Activity Report of Energy Audit UN-WFP
SHARIF INTERNATIONAL
RENEWABLE ENERGY | ENERGY CONSERVATION | AVIATION
October 26, 2017
ELECTRICAL SAFETY ENERGY AUDIT UN-WFP COUNTRY OFFICE BUILDING
ACTIVITY REPORT
1) INTRODUCTION
i)
Background
The basic purpose of electrical safety energy audit at UN-WFP Country Office
building is to inspect, test, analyze and mitigate the risks associated with
electrical systems and equipment with the purpose of maintaining safe
operations and reducing system interactions and equipment breakdown.When
the object of study is an occupied building then reducing energy consumption
while maintaining or improving human comfort, health and safety are of primary
concern. Beyond simply identifying the sources of energy use, an energy audit
seeks to prioritize the energy uses according to the greatest to least cost
effective opportunities for energy savings.
Scope of the Evaluation
1
To achieve properly engineered electrical distribution system by evaluating the
electrical load and operating load requirements for UNWFP building. The
purpose of this assessment is to review the design drawings and physical power
distribution network including power regulator/ control system to determine the
rating of electrical wiring/ transmission systems. The building is already equipped
with electrical infrastructure but may require improvements works.
Page
ii)
HEAD OFFICE: No 151-A, STREET NO. 8, CHAKLALA SCHEME III, RAWALPINDI, PAKISTAN 46000
TEL: (-,-,- | FAX: (-,-
LAHORE: 150-FF, “Y” Block, Commercial Area, DHA, Lahore. Tel: (-,-
WEB:HTTP://SHARIFINTERNATIONAL.NET | MAIL-
SHARIF INTERNATIONAL
RENEWABLE ENERGY | ENERGY CONSERVATION | AVIATION
2) METHODOLOGY
ACTIVITIES:
As per the TOR the following activities have been carried out till 23 Oct, 2017 for the conduct
of Electrical Safety Energy Audit at UN-WFP Country Office building:
Building envelope (Thermal imaging)
Leakage refrigerant gas test and set point temperature test.
Flue Gas/Stack Emission Analysis of two DG Sets.
Fuses and Capacitors have been checked in PFI panel
Transformer Load test and temperature test have been noted.
Vibration Analysis of compressors on Roof top for HVAC.
Lux deliver test, Load energy consumption test
Water flow and temperature test.
Thermal Imaging of DBs, junction boxes and Motor Speed test
Luminaries quantity, wattage and type calculation for Basement, Ground floor,
Mezzanine floor and first floor.
Checked Electrical Appliances Power consumption, Distribution box, breakers and
lighting control circuit.
Tagging of All Lighting DB’s , Power and UPS plug Socket tagging has been completed
Completed Lighting plan Engineering Drawings for Basement, Ground, Mezzanine and
First floor
Completed Power and UPS plugs Engineering Drawings for Basement, Ground and
2
Mezzanine floor.
Page
HEAD OFFICE: No 151-A, STREET NO. 8, CHAKLALA SCHEME III, RAWALPINDI, PAKISTAN 46000
TEL: (-,-,- | FAX: (-,-
LAHORE: 150-FF, “Y” Block, Commercial Area, DHA, Lahore. Tel: (-,-
WEB:HTTP://SHARIFINTERNATIONAL.NET | MAIL-
SHARIF INTERNATIONAL
RENEWABLE ENERGY | ENERGY CONSERVATION | AVIATION
FLUE GAS/STACK EMISSION ANALYSIS OF TWO DG SETS.
There were two generators installed at UN-WFP Country office building, first unit is of 230 KVA FG
Wilson Model P-230H and another unit of 500 KVA FG Wilson Model P-500H. Flue gas analysis was
carried out at On-Load state in order to check the efficiency of combustion.
Test Report of Gaseous Emissions Analysis
Sample Description: Generators
Contact Person: Engr. Arsalan
Date of Testing:-
Report No: SI/18/23
Type of Fuel: Diesel
Location: WFP Office Diplomatic Enclave, Sector G-5
Islamabad.
FG Wilson Model P-230H
Sr. No
Parameter
1
NOx
2
SO2
3
CO
159
800 mg/Nm3
4
Smoke
1.5
5
Noise
73.8
40% or 2 on Ringlemann Scale
Noise (Commercial Area)
65 dB (A) Day Time
55 dB (A) Night Time
NEQS
600 mg/Nm3 (Oil Fired)
1,700 mg/Nm3
Page
3
NO
421
Results
NO2
NOx-
HEAD OFFICE: No 151-A, STREET NO. 8, CHAKLALA SCHEME III, RAWALPINDI, PAKISTAN 46000
TEL: (-,-,- | FAX: (-,-
LAHORE: 150-FF, “Y” Block, Commercial Area, DHA, Lahore. Tel: (-,-
WEB:HTTP://SHARIFINTERNATIONAL.NET | MAIL-
SHARIF INTERNATIONAL
RENEWABLE ENERGY | ENERGY CONSERVATION | AVIATION
Test Report of Gaseous Emissions Analysis
Sample Description: Generators
Contact Person: Engr. Arsalan
Date of Testing:-
Report No: SI/18/23
Type of Fuel: Diesel
Location: WFP Office Diplomatic Enclave, Sector G-5
Islamabad.
