRAWN BY
CHECKED BY
APPROVED BY
DATE
DRAWING NO.
SHEET
51.71 kg
06
NOTES
COLUMNS BBS
STRUCTUR
AL
ELEMENT BAR SIZE
BAR
MARK
BAR
LENGTH
QUANTITY
TOTAL
BAR
LENGTH
SHAPE
CODE
SHAPE
IMAGE
A
B
C
D
E
REINFORCEMENT
VOLUME
REBAR
WEIGHT
RC
COLUMN
RC
COLUMN
H16
01
2900 mm
8
23200 mm
11
2565 mm
350 mm
0 mm
0 mm
0 mm
4664.64 cm³
38.45 kg
H8
02
1075 mm
28
30100 mm
51
220 mm
220 mm
110 mm
110 mm
0 mm
1512.99 cm³
12.47 kg
RC
COLUMN
RC
COLUMN
H16
03
1150 mm
8
9200 mm
27
525 mm
610 mm
0 mm
400 mm
340 mm
1849.77 cm³
15.25 kg
H8
04
1675 mm
2
3350 mm
51
315 mm
425 mm
110 mm
110 mm
0 mm
168.39 cm³
1.39 kg
RC
COLUMN
H8
1. All foundation excavation
depths to be determined on site
and approved by S.E. (minimum
depth = 1200mm)
2. Concrete Covers to Main
Reinforcement to be:
· Foundations 50 mm.
· Columns 40 mm.
· Ground Beams 30 mm.
· Slabs and Walls 20 mm.
3. Blinding to be concrete grade
15/20, nominal mix 1:3:6 by weight.
05
2425 mm
TOTAL
2
4850 mm
48
70700 mm
51
500 mm
610 mm
110 mm
110 mm
0 mm
243.79 cm³
2.01 kg
4. Structural works to be
concrete grade 30/20, nominal
mix 1:1:2.
8439.57 cm³
69.56 kg
5. All cages and formwork to be
inspected and approved by SE
prior to casting.
6. All structural concrete to be
machine mixed and poker
vibrated.
7. All steel reinforcement bars to
be Type 2 Deformed Bars
fabricated to BS 4449 with a
minimum yield strength of 500 MPa
denoted by letter H.
UPSTAND BEAMS BBS
STRUCTURAL
ELEMENT
QUANTITY
TOTAL
BAR
LENGTH
SHAPE
CODE
6750 mm
16
108000 mm
02
9675 mm
16
03
1375 mm
310
BAR SIZE
BAR
MARK
BAR
LENGTH
UPSTAND BEAMS
H12
01
UPSTAND BEAMS
H12
UPSTAND BEAMS
H8
SHAPE IMAGE
A
B
C
D
E
REINFORCEMENT VOLUME
REBAR WEIGHT
11
150 mm
6615 mm
0 mm
0 mm
0 mm
- cm³
100.68 kg
154800 mm
11
9495 mm
200 mm
0 mm
0 mm
0 mm
- cm³
144.31 kg
426250 mm
51
470 mm
120 mm
110 mm
110 mm
0 mm
- cm³
176.60 kg
Rev
Description
Date
PORTFOLIO PROJECT
TOTAL
342
689050 mm
- cm³
421.58 kg
PROJECT TITLE
PROPOSED
TREATED WATER
TANK
RC TOP SLAB BBS
STRUCTURAL
ELEMENT
BAR SIZE
BAR
MARK
BAR
LENGTH
RC TOP SLAB
H12
04
RC TOP SLAB
H12
05
QUANTITY
TOTAL BAR
LENGTH
SHAPE
CODE
9675 mm
250
- mm
6700 mm
364
- mm
614
- mm
SHAPE
IMAGE
A
B
REINFORCEMENT
VOLUME
11
170 mm
9505 mm
- cm³
2254.77 kg
11
6605 mm
105 mm
- cm³
2273.46 kg
- cm³
4528.23 kg
REBAR WEIGHT
CLIENT
TOTAL
N/A
ARCHITECT
N/A
DRAWING TITLE
MATERIALS TAKE-OFFS
AND BAR BENDING
SCHEDULES [PART 2 OF 2]
CONCRETE VOLUME SUMMARY
STRUCTURAL ELEMENT
RC BAFFLE WALL
RC COLUMN
RC FOUNDATION SLAB
RC PAD FOOTING
RC SHEAR KEY
RC TANK WALL
RC TOP SLAB
TOTAL
BBS SUMMARY
CONCRETE VOLUME
4.41 m³
0.78 m³
64.57 m³
0.60 m³
29.40 m³
95.84 m³
58.74 m³
254.34 m³
BAR DIAMETER
Reinforcement Volume
REBAR WEIGHT
H8
H10
H12
H16
- cm³- cm³- cm³- cm³- cm³
262.76 kg
1977.57 kg- kg
105.40 kg- kg
TOTAL
STRUCTURAL ENGINEER
BRIAN N. GATONYE
GITHENG'U
SCALE
AS INDICATED
DRAWN BY
CHECKED BY
APPROVED BY
DATE
DRAWING NO.
SHEET
07