LIST OF COMPLETED PROJECTS:
July 2016 – April 2018
Quantity Surveyor – Civil, Structural, Architectural
Rider Levett Bucknall Philippines Inc.
Suite 602 PDI Condominium, Arch Bishop Reyes, Ave Corner J. Panis St.
Banilad, Cebu City.
Projects:
GRAND TOWER CEBU
A 30-storey retail, office and condo-hotel development right at the heart of
Cebu's Business District.
SOLINEA TOWER 2
Solinea is located within Cebu Business Park, a 50-hectare master planned
develoment established as the business and lifestyle center of Cebu and
Southern Philippines. Tower 2 consists of 35 storey with a total of 591 units.
BPI CEBU CORPORATE CENTER
BPI Cebu Corporate Center is Alveo Land’s first office condominium in the
Southern Philippines. It’s a signature Cebu address that offers professional work
spaces for purchase. Designed with an iconic glass façade and premier facilities
and common areas, this 18-storey building sets the standard for innovation in
the region.
April 2018 – April 2019
Field Engineer, QA/QC
Monocrete Construction Philippines Inc.
Tayud, Consolacion, Cebu
Projects:
ULTIMA RESIDENCES FUENTE TOWER
FUENTE TOWER 3-is a loft type Condominium, BARE with a provision of 1 to 3
bedrooms. It is a high-rise 28-storey mix-use Condominium situated beside the
28-storey CLUB ULTIMA that would served as the facilities center of condo
owners.
HM TOWER
HM Tower is an 18-storey office building located within Cebu IT Park. It has a
typical floor plate of 1,129.08 sqm. HM Tower is one of the more premium offices
located in the Cebu IT Park. The typical tenants are multinationals and BPO
companies.
ROBINSONS GALLERIA CEBU
The main mall is four storeys tall, while a BPO building with a total floor space of
9,000 m2 (97,000 sq ft) is three storeys tall. There will be six cinemas in the
mall. The mall also has an al fresco dining area and the mall's interiors feature
lush gardens.[4] When the whole development is finished, it will have a 153room hotel named Summit Galleria Hotel, BPO towers, and three high-rise
condominiums (which will be located at the back of the mall).
April 2019 – April 2022
Project Manager
April Rose Ent. & Builders
Toledo City, Cebu
Projects:
RETROFITTING / STRENGTHENING OF SAN ROQUE BRIDGE (B00528CB)
ALONG TOLEDO – TABUELAN – SAN REMIGIO ROAD AT BRGY. SAN
ROQUE, ASTURIAS, CEBU. (Php 5,579,726.47)
CONRETING / IMPROVEMENT OF MANGGA – STO NINO ROAD SECTION
AT TUBURAN, CEBU (Php 11,850,000.00)
CONCRETING / IMPROVEMENT OF DAANLUNGSOD – CALANGAHAN ROAD
SECTION AT TUBURAN CEBU (Php 47,977,390.11)
August 2022 – December 2024
Project Manager
Aloja Builders and Realty
Compostela, Cebu
Projects:
PROPOSED 150MM DIA. X 1,194 L.M. D.I. PIPELINE EXPANSION PROJECT
FOR LUSARAN DROP OFF NO. 4 AT BRGY. BINALIW, CEBU CITY, CEBU.
(Php 15,012,296.85)
DESLUDGING AND BACKFILLING OF THE LAGOON AT THE MCWD SEPTAGE
TREATMENT FACILITY AT THE NORTH RECLAMATION AREA, CEBU CITY.
(Php 50,846,-HB0061
-
Convergence
and
Special
Support
Program
-
Basic
Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to
Support
Social
Services
-
Construction
of
Multi-Purpose
Building
(Municipal Building) at Brgy. Poblacion, Candijay, Bohol, Philippines.
(Php 100,000,-HB0105
-
Convergence
and
Special
Support
Program
-
Basic
Infrastructure Program (BIP) - Access Roads and/or Bridges from the
National Road/s leading to Major/Strategic Public Buildings/Facilities Construction (Concreting) of Road at Barangay Bugan Sur to Barangay
Cambigsi, Bilar , Bohol, Philippines, Sta. 0+000.00 – Sta. 0+896.75
(Exemption: Sta. 0+066.13 – Sta. 0+072.41); Sta-.
(Php 34,303,500.00)
- Sta.