FG Wilson Model P-500 P3
Sr. No
Parameter
1
NOx
2
SO2
3
CO
255
800 mg/Nm3
4
Smoke
1.8
5
Noise
73.8
40% or 2 on Ringlemann Scale
Noise (Commercial Area)
65 dB (A) Day Time
55 dB (A) Night Time
NEQS
600 mg/Nm3 (Oil Fired)
1,700 mg/Nm3
Page
4
NO
476
Results
NO2
NOx-
HEAD OFFICE: No 151-A, STREET NO. 8, CHAKLALA SCHEME III, RAWALPINDI, PAKISTAN 46000
TEL: (-,-,- | FAX: (-,-
LAHORE: 150-FF, “Y” Block, Commercial Area, DHA, Lahore. Tel: (-,-
WEB:HTTP://SHARIFINTERNATIONAL.NET | MAIL-
SHARIF INTERNATIONAL
RENEWABLE ENERGY | ENERGY CONSERVATION | AVIATION
Stack emission Analysis of DG sets
Checking Load Distribution in LT
panel
Capacitor in PFI panel is out of
order
HRC Fuses in PFI panel is not working
properly
5
Checking the Parameters in UPS
Page
Calculated power in DB
HEAD OFFICE: No 151-A, STREET NO. 8, CHAKLALA SCHEME III, RAWALPINDI, PAKISTAN 46000
TEL: (-,-,- | FAX: (-,-
LAHORE: 150-FF, “Y” Block, Commercial Area, DHA, Lahore. Tel: (-,-
WEB:HTTP://SHARIFINTERNATIONAL.NET | MAIL-
SHARIF INTERNATIONAL
RENEWABLE ENERGY | ENERGY CONSERVATION | AVIATION
Checking the Load by measuring
the Input main Voltage in LT panel
Measuring Actual temperature of PMT
Tracing of UPS and Power Sockets
Tracing of UPS and Power Sockets
Page
6
Tracing of UPS and Power Sockets
Vibration Analysis of Compressors
HEAD OFFICE: No 151-A, STREET NO. 8, CHAKLALA SCHEME III, RAWALPINDI, PAKISTAN 46000
TEL: (-,-,- | FAX: (-,-
LAHORE: 150-FF, “Y” Block, Commercial Area, DHA, Lahore. Tel: (-,-
WEB:HTTP://SHARIFINTERNATIONAL.NET | MAIL-
SHARIF INTERNATIONAL
RENEWABLE ENERGY | ENERGY CONSERVATION | AVIATION
Page
7
Building Envelope Thermography
HEAD OFFICE: No 151-A, STREET NO. 8, CHAKLALA SCHEME III, RAWALPINDI, PAKISTAN 46000
TEL: (-,-,- | FAX: (-,-
LAHORE: 150-FF, “Y” Block, Commercial Area, DHA, Lahore. Tel: (-,-
WEB:HTTP://SHARIFINTERNATIONAL.NET | MAIL-
SHARIF INTERNATIONAL
RENEWABLE ENERGY | ENERGY CONSERVATION | AVIATION
Page
8
Thermography of Panels and Wires
HEAD OFFICE: No 151-A, STREET NO. 8, CHAKLALA SCHEME III, RAWALPINDI, PAKISTAN 46000
TEL: (-,-,- | FAX: (-,-
LAHORE: 150-FF, “Y” Block, Commercial Area, DHA, Lahore. Tel: (-,-
WEB:HTTP://SHARIFINTERNATIONAL.NET | MAIL-
SHARIF INTERNATIONAL
RENEWABLE ENERGY | ENERGY CONSERVATION | AVIATION
Tagging is under process:
Page
9
Engineering Drawings:
HEAD OFFICE: No 151-A, STREET NO. 8, CHAKLALA SCHEME III, RAWALPINDI, PAKISTAN 46000
TEL: (-,-,- | FAX: (-,-
LAHORE: 150-FF, “Y” Block, Commercial Area, DHA, Lahore. Tel: (-,-
WEB:HTTP://SHARIFINTERNATIONAL.NET | MAIL-
SHARIF INTERNATIONAL
Page
10
RENEWABLE ENERGY | ENERGY CONSERVATION | AVIATION
HEAD OFFICE: No 151-A, STREET NO. 8, CHAKLALA SCHEME III, RAWALPINDI, PAKISTAN 46000